BRISBANE CITY COUNCIL'S APPROVAL PACKAGE.



APPLICATION DETAILS

This package relates to the application detailed below
Address of Site: 19 WALTER ST BULIMBA QLD 4171
8 REDCAR ST BULIMBA QLD 4171
Real Property Description of Site: L2 SP.240196
L1 RP.73474
Aspects of development and type of approval: DA - SPA - Carry out Building Work Preliminary Approval under s241 - Single Unit Dwelling
DA - SPA - Material Change of Use Development Permit - Single Unit Dwelling
DA - SPA - Reconfigure a Lot Development Permit - Subdivision of Land
Council File Reference: A007026505
Permit Reference Number/s: DABW235080410; DAMC235080510; DARL235080610.
Package Status: APPROVED - Version 4 (19th of June, 2026 4:22:44 PM)
Package Generated: 19/06/2026


PROJECT TEAM

The assessment of this application has been undertaken by:
Ruka KEARNS
Urban Planner
Planning Services South
Ruka.Kearns@brisbane.qld.gov.au
3178 9717
Timothy BYRNE
Principal Urban Planner
Planning Services South
Timothy.Byrne@brisbane.qld.gov.au
(07) 3403 0314
Mark CONNELLAN
Principal Urban Planner
Development Assessment Planning Services North
mark.connellan@brisbane.qld.gov.au
07 3403 4436
Dalina HOWDEN
Senior Urban Planner
Trunk Infrastructure & Calculations
dalina.howden@brisbane.qld.gov.au
(07) 3178 3895
Jolanta KRAWUS
Principal Engineer, Development Assessment
Engineering Scoping
jolanta.krawus@brisbane.qld.gov.au
34036190


DRAWINGS AND DOCUMENTS



The term 'drawings and documents' or similar expressions mean:
Drawing or Document Number Plan Date
Ground Floor Plan SK01b (Amended In Red 08-NOV-2012) 05-JUN-2012 (Received)
First Floor Plan SK02b (Amended In Red 08-NOV-2012) 05-JUN-2012 (Received)
Elevations SK03b (Amended In Red 08-NOV-2012) 05-JUN-2012 (Received)
Site Plan A102 Rev. A (Amended In Red 16-JUN-2026) 30-JUN-2010 (Received)
Demolition Plan A103 Rev. A 30-JUN-2010 (Received)
Plan - External Works A104 Rev. A (Amended In Red 16-JUN-2026) 30-JUN-2010 (Received)
Site Survey A105 Rev. A 30-JUN-2010 (Received)
Level 0 Floor Plan A201 Rev. A (Amended In Red 16-JUN-2026) 30-JUN-2010 (Received)
Level 1 Floor Plan A202 Rev. A (Amended In Red 08-NOV-2012) 30-JUN-2010 (Received)
Roof Floor Plan A203 Rev. A (Amended In Red 08-NOV-2012) 30-JUN-2010 (Received)
East & West Elevations A301 Rev. A (Amended In Red 08-NOV-2012) 30-JUN-2010 (Received)
North & South Elevations A302 Rev. A (Amended In Red 08-NOV-2012) 30-JUN-2010 (Received)
A & B Sections A401 Rev. A 30-JUN-2010 (Received)
C & D Sections A402 Rev. A (Amended In Red 08-NOV-2012) 30-JUN-2010 (Received)
E & F Sections A403 Rev. A 30-JUN-2010 (Received)
G & H Sections A404 Rev. A 30-JUN-2010 (Received)
J Sections A405 Rev. A 30-JUN-2010 (Received)
Reconfiguration of a Lot S-9373 30-JUN-2010 (Received)
Site Plan DA01 (Amended In Red 16-JUN-2026) 20-MAY-2026 (Received)
Carport Details Plan DA02 (Amended In Red 16-JUN-2026) 20-MAY-2026 (Received)


Advice

Please see the attached document(s) for any advices.

APPROVAL CONDITIONS



Permit to Which These Conditions Relate: DA - SPA - Carry out Building Work
Activity(ies): Single Unit Dwelling
Stage: Single Unit Dwelling

Standard Advice
 
Timing
1)   Noise And Dust Emissions-Advice Only

All development involving the emission of noise and dust from building/construction activities requires that the emission be in accordance with the requirements of the Environmental Protection Regulation 1998 Part 2A - Environmental Nuisance.

Pursuant to the Environmental Protection Regulation 1998 Part 2A - Environmental Nuisance-
6W. A builder or building contractor must not carry out building work on a building site in a way that makes or causes audible noise to be made from the building work-
(a) on a Sunday or public holiday, at any time; or
(b) on a Saturday or business day, before 6.30 a.m. or after 6.30 p.m.

Please note: The above information has been provided to the applicant as an advice only, and does not form part of the development approval conditions. This advice has been provided to the applicant to inform them of other obligations they may have to comply with (under state legislation or local laws) prior to their activity commencing.

GUIDELINE
All development involving the emission of noise and dust from building/construction activities requires that the emission be in accordance with the requirements of the Environmental Protection Regulation 1998 Part 2A - Environmental Nuisance.

 
As indicated
 
2)   Further Development Permit required

This Preliminary Approval (Carry Out Building Works) does not include assessment against the Building Code of Australia and does not permit building work to occur. Prior to the commencement of any building work, Development Permit(s) for Carrying Out Building Work will be required.

 
Prior to building work commencing
 



Permit to Which These Conditions Relate: DA - SPA - Material Change of Use
Activity(ies): Single Unit Dwelling
Stage: Single Unit Dwelling

General/Planning Requirements
 
Timing
3)   Approved Drawings & Documents

A legible copy of the approved drawings and documents bearing "Council Approval" and the Development Approval Conditions package is to be available on site at all times during construction and earthworks.

GUIDELINE
This condition is imposed to ensure compliance with the development conditions of approval. The copy of the conditions and plans should be located in any site management office or with the site foreman. Any copies of conditions or plans that are illegible shall be deemed to be non compliance with this condition of approval.

 
As indicated
 
4)   Time for Completion of Development

The approved development new carport on the Single Unit Dwelling at 19 Walter Street, Bulimba must be completed within 2 years from the day the approval takes effect.

Note: If the development is started but not completed within the time specified above, the approval (to the extent it relates to any development not completed) lapses.

Timing: Development to be completed within 2 years.

 
As indicated
 
5)   Carry Out The Approved Development

Carry out the approved development generally in accordance with the approved drawing(s) and/or document(s).

 

Note:-

This development approval may include the location of fences, retaining walls and/or external walls of buildings on the boundary of a lot. The approval does not constitute permission to enter neighbouring properties to carry out the construction of fences, retaining walls and/or external walls of buildings on the boundary of a lot. Permission must be obtained from relevant property owners.

GUIDELINE
This condition refers to the approved plans, drawings and documents to which the approval relates and is the primary means of defining the extent of the approval. Approved plans, drawings and documents are stamped PLANS and DOCUMENTS referred to in the APPROVAL and are dated to reflect the date of approval of the application by Council's Delegate.

 
While development is occurring on the site and then to be maintained
 
6)   Complete All Building Work

Complete all building work associated with this development approval, including work required by any of the following conditions. Such building work is to be carried out generally in accordance with the approved plans, drawing(s), and/or documents and, where the building work is assessable development, in accordance with a current development permit.

GUIDELINE
This condition is imposed to ensure all building work associated with the use are in place before the use commences. It is not appropriate that the site be used without such work being completed. Please note that the work referred to in this condition involves operational work and may therefore constitute 'assessable development'. The Council informs you there fore that this condition does not authorise assessable development to occur and a development permit may therefore be necessary. Please refer to the Council's information sheets. For any enquiries about this condition, please contact the Assessment Manager.

 
Prior to commencement of use
 
7)   Maintain The Approved Development

Maintain the approved development (including landscaping, parking, driveways and other external spaces) in accordance with the approved drawing(s) and/or documents, and any relevant Council or other approval required by the conditions.

GUIDELINE
This condition restricts changes that can be made to the approved development. Approved plans and documents are stamped PLANS and DOCUMENTS referred to in the APPROVAL and are dated to reflect the date of determination of the application by the Council's delegate. The extent to which plans can be modified is constrained by the requirements of the relevant planning legislation. Please note to investigate the legislation applicable to this approval. It will be necessary to make a new application if the change does not meet the specifications of the relevant planning legislation. For any enquires about this condition, please contact the Assessment Manager.

 
To be maintained
 
8)   Single Unit Dwelling - Survey Plan Endorsement

The survey plan associated with the proposed subdivision shall not be endorsed by Council until the proposed buildings are constructed to lock up stage.

 
As indicated
 
9)   MCU & ROL

Monetary contributions contained in the Reconfiguration of Lot for Single-Unit Dwellings (1 into 3) as part of this approval, must be complied with prior to survey plan endorsement, community management statement, or commencement of use which ever is sooner.

GUIDELINE
This condition is imposed to ensure that the related Material Change of Use for Multi-unit dwelling application is completed in accordance with the conditions of approval, as no staging is included as part of this approval.

 
Prior to survey plan endorsement
 
10)   Erect Screen Fence

Erect a screen fence along the boundaries of the site as shown on the approved plans. Where not otherwise designated as an acoustic fence, and unless an alternative design for the fence is agreed to with the owner of adjoining land, the screen fence is not to exceed 1.8 metres in height and be constructed from timber palings.

GUIDELINE
This condition is imposed to ensure visual privacy between the development and adjoining properties.

 
Prior to commencement of use
 
Monetary Contributions and Securities
 
Timing
11)   Pay Outstanding Charges, Expenses and fees

Pay to Council any outstanding charges or expenses levied by the Council over the subject land. This includes all Council Infrastructure Charges and Compliance fees conditioned as part of this approval.

 

The Infrastructure contributions/Charges payment must be made prior to issuing the Plumbing Compliance Certificate for the site or at a time detailed in the TIMING clause of this condition.

TIMING

Prior to issuing certificate of classification, commencement of use, endorsement of Survey Plan, making a request for compliance assessment under Section 401 of the Sustainable Planning Act 2009, issuing the Plumbing Compliance Certificate for the site, whichever comes first.

 

GUIDELINE
This condition is imposed to ensure that there are no outstanding charges existing over the subject site, including outstanding rates. If there are outstanding monies, they must be paid in accordance with the TIMING of this condition.

 
As indicated
 
Architecture
 
Timing
12)   Front Fence Materials and Design

Any front fence is to be constructed to either:

  • a maximum height of 1.5 metres above the front alignment ground level, with a minimum 50% transparency; or
  • a maximum height of 1. 2 metres above the front alignment ground level, if less than 50% transparency.
 
As indicated
 
13)   Balconies and Terraces to Remain Unenclosed

All balconies and terraces shown on the approved drawings and documents, are to remain unenclosed with no shutters, glazing, louvres or similar permanent fixtures other than those consistent with the relevant "Brisbane City Plan 2000 - Residential Code" and clearly depicted on the approved drawings.

GUIDELINE
This condition is imposed to minimise bulk and protect the appearance of the development within the area. For any enquiries about this condition, please contact the Architect, Development Assessment.

 
Prior to the commencement of the use and then to be maintained
 
14)   Driveway Material and Finishes

Provide materials and finishes to the driveway and external carparking surfaces which reduce the visual impact of these areas when viewed from the street. In order to achieve this outcome, one or a combination of the following is to be used:

  • Coloured aggregate;
  • Cement pavers; and/or
  • Banding and patterns in the surface design.

GUIDELINE
This condition is imposed to ensure that the development is appropriately coloured and textured so as not to visually detract from the surrounding residential area. For any enquiries about this condition, please contact the Architect, Development Assessment.

 
Prior to the commencement of the use and then to be maintained
 
15)   Overall Height - Survey Certification

The overall height of the proposed building(s) is to be in accordance with the following requirement: Construct the floor levels in accordance with the floor levels on the approved elevations as they relate to the contour survey.

GUIDELINE
This condition is imposed to ensure the floor levels and maximum overall height of the proposed building is in accordance with the development approval. For any enquiries about this condition, please contact the Architect, Development Assessment.

PROOF OF FULFILMENT
This information is to be submitted to the Architect, Development Assessment, and written confirmation of receipt provided by Council.

 
Prior to commencement of use
15(a) Submit Certification

Submit certification from a licensed surveyor that the as constructed floor levels are in accordance with this condition and that the maximum overall height of the building does not exceed 8.5 metres above ground level as defined in City Plan at any point.

PROOF OF FULFILMENT
This information is to be submitted to the Architect, Development Assessment.

 
Prior to commencement of use
 
16)   Screen A/C and Other Plant Enclosures

Install and maintain suitable screening to all air conditioning, lift motor rooms, plant and service facilities located at the top of or on the external face of the building. The screening structures must be constructed from materials that are consistent with materials used elsewhere on the facade of the building. There are to be no individual external air conditioning units.

PROOF OF FULFILMENT
Certification submitted to the Architect, Development Assessment confirming 'as constructed' screening for air conditioning, lift motor rooms, plant etc. is generally in accordance with approved drawings.

 
Prior to the commencement of the use and then to be maintained
 
17)   Screening of Openings from Habitable Areas

All openings from habitable areas in the development including, but not limited to, windows from habitable rooms and balconies, are to be screened in accordance with the relevant requirements set out in the Residential Design – Single Unit Dwelling Code.

 
Prior to the commencement of the use and then to be maintained
 
Landscape Architecture and Open Space Planning
 
Timing
18)   Landscape the Site - Concept Plan Approved for Self Certification

Landscape the site to contribute to the integration of the new development with the existing context and to provide a high level of amenity in accordance with the Landscaping Code. 

A plan is not required to be lodged with Council for further approval.

GUIDELINE
This condition does not require the submission of an Operational Works or Compliance Assessment application to Council for approval.

PROOF OF FULFILMENT
Landscaping compliant with the Landscaping Code and constructed to a high standard is implemented and maintained.

 
Prior to the commencement of the use and then to be maintained
18(a) Prepare a Detailed Landscape Plan for Self Certification

Prepare a detailed Plan for landscape areas nominated on the approved plans of layout, in accordance with the approved Landscape Concept Plan, the relevant City Plan Codes, Best Trade Practice and the following conditions.

  • Trees to be retained are documented, protected and integrated into the landscape design in accordance with AS4970 (the Australian Standard for the Protection of Trees on Development sites).

GUIDELINE
This condition does not require the submission of an Operational Works or Compliance Assessment application to Council for approval.

PROOF OF FULFILMENT
A detailed Landscape Plan is prepared to direct the implementation of the landscape.

 
Prior to commencement of site works
18(b) Construct Designed Work

Construct landscaping in accordance with the prepared detailed Landscape Plan; the relevant City Plan Codes, Council Standards and Best Trade Practice.

PROOF OF FULFILMENT
The Compliance Certificate - Landscaping is submitted to Council together with as constructed plans.

 
Prior to commencement of use
18(c) Certify Work

On completion provide written certification from:

  • A qualified and experienced Landscape Architect that the prepared drawings comply with the relevant City Plan Codes and Best Trade Practice (Part A of the Compliance Certificate - Landscaping); and
  • A licensed and experienced Landscape Architect or Landscape Contractor that the completed landscaping complies with the detailed Landscape Plan, Council Standards and Best Trade Practice (Part B of the Compliance Certificate - Landscaping).
  • Submit a copy of the as-constructed detailed Landscape Plan together with the completed Compliance Certificate - Landscaping, to the Landscape Architect, Development Assessment.

PROOF OF FULFILMENT
The Compliance Certificate - Landscaping is submitted to Council together with As Constructed plans.

 
Prior to commencement of use
18(d) Maintain Landscape Work

Maintain the landscape generally in accordance with the detailed plans and to industry standards.   

  • Existing trees within the site are to be retained and protected.   
  • The trees are to be maintained on a regular basis - to achieve their ultimate height and form - by a qualified Arborist in accordance with Australian Standard 4373.
 
To be maintained
 
19)   Retain Existing Street Tree(s)

Identify, retain and protect the existing street trees unless otherwise determined in writing by Councils Arborist Local Asset Services.

GUIDELINE
Street trees are Protected under the Natural Assets Local Law 2003. Written approval to prune or remove street trees must be obtained from the Arborist Local Asset Services.

PROOF OF FULFILMENT
Street trees are retained protected and integrated into the new development

 
While development is occurring on the site
19(a) Implement Protection Measures

Install protection measures in accordance with Best Practice.  There is to be no excavation, filling or storage of materials or plant within the drip line of the tree.

GUIDELINE
Protection measures are to be removed prior to the commencement of the use. Note a footpath permit may be required if protection fencing is employed.

PROOF OF FULFILMENT
Street trees are retained and protected from damage due to construction.

 
While development is occurring on the site
 
Pollution
 
Timing
20)   Acoustic Barrier - General

Erect an acoustic barrier (relative to the finished RL of the building pad) along any vehicle movement areas that are located within 3m of any adjacent dwelling(s).

The acoustic barrier must:

  • Be returned by not less than one metre at each end;
  • Be constructed of a material with a minimum surface area density of 10 kg/m2;
  • Be constructed of an aesthetically pleasing weather-resistant material such as earth mound, fibre cement, painted or treated timber, brick or a combination thereof;

GUIDELINE
This condition is imposed to ensure that vehicle manoeuvring areas do not adversely impact the amenity of adjacent dwellings.

 
Prior to the commencement of the use and then to be maintained
 
Engineering
 
Timing
21)   On-site Erosion (Low Risk)

Minimise on-site erosion and the release of sediment or sediment-laden stormwater from the site at all times.

GUIDELINE
This condition applies where the soil erosion and sedimentation risk is considered low. Note that the Erosion and Sediment Control Management plan is not required to be submitted for Council endorsement.

 
As indicated
21(a) Prepare an Erosion and Sediment Control (ESC) Management Plan - On-site Erosion (Low Risk)
Prepare an Erosion and Sediment Control (ESC) Management Plan for the site in accordance with the Healthy Waterways document "Controlling Stormwater Pollution on Your Building Site" 2006 (or later version) and Council's "Erosion and Sediment Control Standard" (Version 9 or later)

GUIDELINE
This condition applies where the soil erosion and sedimentation risk is considered low. The Erosion and Sediment Control Management plan is not required to be submitted for Council endorsement.

 
Prior to commencement of site works
21(b) Implement and Maintain the ESC Management Plan - On-site Erosion (Low Risk)
Implement and maintain the ESC Management Plan on-site for the duration of the operational or building works, and until all exposed soil areas are permanently stabilised (e.g. turfed, hydromulched, concreted, landscaped). The prepared ESC Management Plan must be available on-site for inspection by Council Officers during these works

GUIDELINE
This condition applies where the soil erosion and sedimentation risk is considered low. The Erosion and Sediment Control Management Plan is not required to be submitted for Council endorsement.

 
While site/operational/building work is occurring
 
22)   Filling and Excavation (Minor)

Prepare an earthworks plan and undertake the works on the site in accordance with Council's "Filling and Excavation Code".

GUIDELINE
This condition is imposed for applications when minor earthworks are proposed in conjunction with a development proposal. The plans are to include: - Maintenance of access roads to and from the site such that they remain free of all fill material and are cleaned as necessary; - Preservation of all drainage structures from the effects of structural loading generated by the earthworks; and - Protection of adjoining properties and roads from ponding or nuisance from stormwater. A copy of the Earthworks Plan, prepared by a suitably qualified person, must be available on-site for inspection by Council Officers during these works. For any enquiries about this condition, please contact the Engineering Delegate, Development Assessment.

 
Prior to site works/building works commencing
22(a) Suitable Fill Material

All fill material placed on the site is to comprise only natural earth and rock and is to be free of contaminants (as defined by section 11 of the Environmental Protection Act 1994) and noxious, hazardous, deleterious and organic materials.

GUIDELINE
Suitable fill material is that deemed to comply with the requirements of AS 3798, Guidelines on Earthworks for Commercial and Residential Developments.

 
While site/operational/building work is occurring
 
23)   Retaining Walls

Design and construct all retaining walls, and associated fences , in compliance with Council's Filling and Excavation Code.

GUIDELINE
This condition is intended to ensure that retaining walls associated with the development, are designed and constructed in accordance with Council's Filling & Excavation Code and the Building Code of Australia and also, to ensure that no adverse impact is created by the structures on the surrounding properties. The retaining wall designer should note that timber retaining walls facing onto Council property (including the road reserve) will not be permitted. Retaining walls facing onto road reserve or parkland are to be contained entirely within the proposed development site, including the retaining wall's footings. If the retaining wall is higher than 1 metre and/or where the combined height of the retaining wall and fence exceeds 2.0 metres, a Development Permit for Building Work will need to be obtained. For any enquires about this condition please contact the Engineering Delegate, Development Assessment.

PROOF OF FULFILMENT
For any retaining walls greater than 1.0 metre in height and/or where the combined height of the retaining wall and fence exceeds 2.0 metres, a Development Permit for Building Work. Certification from a Registered Professional Engineer Queensland (RPEQ-Civil) that the retaining wall complies with the Filling and Excavation Code. The certification is to include the stormwater drainage (surface and seepage water) associated with the wall ensuring that the water is directed to an acceptable lawful and legal point of discharge and does not cause any ponding, nuisance or disturbance to adjacent property owners.

 
Prior to survey plan endorsement
 
24)   Granting Easements

Grant the following easement(s):

i. Easements for underground drainage and access purposes, as required to preserve the rights of upstream properties in favour of Brisbane City Council.

ii. Easements for underground drainage, overland flow, open cut, and access purposes as may be required, in favour of Brisbane City Council.

iii. Easements for underground drainage, open cut, overland flow and access purposes over that part of the site within the Waterway Corridor and/or that part of the site affected by 100 year Average Recurrence Interval (ARI) flooding, in favour of Brisbane City Council.

iv. Easements for sewerage and water supply purposes in favour of Brisbane city Council over sewerage rising mains or water mains.

v. Easement for the purpose of access, construction and maintenance of utility services over proposed lot(s) 1, 2 and 3.


GUIDELINE
This condition is imposed to provide access, maintenance of services and to protect drainage paths if required. Easements in favour of the Brisbane City Council are required to have the necessary easement documentation prepared (free of costs and compensation to Council) by the Brisbane City council. Easements not in favour of the Brisbane City Council are required to have the necessary documentation prepared by the applicant's private solicitors. Easements are to be shown on a Survey Plan and lodged with the Delegate Plan Sealing, Licensing Sealing and Certificates Unit. Enquiries regarding any legal documentation can be directed to Licensing, Sealing and Certificates Unit, Development Assessment (ph: 3403 9050). For any other enquiries about this condition, please contact the Engineering Delegate, Development Assessment.

PROOF OF FULFILMENT
Registration of the easement on the plan of survey and on the property title with the Department of Natural Resources.

 
Prior to commencement of use
 
25)   Minimum Habitable Floor Levels

Design and construct all proposed building levels, floor levels and ancillary structures to have the appropriate freeboard in accordance with Council's "Subdivision and Development Guidelines" so as not to be flooded during a 50 year ARI local flood event or a 100 year ARI creek or river flood event, whichever is the higher flood level.

GUIDELINE
This condition is imposed when the site is affected by flooding. For flood level information, Council Flood Reports are now available from any of Council's Customer Service Centres and Regional Business Centres. The new Flood Report provides the latest flood information for a nominated property plus other useful information about flooding and your development. Copies of the "Subdivision and Development Guidelines", "Standard Drawings" and "Water Sensitive Urban Design Guidelines" can be downloaded from Brisbane City Council's website at www.brisbane.qld.gov.au.

 
Prior to site/building works commencing and then to be maintained
25(a) Construct Buildings

Construct all proposed building(s) in accordance with Council's "Subdivision and Development Guidelines" to ensure that minimum habitable floor levels are RL 3.17 metres AHD and non habitable floor levels of RL 2.97 metres AHD.

GUIDELINE
This condition is imposed when the site is affected by flooding and is to ensure flood immunity to development.

PROOF OF FULFILMENT
Construction of such works must be certified by a Registered Professional Engineer-Queensland (RPEQ) or a Registered Surveyor. A copy of the certification, ensuring the works have been constructed in accordance with the endorsed hydraulic report, must be forwarded for acceptance by the Engineering Delegate.

 
Prior to the commencement of the use and then to be maintained
 
26)   Repair Damage To Kerb, Footpath Or Road

Repair any damage to existing kerb and channel, footpath or roadway (including removal of concrete slurry from footways, roads, kerb and channel and stormwater gullies and drainlines) that may occur during any works carried out in association with the approved development. This will include the re-instatement of the existing traffic signs and pavement markings that may have been removed or damaged.

GUIDELINE
This condition is imposed for the repair of damage to the existing road infrastrucure including traffic signs and pavement marking during works associated with the development.

PROOF OF FULFILMENT
Acceptance of the completed works by the Engineering Delegate, Development assessment.

 
Prior to commencement of use
 
27)   Individual General Refuse Bin

Provide an individual general refuse bin and a recycle bin per dwelling, which is to be stored as indicated on the approved plans.

GUIDELINE
This condition is imposed to ensure that adequate arrangements are made for the storage of refuse and recycle bins in accordance with Council's Guidelines.

 
Prior to the commencement of the use and then to be maintained
 
28)   Single Unit Dwelling - Infrastructure

The applicant(s) is to acknowledge in writing that at the time of reconfiguration, each allotment will require a separate sewer, water, electricity and phone connection prior to the endorsement of the survey plan.

GUIDELINE
This condition is imposed to ensure the applicant is aware that even though separate services are not conditioned as part of the Material Change of Use, separate services will be conditioned under any reconfiguration approval to create freehold title allotments. For any enquiries about this condition, please contact the Engineering Delegate, Development and Regulatory Services.

 
As indicated
 
29)   BOS (Building over Sewer) Certification
A Private Building Certifier / Registered Professional Engineer, to assess and obtain approval for Building Over or Near Sewer Infrastructure.

GUIDELINE
To avoid unnecessary expense, delay or rework, the applicant is to obtain assessment and approval for permission to "Build Over Sewer" at the lodgement of building approval. For any enquiries regarding this condition, please contact the Private Building Certifier.

PROOF OF FULFILMENT
Assessment and approval of "Build Over Sewer" obtained by the Private Certifier/RPEQ.

 
Prior to lodging an application for Building Works
 
30)   Provide/Extend Sewer Connection(s)

Provide a sewer property connection to serve the development designed and constructed in accordance with approved engineering plans and "BCC Sewerage Standards".

 

GUIDELINE
This condition is imposed to provide a separate new sewerage connection to the development. The "BCC Sewerage Standards" are available on BCC's internet site (www.brisbane.qld.gov.au) and can be downloaded free of charge. For enquiries regarding this condition, please contact the Engineering Delegate, Development Assessment.

 
Prior to commencement of use
30(a) Submit Plans

Submit engineering plans showing the design of the works are in accordance the "BCC Sewerage Standards" and have been checked and certified by a Registered Professional Engineer of Queensland (RPEQ). Obtain endorsement from the Delegate, Development Assessment.

GUIDELINE
This condition is imposed to ensure that the required works are designed in accordance with this development permit and relevant standards.

PROOF OF FULFILMENT
Checked and certified by a Registered Professional Engineer of Queensland (RPEQ) and endorsed by the Delegate, Development Assessment.

 
Prior to undertaking the works
30(b) Submit As Constructed Drawings

Submit "As Constructed" plans certified by a Registered Professional Engineer Queensland-Civil (RPEQ-Civil), that the plans are a true record of the works "as constructed" and are in accordance with the endorsed plans, approved modifications and in accordance with Council's Sewerage Standards.

GUIDELINE
A copy of the notification is to be sent to Council to be kept as a record.

PROOF OF FULFILMENT
Checked and certified by a Registered Professional Engineer of Queensland (RPEQ) and accepted by the Delegate, Development Assessment.

 
Prior to the commencement of the on-maintenance period or Prior to commencement of use
30(c) Implement Endorsed Plans

Construct the works in accordance with the endorsed engineering plans and the "BCC Sewerage Standards".

GUIDELINE
This condition is imposed to ensure that the required works are carried out in accordance with this development permit, relevant standards and endorsed plans.

PROOF OF FULFILMENT
Accepted "on-maintenance" and "off-maintenance" as a Council asset by the Engineering Delegate, Development Assessment

 
Prior to commencement of use
 
31)   BONSW (Build Over Near Stormwater)

Obtain written permission from Council to build over or near storm water infrastructure (pipe drainage system or an easement for overland flow), or, to relocate a storm water drainage system, all at no cost to Council.

GUIDELINE
This condition has been imposed to ensure that acceptable measures will be incorporated into the development to protect Council's Infrastructure. For any enquiries about this condition, please contact Council's Customer Contact Centre on 3403 8888.

 
Prior to building work commencing
 
32)   Lawful Point Of Discharge

Submit to the Engineering Delegate, Development Assessment, written consent for a lawful point of discharge from the owners of properties, including the holders of easements, affected by any stormwater discharge from the site. Such consent may require supporting engineering plans and calculations.

GUIDELINE
This condition is imposed where it is necessary to obtain a lawful point of discharge for a drainage outlet and/or authority to pipe across adjacent properties to the lawful point of discharge. The detailed design application seeking engineering approval in respect of this work should show the drainage outlet and/or the drainage across adjacent properties to the lawful point of discharge. A definition of "Lawful Point of Discharge" can be found in Council's "Subdivision and Development Guidelines" (download for free from www.brisbane.qld.gov.au) or the Department of Natural Resources, Mines and Water's "Queensland Urban Drainage Manual" (QUDM). For any enquiries about this condition, please contact the Engineering Delegate, Development Assessment.

PROOF OF FULFILMENT
Evidence should be provided in the form of a signed letter from the affected property or easement owner(s) through which the drainage is proposed to traverse agreeing to the point of discharge.

 
Prior to lodging an application for Building Works
 
33)   Remove Redundant Drainage Outlets

Remove any redundant drainage outlets from the kerb and channel including any associated pipe work across the footway and reinstate the kerb and channel and the footway area in accordance with Council's "Subdivision and Development Guidelines".

GUIDELINE
This condition is imposed to ensure that redundant infrastructure in the road reserve is removed and remedial works are undertaken.

 
Prior to commencement of use
 
34)   On Site Drainage - Minor (General)

Stormwater run-off from roof and surface areas is to be collected internally and piped generally in accordance with the "Subdivision and Development Guidelines" to a lawful point of discharge. This is either via:

  • a stormwater gully through downstream properties with appropriate consent; or
  • the existing kerb and channel; or
  • onsite rainwater tank(s) with an RPEQ approved soakage pit.

GUIDELINE
The purpose of this condition is to ensure that stormwater run off from the site and adjacent properties will be handled adequately. Disposal of storm water by gravity pipeline is required. The design, design documentation, (including test results) and the Certificate of Completion are to be forwarded to and retained by the current and future owner(s) as proof of initial compliance with this Condition of Development and to assist in the on-going compliance with this Condition of Development and any future auditing. Where it is proposed to perform works in the road reserve, a permit is to be obtained from Council by calling the Council's Customer Contact Centre on 3403 8888.

 
Prior to commencement of use
 
35)   Ponding Of Stormwater

Adjoining properties and roads are to be protected from ponding or nuisance from stormwater as a result of the works.

GUIDELINE
This condition is imposed to ensure that the developer is aware that they are responsible for all remedial works required as a result of any site works and, that they must protect neighbouring properties and roads from ponding and nuisance water from the proposed development. Where this rectification work involved drainage, plans are to be lodged showing the manner in which it is intended to rectify the site drainage. These plans must be approved by the Engineering Delegate. For any enquiries about this condition, please contact the Engineering Delegate, Development Assessment.

 
Prior to the commencement of the use and then to be maintained
 
36)   Telecommunications

Enter into an agreement with a telecommunication carrier to provide underground telecommunication services within and adjacent to the proposed development in accordance with the "Subdivision and Development Guidelines".

GUIDELINE
This condition is imposed to ensure the provision of essential telecommunication services to all allotments. For any enquiries about this condition, please contact a relevant service provider regarding telecommunication services.

PROOF OF FULFILMENT
A copy of the agreement is forwarded together with the request for survey plan endorsement to the Plan Sealing Officer, Development Assessment.

 
Prior to commencement of site works
 
37)   Electricity (Overhead Supply Area)

Provide electricity services to the Development or to the proposed dwellings in accordance with the relevant power authority supply requirements and the "Subdivision and Development Guidelines".

GUIDELINE
This condition is imposed when a proposed development is located within an existing overhead supply area and it is intended to utilise the existing overhead power supply network. Please ensure that: - Any additional electrical poles needed for supply are located within the development and NOT the road reserve, - Any extensions to the existing electricity mains are to be constructed underground, - If a pole-mounted transformer is required to supplement supply, it is to be located within the frontage of the development. For any enquiries about this condition, please contact the City Lighting Unit (ph. 3403 8888) regarding electricity reticulation or Energex (ph: 131 253) regarding electricity supply.

 
Prior to commencement of use
37(a) Agreement with Supplier
Enter into an agreement with an electricity supplier to provide the service to each lot/dwelling; and

GUIDELINE
Forward a copy of the agreement to the Delegate Engineering, Development Assessment.

PROOF OF FULFILMENT
A copy of the agreement with the electricity supplier is provided to the Plan Sealing Officer, Development Assessment.

 
Prior to commencement of use
 
38)   Service Conduits & Mains

Supply and install all service conduits and meet the cost of any alterations to public utility mains, existing mains, services or installations required in connection with the approved development in accordance with the "Subdivision and Development Guidelines".

GUIDELINE
This condition is imposed when additions, alterations or extensions to service conduits, mains and other services are required as a result of the approved development. This includes the provision of all services and/or conduits along the full length of any rear allotment access or access easement. This includes the relocation of any fire hydrant and/or valves from within the limits of the development's vehicular footway crossings if applicable. Applicants should liaise with the appropriate service authorities. Typical underground service conduiting to be constructed includes, power, phone, telecommunications, sewer, stormwater and gas if applicable. For any enquiries about this condition, please contact the Engineering Delegate, Development Assessment (regarding advise on traffic signal conduits, stormwater, water supply and sewerage mains) or the relevant public utility authorities (for advice on other services).

 
Prior to commencement of use
38(a) As Constructed Plans

Submit "As Constructed" plans including an asset register, checked and certified by a registered Professional Engineer Queensland (RPEQ) that are in accordance with Council's "Subdivision and Development Guidelines" and "BCC Water Supply Standard 2005" and "BCC Sewerage Standards 2005".

GUIDELINE
This condition is imposed to ensure the Council has a record of the actual details of the works constructed for future reference.

 
Prior to commencement of use
 
39)   Provide Permanent Vehicular Crossover

Construct 2 x 3 metre wide type A permanent vehicular crossover to the Walter Street frontage of the site and a 3 metre wide type A permanent vehicular crossover to the Redcar Street frontage of the site in accordance with Council's "Subdivision and Development Guidelines".

GUIDELINE
The intention of this condition is to ensure that such works are designed and constructed to a standard suited to the demands created by the approved development. The Developer must obtain the necessary driveway permit prior to commencing any vehicle access works. This ensures the proposed internal site levels will suit the necessary permanent levels of the footway areas adjacent to the site. Such works may include footpath reconstruction, reprofiling and/or relocation of services. Additional Council permission is required to interfere with street trees, stormwater gullies/drains and swales. The cost of moving services, utilities and assets is the responsibility of the Developer. The permission of the service/utility/asset owner will also be required prior to carrying out any works. Copies of the "Subdivision and Development Guidelines", Standard Drawings and Water Sensitive Urban Design Guidelines can be downloaded from Brisbane City Council's website at www.brisbane.qld.gov.au. Contact Council's Vegetation and Pest Services if the driveway will affect a street tree. For any further enquiries about this condition please contact the Engineering Delegate, Development Assessment.

 
Prior to commencement of use
 
40)   Remove Redundant Crossing

Remove the existing vehicular crossing(s) on the frontage(s) of the site and reinstate in accordance with Council's "Subdivision and Development Guidelines".

GUIDELINE
This condition is imposed when existing kerb openings and or driveway crossings become redundant as a result of the new development. In addition to removing the concrete driveway the kerb and channel, road pavement, footways and footpaths must be reinstated. Copies of the "Subdivision and Development Guidelines" Standard Drawings and Water Sensitive Urban Design Guidelines can be downloaded from Brisbane City Council's website at www.brisbane.qld.gov.au. For any further enquiries about this condition please contact the Engineering Delegate, Development Assessment.

PROOF OF FULFILMENT
Construction of such works must be certified by a Registered Professional Engineer-Queensland (RPEQ). A copy of the certification, ensuring the works have been constructed in accordance with Council's Standards, must be forwarded to the Engineering Delegate, Development Assessment.

 
Prior to commencement of use
 
41)   Service, Meter Assembly and Meter Box

Provide a water service with approved Council meter assembly and meter box to the front real property boundary of the development and a water meter to each tenement in accordance with the "Brisbane City Council Water Supply Standards".

Where a mixed usage site is approved for development and the proposed development comprises mixed classifications as defined by the Building Code of Australia containing any of Classes 5 to 9 and any of Classes 2 to 4, then the developer must provide a separate metered water service for the Class 2 to 4 occupancy as opposed to the Class 5 to 9 occupancy. This requirement is exclusive of any special fire service consideration ie. internal hydrants, fire hose reels and sprinkler systems.

Each Lot / Tenement within the development must be provided with a water sub meter in accordance with the "Brisbane City Council Water Supply Standards and the Interim Technical Specification for Submetering."

GUIDELINE
This condition is imposed to ensure that a water service and meter(s) are provided to a Development / Community Title Development / Standard / Building or Volumetric format. This is exclusive of of any special fire service consideration ie. internal hydrants, fire hose reels and sprinkler systems.

PROOF OF FULFILMENT
All works descibed by this condition and its parts have been complied with and been accepted for on-maintenance by the Engineering Delegate, Development Assessment.

 
Prior to the commencement of the use or prior to the endorsement of a Community Management Statement, whichever is sooner
41(a) Submit Plans - Water Service, Meter Assembly and Meter Box

Submit engineering plans prepared by the registered Professional Engineer, Queensland (RPEQ), and in accordance with Council's " Water and Sewerage Reticulation Standards and the Interim Technical Specification for Submetering" showing service and meter works. (The size of the service shall be determined by the water supply requirement of the proposed development). Obtain endorsement of the plans from the Engineering Delegate, Development Assessment.

GUIDELINE
This condition is imposed to ensure that the required works are designed in accordance this relevant permit, relevent standards and BCC Water Supply Standards.

PROOF OF FULFILMENT
Plans are submitted and endorsed by the Engineering Delegate, Development Assessment.

 
Prior to commencement of the works
41(b) Implement Endorsed Plans - Water Service, Meter Assembly and Meter Box

Construct the works in accordance with the endorsed engineering plans and the BCC Water Supply Standards.

PROOF OF FULFILMENT
The works are constructed in accordance with the endorsed plans and BCC Water Supply Standards and are accepted on-maintenance by the Engineering Delegate, Development Assessment.

 
Prior to the commencement of the use or prior to the endorsement of a Community Management Statement, whichever is sooner
41(c) Water Meter Details - Service, Meter Assembly and Meter Box

Provide to the Engineering Delegate, Development Assessment evidence that the meter(s) supplied and installed comply with the BCC Water Supply Standards as follows:-

  1. Where the meter(s) are obtained from Council, provide a copy of the receipt of purchase for each meter.
  2. Where the meter(s) are obtained from sources other than Council, provide a copy of the receipt of purchase and the receipt of the payment of the documentation fee for each meter.

GUIDELINE
This condition is imposed to ensure that meter(s) supplied and installed comply with BCC Water Supply Standards.

PROOF OF FULFILMENT
Copies of the required receipts have been supplied to the Engineering Delegate, Development Assessment.

 
Prior to the commencement of the use or prior to the endorsement of a Community Management Statement, whichever is sooner
41(d) Remove Existing Water Meter

The existing water meter located within the frontage of the property is to be removed as part of this application.

 
Prior to the commencement of the use or prior to the endorsement of a Community Management Statement, whichever is sooner
 
Standard Advice
 
Timing
42)   Construction Noise and Dust Emissions

Pursuant to the Environmental Protection Act 1994, all development involving the emission of noise and dust from building and/or construction activities, must ensure that the emissions are in accordance with the requirements of the Act.
The Environmental Protection Act 1994 prescribes that:

1. A person must not carry out building work in a way that makes an audible noise-
-  on a business day or Saturday, before 6.30a.m. or after 6.30p.m; or
-   on any other day, at any time. 
2. The reference in subsection (1) to a person carrying out building work-
-  includes a person carrying out building work under an owner-builder permit; and
-  otherwise does not include a person carrying out building work at premises used by the person only for residential purposes.

Note: A request can be made to work outside of these hours by submitting an Environmental Management Plan for assessment and obtaining an endorsed decision from the Environmental Management delegate Development Services.

 
As indicated
 
43)   Further Development Permit Required

Further Development Permit(s) to carry out assessable building work under the Building Act may be required.

 
As indicated
 
44)   Currency Period

The currency period for this development approval is stated in the Decision Notice and is expressed as a date.

This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016.

 
As indicated
 
45)   Damage to Trees on Adjoining Land

Please note that any damage caused to vegetation on adjoining land as a result of exercising this development approval may result in an offence under other legislation (e.g. Natural Assets Local Law) and/or civil action

 
As indicated
 
46)   Cultural Heritage

Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage.

 

The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care.

 

For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships).

 
As indicated
 



Permit to Which These Conditions Relate: DA - SPA - Reconfigure a Lot
Activity(ies): Subdivision of Land
Stage: Reconfiguring a lot (1 into 3 lots)

General/Planning Requirements
 
Timing
47)   Carry Out The Approved Development - ROL

Carry out the approved development generally in accordance with the approved drawing(s) and/or document(s).

 

Note:-

This development approval may include the location of fences, retaining walls and/or external walls of buildings on the boundary of a lot. The approval does not constitute permission to enter neighbouring properties to carry out the construction of fences, retaining walls and/or external walls of buildings on the boundary of a lot. Permission must be obtained from relevant property owners.

 

GUIDELINE
This condition refers to the approved plans, drawings and documents to which the approval relates and is the primary means of defining the extent of the approval. Approved plans, drawings and documents are stamped PLANS and DOCUMENTS referred to in the APPROVAL and are dated to reflect the date of approval of the application by Council's Delegate. This condition should be read in conjunction with the following conditions which may require operational work or building work to be completed before the Council will endorse any survey plan. The extent to which plans, drawing(s) and/or documents can be modified is constrained by the requirements of the relevant planning legislation. Please note to investigate the legislation applicable to this approval.

 
While development is occurring on the site
 
48)   Complete All Operational Work

Complete all operational work associated with this development approval, including work required by any of the following conditions. Such operational work is to be carried out generally in accordance with the approved plans, drawing(s), and/or documents or, if requiring a further approval from the Council, in accordance with the relevant approval(s).

GUIDELINE
This condition is imposed to ensure all operational works associated with the use are completed before the use commences. It is not appropriate that the site be used without such work being completed in accordance with any detailed design approvals. Please note that the work referred to in this condition involves operational work and may therefore constitute 'assessable development'. Therefor this condition does not authorise assessable development to occur and a development permit may therefore be necessary. Information sheets can be downloaded for free from the City Plan section of Brisbane City Council's website: www.brisbane.qld.gov.au

 
Prior to survey plan endorsement
 
49)   Single Unit Dwelling - Survey Plan Endorsement

The survey plan associated with the proposed subdivision shall not be endorsed by Council until the proposed (Single Unit Dwellings) buildings are constructed to lock up stage.

GUIDELINE
This condition is imposed to ensure all work and/or actions associated with the use are completed before the survey plan is endorsed.

 
As indicated
 
Monetary Contributions and Securities
 
Timing
50)   Pay Outstanding Charges Or Expenses

Pay to Council any outstanding charges or expenses levied by the Council over the subject land.

 

GUIDELINE
This condition is imposed to ensure that there are no outstanding charges existing over the subject site, including outstanding rates. If there are any outstanding monies over the subject property, they must be paid in full prior to endorsement of the survey plan.

 
Prior to survey plan endorsement
 
51)   Infrastructure Contributions Planning Scheme Policies (ROL - Infill - Lodged between 1 July, 2007 & 30 June, 2010)

Pay to Council a monetary contribution towards the cost of providing infrastructure using the methodology and at the rate specified in the Infrastructure Contributions Planning Scheme Policies for the Contribution Area at the time when payment is made. The following table is a summary of the current Infrastructure Charges Units (ICUs) payable:-

Infrastructure Type

Contribution

Value in Infrastructure Contribution Units (ICUs)

Area / Precinct

Contribution

Credits

Net Contribution

Transport

12a

9,206 ICUs

3,877 ICUs

5,329 ICUs

Community Purposes

135

7,309 ICUs

2,370 ICUs

4,939 ICUs

Water Supply

Wellers Hill

9,996 ICUs

4,160 ICUs

5,836 ICUs

Sewerage

HAMN1

16,334 ICUs

6,801 ICUs

9,533 ICUs

Waterways

20a Perrin LSMP

10,910 ICUs

7,837 ICUs

3,073 ICUs

Totals

53,755 ICUs

25,045 ICUs

28,710 ICUs

Credits where applicable have been included in the ICU calculations.

The value of an ICU is specified in the Fees and Charges Schedule and is adjusted each financial year. In the 2010/2011 financial year, the value of an ICU is $1.89.

The amount payable is currently assessed at $54,261.90 (10/11).

 

GUIDELINE
This condition is imposed to obtain contribution(s) towards the provision of adequate infrastructure for transport, community purposes, water supply, sewerage and waterways. For enquiries about this condition, please contact the Delegate, Development Assessment.

PROOF OF FULFILMENT
The monetary payment based on the value of the ICU at the time of payment is received and receipted by Council before the time set out for payment.

 
Prior to survey plan endorsement
51(a) Subsidy Advice - Infrastructure Contributions Planning Scheme Policies (ROL - infill - Lodged between 1 July, 2007 & 30 June, 2010)

INFRASTRUCTURE CONTRIBUTIONS SUBSIDY

You will be entitled to an infrastructure contributions subsidy in accordance with Council's "Infrastructure Contributions Subsidy Administrative Policy" provided that

  • this approval takes effect and
  • the applicable infrastructure contributions are paid prior to 30 June in the financial year following the financial year in which the development approval takes effect.

The following table summarises the subsidy to be applied to the applicable full infrastructure contributions as calculated at the time of payment.

Infrastructure Contribution Type

Subsidy to be applied (%)

Contribution (%)

Water Supply

35

65

Sewerage

35

65

Community Purposes

35

65

Transport

35

65

Waterways

35

65

 

BEFORE YOU PROPOSE TO PAY INFRASTRUCTURE CONTRIBUTIONS, YOU MUST request an itemised breakdown showing the applicable infrastructure contributions, the subsidy (if any) to be applied and the contributions to be paid.

This request must be made in writing on the REQUEST FOR ITEMISED BREAKDOWN OF INFRASTRUCTURE CONTRIBUTIONS FORM to the Team Leader, Plan Sealing Unit, Development Assessment Branch or by email to plan_sealing@brisbane.qld.gov.au in sufficient time so that payment can be made no later than 30 June. Council aims to provide a response to your request within 10 business days.

This request must be made in writing on the REQUEST FOR ITEMISED BREAKDOWN

GUIDELINE
This advice indicates that you may be entitled to a subsidy for Infrastructure Contributions in accordance with Council's Infrastructure Contributions Subsidy Administrative Policy.

 
Prior to survey plan endorsement
 
Engineering
 
Timing
52)   On-site Erosion (Low Risk)

Minimise on-site erosion and the release of sediment or sediment-laden stormwater from the site at all times.

Note: Plans do not have to be submitted to Council for approval.

GUIDELINE
This condition applies where the soil erosion and sedimentation risk is considered low. Note that the Erosion and Sediment Control Management plan is not required to be submitted for Council endorsement.

 
As indicated
52(a) Prepare an Erosion and Sediment Control (ESC) Management Plan - On-site Erosion (Low Risk)
Prepare an Erosion and Sediment Control (ESC) Management Plan for the site in accordance with the Healthy Waterways document "Controlling Stormwater Pollution on Your Building Site" 2006 (or later version) and Council's "Erosion and Sediment Control Standard" (Version 9 or later)

GUIDELINE
This condition applies where the soil erosion and sedimentation risk is considered low. The Erosion and Sediment Control Management plan is not required to be submitted for Council endorsement.

 
Prior to commencement of site works
52(b) Implement and Maintain the ESC Management Plan - On-site Erosion (Low Risk)
Implement and maintain the ESC Management Plan on-site for the duration of the operational or building works, and until all exposed soil areas are permanently stabilised (e.g. turfed, hydromulched, concreted, landscaped). The prepared ESC Management Plan must be available on-site for inspection by Council Officers during these works

GUIDELINE
This condition applies where the soil erosion and sedimentation risk is considered low. The Erosion and Sediment Control Management Plan is not required to be submitted for Council endorsement.

 
While site/operational/building work is occurring
 
53)   Granting Easements

Grant the following easement(s):

i. Easements for underground drainage and access purposes, as required to preserve the rights of upstream properties in favour of Brisbane City Council.

ii. Easements for underground drainage, overland flow, open cut, and access purposes as may be required, in favour of Brisbane City Council.

iii. Easements for underground drainage, open cut, overland flow and access purposes over that part of the site within the Waterway Corridor and/or that part of the site affected by 100 year Average Recurrence Interval (ARI) flooding, in favour of Brisbane City Council.

iv. Easements for sewerage and water supply purposes in favour of Brisbane city Council over sewerage rising mains or water mains.

v. Easement for the purpose of access, construction and maintenance of utility services over proposed lot(s) 1, 2 and 3.


GUIDELINE
This condition is imposed to provide access, maintenance of services or to protect drainage paths. Easements in favour of the Brisbane City Council are required to have the necessary easement documentation prepared (free of costs and compensation to Council) by the Brisbane City council. Easements not in favour of the Brisbane City Council are required to have the necessary documentation prepared by the applicant's private solicitors. Easements are to be shown on a Survey Plan and lodged with the Delegate Plan Sealing, Licensing Sealing and Certificates Unit. Enquiries regarding any legal documentation can be directed to Licensing, Sealing and Certificates Unit, Development Assessment (ph: 3403 8888). For any other enquiries about this condition, please contact the Engineering Delegate, Development Assessment.

PROOF OF FULFILMENT
Registration of the easement on the plan of survey and on the property title with the Department of Natural Resources.

 
Prior to survey plan endorsement
 
54)   Repair Damage To Kerb, Footpath Or Road

Repair any damage to existing kerb and channel, footpath or roadway (including removal of concrete slurry from footways, roads, kerb and channel and stormwater gullies and drainlines) that may occur during any works carried out in association with the approved development. This will include the re-instatement of the existing traffic signs and pavement markings that may have been removed or damaged.

GUIDELINE
This condition is imposed for the repair of damage to the existing road infrastrucure including traffic signs and pavement marking during works associated with the development.

PROOF OF FULFILMENT
Acceptance of the completed works by the Engineering Delegate, Development Assessment.

 
Prior to survey plan endorsement
 
55)   Provide/Extend Sewer Property Connection

Provide or extend a sewerage property connection to each allotment in accordance with an approved detail design and "BCC Sewerage Standards".

GUIDELINE
Provide adequate sewerage facilities and infrastructure for each allotment individually and collectively. The "BCC Sewerage Standards" are available on BCC's internet site (www.brisbane.qld.gov.au) and can be downloaded free of charge. For any enquiries about this condition, please contact the Engineering Delegate, Development Assessment.

 
Prior to undertaking the works
55(a) Submit Plans

Submit engineering plans showing the design of the works are in accordance the "BCC Sewerage Standards" and have been checked and certified by a Registered Professional Engineer of Queensland (RPEQ). Obtain endorsement from the Delegate, Development Assessment.

GUIDELINE
This condition is imposed to ensure that the required works are designed in accordance with this development permit and relevant standards.

PROOF OF FULFILMENT
Checked and certified by a Registered Professional Engineer of Queensland (RPEQ) and endorsed by the Delegate, Development Assessment.

 
Prior to undertaking the works
55(b) Submit As Constructed Drawings

Submit "As Constructed" plans and an assests register in accordance with the approved design and "BCC Sewerage Standards".

GUIDELINE
A copy of the notification is to be sent to Council to be kept as a record.

PROOF OF FULFILMENT
Checked and certified by a Registered Professional Engineer of Queensland (RPEQ) and accepted by the Delegate, Development Assessment.

 
Prior to the commencement of the on-maintenance period or Prior to commencement of use
55(c) Implement Endorsed Plans

Construct the works in accordance with the endorsed engineering plans and the "BCC Sewerage Standards".

GUIDELINE
This condition is imposed to ensure that the required works are carried out in accordance with this development permit, relevant standards and endorsed plans.

PROOF OF FULFILMENT
Accepted "on-maintenance" and "off-maintenance" as a Council asset by the Engineering Delegate, Development Assessment

 
Prior to survey plan endorsement
 
56)   Ponding Of Stormwater

Adjoining properties and roads are to be protected from ponding or nuisance from stormwater as a result of the works.

GUIDELINE
This condition is imposed to ensure that the developer is aware that they are responsible for all remedial works required as a result of any site works and, that they must protect neighbouring properties and roads from ponding and nuisance water from the proposed development. Where this rectification work involved drainage, plans are to be lodged showing the manner in which it is intended to rectify the site drainage. These plans must be endorsed by the Engineering Delegate. For any enquiries about this condition, please contact the Engineering Delegate, Development Assessment.

 
While development is occurring on site and during the on-maintenance period
 
57)   Lawful Point Of Discharge

Submit to the Engineering Delegate, Development Assessment, written consent for a lawful point of discharge from the owners of properties, including the holders of easements, affected by any stormwater discharge from the site. Such consent may require supporting engineering design plans and calculations.

GUIDELINE
This condition is imposed where it is necessary to obtain a lawful point of discharge for a drainage outlet and/or authority to pipe across adjacent properties to the lawful point of discharge. The detailed design application seeking engineering approval in respect of this work should show the drainage outlet and/or the drainage across adjacent properties to the lawful point of discharge. A definition of "Lawful Point of Discharge" can be found in Council's "Subdivision and Development Guidelines" (download for free from www.brisbane.qld.gov.au) or the Department of Natural Resources, Mines and Water's "Queensland Urban Drainage Manual" (QUDM). For any enquiries about this condition, please contact the Engineering Delegate, Development Assessment.

PROOF OF FULFILMENT
Evidence should be provided in the form of a signed letter from the affected property or easement owner(s) through which the drainage is proposed to traverse agreeing to the point of discharge.

 
Prior to survey plan endorsement
 
58)   Remove Redundant Drainage Outlets

Remove any redundant drainage outlets from the kerb and channel including any associated pipe work across the footway and reinstate the kerb and channel and the footway area in accordance with Council's "Subdivision and Development Guidelines".

GUIDELINE
This condition is imposed to ensure that redundant infrastructure in the road reserve is removed and remedial works are undertaken.

 
Prior to commencement of use
 
59)   Telecommunications

Enter into an agreement with a telecommunication carrier to provide underground telecommunication services within and adjacent to the proposed development in accordance with the "Subdivision and Development Guidelines".

GUIDELINE
This condition is imposed to ensure the provision of essential telecommunication services to all allotments. For any enquiries about this condition, please contact a relevant service provider regarding telecommunication services.

PROOF OF FULFILMENT
A copy of the agreement is forwarded together with the request for survey plan endorsement to the Plan Sealing Officer, Development Assessment.

 
Prior to undertaking the works
 
60)   Electricity - Minor Development

Enter into an agreement with an electricity supplier to provide necessary services to all allotments in the development in accordance with the "Subdivision and Development Guidelines".

GUIDELINE
This condition is imposed to ensure that services will be provided to all allotments and that no costs or future maintenance costs are borne by Council. For developments where it is considered that the surrounding area has been fully developed and the area supplied by overhead electricity reticulation, undergrounding of cables is not required provided the following criteria is met: - No additional poles are installed within the road reserve; - Power is taken direct from an existing Energex distribution pole to the building or, via a private property pole. (A private property pole is only permitted when overhead power is on the opposite side of the street); - Aerial 'flying-fox' not being an acceptable alternative. For any enquiries about this condition, please contact relevant service providers for electricity services.

PROOF OF FULFILMENT
A copy of the agreement is forwarded together with the request for survey plan endorsement to the Plan Sealing Officer, Development Assessment.

 
Prior to commencement of site works
 
61)   Service Conduits & Mains

Supply and install all service conduits and meet the cost of any alterations to public utility mains, existing mains, services or installations required in connection with the approved development in accordance with the "Subdivision and Development Guidelines" and Standard Drawings.

GUIDELINE
This condition is imposed when additions, alterations or extensions to service conduits, mains and other services are required as a result of the approved development. This includes the provision of all services and/or conduits along the full length of any rear allotment access or access easement. This includes the relocation of any fire hydrant and/or valves from within the limits of the development's vehicular footway crossings if applicable. Applicants should liaise with the appropriate service authorities. Typical underground service conduiting to be constructed includes, power, phone, telecommunications, sewer, stormwater, optic fibre, traffic signals and gas if applicable. For any enquiries about this condition, please contact the Engineering Delegate, Development Assessment (regarding advise on traffic signal conduits, stormwater, water supply and sewerage mains) or the relevant public utility authorities (for advice on other services).

 
Prior to survey plan endorsement
61(a) Submit As Constructed Plans

Submit "As Constructed" plans including an asset register, approved by a registered Professional Engineer Queensland (RPEQ) that are in accordance with Council's "Subdivision and Development Guidelines", Standard Drawings, "Water Supply Standard 2005" and "Sewerage Standards 2005".

GUIDELINE
This condition is imposed to ensure the Council has a record of the actual details of the works constructed for future reference.

 
Prior to survey plan endorsement
 
62)   Construct Permanent Vehicle Crossover

Construct 2 x 3 metre wide Type A permanent vehicular crossovers to the Walter Street frontage of the site and a 3 metre wide Type A permanent vehicular crossover to the Redcar Street frontage of the site in accordance with Council's "Subdivision and Development Guidelines".

GUIDELINE
The intention of the condition is to ensure that such works are designed and constructed to a standard suited to the demands created by the approved development. The Developer must obtain the necessary driveway permit prior to commencing any vehicle access works. Such works may include footpath reconstruction, reprofiling and/or relocation of services. The cost of moving services, utilities and assets is the responsibility of the Developer. The permission of the service/utility/asset owner will be required. Council permission is required if street trees, stormwater gullies/drains, water or sewer and swales are affected. Additional requirements may apply if the proposed access is in a cul de sac or is shared or is near slip lanes, median strips, corner truncations, intersections, bus stops or traffic signs. Copies of the "Subdivision and Development Guidelines", "Standard Drawings" and "Water Sensitive Urban Design Guidelines" can be downloaded from Brisbane City Council's website at www.brisbane.qld.gov.au. For any further enquiries about this condition please contact the Engineering Delegate, Development Assessment or Council's Vegetation and Pest Services if it is a street tree.

 
Prior to survey plan endorsement
 
63)   Provide Service & Meter For Each Lot

Provide a water service, approved meter assembly and meter box to the boundary of each lot shown on the approved plans and in accordance with the "BCC Water Supply Standards - 2005".

GUIDELINE
If the meters are purchased from Council, forward a copy of the receipt together with the request for survey plan endorsement, to the Delegate Plan Sealing, Licensing, Sealing and Certificates Unit, Development Assessment. For any enquiries about this condition please contact the Engineering Delegate, Development Assessment.

 
Prior to survey plan endorsement
 

** End of Package **