| Address of Site: | 256 TELEGRAPH RD BRACKEN RIDGE QLD 4017 |
| Real Property Description of Site: | L19 RP.890545 |
| Aspects of development and type of approval: | DA - SPA - Material Change of Use Development Permit - Centre Activity
Within Centre |
| Council File Reference: | A006982030 Permit Reference Number/s: DAMC283356513. |
| Package Status: | APPROVED - Version 2 (22nd of April, 2026 3:15:41 PM) |
| Package Generated: | 22/04/2026 |
| Richard WELCH Senior Engineer Engineering Scoping Richard.Welch@brisbane.qld.gov.au 34070603 |
Chris HENNESSY Engineering Services Traffic Chris.Hennessy@brisbane.qld.gov.au (07) 3403 5768 |
Michael PICKERILL Network Planning Michael.Pickerill@brisbane.qld.gov.au |
| Jillian OLDING WaRRS Assessment Jillian.Olding@brisbane.qld.gov.au 0403878801 |
Bella FAULKNER Landscape Architect Landscape Architecture Team Isabella.Faulkner@brisbane.qld.gov.au 07 3403 8888 |
Carly MANLEY Senior Urban Planner Planning Services North carly.manley@brisbane.qld.gov.au (07) 3178 7004 |
| Joe MCSHANE Principal Urban Planner Planning Services North CPAS-DS-PS-North@brisbane.qld.gov.au (07) 3407 1306 |
STEPHEN ANDERSON Principal Technical Officer Engineering Services stephen.anderson@brisbane.qld.gov.au 07 3403 4910 |
Anthony BOWLES Senior Urban Planner Development Assessment Planning Services North Anthony.Bowles@brisbane.qld.gov.au 34039662 |
| Dean DRYSDALE Principal Urban Planner Development Assessment Planning Services North dean.drysdale@brisbane.qld.gov.au 07 3403 9165 |
DRAWINGS AND DOCUMENTS
| Drawing or Document | Number | Plan Date |
|---|---|---|
| Proposed Site Plan | DAA002 Rev A | 25-MAR-2026 (Received) |
| Original Approved Conditions (1)253/15-968/95 | Attachment A | 02-OCT-2013 |
| Demolition Site Plan | DA001 Rev A | 25-MAR-2026 (Received) |
| Demolition Floor Plan | DA003 Rev A | 25-MAR-2026 (Received) |
| Proposed Floor Plan | DA004 Rev A | 25-MAR-2026 (Received) |
| Southern Elevation | DA005 Rev A (Amended In Red 21-APR-2026) | 25-MAR-2026 (Received) |
| Western Elevation | DA006 Rev A (Amended In Red 21-APR-2026) | 25-MAR-2026 (Received) |
| Northern Elevation | DA007 Rev A (Amended In Red 21-APR-2026) | 25-MAR-2026 (Received) |
| Eastern Elevation | DA008 Rev A (Amended In Red 21-APR-2026) | 25-MAR-2026 (Received) |
APPROVAL CONDITIONS
| Permit to Which These Conditions Relate: | DA - SPA - Material Change of Use |
| Activity(ies): | Centre Activity Within Centre |
| Stage: | Centre Activity Within Centre |
| 1) Time for Completion of Development The works authorised by this change application are limited to the refurbishment of the existing building including both internal alterations and facade changes, as shown on the approved DRAWINGS AND DOCUMENTS. The works must be completed within 2 years of this change application taking effect.
Note: If the development is started but not completed within the time specified above, the approval (to the extent it relates to any development not completed) lapses. |
As indicated |
| 2) Original Condition Package All conditions relating to approval 253/15-968/95 issued on 02 October 2013 remain applicable, unless varied by this approval. |
At all times |
| 3) Approved Drawings & Documents A legible copy of the approved
drawings and documents bearing "Council Approval" and the Development
Approval Conditions package is to be available on site. |
While site/operational/building work is occurring |
| 4) Carry Out The Approved Development Carry out the approved
development generally in accordance with the approved drawing(s) and/or
document(s), including those approved under the original approval 253/15-968/95
(Attachment A). |
While site/operational/building work is occurring and then to be maintained |
| 5) Complete All Building Work Complete all building work associated with this
development approval, including work required by any of the conditions included
in the Conditions Package. Such building work is to be carried out generally in
accordance with the approved drawing(s), and/or documents and, where the
building work is assessable development, in accordance with a current
development permit. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL), and then to be maintained |
| 6) Maintain the Approved Development Maintain the approved development
(including landscaping, parking, driveways and other external spaces) generally
in accordance with the approved drawing(s) and/or documents, and any relevant
Council engineering or other approval required by the conditions. |