BRISBANE CITY COUNCIL'S APPROVAL PACKAGE.



APPLICATION DETAILS

This package relates to the application detailed below
Address of Site: 21 GLEN RD TOOWONG QLD 4066
25 GLEN RD TOOWONG QLD 4066
U 1 GLEN IRIS COURT 21 GLEN RD TOOWONG QLD 4066
U 2 GLEN IRIS COURT 21 GLEN RD TOOWONG QLD 4066
U 3 GLEN IRIS COURT 21 GLEN RD TOOWONG QLD 4066
Real Property Description of Site: LCommon Property BUP.5345
L5 RP.45753
L1 BUP.5345
L2 BUP.5345
L3 BUP.5345
Aspects of development and type of approval: DA - PA - Material Change of Use Development Permit - multiple dwelling
Council File Reference: A006978543
Permit Reference Number/s: DAMC457594224.
Package Status: APPROVED - Version 2 (22nd of May, 2026 6:48:17 PM)
Package Generated: 11/06/2026


PROJECT TEAM

The assessment of this application has been undertaken by:
STEPHEN WARNER
Principal Urban Planner
Planning Services Governance
stephen.warner@brisbane.qld.gov.au
34034241
Ashleigh COOMBES
Principal Urban Planner
Planning Services South
Ashleigh.Coombes@brisbane.qld.gov.au
(07) 3403 1937
Amir POURFARZAD
Principal Engineer
Engineering Services Traffic
Amir.Pourfarzad@brisbane.qld.gov.au
Paul STONE

WaRRS Assessment
paul.stone@brisbane.qld.gov.au
317 85854
Justin LEE
Principal Engineer
Engineering Services North
Justin.Lee@brisbane.qld.gov.au
34038888
Radmila SUBOTIC
Senior Landscape Architect
Landscape Architecture Team
Radmila.Subotic@brisbane.qld.gov.au
31780113
Callan BENNETT
Principal Architect
Architecture Team
Callan.Bennett@brisbane.qld.gov.au
07 31780595
Ashleigh COOMBES
Principal Urban Planner
Planning Services South
Ashleigh.Coombes@brisbane.qld.gov.au
(07) 3403 1937
Christine GRAY
Principal Urban Planner
Planning Services North
christine.gray@brisbane.qld.gov.au
3407 0160
Jack WOOLSTON
Senior Urban Planner
Planning Services Special Assessment
Jack.Woolston@brisbane.qld.gov.au
07 3178 5033
Llewellyn BATSON
Principal Urban Planner
Planning Services Special Assessment
Llewellyn.Batson@brisbane.qld.gov.au
(07) 340 34980


DRAWINGS AND DOCUMENTS



The term 'drawings and documents' or similar expressions mean:
Drawing or Document Number Plan Date
Landscape Report 375203 Issue H 08-MAR-2026 (Received)
Proposed Site Plan 01-21 Revision G 08-MAR-2026 (Received)
Floor Plan - Basement 02 02-00 Revision H (Amended In Red 12-MAY-2026) 08-MAR-2026 (Received)
Floor Plan - Basement 01 02-01 Revision H (Amended In Red 12-MAY-2026) 08-MAR-2026 (Received)
Floor Plan - Ground 02-02 Revision H 08-MAR-2026 (Received)
Floor Plan - Level 01 02-04 Revision H 08-MAR-2026 (Received)
Floor Plan - Level 02 - 15 (Typical) 02-06 Revision I 08-MAR-2026 (Received)
Floor Plan - Roof Terrace 02-07 Revision H 08-MAR-2026 (Received)
Floor Plan - Roof Services Undercroft 02-07.U Revision F 08-MAR-2026 (Received)
Floor Plan - Roof 02-08 Revision H 08-MAR-2026 (Received)
Building Elevations - 01 03-01 Revision H 08-MAR-2026 (Received)
Building Elevations - 02 03-02 Revision H 08-MAR-2026 (Received)
Building Sections - Sheet 01 04-00 Revision H 08-MAR-2026 (Received)
Building Sections - Sheet 02 04-01 Revision H 08-MAR-2026 (Received)
Building Sections - Detail Sections 04-10 Revision G 08-MAR-2026 (Received)
Building Sections - Detail Sections 04-11 Revision G 08-MAR-2026 (Received)
Building Sections - Detail Sections 04-12 Revision G 08-MAR-2026 (Received)
Building Sections - Detail Sections 04-13 Revision G 08-MAR-2026 (Received)
Floor plan - Mezzanine 02-03 Revision H 08-MAR-2026 (Received)


Advice

Please see the attached document(s) for any advices.

APPROVAL CONDITIONS



Permit to Which These Conditions Relate: DA - PA - Material Change of Use
Activity(ies): multiple dwelling
Stage: Multiple dwelling (30 units)

General/Planning Requirements
 
Timing
1)   Security Lighting - On Site

Install and maintain a suitable system of security lighting to operate from dusk to dawn within all areas where the public may gain access, including car parking areas, internal pathways, building entrances and vegetated areas. Lighting of publicly accessible internal areas is in accordance with Australian Standard - AS/NZS 1158.3.1 Lighting for roads and public spaces - Pedestrian area lighting - Performance and design requirements.

All external lighting within the site is in accordance with Australian Standard - AS4282- Control of the Obtrusive Effects of Outdoor Lighting.

Lighting must be maintained in safe and good working order.

Timing: 'Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first'

 
As indicated
 
2)   Building Format Plan

Where the timing of a condition, or part thereof , states 'Prior to issue of Certificate of Occupancy/Final Inspection Certificate' or 'Prior to commencement of use' and the development involves the creation of a Building Format Plan, the timing of the condition, or part thereof, is taken to mean 'prior to Council's endorsement of any plan of subdivision'.

 
As indicated
 
3)   Attend a pre-start meeting

Arrange and attend a pre-start meeting with Building and Construction Management Team, Development Services.

Council will only attend the pre-start meeting once all applicable compliance fees have been paid.

Note: To request a pre-start meeting and associated lodgement requirements, refer to Council's website and search 'Pre-start meeting'.

Timing: Prior to site/operational/building work commencing.

 
As indicated
 
4)   Car Parking

The car parking within the premises must be maintained exclusively for the ancillary use of the development. The parking must not be made available to the general public and there must not be signage erected on or in the vicinity of the site advertising the availability of car parking to the general public.

 
At all times
 
5)   Maintain the Approved Development

Maintain the approved development in accordance with the approved DRAWINGS AND DOCUMENTS, and any other relevant Council approval required by the conditions.

 
At all times
 
6)   Approved Drawings and Documents

A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers.

Note: This condition is imposed to ensure compliance with the conditions of development approval.

 
While site/operational/building work is occurring
 
7)   Carry Out the Approved Development

Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks). Permission to enter neighbouring properties must be obtained from the relevant property owners.

 
While site/operational/building work is occurring
 
8)   Complete All Building Work

Complete all building work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such building work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: Building work must also be completed in accordance with any other current development approval.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
9)   Visitor Parking

Visitor car parking spaces must:
- Be clearly labelled as 'Visitor Parking';
- Remain unimpeded by landscaping, water tanks, storage (temporary or otherwise), gates or any other fitting, fixture or structure; and
- Provide 24 hour unrestricted access for all bona fide visitors to the whole site.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
Architecture
 
Timing
10)   Final External Detailing of Building

Construct the development in accordance with drawings approved pursuant to this condition. The drawings must be in accordance with the APPROVED DRAWINGS AND DOCUMENTS, relevant Brisbane Planning Scheme Codes and the requirements of this condition.

 
To be maintained
10(a) Submit Drawings

Submit to, and obtain approval from, Development Services drawings prepared by a Registered Architect or Queensland Building Construction Commission Open Licence Class Building Designer showing the final developed details of the facade treatment, the ground interface and the roof top/building capping elements which depict a higher level of documentation detail than that shown on the APPROVED DRAWINGS AND DOCUMENTS, including:
- Elevation and facade treatment drawings for all ground, podium and typical tower floor levels that demonstrate the final design outcome for all elevations of the built form including:
- Detailed plans, sections and elevations at 1:50 or 1:20 scale for elements at the facade including structural elements and fixed and operable elements such as balustrades, screens, doors, windows, projecting fins and planter beds/trellises
- All servicing and infrastructure, including but not limited to, padmount transformers, pump rooms, fire hydrant boosters etc.
- Roof top or building capping elements, awnings and soffits
- One rendered perspective showing the intended finished built form

The drawings must:
- include dimensions for the extent of projecting elements, balustrade height and door and window/glazing configurations
- nominate materials, colours and finishes
- have title blocks and be cross referenced to larger scaled drawings.

Timing: Prior to building works at ground level commencing

 
As indicated
10(b) Pre-Start Meeting

Arrange and attend a pre-start meeting with Development Services.

Applicable compliance and inspection fees must be paid to Council, in full, prior to the meeting being held.

Note: To arrange a pre- start meeting with Development Services an email must be sent to dalodgement@brisbane.qld.gov.au.

Timing: Prior to any work commencing to comply with this condition.

 
As indicated
10(c) Implement Approved Drawings

Carry out the building work in accordance with the approved drawings.

Note: The requirement to use particular materials and finishes is imposed only for the purpose of achieving a built form outcome that displays design merit. Council has not assessed the materials and finishes for compliance with the Building Act, the Building Fire Safety Regulation, the Building Regulation, the Building Code of Australia, the Queensland Development Code, relevant Australian Standards, fire safety standards or any other relevant requirement of a statutory authority with regard to building work.

Timing: While building work is occurring and then to be maintained.

 
As indicated
10(d) Submit Certification

Submit to Development Services certification by a Registered Architect; Queensland Building Construction Commission Open Licence Class Building Designer or Building Certifier confirming that the building has been constructed in accordance with the approved drawings.

Timing: Prior to the Final Certificate/Certificate of Occupancy or commencement of the use, whichever comes first.

 
As indicated
 
11)   Overall Height

The overall height of the building(s) must be in accordance with the floor and roof levels and overall height shown on the APPROVED DRAWINGS AND DOCUMENTS.

NOTE: This condition should be read in conjunction with any other relevant condition requiring minimum height clearances for basement or undercover car parking and manoeuvring areas.

 
While site/operational/building work is occurring and then to be maintained
11(a) Submit Certification

Submit to Development Services certification from a Registered Surveyor (Qld) confirming that the 'as constructed' floor and roof levels and overall height are in accordance with the requirements of this condition.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
12)   Light Reflectivity and Solar (Heat) Reflectivity

Submit to Development Services documentary evidence that the level of light reflectivity from the glazing incorporated in the approved development does not exceed 20%.

Timing: Prior to building work above ground level commencing.

 
As indicated
12(a) Install Glazing

Install and maintain glazing in accordance with the above specification.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained.

 
As indicated
 
13)   Environmental Sustainability

Construct and maintain the building(s) in accordance with 'Best Practice' environmentally sustainable measures.

 
While site/operational/building work is occurring and then to be maintained
13(a) Submit Sustainability Management Plan

Submit to, and obtain approval from, Development Services a Sustainability Management Plan prepared by a Registered Architect / Registered Professional Engineer Queensland (suitably qualified and experienced in sustainability management) incorporating measures for the development to achieve at least a 'Best Practice' environmentally sustainable rating for the building in accordance with a recognised Environmental Rating System suitable for the approved development (such as Green Star).

Note: For the purpose of this condition 'Best Practice' outcomes must exceed the requirements of the Building Code of Australia and achieve the equivalent of a Green Star 4 star rating.

Timing: Prior to commencement of building work above ground level.

 
As indicated
13(b) Implement Sustainability Management Plan

Implement and maintain the approved Sustainability Management Plan.

Timing: While site/operational/building work is occurring and then to be maintained.

 
As indicated
13(c) Submit Certification

Submit to Development Services certification by a Registered Architect / Registered Professional Engineer Queensland (suitably qualified and experienced in sustainability management) confirming that the approved Sustainability Management Plan has been implemented in accordance with the requirements of this condition.

Timing: Prior to the commencement of the use.

 
As indicated
 
14)   Mitigate Wind Impacts

Mitigate any adverse wind impacts arising from the implementation of the development in accordance with a Wind Impact Assessment Report and Architectural Drawings approved pursuant to this condition.

 
While site/operational/building work is occurring and then to be maintained
14(a) Submit Wind Impact Assessment Report

Submit to, and obtain approval from, Development Services a detailed Wind Impact Assessment Report, including any outcomes obtained from an in-depth assessment prepared by a Registered Professional Engineer, Queensland (experienced in assessing building wind impacts), demonstrating that wind impacts arising from the implementation of the development, will not adversely affect pedestrian comfort levels and stationary activities within the development and for the public realm at street level.

Note: This condition is imposed to protect the amenity of the public realm and communal areas within the development from adverse wind conditions created by the development.

Timing: Prior to site/operational/building work commencing above ground.

 
As indicated
14(b) Submit Architectural Drawings

Submit to, and obtain approval from, Development Services revised and properly made Architectural Drawings indicating any alterations to the approved building design and/or mitigation measures identified as being necessary to ensure the amenity of these areas meets the standards for comfort for their use, as advised in the Wind Impact Assessment Report approved pursuant to (a) above.

Timing: Prior to site/operational/building work commencing above ground

 
As indicated
14(c) Implement Wind Impact Assessment Report and Architectural Drawings

Carry out the works in accordance with the approved Wind Impact Assessment Report and approved Architectural Drawings.

Timing: While site/operational/building work is occurring.

 
As indicated
14(d) Submit Certification

Submit to Development Services, certification from a Registered Professional Engineer, Queensland (experienced in assessing building wind impacts), certifying that the work(s) have been carried out in accordance with the approved Wind Impact Assessment Report and approved Architectural Drawings.

Timing: Prior to commencement of use.

 
As indicated
 
15)   Driveway Material and Finishes

Provide materials and finishes to the driveway and external carparking surfaces that reduce the visual impact of these areas when viewed from the street. One or a combination of the following must be used:

-  Coloured aggregate;

-   Concrete pavers; and/or

-  Banding and patterns in the surface design.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
16)   Provide Pedestrian Prioritised Pathway

Provide a pedestrian prioritised pathway from the street frontage to the Lobby. The pathway must be differentiated in colour and texture from the driveway surface.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
17)   Balconies/Verandahs/Terraces

No balconies/verandahs/terraces may be enclosed with solid balustrades, solid walls, fixed and/or operable, moveable or adjustable screening unless these features are clearly shown on the APPROVED DRAWINGS AND DOCUMENTS

Note: Any Community Management Statement that may apply to this approval must contain a by-law which reflects the requirements of this condition.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
18)   Screen Air Conditioning and Other Plant Enclosures

Install and maintain suitable screening to all air conditioning units, lift motor rooms, hot water systems plant and service facilities where externally visible or located on top of the building including where visible and/or located within private open space areas, communal open space areas, adjoining properties or public land. The screening structures must be constructed from durable materials that are consistent with materials used elsewhere on the facade of the building.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
19)   Sun Shading Devices

Provide sun shading in accordance with the approved DRAWINGS AND DOCUMENTS.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
20)   Screening

Provide suitable privacy screening to windows or balconies, landings, terraces and decks of the proposed dwelling(s) in accordance with the approved DRAWINGS AND DOCUMENTS.

Suitable screening options must be:

· Opaque balustrade glazing as shown hatched on the approved drawings.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
21)   Provide Detailed and Textured Model

Submit to Virtual Brisbane, a digital model for inclusion into the Brisbane City Council Virtual Brisbane 3D model. This must be a high quality, detailed and textured 3D exterior model of the approved development at a standard which can be publicly viewable. This must be of a compatible file format, include property boundaries and show heights in Australian Height Datum (AHD). For information on the submission and a complete list of requirements' visit: www.brisbane.qld.gov.au/virtualbrisbane3Drequirements

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate

 
As indicated
 
Landscape Architecture and Open Space Planning
 
Timing
22)   Retain and Protect Existing Street Tree(s)

Identify, retain and protect the existing street trees including the roots unless otherwise agreed in writing with Program, Planning and Integration Arboriculture (PPI Arb).

Note: Street trees are protected under the Natural Assets Local Law. Street trees must not be removed or pruned without prior approval from PPI Arb.

Where driveway crossovers occur within the Tree Protection Zone (TPZ) of existing street trees, seek approval from the Arboricultural Team in Program Planning and integration, City Standards for the final driveway crossover design and construction methodology to ensure the successful retention of the existing street tree(s)

PROOF OF FULFILMENT
Contextual photographic evidence that the tree has been retained in equal or greater health than before development commenced. OR, evidence in writing from Asset Services Arboriculture that an alternative arrangement has been made. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
At all times
22(a) Implement Protection Measures

Install tree protection measures in accordance with Australian Standard - AS4970 Retention of Trees on Development Site.

There must be no excavation, filling or storage of materials or plant within the drip line of the tree(s).

Where works are within the canopy drip line of existing street trees, contact PPI Arb Coordinator in relation to the required provision of protection measures.

Note: If fencing is to protect street trees, a permit to temporarily occupy the footway will be required from Compliance and Regulatory Services.

Timing: Prior to site/operational/building work occurring.

PROOF OF FULFILMENT
Contextual photographic evidence to demonstrate the installation of protection measures prior to building works commencing. Timing: Prior to site / operational / building work occurring.

 
As indicated
22(b) Maintain Protection Measures

Maintain protection measures while development is occurring and remove protection measures prior to commencement of the use.

Timing: While to site/operational/building work is occurring.

 
As indicated
 
23)   Streetscape Works - Neighbourhood Street Major

Carry out streetscape improvement works including concrete path (where required by this condition), turf and street trees to the verge to a Neighbourhood Street Major standard in accordance with the relevant Brisbane Planning Scheme Codes, Brisbane Standard Drawings (BSD), the requirements of this condition and the Infrastructure Design Planning Scheme Policy including sections 3.7.4.4 and 3.7.5.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
23(a) Concrete Path

Install a 1.8m wide broom finished standard Portland grey concrete path.

The edge of the path is to be setback 1300mm from the back of kerb. Where the path cannot be installed on this alignment due to conflicts such as street trees, or power poles, ensure the path is installed a minimum distance of:
- 1300mm from the back of kerb
- 500mm from the property boundary
- 600mm from the edge of the conflict

Longitudinal footpath grade to follow existing road grade. Do not adjust longitudinal path grade to suit building entry.

If the above requirements cannot be achieved, contact the Landscape Architecture Team via email: specialistservices@brisbane.qld.gov.au.

Transition to existing paths on verges that adjoin the development. The transition is to occur fronting the adjoining developments, not the subject site.

Note: standard path alignments are shown on Brisbane Standard Drawing BSD-5201 sheet 2 but will vary depending on verge width and location.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Photographic evidence of concrete path. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
23(b) Submit As-Constructed Drawings

Submit to Development Services As Constructed plans including an asset register, checked by a Registered Professional Engineer Queensland, certifying that the concrete path works have been completed in accordance with relevant Brisbane Planning Scheme Codes/Policies.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
As constructed drawings signed by an RPEQ. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
23(c) Turf

Install turf to the full width of the verge excluding any concrete path required by this condition.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Photographic evidence of installed turf. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
23(d) Street Tree(s)

Enter into and implement an arrangement with the Program Planning and Integration Regional Coordinator Arboriculture in relation to the required provision of the street tree planting in accordance with the above sections of the Infrastructure Design Planning Scheme Policy, including the number, species, location, installation and maintenance of the required street tree(s) as determined by Program Planning and Integration. Provide to Development Assessment a copy of the agreement signed by Program Planning and Integration.

Note: Street trees should not be planted until all utilities have been installed.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
A copy of the agreement with Program Planning and Integration and/or photographic evidence of installed trees. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
24)   Landscape the Site

Landscape the site as indicated on the approved Landscape Report 375203 Issue H dated received 08/03/2026 and in accordance with the requirements of this condition.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
24(a) Submit Building Layout Details

Submit to Development Services, and obtain approval from for, details of the final building layout below and at ground level to demonstrate that provision has been made for deep planting, perimeter planting, services and existing trees that are required to be retained. The details must be provided by a qualified Landscape Architect or RPEQ.

Timing: Prior to building works commencing.

 
As indicated
24(b) Submit Detailed Landscape Plan

Submit to Development Services, and obtain approval for, a detailed Landscape Plan for all on-site landscape works identified on the approved RPS Landscape Report stamped Received 04/07/2025. The plan must be prepared at a scale of 1:100 by a qualified Landscape Architect and must comply with the relevant Brisbane Planning Scheme Codes. The plan must include the following:

Siteworks
- The extent of soft and hard landscape;
- The extent of basement and/or roof lines;
- Location and description of fencing, retaining walls and ramps;
- Existing and finished levels to external works particularly in critical areas (e.g. top and toe of retaining walls and steps);
- Description/details of critical design elements where applicable (e.g. surface treatments, stabilisation of batters, podium planters);
- Basic specification notes on plan for all landscape works

Planting
- A planting schedule listing plants by botanical names, quantities, pot size, height, spread and calliper at time of planting

Deep Planting
- Providing deep planting areas in accordance with the relevant Brisbane Planning Scheme Codes, and the following:
- is exclusively used for landscaping and is accessible for maintenance purposes;
- is 100% open to the sky with access to light and rainfall and extends into the natural ground with no underground development;
- is consolidated to provide maximum advantage and opportunity to protect or establish trees capable of growing to a minimum canopy diameter of 5m and/or minimum height of 5m within 5 years of planting;
- is planted with large subtropical tree species that at maturity are complementary in scale and height to the building form.

Timing: Prior to building work above ground level commencing.

 
As indicated
24(c) Additional Requirements - Multi-Unit Dwelling/Single Unit Dwelling

In addition to the requirements listed above, the plan must include the following:

Planting
- Provide columnar trees along site boundaries;
- Provide screening trees and shade trees along rear boundary;
- Provide flowering / shade trees within the frontage as 45 litre stock or larger, staked and tied;
- Provide low shrubs and groundcovers to all landscape areas;
- Provide for the street frontage excluding the driveway crossover and pedestrian access;
- Provide landscaping for a side boundary excluding the area for built to boundary walls;
- Provides one tree per 20m of frontage capable of growing 15m high (minimum) at maturity;
- Provide tree planting to achieve a minimum of 25% shade to outdoor communal spaces within 5 years;
- Provide a minimum of 25% landscaping within communal outdoor space consisting of a balanced combination of soft and hard landscape features;

Amenity
- Ensure appropriate measures are taken to allow the healthy retention of existing vegetation where this is situated outside the building footprint;
- Trees required to be retained are documented, protected and integrated into the landscape design in accordance with Australian Standard - AS4970 Protection of trees on development sites;
- Provide a prioritised pedestrian entry;
- Fences and retaining walls must not exceed 2.0 metres in height from ground level unless stepped back and planted;
- Hard surfaces must grade to landscaped areas

- Terracing of retaining walls in accordance with the relevant Brisbane Planning Scheme Codes. Planting must consist of drought-hardy small trees, medium shrubs and groundcovers planted at densities that, under normal growing conditions, will result in complete surface mulch coverage within 12 months of planting.

Specifications
- Provide mulch and soil to meet Australian Standards;
- Ensure that soil media is ameliorated to increase its water- holding abilities.

Timing: Prior to building work above ground level commencing.

 
As indicated
24(d) Additional Requirements - Containerised Planting

In addition to the requirements listed above, the plan must include the following:
- Provide containerised planting areas in accordance with BSD- 9004;
- Clearly identify the location, width and depth or containerised planting areas
- Details of raised planters must demonstrate adequate width, depth and suitability of soil for the planting. Minimum internal depths of planters to be: trees - 1000mm; large shrubs and palms - 800mm; small shrubs and groundcovers - 600mm;
- Provide a reticulated drip irrigation system (connected to non-town water source) to all containerised planting areas, with drainage connected to the stormwater system.

Timing: Prior to building work above ground level commencing.

 
As indicated
24(e) Additional Requirements - Irrigation

In addition to the requirements listed above, the plan must include the following:
- Provide a reticulated drip irrigation system (connected to a non-potable water resource) to all planting areas

Timing: Prior to building work above ground level commencing.

 
As indicated
24(f) Construct Approved Works

Carry out the landscaping and associated works in accordance with the approved detailed Landscape Plan.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
24(g) Certify Works

On completion of the works, provide Development Services with a copy of the as-constructed detailed Landscape Plan together with certification from a qualified Landscape Architect or qualified Landscape Contractor that the completed landscape work complies with the approved detailed Landscape Plan (Brisbane City Council Form CC10613 Landscape Works Certificate).

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
24(h) Maintain the Landscape Works

Maintain the landscape generally in accordance with the approved detailed Landscape Plan.

Timing: Prior to commencement of use, whichever comes first.

 
As indicated
 
25)   Landscape the site - Container planting for rooftop gardens and/or green walls

Landscape the site through the provision of container planting in accordance with the requirements of this condition.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
25(a) Prepare Detailed Container Planting Design for self-certification

Prepare a Detailed Container Planting Design for all container planting identified on the approved DRAWINGS AND DOCUMENTS. The plan must be prepared and certified by suitably qualified professionals and must comply with the relevant Brisbane planning scheme codes. In addition to the above, the design must include the following:
- Shade and aspect studies including:
- Sunshade modelling for 9am, noon and 3pm on June 21, September 22 and December 21;
- Detailed estimates of required weekly water consumption for irrigation for each calendar month by an Irrigation Association of Australia certified irrigation designer, holding a Diploma of Irrigation
- a dedicated rainwater irrigation tank with green wall drainage return and overflow connected to the stormwater system;
- a reticulated drip irrigation system with stand-alone power supply and smart-tech central control and alert;
- waterproofing;
- adequate fascia protection and drip tray depth to minimize drips onto the footpath or surrounding properties;
- for planter boxes:
- adequate width, depth and suitability of soil for the planting. Minimum internal depths of planters unless otherwise endorsed by Development Services to be: trees - 1000mm; large shrubs and palms - 800mm; small shrubs and groundcovers - 600mm;;
- a plant schedule that demonstrates planting appropriate to container type, size and location, - considering orientation, shading and wind direction;
- structural design by an RPEQ to ensure that the saturated weight of container planting is suitable for the building;
- a 12-month establishment period maintenance program for planting;
- an ongoing annual maintenance program including clearly defined access plan.

Timing: Prior to building work commencing.

 
As indicated
25(b) Implement certified Detailed Landscape Container Planting Design

Carry out the works in accordance with the above certified Detailed Landscape Container Planting Design.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
25(c) Certify work - Implementation

On completion of the work, submit to Development Services the following:
- For planter boxes including vegetation supported by trellises and screens, certification by a Qualified Landscape Architect that construction and planting has been carried out in accordance with the conditions of development approval and the approved drawings
- Certification of irrigation design including irrigation tank size by an Irrigation Association of Australia certified irrigation designer, holding a Diploma of Irrigation
- Certification by a Registered Professional Engineer Queensland that stormwater drainage and structural design have been provided in accordance with the conditions of development approval
- As-constructed drawings showing:
- The extent and internal dimensions of planter boxes
- The extent and type of trellises and screens to support planting
- The extent of green walls;
- Planting layout and species.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
25(d) Certify work - establishment period

On completion of the 12-month establishment period, submit to Development Services certification that planting has been established in accordance with the certified Detailed Landscape Container Planting Design.

Timing: 12 months after implementation of the certified Detailed Landscape Container Planting Design.

 
As indicated
25(e) Maintain container planting

Rooftop gardens AND / OR Green walls

Maintain the container planting generally in accordance with the certified Detailed Landscape Container Planting Design.

Timing: To be maintained.

 
As indicated
 
Pollution
 
Timing
26)   Mechanical Plant or Equipment - Acoustically Screened

Mechanical plant or equipment is to be acoustically screened from an adjoining sensitive use. Mechanical plant includes generators, motors, compressors and pumps such as air-conditioning, refrigeration and cold room motors. Acoustically screened is defined in City Plan 2014.

NOTE: This condition does not authorise environmental nuisance under the Environmental Protection Act 1994.

PROOF OF FULFILMENT
Submit to Development Services, certification that all mechanical plant or equipment, is acoustically screened. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
27)   Dampening of Grilles and Metal Plates

All metal grilles, metal plates or similar located within vehicle parking and manoeuvring areas must be securely fastened and meet the requirements of AS3996:2019, Access covers and grates.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
Engineering
 
Timing
28)   On-site Erosion (Medium Risk)

Manage on-site erosion and the release of sediment or sediment laden water from the site at all times by implementing best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version).

Timing: Prior to commencement of any land disturbing activities and until all exposed soil areas are permanently stabilised against erosion.

 
As indicated
28(a) Manage earth disturbance on- site

(i) Drainage control measures must be implemented and maintained to minimise water flow onto areas of exposed earth.

(ii) Sediment and erosion control measures must be implemented and maintained to prevent soil loss from earth disturbance areas and prevent deposition beyond earth disturbance areas.

(iii) No release of contaminants to land beyond on-site area of earth disturbance other than releases that achieve water pollutant concentration release limits of:

A. 50mg/L TSS (Total Suspended Solids);

B. Turbidity, Nephelometric Turbidity Units (NTU) value less than 10% above background, 75 NTU, or as agreed in writing by an Officer from Councils Erosion and Sediment Control (ESC) Team in Compliance and Regulatory Services;

C. pH between 6.5 and 8.5 at all times.

(iv) Maintain a written record to demonstrate that water discharges from the site, including any dewatering operations, meet the release limits as detailed in (iii) for water discharge(s) from the site that occur during or immediately after a rainfall event, and during normal business hours. The water quality of the discharge flows must be measured at each discharge point from the site, including but not limited to sediment basin outlets, other applicable sediment control devices, the site water drainage system, and recorded against the release limits at least once on each calendar day until such discharge stops.

Timing: Prior to commencement of any earth disturbing activities and until all exposed soil areas are permanently stabilised against erosion.

 
As indicated
28(b) Provide Land Occupier Notification to Council

(i) Notify Council's ESC Team of proposed land occupier/s by sending an email to CARS-ESC@Brisbane.qld.gov.au

(ii) If the land is to be occupied by any person other than the registered landowner then advice must be provided to Council that confirms the name, contact information and the duration of any proposed occupation of the land.

Timing: Prior to commencement of any earth disturbing activities.

 
As indicated
28(c) Prepare Erosion and Sediment Control Plan

Prepare an Erosion and Sediment Control Plan (ESCP) in accordance with best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version) and, to the extent of any inconsistency, relevant Brisbane Planning Scheme Codes and Policies.

Obtain a design certificate in accordance with the relevant Brisbane Planning Scheme Codes and Policies.

The ESCP and design certificate must be certified by a Certified Professional in Erosion and Sediment Control (CPESC) or a Registered Professional Engineer Qld (RPEQ) with suitable qualifications and experience in erosion and sediment control.

Documentary evidence demonstrating appropriate qualifications in erosion and sediment control must be provided to the Council upon request.

Timing: Prior to the commencement of any earth disturbing activities.

 
As indicated
28(d) Attend a pre-start meeting

Arrange and attend a pre-start meeting for Erosion and Sediment Team, Compliance and Regulatory Services (CARS).

All relevant documentation, including the certified erosion and sediment control plan and the certified design certificate must be submitted with the request.

Note: To request a pre-start meeting refer to Council's website and search 'Pre-start meeting'.

- A minimum 10 working days' notice is required.

Timing: Prior to the commencement of any earth disturbing activities.

 
As indicated
28(e) Implement Certified Erosion and Sediment Control Plan

Implement the certified ESCP and maintain all ESC measures in accordance with best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version) and, to the extent of any inconsistency, relevant Brisbane Planning Scheme Codes and Policies.

The ESCP and design certificate must be available on site at all times for inspection by Council officers. Any alteration to supplementary or Type 3 ESC measures must be reflected in the certified ESCP. Any alteration to Type 2 or Type 1 ESC measures will require a revised ESCP and design certificate that has been certified by either the CPESC or RPEQ.

Timing: While earth disturbing activities are occurring and until all exposed soil areas are permanently stabilised against erosion.

 
As indicated
 
29)   Information Signage

Erect an information sign on the subject property in accordance with Council's general requirements for signage and in accordance with the requirements outlined below:
a) The sign should provide a brief description of the development proposed;
b) The sign is to list the name, postal and/or email address and a contact telephone number for the following parties (where relevant) that are undertaking work on the site:
- Developer;
- Project Coordinator;
- Architect/Building Designer;
- Builder;
- Civil Engineer;
- Civil Contractor/s; and
- Landscape Architect;
c) The lettering on the sign is to be at least 25 millimetres in height, be of regular weight and in sentence case;
d) The sign is to be a minimum size of 1,200 millimetres by 900 millimetres;
e) The maximum area of the sign is to be 2.0m2;
f) The sign is to be positioned as follows:
- located centrally along each road frontage of the site to Glen Road;
- located on or within 1.5 metres of the road frontage;
- mounted at least 300 millimetres above ground level; and
- clearly visible from the street for a pedestrian;
g) The sign is to contain no commercial or corporate advertising other than the name, logo or slogan of the parties outlined in part (b) of this condition;
h) The sign is to be non-illuminated; and
i) Both the sign and the supporting structure are to be made of weatherproof material and to be properly maintained at all times;

Timing: Prior to site works commencing and then to be maintained until completion of the development for all stages.

 
As indicated
 
30)   Engineering Pre-Start Meeting

Arrange and attend a pre-start meeting with Engineering Services, Development Services.

Council will only attend the pre-start meeting once all applicable compliance and inspection fees have been paid.

Note: Prior to arranging an engineering pre-start meeting, review the Pre-start Meeting Guidelines - Civil Engineering Works kit.

To request a pre-start meeting and associated lodgement requirements, refer to Council's website and search 'Pre- start meeting'.

Timing: Prior to site/operational/building work commencing.

 
As indicated
 
31)   Basement Excavation and Support

Basement excavation and support of all exposed walls must be carried out in accordance with the relevant Brisbane Planning Scheme Codes and the requirements of this condition.

 
Prior to building work commencing
31(a) Prepare Engineering Drawings

Engineering drawings for the work required by this condition must be prepared and certified by a Registered Professional Engineer Queensland (Structural), in accordance with the relevant Brisbane Planning Scheme Codes detailing the design of the proposed excavation as well as proposed temporary and permanent support (if no temporary proposed) systems.

The design must include at least the following:
- The location (in plan and section) of the proposed excavation;
- Detailed design of proposed temporary support of the excavation;
- If no temporary support is proposed then detail design of the proposed permanent support of the excavation;
- Any retention system, including associated drainage, is to be wholly contained within the site unless written approval has been obtained from the affected neighbouring property owner;
- The existing and proposed finished levels in reference to the Australian Height Datum (including cross-sections or long sections into the adjacent properties);
- Preservation of all drainage structures from the effects of structural loading generated by the excavation;
- Protection of adjoining properties and roads from adverse impacts as a result of Building Works;
- All existing Brisbane City Council stormwater lines and Maintenance Holes, including depths of Maintenance Holes and clearances to retention structures is to be shown.
Where ground or rock anchors are proposed as a temporary support (Note: permanent anchors are not acceptable) the design must include the following in addition to the above:
- Anchor position/s and length/s (in elevation view and sectional view);
- Where the anchoring system is proposed to encroach into a neighbouring property, written approval is to be obtained from the affected property owner;
- Plans must show the location of the ground anchors in relation to all existing services and public utilities. The cost of relocating any existing services, public utilities or BCC assets is the responsibility of the Developer.

Notes:
- The Earthworks drawings are not required to be submitted for Council approval.
- Where any ground anchors or rock bolts are proposed within 10metres in the vertical plane of a UU sewer, UU water main, BCC stormwater line or combined sanitary drain, assessment will be required against the QDC section MP1.4 by the building certifier.
- Ground anchors are not to be located closer than 1.0m vertically or 1.0m horizontally from existing or proposed Council Infrastructure.
- If the basement excavation impacts on the road reserve, the developer must obtain applicable footpath and road permits prior to commencing any works. Such impacts may include footpath occupation, road closures, re-profiling, ground anchors and/or relocation of services.
- Where public utilities such as UU sewer or water infrastructure, electricity, telecommunication or gas infrastructure will be affected advice must be obtained from the respective utility owner.

Timing: Prior to site/operational/building work commencing.

 
As indicated
31(b) Implement Certified Engineering Drawings

Construct and maintain the basement excavation and proposed support system in accordance with the above certified engineering drawings.

Note: A copy of the certified engineering drawings must be available on- site for inspection by Council Officers during these works.

Timing: While basement excavation and support system installation is occurring.

 
As indicated
31(c) Submit Post Construction Certification

Submit certification by a Registered Professional Engineer Queensland that the basement excavation and support have been installed in compliance with the certified engineering drawings, the relevant Brisbane Planning Scheme Codes and the requirements of this condition.

Where ground or rock anchors have been installed, submit certification by a Registered Professional Engineer Queensland (Geo-technical) that all anchors have been de- stressed.

Timing: Prior to building work commencing above ground.

 
As indicated
 
32)   CBD/City Frame Construction Management Plan

Carry out development in accordance with a Construction Management Plan (CMP) prepared in accordance with the Central Business District and City Frame Development Services Construction Management Guidelines and the requirements set out in this condition, and the following outcomes:

- Construction vehicle movements must be managed to minimise impact on the road network, and neighbouring properties.

- Access to all properties along Glen Road are to be maintained.

- A safe environment for cyclists travelling along Glen Road (Primary Cycle Route) must be maintained at all times.

- Long term footway and / or road closures are not supported. The duration of any closure(s) must be minimised to allow for particular components of the development to be constructed safely. However, the construction works requiring closure(s) must be prioritised to allow for footpath and road areas to be re-opened for public use as soon as safe and practical to do so.

Note: This condition imposes restrictions on development construction management to regulate increased truck access, on street work zone and closures and all associated activities in the CBD and City Frame as a result of major State and Local Government infrastructure projects occurring in Brisbane.

 
While site/operational/building work is occurring
32(a) Submit Construction Management Plan

Submit to, and obtain approval from, Development Services a Construction Management Plan for the demolition, excavation and construction phases of the approved development. Separate Construction Management Plans may be appropriate for the individual components.

The Construction Management Plan must be in accordance with the Central Business District and City Frame Development Services Construction Management Guidelines and the relevant Brisbane Planning Scheme Codes and address the following:
(i) Provision for pedestrian management including acceptable alternative DDA compliant pedestrian routes (adjacent to or surrounding the site);

(ii) Existing and proposed kerbside allocation signs and line marking (such as bus stops, loading zones and parking meters and/or ticket dispensers);

(iii) Location of and impacts to any Council or other public utility or local authority's assets on or within external to the site;

(iv) Details of all proposed work zones and/or lane closures, including justification;

(v) Location and design of temporary vehicular construction access points, including frequency of use;

(vi) Management and mitigation strategies for the impact of dust, noise and vibration upon adjoining and nearby properties;

(vii) Provision for loading and unloading of materials including the location of any remote loading sites;

(viii) Location of materials, structures, plant and equipment to be stored or placed on the construction site;

(ix) Location of proposed external hoardings and/or gantries, and including clearances to the impacts of this on existing street furniture and other footpath assets located within the verge as well as impacts on any existing advertising signage located either along or adjacent to the site frontage - this includes any potential obstruction of sight lines for such advertising (e.g. bus stops with advertising);

(x) Location of proposed employee and visitor parking areas;

(xi) Anticipated staging and programming;

(xii) Impacts of any actions proposed to address any of the above items or any actions resulting from construction of the development that will impact on existing street trees;

(xiii) Complaint management processes to be implemented; and

(xiv) Compliance with the Management Plans Planning Scheme Policy and other relevant Planning Scheme Policies.

Note: Pre-approval of work zones and/or lane closures associated with construction of the development will be managed by Development Services however the Construction Management Plan must be supported by "approvals in principle" or written approvals from other relevant Council sections or other governing bodies responsible for any other potentially impacted infrastructure.

Timing: Prior to site/operational/building work commencing.

 
As indicated
32(b) Construction Management Plan - Dilapidation Report

Submit a dilapidation report to engineeringservices@brisbane.qld.gov.au detailing the pre-existing condition of the roadway, both footways, both verges and Council infrastructure, including vegetation, for 100m from the site entry in both directions or to the next street intersection (if less than 100m from the site entry) in both directions.

Timing: Prior to the pre-start meeting.

 
As indicated
32(c) Construction Management Plan - Associated Activities in Road Reserve

Obtain relevant approvals, as listed in part (a) of this condition, to carry out any works within the road reserve required by the approved Construction Management Plan identified in the Central Business District and City Frame Development Services Construction Management Guidelines.

Note: All fees must be paid in full prior to any permit being granted by Council. Council may revoke any permits at any time for non-compliance with requirements or if it considers that safety, capacity and/or operation of public transport, vehicle and pedestrian traffic are likely to be compromised during the construction phase.

Timing: Prior to site/operational/building work commencing.

 
As indicated
32(d) City Frame Construction Management Plan - Documentation on Site

Legible copies of the approved CBD Construction Management Plan and current permits must be kept on site and be made available on request At all times.

The requirements of the CMP must be included in all induction of principal and subcontractors utilised in the development. An outline of the induction provided to contractors may be requested by Council to confirm compliance with this condition.

Timing: While site/operational/building work is occurring.

 
As indicated
32(e) Construction Management Plan - Works to be Performed Out of Hours

Obtain an approval from Development Services for any work that is proposed to be undertaken outside of normal business hours - 6:30am to 6:30pm, Monday to Saturday.

Timing: Prior to site/operational/building work commencing.

 
As indicated
32(f) Implement Approved Construction Management Plan

Carry out the development in accordance with the approved CBD/City Frame Construction Management Plan.

 
While site/operational/building work is occurring
 
33)   Protect Existing Infrastructure

Where there is existing infrastructure in the vicinity of the proposed work, the new work must not damage or compromise the working ability of the existing infrastructure.

Where alterations to public utility mains, existing mains, services or installations are necessitated by the development, prior to alterations commencing, the developer must notify Council or the relevant infrastructure provider and obtain agreement to the alterations.

The developer must meet the costs of the alterations. The alterations must be carried out in accordance with the relevant Brisbane Planning Scheme Codes or infrastructure providers requirements.

 
While site/operational/building work is occurring
33(a) As Constructed Drawings - Alterations to Existing Infrastructure

Submit to Development Services As Constructed drawings showing all new and/or rectification works and an asset register, prepared by a Registered Professional Engineer Queensland.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that the alterations have been completed in accordance with the relevant Brisbane Planning Scheme Codes and any other relevant infrastructure requirements. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
34)   Access, Grades, Manoeuvring, Carparks, Signs and Line Marking

Construct and maintain access, parking and manoeuvring for vehicles on site in accordance with the relevant Brisbane Planning Scheme Codes, as indicated on the approved DRAWINGS AND DOCUMENTS, including the following:

i. A pavement of minimum Local road standard or equivalent surface material (including associated drainage) to the area on which motor vehicles will be driven and/or parked.

ii. Suspended concrete parking areas, aisles and driveways are to be designed and certified by an RPEQ to accommodate the required design vehicles/s identified in this condition.

iii. Manoeuvring on site for an LRV, MRV, RCV and for the loading and unloading of vehicle(s). A minimum height clearance of 4.5m must be provided over all areas accessed by service vehicles. This height clearance is to be clear of any and all obstructions including but not limited to fire sprinklers, services, lighting fixtures, and signs.

iv. Parking on the site for 62 x resident / tenant cars, 5 x visitor cars including 1 x parking space for people with disabilities, and for the loading and unloading of vehicle(s) within the site. There must a minimum number of 67 x car parking spaces in total provided on site.

v. Provide and maintain 30 x secure bicycle parking spaces for residents, and 7 x lockable bicycle parking spaces for visitors. The accessway(s) to bicycle parking areas must maintain a minimum width of 1.5m. Signage and pavement marking must be provided through the ground level car park areas to ensure that visitors can safely access the visitor bicycle parking area.

vi. A minimum of 2.3 metres height clearance to all undercover parking areas, including the entry and access to these areas, and a minimum of 2.5 metres above parking spaces for people with disabilities. The minimum clear height must be measured to the lowest protrusion from the ceiling (e.g. fire sprinklers, services, lighting fixtures, signs, etc).

vii. A height clearance sign located at the entrance(s) to undercover car parking areas and a directional visitor parking sign clearly visible from the vehicle entrance to the site.

viii. An appropriate area for the storage and collection of refuse, including recyclables, in a position which is accessible to service vehicles on the site.

ix. The internal traffic system is to be implemented in accordance with an RPEQ Traffic System Design, ensuring that vehicles accessing the site (and manoeuvring down through basement areas) are assigned priority to contain all queuing of vehicles within the site. Cycle times must be appropriately designed and implemented, and signals are to be positioned in suitable locations to be consistently viewable by motorists. The RPEQ Traffic System Design must also address and consider how vehicles in car parking spaces forward of the “car queuing area” holding line will be managed.

x. A kerb is to be provided between the driveway and the ramped pedestrian access; to maintain safe movement of pedestrians. A kerb ramp is to be provided in an appropriate location to provide a wheelchair friendly access to the ground level areas of the development from the PWD parking bay.

xi. Prepare and implement signs and line markings drawings that show the internal paved areas signed and delineated in accordance with the approved drawings and documents. The drawings must be prepared and certified by a Registered Professional Engineer Queensland in accordance with the relevant Brisbane Planning Scheme Codes and the Manual of Uniform Traffic Control Devices.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland, that the above requirements have been implemented in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first and then to be maintained.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
35)   Repair Damage to Kerb, Footpath or Road

Repair any damage to the existing kerb and channel, footpath or roadway (including removal of concrete slurry from footways, roads, kerb and channel, stormwater gullies and drainlines) and re-instate existing traffic signs and pavement markings that have been removed or damaged during any works carried out in association with the approved development.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
35(a) Interim Repairs

If at any time during the construction phase of the approved development, damage to the existing kerb and channel, footpath or roadway creates unsafe, unreasonable and/or not fit for purpose conditions as assessed by Council, interim repairs must be undertaken as directed by Program Planning and Integration.

Note: Any interim repairs required to be undertaken shall not be considered to satisfy the requirements of this condition for the permanent repair of the infrastructure prior to the issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

Timing: While site / operational / building works is occurring.

 
As indicated
 
36)   Retaining Walls

Design and construct all retaining walls and associated fences, in accordance with the relevant Brisbane Planning Scheme Codes and the following:

- All retaining walls including the footings, must be located wholly within the property boundaries of the site where works are occurring

- Runoff from surface drains and subsoil drainage associated with the retaining walls must be collected and connected to a lawful point of discharge (LPD) where possible. If no LPD is available the surface drains and sub-soil drainage must be designed, installed and discharged to ensure there is no ponding, nuisance or concentration of stormwater discharge to adjacent properties.

- Retaining walls to stabilise excavation must be set back from property boundaries to accommodate subsoil drainage without encroachment into the neighbouring property. This set back may vary depending on the height, structure and design of the retaining wall, surcharge loadings from neighbouring properties, and to provide a surface drain along the top of the retaining wall

- For retaining walls in excess of 1.0m in height:
- walls must be vertically and horizontally tiered by a ratio of 1:1 unless an alternative has been approved by Development Services
- walls must be designed and certified by a Registered Professional Engineer Queensland
- walls facing onto Council property (including the road reserve and parkland) must not be constructed from timber.

NOTE: Refer to City Plan 2014; Infrastructure Design Planning Scheme Policy (IDPSP) for Council’s definition of a LPD.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
36(a) Certification of Retaining Walls

For retaining walls over 1.0m in height, obtain certification from a Registered Professional Engineer Queensland that the design and construction of the retaining walls and ancillary drainage are in accordance with the requirements of this condition.

 
As indicated
 
37)   Minimum Flood Planning Levels

Design and construct all building pad levels, floor levels and ancillary structures to the appropriate flood planning level with freeboard (where required) in accordance with the relevant Brisbane Planning Scheme Codes and the approved drawings and documents.

The minimum habitable floor level must be 7.7 metres AHD.

The minimum carpark level and vehicle manoeuvring level must be 7.2 metres AHD.

The minimum level for essential electrical services must be 7.7 metres AHD.

PROOF OF FULFILMENT
As-Constructed drawings prepared by a Registered Surveyor (Qld). The Registered Surveyor (Qld) must certify that the development has been constructed in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
38)   Basements in Flood Planning or Coastal Hazard Areas

Design and construct all basements affected by flooding within the Brisbane River Planning Areas, including stormwater, electrical and sanitary facilities, in accordance with the following:
i) All ventilation openings, driveway entry/exit ramps and pedestrian entrances into the basement must be constructed to achieve the minimum flood planning levels identified in the relevant Brisbane Planning Scheme Codes to prevent the ingress of floodwaters into the basement
ii) The basement subsoil drainage and associated stormwater drainage/flow management must be designed by a Registered Professional Engineer Queensland (RPEQ) to manage the expected sub-surface flow rate resulting from flooding at the highest defined flood event and/or tidal waters (where applicable).
iii) Where any part of a basement is below 2m AHD or subject to saline groundwater conditions, a RPEQ must certify that the design of concrete structures is suitable to withstand the corrosive effects of saline water for the design life of the structure.

iv) The basement is to maintain structural integrity during a flood, with walls and floors designed to resist hydrostatic pressures.
v) All stormwater pump systems must have backflow prevention devices and designed with a discharge point that will gravity drain into a Council stormwater system, or other Lawful Point of Discharge.
vi) All sewer connections must include backflow prevention devices.
vii) All roofwater drainage is to be directed to a lawful point of discharge via gravity drainage, not directed into the basement.

Note: Basement means a space:
(a) between a floor level in a building and the floor level that is immediately below it; and
(b) no part of which is more than 1m above ground level.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland that the development has been designed and constructed in accordance with this condition.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
38(a) Submit Certification to Council

Submit to Development Services certification by a Registered Professional Engineer Queensland that the stormwater, subsoil drainage, structural design and sewer hydraulic design, specifications and drawings for the basement construction is in accordance with the requirements of this condition.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
38(b) Submit As Constructed Drawings to Council

Submit to Development Services As Constructed drawings certified by a Registered Professional Engineer Queensland (RPEQ) showing the surveyed basement entry levels, subsoil drainage details and where relevant, an RPEQ certified pump design with backflow prevention details.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
39)   Floodproof Basements

Where a basement is required to be substantially impermeable to floodwaters (eg. essential services are located within a basement or room located below the highest flood level affecting the site in an area affected by the Brisbane River Flood Planning Areas, Creek/Waterway Flood Planning Areas or Coastal Hazard Area), the building is to be designed and constructed to provide either:

i) A substantially impermeable tanked basement that is designed to prevent the basement being flooded during a 1% AEP River or Creek/Waterway flood event, or a 1% AEP Storm Tide flood event.  All walls and floors are to be designed by a Registered Professional Engineer Queensland (Structural) to resist hydrostatic pressures expected.

OR

ii) A subsoil drainage system and pump system designed by a Registered Professional Engineer Queensland and constructed to prevent the basement from flooding and meet the following:

a) The pump system is to utilise a duty and standby pump system that is sized to manage the expected sub-surface flow rate resulting from flooding at the highest defined flood event and/or tidal waters (where applicable)

b) The pumps are connected to a backup power supply that is located above the highest defined flood level. The backup power supply is not to be located in the basement.

c) The backup power supply is to be a battery (ideally connected to a solar system that can operate with mains power disconnected to recharge and run pumps and other essential services), fuel or gas power source. The battery capacity, generator size and/or fuel storage must be sufficient to run the pumps for a minimum 48h period where the site is affected by the Brisbane River Flood Planning Areas. Where fuel storage is required it must be clearly shown on plans and volume specified.

Notes:
Basement means a space:
(a) between a floor level in a building and the floor level that is immediately below it; and
(b) no part of which is more than 1m above ground level.

Essential electrical services include any area or room used for fire control panel, telephone PABX, sensitive substation equipment including transformers, low voltage switch gear, high voltage switch gear, battery chargers, protection control and communication equipment, low voltage cables (excluding basement lighting), high voltage cables, lift motors, car stackers, and lift or pump controls.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland that the development has been designed and constructed in accordance with this condition.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
39(a) Submit Certification to Council

Provide to Development Services  certification from a Registered Professional Engineer Queensland (Structural) that the basement has been designed and constructed to prevent floodwaters from entering the basement and ensure structural integrity during a defined flood event, in accordance with the requirements of this condition.

Note: This certification is only required to be provided where a tanked, substantially impermeable basement design is being provided.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
39(b) Certification to Council

Submit to Development Services certification by a Registered Professional Engineer Queensland that the stormwater, subsoil drainage, pump and backup power supply has been designed and constructed in accordance with the requirements of this condition in order to prevent the basement from flooding during a 1% AEP River or Creek/Waterway flood event, or a 1% AEP Storm Tide flood event.

Note: This certification is only required to be provided where a subsoil drainage and pump system has been provided in lieu of a tanked, substantially impermeable basement.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
40)   Residential Refuse Collection - On Site

Provide for the installation and collection of refuse/recycling bins by Brisbane City Council's Waste and Resource Recovery Services.

 
At all times
40(a) Arrange Refuse Collection

Arrange for the installation of refuse/recycling bins and for the subsequent collection of refuse including recycling from the site by Brisbane City Council's Waste and Resource Recovery Services.

Timing: A minimum of four weeks prior to the commencement of use and then to be maintained.

 
As indicated
40(b) Indemnify Council

The owner and any subsequent owner must, by approved form to Waste and Resource Recovery Services, indemnify Council and its agents in respect of any damage to the pavement and other driving surfaces.

Timing: When an arrangement for refuse/recycling collection services is made with Brisbane City Council and then to be maintained.

 
As indicated
40(c) Notify Future Owner

The owner must notify any future owner/body corporate that the development has been approved on the basis that an indemnity must be provide for refuse collection vehicles to enter the property.

Timing: At time of a change of ownership.

 
As indicated
 
41)   Refuse Storage - On Site Collection

Provide a roofed and wholly screened refuse enclosure utilising materials consistent with the development or a dedicated refuse storage room, as shown on the approved plans and documents.

The enclosure/refuse storage room must be of a design to accommodate the quantity of refuse and recycling including source separation to allow for low servicing collection of the development.

Bins must be located in an area which allows them to be manoeuvred from the bin storage area to the designated internal collection point.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
42)   Lawful Point of Discharge

Submit to Development Services, evidence of written consent for a lawful point of discharge from the owners of properties affected by any stormwater discharge from the site.

Note: Refer to Council's website for a standard lawful point of discharge agreement template which is acceptable to Council.

 
Prior to site/operational/building work commencing
 
43)   Remove Redundant Drainage Outlets

Remove any redundant drainage outlets from the kerb and channel including any associated pipe work across the footway and reinstate the kerb and channel and the footway area in accordance with the relevant Brisbane Planning Scheme Codes.

Note: Guidance for the preparation of drawings and/or documents to comply with this condition is provided in the Brisbane Planning Scheme Policies.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
44)   All Basements - Stormwater Runoff

Design and construct basements to manage stormwater runoff in accordance with the relevant Brisbane Planning Scheme Codes and the following:

(i) All stormwater pump systems must be designed to gravity drain to a Council stormwater system.

(ii) The driveway into a basement must be designed and constructed to minimise local driveway stormwater runoff entering the basement. The drainage must be designed to capture runoff from a 10% AEP rainfall event and gravity drain to a lawful point of discharge.

(iii) Vehicle access into any basement from a Council road will require the basement driveway to ramp up a minimum of 200mm, above adjacent road channel invert, to maintain road major flow capacity.

(iv) All roofwater drainage is to be directed to a lawful point of discharge via gravity drainage, not directed into the basement.

(v) Any stormwater within a basement that connects via gravity drainage directly to a council pipe or manhole must incorporate backflow prevention devices.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland that the development has been designed and constructed in accordance with this condition.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
44(a) Submit Certification to Council

Submit to Council certification by a Registered Professional Engineer Queensland that the stormwater, subsoil drainage, specifications and drawings for the basement construction is in accordance with the requirements of this condition.

 

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
45)   Ponding of Stormwater

Carry out the approved development to ensure that adjoining properties and roads are protected from ponding or nuisance from stormwater during construction.

Notes: If remedial works are necessary to comply with this condition, prior approval must be obtained from Development Services.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
46)   On Site Drainage - Minor

Provide a stormwater connection to all new or existing allotments and provide drainage infrastructure to ensure stormwater run-off from all roof and developed surface areas will be collected internally and piped in accordance with the relevant Brisbane Planning Scheme Codes to a lawful point of discharge being the kerb and channel of Glen Road.

The discharge to the kerb and channel must be limited to 30L/s in the 5% AEP Event.

Note:
- Guidance for the preparation of drawings and/or documents to comply with this condition is provided in the Brisbane Planning Scheme Policies.
- Queensland Building and Construction Commission licensed hydraulic consultants may design the stormwater system for sites less than 2000m2 with an upstream catchment servicing no more than 4 residential lots. This excludes stormwater drainage design (including subsoil drainage) of basements in flood planning areas and the design of any onsite stormwater detention system
- Where external works are required and infrastructure will be handed over to Council (e.g. Stormwater pipes 375mm or greater and/or manholes within the road reserve, etc), the applicant will be required to request a Pre-Start with Council and ensure all future owned Council assets follow the On/Off Maintenance process in accordance with Council's Infrastructure Installation & Construction Requirements Manual.

- Guidance for requesting a pre-start and co-ordinating the On/Off Maintenance process can be found on Council's website (https://www.brisbane.qld.gov.au/planning-and-building/applying-and-post- approval/on-and-off-maintenance-approvals).

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
47)   Sealing of Abandoned Existing Sewer Property Connection

Permanently seal the existing sewer property connection, which will be built over or not reused to serve the proposed development.

Note: Connection permanently abandoned to the satisfaction of the Manager, Plumbing Services or the Delegate, Development Services.

 
Prior to site/operational/building work commencing
 
48)   Service Conduits and Mains

Provide and install all service conduits and meet the cost of any alterations to public utility mains, existing mains, services, street lighting or installations that are required to carry out the approved development. These works must be in accordance with the relevant Brisbane Planning Scheme Codes, and include the following, where applicable:
- the provision of all services and/or conduits along the full length of any rear allotment access or access easement.
- the breaking and/or relocation of any existing sewer combine drains.
- the relocation of any fire hydrant and/or valves from the development's vehicular footway crossings.
- the retention and/or relocation of any existing foul water lines that currently exist within the site.
- any new or existing installations of electrical pillar boxes, pad mounted transformers (PMTs), water reticulation mains, water meters and the like, must be installed/relocated to their ultimate alignment relative to the new property boundary and clear of the usable footpath areas irrespective of the alignment of the existing services/conduits.

Note:
- The cost of moving services, utilities and assets is the responsibility of the Developer. The permission of the service, utility or asset owner will be required. Council permission is required if street trees, stormwater gullies/drains, and swales are affected. Urban Utilities permission is required if water supply and sewerage services are affected.
- Standard utility alignments may be found on Council's 'Brisbane Standard Drawings' 1013 to 1016 inclusive.
- Applicants must liaise with the appropriate service authorities. Typical underground services and/or conduits to be constructed include power, phone, telecommunications, sewer (including private combine drains) stormwater and gas, if applicable.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
48(a) Submit As Constructed Drawings

Submit to Development Services As Constructed drawings, including an asset register, prepared and certified by a Registered Professional Engineer Queensland.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the requirements of this condition. Note: Civil works are to be certified by a RPEQ(Civil) and electrical works are to be certified by a RPEQ (Electrical).

 
As indicated
 
49)   Telecommunications

Submit to Development Services, certification from an authorised telecommunications carrier/contractor, that the following works and infrastructure have been undertaken and installed in accordance with telecommunications industry standards:
- Provide telecommunications to the subject buildings, lead-in conduits and equipment space in a suitable location within the buildings, to suit the carrier of choice.
- If new pits and conduit infrastructure are required to be installed within the road reserve fronting the site, it must be suitably sized to cater for future installation of fibre optic cables.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
50)   Agreement with Electricity Supplier

Submit to Development Services, evidence of an agreement with an electricity supplier to provide necessary services to the development in accordance with the relevant Brisbane Planning Scheme Codes.

Where development is within an established area of overhead electricity supply and the electricity supplier determines that a property pole is the appropriate solution to supply electricity to the development, the developer must be responsible for the installation of the property pole(s).

In the above circumstances, submit to Development Services, certification from the developer's electrical consultant confirming that the above installation has been completed in accordance with the relevant AS/NZS Standards and the Queensland Electricity Connection Manual (QECM) and Queensland Electricity Metering Manual (QEMM).

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
51)   Water and Wastewater

Pursuant to Schedule 18 of the Planning Regulation 2017 submit to Development Services, documentary evidence, issued by the relevant distributor-retailer, to verify that the conditions of any necessary connection certificate under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009, have been complied with.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
52)   Permanent Driveway Crossover

Provide a 6.5 metre wide Type B2 permanent driveway crossover to the Glen Road frontage of the site in accordance with the relevant Brisbane Planning Scheme Codes and located as shown on the approved DRAWINGS AND DOCUMENTS.

A footpath continuity treatment is to be provided across the driveway; in accordance with BSD- 2021.

Written consent must be obtained from Program, Planning and Integration Arboriculture (PPI Arb) prior to any works occurring that will either impact on or require removal of a street tree (this includes pruning, excavation or fill within the root zone/canopy of the tree)

At all times during construction of the crossover, safe pedestrian access along the site frontage must be maintained.

Note: No further driveway permit is required however additional footway permits or lane closure permits may be required for footpath/verge closures and/or lane closures. These permits must be obtained prior to construction of the crossover.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
53)   Redundant Driveway Crossover

Remove the redundant existing driveway crossover(s) on the frontage(s) of the site and reinstate the kerb and channel, road pavement, footways and footpaths in accordance with the relevant Brisbane Planning Scheme Codes.

Note:
For kerb and channel reinstatement, the existing channel is required to be removed and the kerb and channel reinstated in one pour.

Additional footway permits or lane closure permits may be required for footpath/verge closures and/or lane closures. These permits must be obtained prior to construction of the crossover.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
Standard Advice
 
Timing
54)   Construction Noise and Dust Emissions

Pursuant to the Environmental Protection Act 1994, all development involving the emission of noise and dust from building and/or construction activities, must ensure that the emissions are in accordance with the requirements of the Act.
The Environmental Protection Act 1994 prescribes that:

1. A person must not carry out building work in a way that makes an audible noise-
-  on a business day or Saturday, before 6.30a.m. or after 6.30p.m; or
-   on any other day, at any time. 
2. The reference in subsection (1) to a person carrying out building work-
-  includes a person carrying out building work under an owner-builder permit; and
-  otherwise does not include a person carrying out building work at premises used by the person only for residential purposes.

Note: A request can be made to work outside of these hours by submitting an Environmental Management Plan for assessment and obtaining an endorsed decision from the Environmental Management delegate Development Services.

 
As indicated
 
55)   Natural Asset Local Law (NALL) - Protected Vegetation on Public Land, Road or Park

The interference with or removal of protected vegetation on a public land or park requires a permit under the Natural Assets Local Law (NALL), issued by Program Planning and Integration (PPI).

Detailed arrangements must be made with PPI in relation to the works carried out on protected vegetation (including provision for tree removal and replacement tree planning costs as determined by the Arboriculture Team) prior to carrying out any works on protected vegetation. PPI Arboriculture Team can be contacted via BI- PPI-PLANNING-ARB@brisbane.qld.gov.au.

Note: All requirements of development approval conditions with timing stipulated as 'prior to site works commencing' (or equivalent) must be fulfilled before Council can issue a NALL permit.

 
As indicated
 
56)   Contaminated Materials and Soils

Any contaminated materials or soils encountered during siteworks, must be handled, stored and disposed of in accordance with the requirements of the relevant authority of the Queensland Government. A person must not dispose of contaminated soil or a hazardous substance at a place other than at a place approved by the relevant authority of the Queensland Government.

 
As indicated
 
57)   Management of Asbestos

Disposal, handling and restoration of any building materials containing asbestos must be in accordance with current state and federal legislation.

 
As indicated
 
58)   Further Development Permit Required

Further Development Permit(s) to carry out assessable building work under the Building Act may be required.

 
As indicated
 
59)   Plumbing and Drainage Work

Pursuant to the Plumbing and Drainage Act 2018, any plumbing and drainage work must be carried out in compliance with the Plumbing and Drainage Regulation 2019.

Note: All new and existing plumbing services should be located within the lot that they serve.

Compliance assessable plumbing and drainage work requires approval by Brisbane City Council prior to the work being carried out.

 
As indicated
 
60)   Currency Period

The currency period for this development approval is stated in the Decision Notice and is expressed as a date.

This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016.

 
As indicated
 
61)   Equitable Access

Provision must be made during and after construction for equitable access for persons with disabilities to and within the site and on adjoining public areas, in accordance with the following:
- Queensland Anti-Discrimination Act 1991;
- Federal Disability Discrimination Act 1992;
- Australian Standards AS1428 Parts 1-4;
- Australian Standard for Access and Mobility; and
- National Construction Code.

 
As indicated
 
62)   Damage to Trees on Adjoining Land

Please note that any damage caused to vegetation on adjoining land as a result of exercising this development approval may result in an offence under other legislation (e.g. Natural Assets Local Law) and/or civil action

 
As indicated
 
63)   Fire Ant Movement Controls

To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected.

These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products.

Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014.

For further information contact the relevant Queensland State Government department on 13 QGOV.

 
As indicated
 
64)   Water and Wastewater

Services for water and wastewater (sewerage) are not under the jurisdiction of Brisbane City Council. Authorisation to connect the approved development to the water/wastewater networks and for property service connections required a Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009.

For further information about any necessary Water Approvals contact Urban Utilities.

 
As indicated
 
65)   Cultural Heritage

Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage.

 

The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care.

 

For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships).

 
As indicated
 