BRISBANE CITY COUNCIL'S APPROVAL PACKAGE.



APPLICATION DETAILS

This package relates to the application detailed below
Address of Site: 77 MINIMINE ST STAFFORD QLD 4053
Real Property Description of Site: L78 RP.74875
Aspects of development and type of approval: DA - PA - Reconfiguring a Lot Development Permit - Subdivision of Land
Council File Reference: A006957882
Permit Reference Number/s: DARL473215726.
Package Status: APPROVED - Version 1 (24th of June, 2026 4:52:39 PM)
Package Generated: 24/06/2026


PROJECT TEAM

The assessment of this application has been undertaken by:
James LANGSTON
Principal Engineer
Engineering Services Hydraulics
james.langston@brisbane.qld.gov.au
34034918
Tim WRAFTER
Principal Engineer
Engineering Services Hydraulics
Tim.Wrafter@brisbane.qld.gov.au
Richard WELCH
Senior Engineer
Engineering Scoping
Richard.Welch@brisbane.qld.gov.au
34070603
Lani ROBERTS
Landscape Architect
Landscape Architecture Team
Lani.Roberts@brisbane.qld.gov.au
07 3403 8888
Luke HADRICK
Urban Planner
Planning Services North
Luke.Hadrick@brisbane.qld.gov.au
(07) 3178 9403
Rhea CONNOLLY
Principal Urban Planner
Planning Services North
Rhea.Connolly@brisbane.qld.gov.au
3178 0651


DRAWINGS AND DOCUMENTS



The term 'drawings and documents' or similar expressions mean:
Drawing or Document Number Plan Date
Site Plan Proposed Subdivision Plan 100-01 Issue F (Amended In Red 18-JUN-2026) 05-JUN-2026 (Received)
Preliminary Services Plan S25-243-P01 (Amended In Red 18-JUN-2026) 05-JUN-2026 (Received)


Advice

Please see the attached document(s) for any advices.

APPROVAL CONDITIONS



Permit to Which These Conditions Relate: DA - PA - Reconfiguring a Lot
Activity(ies): Subdivision of Land
Stage: Reconfiguration of a Lot (1 into 2)

General/Planning Requirements
 
Timing
1)   Maintain the Approved Development

Maintain the approved development generally in accordance with the approved DRAWINGS AND DOCUMENTS, and any other relevant Council approval required by the conditions.

 
At all times
 
2)   Carry Out the Approved Development

Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks). Permission to enter neighbouring properties must be obtained from the relevant property owners.

 
While site/operational/building work is occurring
 
3)   Approved Drawings and Documents

A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers.

Note: This condition is imposed to ensure compliance with the conditions of development approval.

 
While site/operational/building work is occurring
 
4)   Demolish or Relocate Buildings/Structures

Demolish buildings/structures on the site in accordance with the approved DRAWINGS AND DOCUMENTS and where applicable, the approved Construction Management Plan.

The removal of buildings/structures includes the removal of all existing concrete slabs, foundations and footings.

 
Prior to Council's notation on the plan of subdivision
 
5)   Complete All Operational Work

Complete all operational work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such operational work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS or, if requiring a further approval from the Council, in accordance with the relevant further approval(s).

 
Prior to Council's notation on the plan of subdivision and then to be maintained
 
Landscape Architecture and Open Space Planning
 
Timing
6)   Retain and Protect Existing Street Tree(s)

Identify, retain and protect the existing street trees including the roots unless otherwise agreed in writing with Public Space Operations (PSO Arb-PLANNING).

Note: Street trees are protected under the Natural Assets Local Law. Street trees must not be removed or pruned without prior approval from PSO Arb- PLANNING.

Where driveway crossovers occur within the Tree Protection Zone (TPZ) of existing street trees, seek approval from PSO Arb PLANNING for the final driveway crossover design and construction methodology to ensure the successful retention of the existing street trees.

Note: Should ultimate access to Lot 2 be installed as indicatively illustrated on the approved plans, then in-principle support for the removal of Street Tree 1 and Street Tree 2 is supported. However, removal of these trees is not supported until access is required. This will require a separate driveway permit.

PROOF OF FULFILMENT
Contextual photographic evidence that trees have been retained in equal or greater health than before development commenced. OR, evidence in writing from PSO Arb PLANNING that an alternative arrangement has been made.

 
At all times
6(a) Implement Protection Measures

Install tree protection measures in accordance with Australian Standard - AS4970 Protection of Trees on Development Sites.

There must be no excavation, filling or storage of materials or plant within the drip line of the tree(s).

Where works are within the canopy drip line of existing street trees, contact PSO Arb PLANNING in relation to the required provision of protection measures.

Note: If fencing is to protect street trees, a permit to temporarily occupy the footway will be required from Compliance and Regulatory Services.

Timing: Prior to site/operational work occurring.

 
As indicated
6(b) Maintain Protection Measures

Maintain protection measures while development is occurring and remove protection measures prior to commencement of the use.

Timing: While to site/operational work is occurring.

PROOF OF FULFILMENT
Contextual photographic evidence to demonstrate the installation of protection measures prior to building works commencing.

 
As indicated
 
Engineering
 
Timing
7)   Grant Easements

Grant the following easements as may be required:
(i) Easements, generally in accordance with approved plan, in favour of Brisbane City Council for:
- Underground drainage (3.0 metres wide) located centrally over the existing stormwater pipe.

- Easement for open cut and underground drainage purposes (minimum 900mm wide or wider as determined by RPEQ) located over the stormwater pipe servicing the three upstream properties (10, 26, 28 Burrowa Street) and overland flow diversion channel;

Note: The easement plan is to be supported by a plan prepared by a Registered Surveyor (QLD) showing the location and size of the underground drainage, ensuring the infrastructure is fully contained within the easement.

Note: These easements include the provision for Council to obtain access.

Timing: As part of the plan of subdivision notated by Council, and then to be maintained.

 
As indicated
7(a) Submit Plan of Subdivision and Documentation (Council Easement in Gross)

Submit to, and obtain approval from, Development Services a plan of subdivision showing the easement and a request for Council to prepare the necessary easement documentation to demonstrate compliance with the requirements of this condition.

Note: Easements in favour of the Brisbane City Council must have the necessary easement documentation prepared by the Brisbane City Council, free of cost to Council.

Timing: Prior to submission of the request pursuant to Schedule 18 of the Planning Regulation 2017 for Council's notation on the plan of subdivision necessary to comply with this condition or give effect to this approval.

 
As indicated
7(b) Submit Plan of Subdivision and Documentation (other Easement)

Submit to, and obtain approval from, Development Services, a plan of subdivision showing the easement and the necessary easement documentation to demonstrate compliance with the requirements of this condition.

Note: Easements not in favour of the Brisbane City Council must have the necessary documentation prepared by the applicant's private solicitors.

Timing: As part of the submission of the request pursuant to Schedule 18 of the Planning Regulation 2017 for Council's notation on the plan of subdivision necessary to comply with this condition or give effect to this approval.

 
As indicated
7(c) Lodge Notated Plan and Documentation

Lodge the plan of subdivision notated by Council pursuant to Schedule 18 of the Planning Regulation 2017 and the necessary easement documentation with the Registrar of Titles for the relevant Queensland State Government Authority.

Timing: As part of the registration of the plan of subdivision notated by Council.

PROOF OF FULFILMENT
Evidence of the registration of the necessary easement documentation. Timing: Within one month of the registration of the easement documentation.

 
As indicated
 
8)   On-site Erosion (low risk)

Manage on-site erosion and the release of sediment or sediment laden water from the site at all times by implementing best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version). Including but not limited to:

(i) Drainage control measures must be implemented and maintained to minimise water flow across areas of exposed earth.
(ii) Sediment and erosion control measures must be implemented and maintained to prevent soil loss from earth disturbance areas and prevent deposition beyond earth disturbance areas.
(iii) No release of contaminants to land beyond on-site area of earth disturbance.

Note: Guidelines and factsheets to assist with this are available from the 'Healthy Waterways - Water by Design' website at http://hlw.org.au/initiatives/esc/house-sites.

Timing: Prior to commencement of any earth disturbing activities and until all exposed soil areas are permanently stabilised against erosion.

 
As indicated
8(a) Provide Land Occupier Notification to Council

(i) Notify Council's ESC Team of proposed land occupier/s by sending an email to CARS-ESC@Brisbane.qld.gov.au.
(ii) If the land is to be occupied by any person other than the registered landowner then advice must be provided to Council that confirms the name, contact information and the duration of any proposed occupation of the land.

Note: Occupier is any principal contractor occupying the land exercising a right under the development approval.

Timing: Prior to commencement of any earth disturbing activities.

 
As indicated
 
9)   Information Signage

Erect an information sign on the subject property in accordance with Council's general requirements for signage and in accordance with the requirements outlined below:

a) The sign should provide a brief description of the development proposed;

b) The sign is to list the name, postal and/or email address and a contact telephone number for the following parties (where relevant) that are undertaking work on the site:

- Developer;
- Project Coordinator;
- Architect/Building Designer;
- Builder;
- Civil Engineer;
- Civil Contractor/s; and
- Landscape Architect;

c) The lettering on the sign is to be at least 25 millimetres in height, be of regular weight and in sentence case;

d) The sign is to be a minimum size of 1,200 millimetres by 900 millimetres;

e) The maximum area of the sign is to be 2.0m2;

f) The sign is to be positioned as follows:

- located centrally along each road frontage of the site;
- located on or within 1.5 metres of the road frontage;
- mounted at least 300 millimetres above ground level; and
- clearly visible from the street for a pedestrian;

g) The sign is to contain no commercial or corporate advertising other than the name, logo or slogan of the parties outlined in part (b) of this condition;

h) The sign is to be non-illuminated; and

i) Both the sign and the supporting structure are to be made of weatherproof material and to be properly maintained at all times.

Timing: Prior to site works commencing and then to be maintained until completion of the development for all stages.

 
As indicated
 
10)   Protect Existing Infrastructure

Where there is existing infrastructure in the vicinity of the proposed work, the new work must not damage or compromise the working ability of the existing infrastructure.

Where alterations to public utility mains, existing mains, services or installations are necessitated by the development, prior to alterations commencing, the developer must notify Council or the relevant infrastructure provider and obtain agreement to the alterations.

The developer must meet the costs of the alterations. The alterations must be carried out in accordance with the relevant Brisbane Planning Scheme Codes or infrastructure providers requirements.

 
While site/operational/building work is occurring
10(a) As Constructed Drawings - Alterations to Existing Infrastructure

Submit to Development Services As Constructed drawings showing all new and/or rectification works and an asset register, prepared and certified by a Registered Professional Engineer Queensland.

Timing: Prior to Council's notation on the plan of subdivision.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland, confirming that the alterations have been completed in accordance with the relevant Brisbane Planning Scheme Codes and any other relevant infrastructure requirements.

 
As indicated
 
11)   Certified Site Survey Levels

Submit to Development Services, "As Constructed" drawings prepared by a Registered Surveyor (Qld). The registered surveyor must certify that the "As Constructed" drawings are in accordance with the APPROVED PLANS and the relevant Brisbane Planning Scheme Codes and show finished surface level information over the completed development.

Note: The survey information must show surface levels and site contours at 1 metre intervals. All levels must be shown as Reduced Levels to the "Australian Height Datum" (AHD).

 
Prior to Council's notation on the plan of subdivision
 
12)   Filling and/or Excavation (Minor)

Filling and/or excavation works on the site must be in accordance with the APPROVED PLANS and the relevant Brisbane Planning Scheme Codes.

Maintain overland flow path as a new constructed channel through the site and earthworks generally in accordance with approved amended Plan S25-243-PO1.

 
Prior to Council's notation on the plan of subdivision
12(a) Prepare Earthworks Drawings

Earthworks drawings must be prepared and certified by a Registered Professional Engineer Queensland in accordance with the relevant Brisbane Planning Scheme Codes.

The drawings must include the following:

- The location of any cut and/or fill;
- The quantity of fill to be deposited and finished levels;
- The existing and future finished levels in reference to the Australian Height Datum (including cross-sections or long sections into the adjacent properties);
- maintenance of access roads to and from the site such that they remain free of all fill material and are cleaned as necessary
- preservation of all drainage structures from the effects of structural loading generated by the earthworks
- protection of adjoining properties and roads from adverse impacts as a result of proposed works.
- That all vehicles exiting the site will be cleaned and treated so as to prevent material being tracked or deposited on public roads.

Note: The Earthworks drawings are not required to be submitted for Council approval.

Timing: Prior to site/operational work commencing.

 
As indicated
12(b) Implement and Maintain the Earthworks

Carry out and maintain the earthworks in accordance with the requirements of AS3798 and the certified drawings.

All fill material placed on the site must comprise only natural earth and rock and must be free of contaminants (as defined by Part 3, Division 2, Subdivision 2 Environmental contamination, Section 11 of the Environmental Protection Act 1994) and noxious, hazardous, deleterious and organic materials.

Fill material, placement, compaction and testing must comply with the requirements of Australian Standard AS3798, Guidelines on Earthworks for Commercial and Residential Developments.

Note: A copy of the certified Earthworks Drawings must be available on- site for inspection by Council Officers during these works.

Timing: Prior to Council's notation on the plan of subdivision.

 
As indicated
12(c) Submit As Constructed Drawings

Submit to Development Services As Constructed drawings prepared by a Registered Surveyor (Qld).

Timing: Prior to Council's notation on the plan of subdivision.

 
As indicated
12(d) Submit Certification

Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with certified earthworks drawings.

Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that all fill material used complies with the quality requirements of this condition and that placement, compaction and testing has been carried out in accordance with AS3798.

Timing: Prior to Council's notation on the plan of subdivision.

 
As indicated
 
13)   Retaining Walls

Design and construct all retaining walls and associated fences, in accordance with the relevant Brisbane Planning Scheme Codes and the following:

- All retaining walls including the footings, must be located wholly within the property boundaries of the site where works are occurring

- Runoff from surface drains and subsoil drainage associated with the retaining walls must be collected and connected to a lawful point of discharge (LPD) where possible. If no LPD is available the surface drains and sub-soil drainage must be designed, installed and discharged to ensure there is no ponding, nuisance or concentration of stormwater discharge to adjacent properties.

- Retaining walls to stabilise excavation must be set back from property boundaries to accommodate subsoil drainage without encroachment into the neighbouring property. This set back may vary depending on the height, structure and design of the retaining wall, surcharge loadings from neighbouring properties, and to provide a surface drain along the top of the retaining wall

- For retaining walls in excess of 1.0m in height:
- walls must be vertically and horizontally tiered by a ratio of 1:1 unless an alternative has been approved by Development Services
- walls must be designed and certified by a Registered Professional Engineer Queensland
- walls facing onto Council property (including the road reserve and parkland) must not be constructed from timber.

NOTE: Refer to City Plan 2014; Infrastructure Design Planning Scheme Policy (IDPSP) for Council’s definition of a LPD.

 
Prior to Council's notation on the plan of subdivision
13(a) Certification of Retaining Walls

For retaining walls over 1.0m in height, obtain certification from a Registered Professional Engineer Queensland that the design and construction of the retaining walls and ancillary drainage are in accordance with the requirements of this condition.

Timing: Prior to Council notation on the plan of subdivision.

 
As indicated
 
14)   Repair Damage to Kerb, Footpath or Road

Repair any damage to the existing kerb and channel, footpath or roadway (including removal of concrete slurry from footways, roads, kerb and channel, stormwater gullies and drainlines) and re-instate existing traffic signs and pavement markings that have been removed or damaged during any works carried out in association with the approved development.

 
Prior to Council's notation on the plan of subdivision
14(a) Interim Repairs

If at any time during the construction phase of the approved development, damage to the existing kerb and channel, footpath or roadway creates unsafe, unreasonable and/or not fit for purpose conditions as assessed by Council, interim repairs must be undertaken as directed by Program Planning and Integration.

Note: Any interim repairs required to be undertaken shall not be considered to satisfy the requirements of this condition for the permanent repair of the infrastructure prior to Council's notation on the plan of subdivision.

Timing: While site/operational works is occurring

 
As indicated
 
15)   Up Stream Stormwater Drainage Connection

Provide a stormwater drainage connection for the future development of the 3 adjoining upstream properties (located at 10, 26, 28 Burrowa Street) designed for ultimate developed catchment conditions and connected to the existing stormwater infrastructure, generally in accordance with approved Preliminary Services Plan (S25-243-P01) dated Jan 2026.

Note:

- All upslope stormwater connections to existing private properties must extend to the property boundary of the relevant property being ultimately serviced by that connection.

 
Prior to Council's notation on the plan of subdivision
15(a) Submit Stormwater Drawings

Submit to, and obtain approval from, Development Services, stormwater drawings and engineering calculations, prepared and certified by a Registered Professional Engineer Queensland in accordance with the relevant Brisbane Planning Scheme Codes.

NOTE:

- Queensland Building and Construction Commission licensed hydraulic consultants may design the stormwater system for sites less than 2000m2 with an upstream catchment servicing no more than 4 residential lots. This excludes stormwater drainage design (including subsoil drainage) of basements in flood planning areas and the design of any onsite stormwater detention system
- Guidance for the preparation of drawings and/or documents to comply with this condition is provided in the Brisbane Planning Scheme Policies
- A 225mm diameter pipe is the minimum size required to service an upstream development of any kind.

Timing: Prior to site/operational work commencing.

 
As indicated
15(b) Implement Approved Drawings

Carry out the works in accordance with the above approved stormwater drawings.

Timing: Prior to Council's notation on the plan of subdivision.

 
As indicated
15(c) Submit As Constructed Drawings

Submit to Development Services As Constructed drawings prepared and certified by a Registered Professional Engineer Queensland or Queensland Building and Construction Commission licensed hydraulic consultant (where applicable).

Timing: Prior to Council's notation on the plan of subdivision.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland or Queensland Building and Construction Commission licensed hydraulic consultants (where applicable) confirming that the works have been completed in accordance with the above stormwater drawings. Timing: Prior to Council's notation on the plan of subdivision.

 
As indicated
 
16)   Site Drainage - Major

Provide an internal drainage system to collect stormwater run-off from all proposed lots, roofed and developed surface areas and any run-off onto the site from adjacent areas and convey the collected run- off to a lawful point of discharge, in accordance with the relevant Brisbane Planning Scheme Codes. Design of flowpath channel and lot earthworks to be provided by RPEQ and generally in accordance with amended plan S25-243-PO1.

Notes:

- All upslope stormwater connections to existing private properties must extend to the property boundary of all relevant properties being ultimately serviced by that connection.
- The stormwater design must ensure the stormwater runoff from the site does not adversely impact on flooding or drainage (peak discharge and duration for all storm events up to the 1% AEP event) of properties that are upstream, downstream or adjacent to the site. Where a development has not specifically addressed this issue, the development may require implementation of one or more mitigation measures to offset adverse impacts, (e.g. stormwater detention or upgrade of existing stormwater drainage infrastructure).
- Where external works are required and infrastructure will be handed over to Council (e.g. Stormwater pipes 375mm or greater and/or manholes within the road reserve, etc), the applicant will be required to request an on-site Pre-Start with Council and ensure all future owned Council assets follow the On/Off Maintenance process in accordance with Council's Infrastructure Installation & Construction Requirements Manual.

Guidance for requesting a pre-start and co- ordinating the On/Off Maintenance process can be found on Council's website (https://www.brisbane.qld.gov.au/planning-and-building/applying-and- post-approval/on-and-off-maintenance-approvals.

 
Prior to Council's notation on the plan of subdivision
16(a) Submit Site Drainage Drawings

Submit to, and obtain approval from, Development Services, site drainage drawings and engineering calculations, prepared and certified by a Registered Professional Engineer Queensland, in accordance with the relevant Brisbane Planning Scheme Codes.

Note:

- Queensland Building and Construction Commission licensed hydraulic consultants may design the stormwater system for sites less than 2000m2 with an upstream catchment servicing no more than 4 residential lots. This excludes stormwater drainage design (including subsoil drainage) of basements in flood planning areas and the design of any onsite stormwater detention system
- Guidance for the preparation of drawings and/or documents to comply with this condition is provided in the Brisbane Planning Scheme Policies.

Timing: Prior to site/operational work commencing

 
As indicated
16(b) Implement Approved Drawings

Carry out the works in accordance with the approved site drainage drawings.

Timing: Prior to Councils notation on the plan of subdivision.

 
As indicated
16(c) Submit As Constructed Drawings

Submit to Development Services As Constructed drawings prepared and certified by a Registered Professional Engineer Queensland or a Queensland Building and Construction Commission licensed hydraulic consultants (where applicable).

Note: To be submitted via DA- ComplianceEngineering@brisbane.qld.gov.au and include the site address, A00 reference and Condition number in the subject line.

Timing: Prior to Council's notation on the plan of subdivision.

PROOF OF FULFILMENT
Certification (incl. QA documentation, CCTV, etc) from a Registered Professional Engineer Queensland, or a Queensland Building and Construction Commission licensed hydraulic consultants (where applicable), confirming that the works have been completed in accordance with the above stormwater approved site drainage drawings. Timing: Prior to Council's notation on the plan of subdivision.

 
As indicated
 
17)   Ponding of Stormwater

Carry out the approved development to ensure that adjoining properties and roads are protected from ponding or nuisance from stormwater during construction.

Notes: If remedial works are necessary to comply with this condition, prior approval must be obtained from Development Services.

 
Prior to Council's notation on the plan of subdivision
 
18)   Sealing of Abandoned Existing Sewer Property Connection

Permanently seal the existing sewer property connection, which will be built over or not reused to serve the proposed development.

NOTE: Connection permanently abandoned to the satisfaction of the Manager, Plumbing Services or the Delegate, Development Services.

 
Prior to site/operational/building work commencing
 
19)   Service Conduits and Mains

Provide and install all service conduits, including street lighting as required by Council, and meet the cost of any alterations to public utility mains, existing mains, services, street lighting or installations that are required to carry out the approved development. These works must be in accordance with the relevant Brisbane Planning Scheme Codes, and include the following, where applicable:

- the provision of all services and/or conduits along the full length of any rear allotment access or access easement.
- the breaking and/or relocation of any existing sewer combine drains.
- the relocation of any fire hydrant and/or valves from the development's vehicular footway crossings.
- the retention and/or relocation of any existing foul water lines that currently exist within the site.
- any new or existing installations of electrical pillar boxes, pad mounted transformers (PMTs), water reticulation mains, water meters and the like, must be installed/relocated to their ultimate alignment relative to the new property boundary and clear of the usable footpath areas irrespective of the alignment of the existing services/conduits.

Note:

- The cost of moving services, utilities and assets is the responsibility of the Developer. The permission of the service, utility or asset owner will be required. Council permission is required if street trees, stormwater gullies/drains, and swales are affected. Urban Utilities permission is required if water supply and sewerage services are affected.
- Standard utility alignments may be found on Council's 'Brisbane Standard Drawings' 1013 to 1016 inclusive.
- Applicants must liaise with the appropriate service authorities. Typical underground services and/or conduits to be constructed include power, phone, telecommunications, sewer (including private combine drains) stormwater and gas, if applicable.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the requirements of this condition. Note: Civil works are to be certified by a RPEQ(Civil) and electrical works are to be certified by a RPEQ (Electrical)

 
Prior to Council's notation on the plan of subdivision
19(a) Submit Certification to Council

Submit to Development Services certification by a Registered Professional Engineer Queensland (RPEQ) that the works have been completed in accordance with the requirements of the condition. 

Note: Where rear allotment accesses or easements exist, the certification is to be supported by As-Constructed drawings certified by a RPEQ showing all services and/or conduits. Civil works are to be certified by a RPEQ (Civil) and electrical works are to be certified by a RPEQ (Electrical)Timing: Prior to Council's notation of the plan of subdivision.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the requirements of this condition. Note: Civil works are to be certified by a RPEQ(Civil) and electrical works are to be certified by a RPEQ (Electrical)

 
As indicated
 
20)   Telecommunications

Submit to Development Services, evidence of an agreement with a telecommunication carrier to provide underground telecommunication services within and adjacent to the proposed development in accordance with the relevant Brisbane Planning Scheme Codes.

 
Prior to Council's notation on the plan of subdivision
 
21)   Agreement with Electricity Supplier

Submit to Development Services, evidence of an agreement with an electricity supplier to provide necessary services to the development in accordance with the relevant Brisbane Planning Scheme Codes.

Where development is within an established area of overhead electricity supply and the electricity supplier determines that a property pole is the appropriate solution to supply electricity to the development, the developer must be responsible for the installation of the property pole(s).

In the above circumstances, submit to Development Services, certification from the developer's electrical consultant confirming that the above installation has been completed in accordance with the relevant AS/NZS Standards and the Queensland Electricity Connection Manual (QECM) and Queensland Electricity Metering Manual (QEMM).

 
Prior to Council's notation on the plan of subdivision
 
22)   Water and Wastewater

Pursuant to Schedule 18 of the Planning Regulation 2017 submit to Development Services, documentary evidence, issued by the relevant distributor-retailer, to verify that the conditions of any necessary connection certificate under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009, have been complied with.

 
Prior to Council's notation on the plan of subdivision
 
23)   Permanent Driveway Crossover

For Lot 1, provide a modified Dwelling Type permanent driveway crossover to the Burrowa Street frontage of the site in accordance with the relevant Brisbane Planning Scheme Codes and located generally as shown on the approved amended DRAWINGS AND DOCUMENTS.

Modified crossover to be 5.0m wide at the property boundary and tapering to 4.3m wide at the kerb.

The vehicle crossover (including the wings and apron) must be constructed with the following clearance(s), if these cannot be achieved the crossover width is to be reduced:

600mm clear of the stormwater gully; and

1.0meters from the power pole; and

2.0metres clear of the street tree; and

the verge must be designed/graded to provide an adequate flow path for when the existing stormwater infrastructure exceeds capacity; and directed to 0.9m wide easement on the northern boundary.

For Lot 2, provide 5.0metre wide (maximum) Single Dwelling Type permanent driveway crossover to the Burrowa Street frontage of the site in accordance with the relevant Brisbane Planning Scheme Codes and located with a 600mm offset from the western property boundary.

Written consent must be obtained from Public Space Operations Arboricultural Planning Team (PSO-Arb PLANNING) prior to any works occurring that will either impact on or require removal of a street tree (this includes pruning, excavation or fill within the root zone/canopy of the tree)

At all times during construction of the crossover, safe pedestrian access along the site frontage must be maintained.

Note: No further driveway permit is required however additional footway permits or lane closure permits may be required for footpath/verge closures and/or lane closures. These permits must be obtained prior to construction of the crossover.

 
Prior to Council's notation on the plan of subdivision
 
24)   Redundant Driveway Crossover

Remove the redundant existing driveway crossover(s) on the frontage(s) of the site and reinstate the kerb and channel, road pavement, footways and footpaths in accordance with the relevant Brisbane Planning Scheme Codes.

Note:
For kerb and channel reinstatement, the existing channel is required to be removed and the kerb and channel reinstated in one pour.
Additional footway permits or lane closure permits may be required for footpath/verge closures and/or lane closures. These permits must be obtained prior to construction of the crossover.

 
Prior to Council's notation on the plan of subdivision
 
Standard Advice
 
Timing
25)   Construction Noise and Dust Emissions

Pursuant to the Environmental Protection Act 1994, all development involving the emission of noise and dust from building and/or construction activities, must ensure that the emissions are in accordance with the requirements of the Act.
The Environmental Protection Act 1994 prescribes that:

1. A person must not carry out building work in a way that makes an audible noise-
-  on a business day or Saturday, before 6.30a.m. or after 6.30p.m; or
-   on any other day, at any time. 
2. The reference in subsection (1) to a person carrying out building work-
-  includes a person carrying out building work under an owner-builder permit; and
-  otherwise does not include a person carrying out building work at premises used by the person only for residential purposes.

Note: A request can be made to work outside of these hours by submitting an Environmental Management Plan for assessment and obtaining an endorsed decision from the Environmental Management delegate Development Services.

 
As indicated
 
26)   Natural Assets Local Law (NALL) - Protected Vegetation On Site

Work on or around protected vegetation may require a permit under the Natural Assets Local Law 2003 (NALL). Permits under the NALL are issued by Development Services.

To apply for a permit to work on protected vegetation go to Council's website or contact the call centre on 3403 8888.

 
As indicated
 
27)   Standard Advice Disclaimer

The standard advice is provided to the applicant as advice only and does not form part of the development approval conditions. This advice has been provided to inform the applicant of other obligations they may be required to comply with (under state legislation or local laws) prior to the approved activity commencing.

 
As indicated
 
28)   Further Development Permit Required

Further Development Permit(s) to carry out assessable building work under the Building Act may be required.

 
As indicated
 
29)   Plumbing and Drainage Work

Pursuant to the Plumbing and Drainage Act 2018, any plumbing and drainage work must be carried out in compliance with the Plumbing and Drainage Regulation 2019. Plumbing and drainage permit work requires approval by Brisbane City Council prior to the work being carried out.

 
As indicated
 
30)   Currency Period

The currency period for this development approval is stated in the Decision Notice and is expressed as a date.

This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016.

 
As indicated
 
31)   Cultural Heritage

Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage.

The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care.

For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships).

 
As indicated
 
32)   Fire Ant Movement Controls

To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected.

These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products.

Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014.

For further information contact the relevant Queensland State Government department on 13 QGOV.

 
As indicated
 
33)   Water and Wastewater

Services for water and wastewater (sewerage) are not under the jurisdiction of Brisbane City Council. Authorisation to connect the approved development to the water/wastewater networks and for property service connections required a Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009.

For further information about any necessary Water Approvals contact Urban Utilities.

 
As indicated
 
34)   Management of Asbestos

Disposal, handling and restoration of any building materials containing asbestos must be in accordance with current state and federal legislation.

 
As indicated
 
35)   Flood Resilience and Awareness

This advice is provided for buildings that are on sites that are subject to the flood overlay, as shown within City Plan 2014.

Council makes decisions to minimise flood risk based on the best information available at the time of the development application. Flood studies and applicable flood levels may be updated by Council overtime where new flood information is available or changes to engineering standards/methodology have occurred. Flood levels for various flood events and flooding types are outlined in Councils Floodwise Property Reports available from Councils website.

The minimum flood planning levels that apply to new development do not necessarily mean that the development will never flood. Therefore, when choosing materials for building on sites that are known to be affected by flooding, regardless of whether it is constructed to the minimum flood planning level, it is recommended that flood resilient materials are used to improve the speed of recovery and reduce the cost of repairs if required.

For more information refer to:

Council's website at https://www.brisbane.qld.gov.au/community-and-safety/community- safety/disasters-and-emergencies/be-prepared/flooding-in-brisbane/flooding- support-for-residents/flood-resilient-homes-program

Queensland Reconstruction Authority "Flood Resilient Building Guidance for Queensland Homes"https://www.qra.qld.gov.au/resilient- homes/flood-resilient-building-guidance-queensland-homes

 
As indicated
 
36)   In Principle support for street tree interference or removal

As street trees are protected vegetation, the interference with or removal of trees requires a permit under the Natural Assets Local Law (NALL), issued by Public Space Operations Arboricultural Planning Team (PSO-Arb PLANNING). Development Services has sought preliminary advice from PSO-Arb PLANNING regarding the identified removal/interference with existing street tree/s.

Should ultimate access to Lot 2 be installed as indicatively illustrated on the approved PLANS AND DOCUMENTS, then in-principle support for the removal of Street Tree 1 and Street Tree 2 is supported. However, removal of these trees is not supported until access is required. However, a separate NALL permit will be required for crossover installation at that time.

Detailed arrangements must be made with PSO-Arb PLANNING in relation to the works carried out on protected vegetation (including provision for tree removal and replacement tree planning costs as determined by the Arboriculture Team) prior to carrying out any works on protected vegetation. PSO-Arb PLANNING team can be contacted via ISG-CS-PPI-PLANNING- ARB@brisbane.qld.gov.au.

Note: All requirements of development approval conditions with timing stipulated as 'prior to site works commencing' (or equivalent) must be fulfilled before Council can issue a NALL permit.

 
As indicated
 

** End of Package **