| Address of Site: | 17 HARRIER ST ROCHEDALE QLD 4123 509 MILES PLATTING RD ROCHEDALE QLD 4123 519 MILES PLATTING RD ROCHEDALE QLD 4123 |
| Real Property Description of Site: | L801 SP.315940 L10 RP.212895 L11 RP.212895 |
| Aspects of development and type of approval: | DA - PA - Material Change of Use Development Permit - multiple dwelling |
| Council File Reference: | A007001616 Permit Reference Number/s: DAMC404975921. |
| Package Status: | APPROVED - Version 3 (11th of June, 2026 1:18:52 PM) |
| Package Generated: | 15/06/2026 |
| Helen DANALIS Senior Urban Planner Planning Services House & Homes helen.danalis@brisbane.qld.gov.au (07) 3403 6564 |
Craig SLACK Engineer Engineering Scoping craig.slack@brisbane.qld.gov.au (07) 3403 8888 |
Matthew CRANITCH Technical Officer WaRRS Assessment Matthew.Cranitch@brisbane.qld.gov.au |
| Sham NABI Senior Engineer Engineering Services South Sham.Nabi@brisbane.qld.gov.au (07)31785009 |
Kally CHEN Environmental Management Officer Environmental Management Services Kally.Chen@brisbane.qld.gov.au (07) 3403 8888 |
Asiya MOHAMMAD RAZA Urban Planner City Planning Asiya.MohammadRaza@brisbane.qld.gov.au (07) 3403 7737 |
| Kelly MATTHEWS Ecologist Ecology Services kelly.matthews@brisbane.qld.gov.au 0731782942 |
Emily LAING Senior Landscape Architect Landscape Architecture Team Emily.Laing@brisbane.qld.gov.au 07 3403 8888 |
Kim ROGERS Principal Urban Planner Planning Services South kim.rogers@brisbane.qld.gov.au 34071304 |
| Errin Xiaofang LU Senior Urban Planner Planning Services South Errin.Lu@brisbane.qld.gov.au (07) 3403 3694 |
Timothy BYRNE Principal Urban Planner Planning Services South Timothy.Byrne@brisbane.qld.gov.au (07) 3403 0314 |
Tyrah ZARAFA Senior Urban Planner Planning Services Special Assessment tyrah.zarafa@brisbane.qld.gov.au 07 31786103 |
| Nicola MEWING Principal Urban Planner Planning Services Special Assessment Nicola.Mewing@brisbane.qld.gov.au 31781002 |
DRAWINGS AND DOCUMENTS
| Drawing or Document | Number | Plan Date |
|---|---|---|
| Site Plan | BA 1.01 - V | 13-APR-2026 (Received) |
| Ground Floor Plan Townhouses 1-3 | BA 1.02 - V | 13-APR-2026 (Received) |
| Ground Floor Plan Townhouses 4-7 | BA 1.03 - V | 13-APR-2026 (Received) |
| Ground Floor Plan Townhouses 8-11 | BA 1.04 - V | 13-APR-2026 (Received) |
| Ground Floor Plan Townhouses 12-15 | BA 1.05 - V | 13-APR-2026 (Received) |
| Upper Floor Plan Townhouses 1-3 | BA 1.06 - S | 13-APR-2026 (Received) |
| Upper Floor Plan Townhouses 4-7 | BA 1.07 - S | 13-APR-2026 (Received) |
| Upper Floor Plan Townhouses 8-11 | BA 1.08 - S | 13-APR-2026 (Received) |
| Upper Floor Plan Townhouses 12-15 | BA 1.09 - S | 13-APR-2026 (Received) |
| Roof Plan Townhouses 1-3 | BA 1.10 - S | 13-APR-2026 (Received) |
| Roof Plan Townhouses 4-7 | BA 1.11 - S | 13-APR-2026 (Received) |
| Roof Plan Townhouses 8-11 | BA 1.12 - S | 13-APR-2026 (Received) |
| Roof Plan Townhouses 12-15 | BA 1.13 - S | 13-APR-2026 (Received) |
| Elevation Townhouses 1-3 | BA 2.01 - U | 13-APR-2026 (Received) |
| Elevation Townhouses 4-7 | BA 2.02 - U | 13-APR-2026 (Received) |
| Elevation Townhouses 8-11 | BA 2.03 - U | 13-APR-2026 (Received) |
| Elevation Townhouses 12-15 | BA 2.04 - U | 13-APR-2026 (Received) |
| Sections | BA 3.01 - S | 13-APR-2026 (Received) |
| Refuse Area Details | BA 4.01 - S | 13-APR-2026 (Received) |
| Typical Wall Detail | BA 4.02 | 13-APR-2026 (Received) |
| Master Plan Ground Floor Plan | Rev D 20-0575L | 15-SEP-2021 (Received) |
| Deep Planting Plan | Rev D 20-0575L | 15-SEP-2021 (Received) |
| Communal Open Space Plan | Rev D 20-0575L | 15-SEP-2021 (Received) |
| Suggested Planting Palette - Ground Covers | Rev D 20-0575L | 15-SEP-2021 (Received) |
| Suggested Planting Palette - Shrubs | Rev D 20-0575L | 15-SEP-2021 (Received) |
| Suggested Planting Palette - Trees | Rev D 20-0575L | 15-SEP-2021 (Received) |
| Bulk Earthworks Plan | 25341-EW01 Rev C | 13-MAY-2026 (Received) |
| Bulk Earthworks Sections | 25341-EW02 Rev B | 13-MAY-2026 (Received) |
APPROVAL CONDITIONS
| Permit to Which These Conditions Relate: | DA - PA - Material Change of Use |
| Activity(ies): | multiple dwelling |
| Stage: | Multiple Dwelling (15 Units) |
| 1) Commencement of Use The approved Material change of use must not commence use until all conditions relating to Stage 1 of the associated Reconfiguration of a lot approval (Council Ref: A004897067) have been complied with. Timing: When all conditions relating to the earlier stage have been complied with. |
As indicated |
| 2) Extent of works on site Site works and construction activities for the construction of the Multiple dwelling are to be contained within the area identified as Stage 1 in the associated reconfiguration of a lot approval (A004897067). There is to be no storage of materials, parking of vehicles, and/or removal or destruction of vegetation or other ecological features on the balance area of the site, i.e. within Stage 2 of the associated reconfiguration of a lot approval (A004897067). |
At all times |
| 3) Maintain the Approved Development Maintain the approved development in accordance with the approved DRAWINGS AND DOCUMENTS, and any other relevant Council approval required by the conditions. |
At all times |
| 4) Approved Drawings and Documents A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers. Note: This condition is imposed to ensure compliance with the conditions of development approval. |
While site/operational/building work is occurring |
| 5) Carry Out the Approved Development Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS. Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks). Permission to enter neighbouring properties must be obtained from the relevant property owners. |
While site/operational/building work is occurring |
| 6) Complete All Building Work Complete all building work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such building work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS. Note: Building work must also be completed in accordance with any other current development approval. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 7) Visitor Parking Visitor car parking spaces must: |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 8) Overall Height The overall height of the building(s) must be in
accordance with the floor and roof levels and overall height shown on the
APPROVED DRAWINGS AND DOCUMENTS. NOTE: This condition should be read in conjunction with any other relevant condition requiring minimum height clearances for basement or undercover car parking and manoeuvring areas. |
While site/operational/building work is occurring and then to be maintained |
| 9) Driveway Material and Finishes Provide materials and
finishes to the driveway and external carparking
surfaces that reduce the visual impact of these areas when viewed from the
street. One or a combination of the following must be used: |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 10) Provide Pedestrian Prioritised Pathway Provide a pedestrian prioritised pathway from the visitor car parks to the street frontage. The pathway must be differentiated in colour and texture from the driveway surface. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 11) Balconies/Verandahs/Terraces All balconies/verandahs/terraces must remain unenclosed with no shutters,
glazing, louvres or similar permanent fixtures (excluding screening required by
the development approval). Note: Any Community Management Statement that may apply to this approval must contain a by-law which reflects the requirements of this condition. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 12) Screen Air Conditioning and Other Plant
Enclosures Install and maintain suitable screening to all air conditioning, lift motor rooms, plant and service facilities located at the top of or on the external face of the building and within the Private Open Spaces. The screening structures must be constructed from materials that are consistent with materials used elsewhere on the facade of the building. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 13) Sun Shading Devices Provide sun shading in accordance with the approved DRAWINGS AND DOCUMENTS. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 14) Fauna Management Manage the protection and relocation of any fauna prior to and during the clearing of vegetation and ecological features that have been approved for removal. |
While site/operational/building work is occurring |
14(a) Prior to Vegetation/ Ecological Feature
Clearing Inspect the vegetation and ecological features (e.g. nests, tree hollows) to ensure identification of any fauna prior to clearing. The inspection must take place a maximum of 48 hours prior to clearing. If any fauna is identified, clearing operations and other site works must not commence until a licensed Fauna Spotter Catcher (qualified by the relevant Queensland State Government Authority) has inspected the site and implemented any necessary fauna protection measures or relocation procedures. Timing: Prior to vegetation/ ecological feature clearing commencing. |
As indicated |
14(b) During Vegetation/ Ecological Feature
Clearing Where any fauna has been identified, the licensed Fauna Spotter Catcher must be present on site during all clearing operations to monitor works and to respond to any fauna situations that may arise. Timing: While vegetation/ ecological feature clearing is occurring. |
As indicated |
14(c) Submit Evidence Submit written confirmation to Development Services that the inspection of vegetation and ecological features was undertaken prior to undertaking vegetation/ecological feature clearing. Provide certification from the Fauna Spotter Catcher if a licensed Fauna Spotter Catcher was engaged. Timing: Prior to site/operational/building work commencing. |
As indicated |
| 15) Retain and Protect Existing Street Tree(s) Identify, retain and protect the existing street trees unless otherwise agreed in writing with Asset Services. Note: Street trees are protected under the Natural Assets Local Law. Street trees must not be removed or pruned without prior approval from Asset Services. PROOF OF FULFILMENT Contextual photographic evidence that the tree has been retained in equal or greater health than before development commenced. OR, evidence in writing from Asset Services Arboriculture that an alternative arrangement has been made. Timing: Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
At all times |
15(a) Implement Protection
Measures Install tree protection measures in accordance with Australian Standard - AS4970 Retention of Trees on Development Site. There must be no excavation, filling or storage of materials or plant within the drip line of the tree(s). Where works are within the canopy drip line of existing street trees, contact Asset Services Regional Coordinator Arboriculture in relation to the required provision of protection measures. Note: If fencing is to protect street trees, a permit to temporarily occupy the footway will be required from Compliance and Regulatory Services. Timing: Prior to site/operational/building work occurring. PROOF OF FULFILMENT Contextual photographic evidence to demonstrate the installation of protection measures prior to building works commencing. Timing: Prior to site / operational / building work occurring. |
As indicated |
15(b) Maintain Protection
Measures Maintain protection measures while development is occurring and remove protection measures prior to commencement of the use. Timing: While to site/operational/building work is occurring. |
As indicated |
| 16) Landscape the Site - Self Certification Landscape the site in accordance with the requirements of this condition. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
16(a) Detailed Landscape Plan for Self-
Certification Prepare a Detailed Landscape Plan at a scale of 1:100 for all on-site landscape works including planting areas identified on the approved Landscape Concept Plans ‘MASTER PLAN ground floor plan’/D, ‘DEEP PLANTING PLAN’/D, ‘COMMUNAL OPEN SPACE PLAN’/D, SUGGESTED PLANTING PALETTE ground covers and climbers’/D, SUGGESTED PLANTING PALETTE shrubs’/D and ‘SUGGESTED PLANTING PALETTE trees’/D. The plan must be prepared by a Qualified Landscape Architect and must comply with the relevant Brisbane Planning Scheme Codes. The plan must include the following: Timing: Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT A detailed landscape plan accompanied by Brisbane City Council Form CC10616 - Landscape Design Certificate. Timing: Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
16(b) Multiple Unit Dwelling In addition to the
requirements listed above, the plan must include the following: Timing: Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT A detailed landscape plan accompanied by Brisbane City Council Form CC10616 - Landscape Design Certificate. Timing: Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
16(c) Certify Detailed Landscape
Plan On completion of the Detailed Landscape Plan, submit to Development
Services: Timing: Prior to building work commencing. PROOF OF FULFILMENT A detailed landscape plan accompanied by Brisbane City Council Form CC10616 - Landscape Design Certificate. Timing: Prior to building work commencing. |
As indicated |
16(d) Implement Certified Detailed Landscape
Plan Carry out the landscape work in accordance with the above certified detailed Landscape Plan. Timing: Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
16(e) Certify Work On completion of the
landscape work, submit to Development Services: Timing: Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT An as constructed landscape plan accompanied by Brisbane City Council Form CC10613 - Landscape Works Certificate. Timing: Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
16(f) Maintain Landscape Work Maintain the landscape work, including deep planting, in accordance with the certified Detailed Landscape Plan. Timing: To be maintained. |
As indicated |
| 17) Mechanical Plant or Equipment - Acoustically
Screened Mechanical plant or equipment is to be acoustically screened from an adjoining sensitive use. Mechanical plant includes generators, motors, compressors and pumps such as air-conditioning, refrigeration and cold room motors. Acoustically screened is defined in City Plan 2014. NOTE: This condition does not authorise environmental nuisance under the Environmental Protection Act 1994. PROOF OF FULFILMENT Submit to Development Services, certification that all mechanical plant or equipment, is acoustically screened. Timing: Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 18) On-site Erosion (Medium Risk) Manage on-site erosion and the release of sediment or sediment laden water from the site at all times by implementing best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version). Timing: Prior to commencement of any land disturbing activities and until all exposed soil areas are permanently stabilised against erosion. |
As indicated |
18(a) Manage earth disturbance on-
site (i) Drainage control measures must be implemented and maintained to minimise water flow onto areas of exposed earth. (ii) Sediment and erosion control measures must be implemented and maintained to prevent soil loss from earth disturbance areas and prevent deposition beyond earth disturbance areas. (iii) No release of contaminants to land beyond on-site area of earth disturbance other than releases that achieve water pollutant concentration release limits of: A. 50mg/L TSS (Total Suspended Solids); B. Turbidity, Nephelometric Turbidity Units (NTU) value less than 10% above background, 75 NTU, or as agreed in writing by an Officer from Councils Erosion and Sediment Control (ESC) Team in Compliance and Regulatory Services; C. pH between 6.5 and 8.5 at all times. (iv) Maintain a written record to demonstrate that water discharges from the site, including any dewatering operations, meet the release limits as detailed in (iii) for water discharge(s) from the site that occur during or immediately after a rainfall event, and during normal business hours. The water quality of the discharge flows must be measured at each discharge point from the site, including but not limited to sediment basin outlets, other applicable sediment control devices, the site water drainage system, and recorded against the release limits at least once on each calendar day until such discharge stops. Timing: Prior to commencement of any earth disturbing activities and until all exposed soil areas are permanently stabilised against erosion. |
As indicated |
18(b) Provide Land Occupier Notification to
Council (i) Notify Council's ESC Team of proposed land occupier/s by sending an email to CARS-ESC@Brisbane.qld.gov.au (ii) If the land is to be occupied by any person other than the registered landowner then advice must be provided to Council that confirms the name, contact information and the duration of any proposed occupation of the land. Timing: Prior to commencement of any earth disturbing activities. |
As indicated |
18(c) Prepare Erosion and Sediment Control
Plan Prepare an Erosion and Sediment Control Plan (ESCP) in accordance with best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version) and, to the extent of any inconsistency, relevant Brisbane Planning Scheme Codes and Policies. Obtain a design certificate in accordance with the relevant Brisbane Planning Scheme Codes and Policies. The ESCP and design certificate must be certified by a Certified Professional in Erosion and Sediment Control (CPESC) or a Registered Professional Engineer Qld (RPEQ) with suitable qualifications and experience in erosion and sediment control. Documentary evidence demonstrating appropriate qualifications in erosion and sediment control must be provided to the Council upon request. Timing: Prior to the commencement of any earth disturbing activities. |
As indicated |
18(d) Attend a pre-start
meeting Arrange and attend a pre-start meeting for ESC with an Officer from Councils ESC Team in Compliance and Regulatory Services (CARS). Note: To request a pre-start meeting from Council's ESC Team send an email to CARS-ESC@Brisbane.qld.gov.au. All relevant documentation, including both the certified ESCP and the certified design certificate, must be attached to this email. Please allow up to 10 business days for your request to be processed. Timing: Attend the pre- start meeting prior to the commencement of any earth disturbing activities. |
As indicated |
18(e) Implement Certified Erosion and
Sediment Control Plan Implement the certified ESCP and maintain all ESC measures in accordance with best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version) and, to the extent of any inconsistency, relevant Brisbane Planning Scheme Codes and Policies. The ESCP and design certificate must be available on site at all times for inspection by Council officers. Any alteration to supplementary or Type 3 ESC measures must be reflected in the certified ESCP. Any alteration to Type 2 or Type 1 ESC measures will require a revised ESCP and design certificate that has been certified by either the CPESC or RPEQ. Timing: While earth disturbing activities are occurring and until all exposed soil areas are permanently stabilised against erosion. |
As indicated |
| 19) Information Signage Erect an information sign on the subject property in
accordance with Council's general requirements for signage and in accordance
with the requirements outlined below: Timing: Prior to site works commencing and then to be maintained until completion of the development for all stages. |
As indicated |
| 20) Construction Management Plan (Minor) Carry out development in a method consistent with a Construction Management Plan (Minor) prepared in accordance with the requirements of this condition. |
While site/operational/building work is occurring |
20(a) Construction Management Plan (Minor) -
Prepare Plan Prepare a detailed Construction Management Plan (CMP) for the
construction phase of the approved development. The Construction
Management Plan must be in accordance with the relevant Brisbane Planning
Scheme Codes and address the following: The Construction Management Plan must be supported by 'approval in principle' or written approvals from the relevant Council sections or other governing bodies responsible for any potentially impacted infrastructure. The list of relevant infrastructure and contacts is available on Council's website - Search 'Constructions Management Plan'. Note: The Construction Management Plan is not required to be approved by Development Services. Timing: Prior to site/operational/building work commencing. |
As indicated |
20(b) Construction Management Plan (Minor) -
Submit Plan Submit a copy of the Construction Management Plan to Council's Development Services Branch at the following mailbox: engineeringservices@brisbane.qld.gov.au quoting the BCC planning development approval reference number. Timing: At least 10 days prior to site works commencing. |
As indicated |
20(c) Construction Management Plan (Minor) -
Documentation on Site Legible copies of the Construction Management Plan and current permits must be kept on site and be made available on request by Council, At all times. The requirements of the CMP must be included in all induction of principal and subcontractors utilised in the development. An outline of the induction provided to contractors may be requested by Council to confirm compliance with this condition. Timing: While site/operational/building work is occurring. |
As indicated |
20(d) Construction Management Plan - Works to
be Performed Out of Hours Obtain an approval from Development Services for any
work that is proposed to be undertaken outside of normal business hours -
6:30am to 6:30pm, Monday to Saturday. |
As indicated |
20(e) Implement Construction Management Plan
(Minor) Carry out the development in accordance with the submitted Construction Management Plan. |
While site/operational/building work is occurring |
| 21) Protect Existing Infrastructure Where there is existing infrastructure in the vicinity of the proposed work, the new work must not damage or compromise the working ability of the existing infrastructure. Where alterations to public utility mains, existing mains, services or installations are necessitated by the development, prior to alterations commencing, the developer must notify Council or the relevant infrastructure provider and obtain agreement to the alterations. The developer must meet the costs of the alterations. The alterations must be carried out in accordance with the relevant Brisbane Planning Scheme Codes or infrastructure providers requirements. |
While site/operational/building work is occurring |
21(a) As Constructed Drawings - Alterations
to Existing Infrastructure Submit to Development Services As Constructed drawings showing all new and/or rectification works and an asset register, prepared by a Registered Professional Engineer Queensland. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that the alterations have been completed in accordance with the relevant Brisbane Planning Scheme Codes and any other relevant infrastructure requirements. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
| 22) Filling and / or Excavation (Minor) Filling and/or excavation works on the site must be in accordance with the relevant Brisbane Planning Scheme Codes. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
22(a) Prepare Earthworks
Drawings Earthworks drawings must be prepared and certified by a Registered Professional Engineer Queensland in accordance with the relevant Brisbane Planning Scheme Codes. The drawings must include the
following: Timing: Prior to site/operational/building work commencing. Note: The Earthworks drawings are not required to be submitted for Council approval. |
As indicated |
22(b) Implement and Maintain the
Earthworks Carry out and maintain the earthworks in accordance with the certified drawings. Note: A copy of the certified Earthworks Drawings must be available on-site for inspection by Council Officers during these works. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
| 23) Retaining Walls Design and construct all retaining walls and
associated fences, in accordance with the relevant Brisbane Planning Scheme
Codes and the following: |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
23(a) Certification of Retaining
Walls For retaining walls over 1.0m in height, obtain certification from a Registered Professional Engineer Queensland that the design and construction of the retaining walls and ancillary drainage are in accordance with the requirements of this condition. |
As indicated |
| 24) Access, Grades, Manoeuvring, Carparks, Signs and
Line Marking Construct and maintain access, parking and manoeuvring for vehicles on site in accordance with the relevant Brisbane Planning Scheme Codes, as indicated on the approved DRAWINGS AND DOCUMENTS, including the following: i. A pavement of minimum Local road standard or equivalent surface material (including associated drainage) to the area on which motor vehicles will be driven and/or parked. ii. Manoeuvring on site for an RCV and for the loading and unloading of vehicle(s); iii. Parking on the site for 30 X resident/tenant cars, 4 X visitor cars including 1 X parking spaces for people with disabilities and for the loading and unloading of vehicle(s) within the site. There must a minimum number of 34 X total number of spaces provided on site. iv. Provide and maintain 15 resident & 4 visitors secure bicycle parking spaces; v. A minimum of 2.3 metres height clearance to all undercover parking areas and a minimum of 2.5 metres above parking spaces for people with disabilities. The minimum clear height must be measured to the lowest protrusion from the ceiling (e.g. fire sprinklers, services, lighting fixtures, signs, etc). vi. A height clearance sign located at the entrance(s) to undercover car parking areas and a directional visitor parking sign clearly visible from the vehicle entrance to the site. vii. An appropriate area for the storage and collection of refuse, including recyclables, in a position which is accessible to service vehicles on the site. viii. Prepare and implement signs and line markings drawings that show the internal paved areas signed and delineated in accordance with the approved drawings and documents. The drawings must be prepared and certified by a Registered Professional Engineer Queensland in accordance with the relevant Brisbane Planning Scheme Codes and the Manual of Uniform Traffic Control Devices. PROOF OF
FULFILMENT Certification from a Registered Professional Engineer Queensland, that the above requirements have been implemented in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 25) Repair Damage to Kerb, Footpath or Road Repair any damage to the existing kerb and channel, footpath or roadway (including removal of concrete slurry from footways, roads, kerb and channel, stormwater gullies and drainlines) and re-instate existing traffic signs and pavement markings that have been removed or damaged during any works carried out in association with the approved development. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
25(a) Interim Repairs If at any time during the construction phase of the approved development, damage to the existing kerb and channel, footpath or roadway creates unsafe, unreasonable and/or not fit for purpose conditions as assessed by Council, interim repairs must be undertaken as directed by Asset Services. Note: Any interim repairs required to be undertaken shall not be considered to satisfy the requirements of this condition for the permanent repair of the infrastructure prior to the issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. Timing: While site / operational / building works is occurring. |
As indicated |
| 26) Refuse Collection - On Site Provide for the installation and collection of refuse/recycling bins by Brisbane City Council's Waste and Resource Recovery Services or a private waste contractor. |
At all times |
26(a) Arrange Refuse Collection Arrange for the installation of refuse/recycling bins and for the subsequent collection of refuse including recycling from the site by Brisbane City Council's Waste and Resource Recovery Services or a private waste contractor. Timing: A minimum of four weeks prior to the commencement of use and then to be maintained. PROOF OF FULFILMENT Where a private waste contractor is engaged, provide written confirmation from the proposed waste collection contractor of the agreement to service the property. The written agreement must be submitted to Council's Waste and Resource Recovery Services and include full details of the proposed system, bin sizes, number of bins, frequency of collection and the refuse collection vehicle size. Timing: Prior to commencement of use. |
As indicated |
26(b) Notify Future Owner Where Council is engaged as the waste contractor, the owner must notify any future owner/body corporate that the development has been approved on the basis that an indemnity must be provide for refuse collection vehicles to enter the property. Timing: At time of a change of ownership. |
As indicated |
26(c) Indemnify Council The owner and any subsequent owner must, by approved form to Waste and Resource Recovery Services, indemnify Council and its agents in respect of any damage to the pavement and other driving surfaces. Timing: When an arrangement for refuse/recycling collection services is made with Brisbane City Council. |
As indicated |
| 27) Refuse Storage - On Site Collection Provide a roofed and wholly screened refuse enclosure utilising materials consistent with the development or a dedicated refuse storage room, as shown on the approved plans and documents. The enclosure/refuse storage room must be of a design to accommodate the quantity of refuse and recycling including source separation to allow for low servicing collection of the development. Bins must be located in an area which allows them to be manoeuvred from the bin storage area to the designated internal collection point. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 28) Ponding of Stormwater Carry out the approved development to ensure that adjoining properties and roads are protected from ponding or nuisance from stormwater during construction. Notes: If remedial works are necessary to comply with this condition, prior approval must be obtained from Development Services. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 29) Site Drainage - Major Provide an internal drainage system to collect stormwater run-off from all proposed lots, roofed and developed surface areas and any run-off onto the site from adjacent areas and convey the collected run- off to a lawful point of discharge, in accordance with the relevant Brisbane Planning Scheme Codes. Notes: -
All upslope stormwater connections to existing private properties must extend
to the property boundary of all relevant properties being ultimately serviced
by that connection. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
29(a) Submit Site Drainage
Drawings Submit to, and obtain approval from, Development Services, site drainage drawings and engineering calculations, prepared and certified by a Registered Professional Engineer Queensland, in accordance with the relevant Brisbane Planning Scheme Codes. Notes: -
Queensland Building and Construction Commission licensed hydraulic consultants
may design the stormwater system for sites less than 2000m2 with an upstream
catchment servicing no more than 4 residential lots. This excludes stormwater
drainage design (including subsoil drainage) of basements in flood planning
areas and the design of any onsite stormwater detention system Timing: Prior to site/operational/building work commencing |
As indicated |
29(b) Implement Approved
Drawings Carry out the works in accordance with the approved site drainage drawings. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
29(c) Submit As Constructed
Drawings Submit to Development Services As Constructed drawings prepared and certified by a Registered Professional Engineer Queensland or a Queensland Building and Construction Commission licensed hydraulic consultants (where applicable). Note: To be submitted via DA- ComplianceEngineering@brisbane.qld.gov.au and include the site address, A00 reference and Condition number in the subject line. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT Certification from a Registered Professional Engineer Queensland or Queensland Building or Construction Commission licensed hydraulic consultants (where applicable) confirming that the works have been completed in accordance with the above stormwater drawings. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
| 30) Stormwater Quality Manage stormwater quality in accordance with this condition. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
30(a) Implement Stormwater Quality
Management Implement the stormwater quality treatment strategy outlined within the APPROVED DRAWINGS AND DOCUMENTS and any engineering drawings and documents approved pursuant to conditions contained in this development approval. Where a proprietary stormwater quality improvement device has been used to meet the water quality objectives, ensure the device has been approved by Brisbane City Council for use in achieving the water quality targets and meets the required manufacturers specifications (in terms of number and size of units and any pre-treatment requirements). Note: This condition does not require any further approval from Council. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained. |
As indicated |
30(b) Water Quality Maintenance Management
Plan Prepare and implement a Water Quality Maintenance Management Plan in accordance with the Water by Design 'WSUD Technical Design Guidelines for South East Queensland'. The plan must be prepared and certified by a Registered Professional Engineer Queensland. Note: This condition does not require any further approval from Council. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained. |
As indicated |
30(c) Submit Certification Submit to Development Services certification from a Registered Professional Engineer Queensland confirming that the stormwater quality treatments strategy required pursuant to part (a) of this condition has been implemented and where a proprietary stormwater quality improvement device has been used to meet the water quality objectives, the device has been approved by Brisbane City Council for use in achieving the water quality targets and meets the required manufacturers specifications (in terms of number and size of units and any pre-treatment requirements). Note: Manufacturers that have approved devices by Brisbane City Council will be able to provide evidence of Council approval for use. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
30(d) Maintain Management Plans Maintain the certified Water Quality Maintenance Plan and the stormwater quality treatment strategy required pursuant to part (a) of this condition. Include the Water Quality Maintenance Plan in any building management strategy, building management statement or community management statement. Timing: At all times |
As indicated |
| 31) Service Conduits and Mains Provide and install all
service conduits and meet the cost of any alterations to public utility mains,
existing mains, services, street lighting or installations that are required to
carry out the approved development. These works must be in accordance with the
relevant Brisbane Planning Scheme Codes, and include the following, where
applicable: Note: |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
31(a) Submit As Constructed
Drawings Submit to Development Services As Constructed drawings, including an asset register, prepared and certified by a Registered Professional Engineer Queensland. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the requirements of this condition. Note: Civil works are to be certified by a RPEQ(Civil) and electrical works are to be certified by a RPEQ (Electrical). |
As indicated |
| 32) Conduit for Brisbane City Council Provide a single
underground conduit (100mm diameter UPVC class PN9) in favour of Brisbane City
Council on at least one side of all Neighbourhood Access Roads (Bus Route
only), Primary Freight Access Roads and Major Roads. The works must be in
accordance with the relevant Brisbane Planning Scheme Codes and the
following: |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
32(a) Submit As Constructed
Drawings Submit to Development Services, As Constructed drawings, including an asset register, prepared and certified by a Registered Professional Engineer Queensland. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the requirements of this condition. |
As indicated |
| 33) Telecommunications Submit to Development Services, certification from
an authorised telecommunications carrier/contractor, that the following works
and infrastructure have been undertaken and installed in accordance with
telecommunications industry standards: |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 34) Agreement with Electricity Supplier Submit to Development Services, evidence of an agreement with an electricity supplier to provide necessary services to the development in accordance with the relevant Brisbane Planning Scheme Codes. Where development is within an established area of overhead electricity supply and the electricity supplier determines that a property pole is the appropriate solution to supply electricity to the development, the developer must be responsible for the installation of the property pole(s). In the above circumstances, submit to Development Services, certification from the developer's electrical consultant confirming that the above installation has been completed in accordance with the relevant AS/NZS Standards and the Queensland Electricity Connection Manual (QECM) and Queensland Electricity Metering Manual (QEMM). |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 35) Permanent Driveway Crossover Provide two permanent
cross overs: · 5 metre wide modified Type B2 entry cross over towards south · 5.5 metre wide modified Type B2 exit driveway crossovers towards east to the proposed new road frontages of the site in accordance with the relevant Brisbane Planning Scheme Codes and located as shown on the approved DRAWINGS AND DOCUMENTS. Written consent must be obtained from BCC - Field Services, Asset Services Arborist prior to any works occurring that will either impact on or require removal of a street tree (this includes pruning and excavation within the root zone/canopy of the tree) At all times during construction of the crossover, safe pedestrian access along the site frontage must be maintained. Note: No further driveway permit is required however additional footway permits or lane closure permits may be required for footpath/verge closures and/or lane closures. These permits must be obtained prior to construction of the crossover. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 36) Construction Noise and Dust Emissions Pursuant to the Environmental
Protection Act 1994, all development involving the emission of noise and dust
from building and/or construction activities, must ensure that the emissions
are in accordance with the requirements of the Act. |
As indicated |
| 37) Natural Assets Local Law (NALL) - Protected
Vegetation On Site Work on or around protected vegetation may require a permit under the Natural Assets Local Law 2003 (NALL). Permits under the NALL are issued by Development Services. To apply for a permit to work on protected vegetation go to Council's website or contact the call centre on 3403 8888 |
As indicated |
| 38) Natural Asset Local Law (NALL) - Protected
Vegetation on Public Land, Road or Park Work on or around protected vegetation on public land, road or park may require a permit under the Natural Assets Local Law (NALL). Arrangements must be made with Asset Services in relation to the works carried out on protected vegetation on public land, road or park including provision for costs and replacement planting as determined by Asset Services. Timing: Prior to carrying out any works on protected vegetation. |
As indicated |
| 39) Currency Period The currency period for this development approval is stated in the Decision Notice and is expressed as a date. This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016. |
As indicated |
| 40) Cultural Heritage Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage. The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care. For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships). |
As indicated |
| 41) Fire Ant Movement Controls To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected. These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products. Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014. For further information contact the relevant Queensland State Government department on 13 QGOV. |
As indicated |
| 42) Water and Wastewater Services for water and wastewater (sewerage) are not under the jurisdiction of Brisbane City Council. Authorisation to connect the approved development to the water/wastewater networks and for property service connections required a Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009. For further information about any necessary Water Approvals contact Urban Utilities. |
As indicated |