BRISBANE CITY COUNCIL'S APPROVAL PACKAGE.



APPLICATION DETAILS

This package relates to the application detailed below
Address of Site: 17 HARRIER ST ROCHEDALE QLD 4123
509 MILES PLATTING RD ROCHEDALE QLD 4123
519 MILES PLATTING RD ROCHEDALE QLD 4123
Real Property Description of Site: L801 SP.315940
L10 RP.212895
L11 RP.212895
Aspects of development and type of approval: DA - PA - Material Change of Use Development Permit - multiple dwelling
Council File Reference: A007001616
Permit Reference Number/s: DAMC404975921.
Package Status: APPROVED - Version 3 (11th of June, 2026 1:18:52 PM)
Package Generated: 15/06/2026


PROJECT TEAM

The assessment of this application has been undertaken by:
Helen DANALIS
Senior Urban Planner
Planning Services House & Homes
helen.danalis@brisbane.qld.gov.au
(07) 3403 6564
Craig SLACK
Engineer
Engineering Scoping
craig.slack@brisbane.qld.gov.au
(07) 3403 8888
Matthew CRANITCH
Technical Officer
WaRRS Assessment
Matthew.Cranitch@brisbane.qld.gov.au
Sham NABI
Senior Engineer
Engineering Services South
Sham.Nabi@brisbane.qld.gov.au
(07)31785009
Kally CHEN
Environmental Management Officer
Environmental Management Services
Kally.Chen@brisbane.qld.gov.au
(07) 3403 8888
Asiya MOHAMMAD RAZA
Urban Planner
City Planning
Asiya.MohammadRaza@brisbane.qld.gov.au
(07) 3403 7737
Kelly MATTHEWS
Ecologist
Ecology Services
kelly.matthews@brisbane.qld.gov.au
0731782942
Emily LAING
Senior Landscape Architect
Landscape Architecture Team
Emily.Laing@brisbane.qld.gov.au
07 3403 8888
Kim ROGERS
Principal Urban Planner
Planning Services South
kim.rogers@brisbane.qld.gov.au
34071304
Errin Xiaofang LU
Senior Urban Planner
Planning Services South
Errin.Lu@brisbane.qld.gov.au
(07) 3403 3694
Timothy BYRNE
Principal Urban Planner
Planning Services South
Timothy.Byrne@brisbane.qld.gov.au
(07) 3403 0314
Tyrah ZARAFA
Senior Urban Planner
Planning Services Special Assessment
tyrah.zarafa@brisbane.qld.gov.au
07 31786103
Nicola MEWING
Principal Urban Planner
Planning Services Special Assessment
Nicola.Mewing@brisbane.qld.gov.au
31781002


DRAWINGS AND DOCUMENTS



The term 'drawings and documents' or similar expressions mean:
Drawing or Document Number Plan Date
Site Plan BA 1.01 - V 13-APR-2026 (Received)
Ground Floor Plan Townhouses 1-3 BA 1.02 - V 13-APR-2026 (Received)
Ground Floor Plan Townhouses 4-7 BA 1.03 - V 13-APR-2026 (Received)
Ground Floor Plan Townhouses 8-11 BA 1.04 - V 13-APR-2026 (Received)
Ground Floor Plan Townhouses 12-15 BA 1.05 - V 13-APR-2026 (Received)
Upper Floor Plan Townhouses 1-3 BA 1.06 - S 13-APR-2026 (Received)
Upper Floor Plan Townhouses 4-7 BA 1.07 - S 13-APR-2026 (Received)
Upper Floor Plan Townhouses 8-11 BA 1.08 - S 13-APR-2026 (Received)
Upper Floor Plan Townhouses 12-15 BA 1.09 - S 13-APR-2026 (Received)
Roof Plan Townhouses 1-3 BA 1.10 - S 13-APR-2026 (Received)
Roof Plan Townhouses 4-7 BA 1.11 - S 13-APR-2026 (Received)
Roof Plan Townhouses 8-11 BA 1.12 - S 13-APR-2026 (Received)
Roof Plan Townhouses 12-15 BA 1.13 - S 13-APR-2026 (Received)
Elevation Townhouses 1-3 BA 2.01 - U 13-APR-2026 (Received)
Elevation Townhouses 4-7 BA 2.02 - U 13-APR-2026 (Received)
Elevation Townhouses 8-11 BA 2.03 - U 13-APR-2026 (Received)
Elevation Townhouses 12-15 BA 2.04 - U 13-APR-2026 (Received)
Sections BA 3.01 - S 13-APR-2026 (Received)
Refuse Area Details BA 4.01 - S 13-APR-2026 (Received)
Typical Wall Detail BA 4.02 13-APR-2026 (Received)
Master Plan Ground Floor Plan Rev D 20-0575L 15-SEP-2021 (Received)
Deep Planting Plan Rev D 20-0575L 15-SEP-2021 (Received)
Communal Open Space Plan Rev D 20-0575L 15-SEP-2021 (Received)
Suggested Planting Palette - Ground Covers Rev D 20-0575L 15-SEP-2021 (Received)
Suggested Planting Palette - Shrubs Rev D 20-0575L 15-SEP-2021 (Received)
Suggested Planting Palette - Trees Rev D 20-0575L 15-SEP-2021 (Received)
Bulk Earthworks Plan 25341-EW01 Rev C 13-MAY-2026 (Received)
Bulk Earthworks Sections 25341-EW02 Rev B 13-MAY-2026 (Received)


Advice

Please see the attached document(s) for any advices.

APPROVAL CONDITIONS



Permit to Which These Conditions Relate: DA - PA - Material Change of Use
Activity(ies): multiple dwelling
Stage: Multiple Dwelling (15 Units)

General/Planning Requirements
 
Timing
1)   Commencement of Use

The approved Material change of use must not commence use until all conditions relating to Stage 1 of the associated Reconfiguration of a lot approval (Council Ref: A004897067) have been complied with.

Timing: When all conditions relating to the earlier stage have been complied with.

 
As indicated
 
2)   Extent of works on site

Site works and construction activities for the construction of the Multiple dwelling are to be contained within the area identified as Stage 1 in the associated reconfiguration of a lot approval (A004897067).

There is to be no storage of materials, parking of vehicles, and/or removal or destruction of vegetation or other ecological features on the balance area of the site, i.e. within Stage 2 of the associated reconfiguration of a lot approval (A004897067).

 
At all times
 
3)   Maintain the Approved Development

Maintain the approved development in accordance with the approved DRAWINGS AND DOCUMENTS, and any other relevant Council approval required by the conditions.

 
At all times
 
4)   Approved Drawings and Documents

A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers.

Note: This condition is imposed to ensure compliance with the conditions of development approval.

 
While site/operational/building work is occurring
 
5)   Carry Out the Approved Development

Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks).  Permission to enter neighbouring properties must be obtained from the relevant property owners.

 
While site/operational/building work is occurring
 
6)   Complete All Building Work

Complete all building work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such building work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: Building work must also be completed in accordance with any other current development approval.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
7)   Visitor Parking

Visitor car parking spaces must:
-  Be clearly labelled as 'Visitor Parking';
-  Remain unimpeded by landscaping, water tanks, storage (temporary or otherwise), gates or any other fitting, fixture or structure; and
-  Provide 24 hour unrestricted access for all bona fide visitors to the whole site.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
Architecture
 
Timing
8)   Overall Height

The overall height of the building(s) must be in accordance with the floor and roof levels and overall height shown on the APPROVED DRAWINGS AND DOCUMENTS.

 

NOTE: This condition should be read in conjunction with any other relevant condition requiring minimum height clearances for basement or undercover car parking and manoeuvring areas.

 
While site/operational/building work is occurring and then to be maintained
 
9)   Driveway Material and Finishes

Provide materials and finishes to the driveway and external carparking surfaces that reduce the visual impact of these areas when viewed from the street. One or a combination of the following must be used:

-  Coloured aggregate;

-  Concrete pavers; and/or

-  Banding and patterns in the surface design.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
10)   Provide Pedestrian Prioritised Pathway

Provide a pedestrian prioritised pathway from the visitor car parks to the street frontage. The pathway must be differentiated in colour and texture from the driveway surface.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
11)   Balconies/Verandahs/Terraces

All balconies/verandahs/terraces must remain unenclosed with no shutters, glazing, louvres or similar permanent fixtures (excluding screening required by the development approval).

Note: Any Community Management Statement that may apply to this approval must contain a by-law which reflects the requirements of this condition.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
12)   Screen Air Conditioning and Other Plant Enclosures

Install and maintain suitable screening to all air conditioning, lift motor rooms, plant and service facilities located at the top of or on the external face of the building and within the Private Open Spaces. The screening structures must be constructed from materials that are consistent with materials used elsewhere on the facade of the building.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
13)   Sun Shading Devices

Provide sun shading in accordance with the approved DRAWINGS AND DOCUMENTS.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
Ecology
 
Timing
14)   Fauna Management

Manage the protection and relocation of any fauna prior to and during the clearing of vegetation and ecological features that have been approved for removal.

 
While site/operational/building work is occurring
14(a) Prior to Vegetation/ Ecological Feature Clearing

Inspect the vegetation and ecological features (e.g. nests, tree hollows) to ensure identification of any fauna prior to clearing.

The inspection must take place a maximum of 48 hours prior to clearing.

If any fauna is identified, clearing operations and other site works must not commence until a licensed Fauna Spotter Catcher (qualified by the relevant Queensland State Government Authority) has inspected the site and implemented any necessary fauna protection measures or relocation procedures.

Timing: Prior to vegetation/ ecological feature clearing commencing.

 
As indicated
14(b) During Vegetation/ Ecological Feature Clearing

Where any fauna has been identified, the licensed Fauna Spotter Catcher must be present on site during all clearing operations to monitor works and to respond to any fauna situations that may arise.

Timing: While vegetation/ ecological feature clearing is occurring.

 
As indicated
14(c) Submit Evidence

Submit written confirmation to Development Services that the inspection of vegetation and ecological features was undertaken prior to undertaking vegetation/ecological feature clearing.

Provide certification from the Fauna Spotter Catcher if a licensed Fauna Spotter Catcher was engaged.

Timing: Prior to site/operational/building work commencing.

 
As indicated
 
Landscape Architecture and Open Space Planning
 
Timing
15)   Retain and Protect Existing Street Tree(s)

Identify, retain and protect the existing street trees unless otherwise agreed in writing with Asset Services.

Note: Street trees are protected under the Natural Assets Local Law.  Street trees must not be removed or pruned without prior approval from Asset Services.

PROOF OF FULFILMENT
Contextual photographic evidence that the tree has been retained in equal or greater health than before development commenced. OR, evidence in writing from Asset Services Arboriculture that an alternative arrangement has been made. Timing: Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
At all times
15(a) Implement Protection Measures

Install tree protection measures in accordance with Australian Standard - AS4970 Retention of Trees on Development Site.

There must be no excavation, filling or storage of materials or plant within the drip line of the tree(s).

Where works are within the canopy drip line of existing street trees, contact Asset Services Regional Coordinator Arboriculture in relation to the required provision of protection measures.

Note: If fencing is to protect street trees, a permit to temporarily occupy the footway will be required from Compliance and Regulatory Services.

Timing: Prior to site/operational/building work occurring.

PROOF OF FULFILMENT
Contextual photographic evidence to demonstrate the installation of protection measures prior to building works commencing. Timing: Prior to site / operational / building work occurring.

 
As indicated
15(b) Maintain Protection Measures

Maintain protection measures while development is occurring and remove protection measures prior to commencement of the use.

Timing: While to site/operational/building work is occurring.

 
As indicated
 
16)   Landscape the Site - Self Certification

Landscape the site in accordance with the requirements of this condition.

 
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
16(a) Detailed Landscape Plan for Self- Certification

Prepare a Detailed Landscape Plan at a scale of 1:100 for all on-site landscape works including planting areas identified on the approved Landscape Concept Plans ‘MASTER PLAN ground floor plan’/D, ‘DEEP PLANTING PLAN’/D, ‘COMMUNAL OPEN SPACE PLAN’/D, SUGGESTED PLANTING PALETTE ground covers and climbers’/D, SUGGESTED PLANTING PALETTE shrubs’/D and ‘SUGGESTED PLANTING PALETTE trees’/D. The plan must be prepared by a Qualified Landscape Architect and must comply with the relevant Brisbane Planning Scheme Codes.

The plan must include the following:
-  Planting media and mulch in accordance with AS4454 Composts, soil conditioners and mulches and AS 4419-2003 Soils for landscaping and garden use.
-  Unless otherwise specified, trees provided as 45 litre stock or larger, staked and tied, and complying with Australian Standards.
-  Plant selection and densities to achieve full surface coverage of garden beds within 2 years of planting.
-  A reticulated drip irrigation system to all planting areas, with drainage connected to the stormwater system; the irrigation system must be connected to a non-mains water source.
-  Trees required to be retained are documented, integrated into landscape design, and protected in accordance with the relevant sections of Australian Standard AS4970 Protection of trees on development sites.
-  Details of a 12 week establishment period.

Timing: Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
A detailed landscape plan accompanied by Brisbane City Council Form CC10616 - Landscape Design Certificate. Timing: Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
16(b) Multiple Unit Dwelling

In addition to the requirements listed above, the plan must include the following:
-  Deep planting areas as shown on the approved drawings planted with trees capable of growing to a minimum canopy diameter of 5m and a minimum height of 5m within 5 years of planting noting that this is a minimum requirement and trees are expected to grow beyond these measurements.
-  Columnar canopy form or screening tree/shrub species planted at suitable spacings along side and rear boundaries in planting areas shown on the approved drawings.
-  Shade and/or round canopy trees planted at suitable spacings along front boundaries in planting areas shown on the approved drawings.
-  Shade and/or round canopy trees in car parking areas in planting areas shown on the approved drawings.
-  One hose cock within any private landscape and recreation area.

Timing: Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
A detailed landscape plan accompanied by Brisbane City Council Form CC10616 - Landscape Design Certificate. Timing: Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
16(c) Certify Detailed Landscape Plan

On completion of the Detailed Landscape Plan, submit to Development Services:
-  Brisbane City Council Form CC10616 - Landscape Design Certificate prepared by a Qualified Landscape Architect to certify that the Detailed Landscape Plan complies with the requirements of this condition
-   A copy of the certified Detailed Landscape Plan.

Timing: Prior to building work commencing.

PROOF OF FULFILMENT
A detailed landscape plan accompanied by Brisbane City Council Form CC10616 - Landscape Design Certificate. Timing: Prior to building work commencing.

 
As indicated
16(d) Implement Certified Detailed Landscape Plan

Carry out the landscape work in accordance with the above certified detailed Landscape Plan.

Timing: Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
16(e) Certify Work

On completion of the landscape work, submit to Development Services:
-  Brisbane City Council Form CC10613 - Landscape Works Certificate prepared by a Qualified Landscape Architect or licensed Landscape Contractor to certify the completed landscape work complies with the certified Detailed Landscape Plan
-  A copy of the as-constructed certified Detailed Landscape Plan.

Timing: Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
An as constructed landscape plan accompanied by Brisbane City Council Form CC10613 - Landscape Works Certificate. Timing: Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
16(f) Maintain Landscape Work

Maintain the landscape work, including deep planting, in accordance with the certified Detailed Landscape Plan.

Timing: To be maintained.

 
As indicated
 
Pollution
 
Timing
17)   Mechanical Plant or Equipment - Acoustically Screened

Mechanical plant or equipment is to be acoustically screened from an adjoining sensitive use. Mechanical plant includes generators, motors, compressors and pumps such as air-conditioning, refrigeration and cold room motors. Acoustically screened is defined in City Plan 2014.

NOTE: This condition does not authorise environmental nuisance under the Environmental Protection Act 1994.

PROOF OF FULFILMENT
Submit to Development Services, certification that all mechanical plant or equipment, is acoustically screened. Timing: Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained.

 
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
Engineering
 
Timing
18)   On-site Erosion (Medium Risk)

Manage on-site erosion and the release of sediment or sediment laden water from the site at all times by implementing best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version).

Timing: Prior to commencement of any land disturbing activities and until all exposed soil areas are permanently stabilised against erosion.

 
As indicated
18(a) Manage earth disturbance on- site

(i)  Drainage control measures must be implemented and maintained to minimise water flow onto areas of exposed earth.

(ii)  Sediment and erosion control measures must be implemented and maintained to prevent soil loss from earth disturbance areas and prevent deposition beyond earth disturbance areas.

(iii)  No release of contaminants to land beyond on-site area of earth disturbance other than releases that achieve water pollutant concentration release limits of:

  A. 50mg/L TSS (Total Suspended Solids);

  B. Turbidity, Nephelometric Turbidity Units (NTU) value less than 10% above background, 75 NTU, or as agreed in writing by an Officer from Councils Erosion and Sediment Control (ESC) Team in Compliance and Regulatory Services;

  C. pH between 6.5 and 8.5 at all times.

(iv)  Maintain a written record to demonstrate that water discharges from the site, including any dewatering operations, meet the release limits as detailed in (iii) for water discharge(s) from the site that occur during or immediately after a rainfall event, and during normal business hours. The water quality of the discharge flows must be measured at each discharge point from the site, including but not limited to sediment basin outlets, other applicable sediment control devices, the site water drainage system, and recorded against the release limits at least once on each calendar day until such discharge stops.

Timing: Prior to commencement of any earth disturbing activities and until all exposed soil areas are permanently stabilised against erosion.

 
As indicated
18(b) Provide Land Occupier Notification to Council

(i) Notify Council's ESC Team of proposed land occupier/s by sending an email to CARS-ESC@Brisbane.qld.gov.au

(ii) If the land is to be occupied by any person other than the registered landowner then advice must be provided to Council that confirms the name, contact information and the duration of any proposed occupation of the land.

Timing: Prior to commencement of any earth disturbing activities.

 
As indicated
18(c) Prepare Erosion and Sediment Control Plan

Prepare an Erosion and Sediment Control Plan (ESCP) in accordance with best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version) and, to the extent of any inconsistency, relevant Brisbane Planning Scheme Codes and Policies.

Obtain a design certificate in accordance with the relevant Brisbane Planning Scheme Codes and Policies.

The ESCP and design certificate must be certified by a Certified Professional in Erosion and Sediment Control (CPESC) or a Registered Professional Engineer Qld (RPEQ) with suitable qualifications and experience in erosion and sediment control.

Documentary evidence demonstrating appropriate qualifications in erosion and sediment control must be provided to the Council upon request.

Timing: Prior to the commencement of any earth disturbing activities.

 
As indicated
18(d) Attend a pre-start meeting

Arrange and attend a pre-start meeting for ESC with an Officer from Councils ESC Team in Compliance and Regulatory Services (CARS).

Note: To request a pre-start meeting from Council's ESC Team send an email to CARS-ESC@Brisbane.qld.gov.au. All relevant documentation, including both the certified ESCP and the certified design certificate, must be attached to this email.

Please allow up to 10 business days for your request to be processed.

Timing: Attend the pre- start meeting prior to the commencement of any earth disturbing activities.

 
As indicated
18(e) Implement Certified Erosion and Sediment Control Plan

Implement the certified ESCP and maintain all ESC measures in accordance with best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version) and, to the extent of any inconsistency, relevant Brisbane Planning Scheme Codes and Policies.

The ESCP and design certificate must be available on site at all times for inspection by Council officers. Any alteration to supplementary or Type 3 ESC measures must be reflected in the certified ESCP. Any alteration to Type 2 or Type 1 ESC measures will require a revised ESCP and design certificate that has been certified by either the CPESC or RPEQ.

Timing: While earth disturbing activities are occurring and until all exposed soil areas are permanently stabilised against erosion.

 
As indicated
 
19)   Information Signage

Erect an information sign on the subject property in accordance with Council's general requirements for signage and in accordance with the requirements outlined below:
a)  The sign should provide a brief description of the development proposed;
b)  The sign is to list the name, postal and/or email address and a contact telephone number for the following parties (where relevant) that are undertaking work on the site:
     -  Developer;
     -   Project Coordinator;
     -  Architect/Building Designer;
     -  Builder;
     -  Civil Engineer;
     -   Civil Contractor/s; and
     -  Landscape Architect;
c)  The lettering on the sign is to be at least 25 millimetres in height, be of regular weight and in sentence case;
d)  The sign is to be a minimum size of 1,200 millimetres by 900 millimetres;
e)  The maximum area of the sign is to be 2.0m2;
f)  The sign is to be positioned as follows:
     -  located centrally along each road frontage of the site to Miles Plating Road and the proposed New Road;
     -  located on or within 1.5 metres of the road frontage;
     -  mounted at least 300 millimetres above ground level; and
     -   clearly visible from the street for a pedestrian;
g)  The sign is to contain no commercial or corporate advertising other than the name, logo or slogan of the parties outlined in part (b) of this condition;
h)  The sign is to be non-illuminated; and
i)   Both the sign and the supporting structure are to be made of weatherproof material and to be properly maintained at all times;

Timing: Prior to site works commencing and then to be maintained until completion of the development for all stages.

 
As indicated
 
20)   Construction Management Plan (Minor)

Carry out development in a method consistent with a Construction Management Plan (Minor) prepared in accordance with the requirements of this condition.

 
While site/operational/building work is occurring
20(a) Construction Management Plan (Minor) - Prepare Plan

Prepare a detailed Construction Management Plan (CMP) for the construction phase of the approved development.  The Construction Management Plan must be in accordance with the relevant Brisbane Planning Scheme Codes and address the following:
(i)     Provision for pedestrian management including alternative pedestrian routes (adjacent to or surrounding the site);
(ii)    Existing and proposed kerbside allocation signs and line marking (such as bus stops, loading zones and parking meters and/or ticket dispensers);
(iii)   Location of and impacts to any Council or other public utility or local authority's assets on or within external to the site;
(iv)    Location and design of temporary vehicular construction access points, including frequency of use;
(v)     Management and mitigation strategies for the impact of dust, noise and vibration upon adjoining and nearby properties;
(vi)    Provision for loading and unloading of materials including the location of any remote loading sites;
(vii)   Location of materials, structures, plant and equipment to be stored or placed on the construction site;
(viii)  Location of proposed external hoardings and/or gantries, and including clearances to the impacts of this on  existing street furniture and other footpath assets located within the verge as well as impacts on any existing advertising signage located either along or adjacent to the site frontage  - this includes any potential obstruction of sight lines for such advertising  (e.g. 'CityCycle' bicycle stations or bus stops with advertising);
(ix)    Location of proposed employee and visitor parking areas;
(x)     Anticipated staging and programming;
(xi)    Impacts of any actions proposed to address any of the above items or any actions resulting from construction of the development that will impact on existing street trees;
(xii)   Complaint management processes to be implemented; and
(xiii)  Compliance with the Management Plans Planning Scheme Policy and other relevant Planning Scheme Policies.

The Construction Management Plan must be supported by 'approval in principle' or written approvals from the relevant Council sections or other governing bodies responsible for any potentially impacted infrastructure.

The list of relevant infrastructure and contacts is available on Council's website - Search 'Constructions Management Plan'.

Note: The Construction Management Plan is not required to be approved by Development Services.

Timing: Prior to site/operational/building work commencing.

 
As indicated
20(b) Construction Management Plan (Minor) - Submit Plan

Submit a copy of the Construction Management Plan to Council's Development Services Branch at the following mailbox: engineeringservices@brisbane.qld.gov.au quoting the BCC planning development approval reference number.

Timing: At least 10 days prior to site works commencing.

 
As indicated
20(c) Construction Management Plan (Minor) - Documentation on Site

Legible copies of the Construction Management Plan and current permits must be kept on site and be made available on request by Council, At all times.

The requirements of the CMP must be included in all induction of principal and subcontractors utilised in the development. An outline of the induction provided to contractors may be requested by Council to confirm compliance with this condition.

Timing: While site/operational/building work is occurring.

 
As indicated
20(d) Construction Management Plan - Works to be Performed Out of Hours

Obtain an approval from Development Services for any work that is proposed to be undertaken outside of normal business hours - 6:30am to 6:30pm, Monday to Saturday.

Timing: Prior to site/operational/building work commencing.

 
As indicated
20(e) Implement Construction Management Plan (Minor)

Carry out the development in accordance with the submitted Construction Management Plan.

 
While site/operational/building work is occurring
 
21)   Protect Existing Infrastructure

Where there is existing infrastructure in the vicinity of the proposed work, the new work must not damage or compromise the working ability of the existing infrastructure.

Where alterations to public utility mains, existing mains, services or installations are necessitated by the development, prior to alterations commencing, the developer must notify Council or the relevant infrastructure provider and obtain agreement to the alterations.

The developer must meet the costs of the alterations. The alterations must be carried out in accordance with the relevant Brisbane Planning Scheme Codes or infrastructure providers requirements.

 
While site/operational/building work is occurring
21(a) As Constructed Drawings - Alterations to Existing Infrastructure

Submit to Development Services As Constructed drawings showing all new and/or rectification works and an asset register, prepared by a Registered Professional Engineer Queensland.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that the alterations have been completed in accordance with the relevant Brisbane Planning Scheme Codes and any other relevant infrastructure requirements. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
22)   Filling and / or Excavation (Minor)

Filling and/or excavation works on the site must be in accordance with the relevant Brisbane Planning Scheme Codes.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
22(a) Prepare Earthworks Drawings

Earthworks drawings must be prepared and certified by a Registered Professional Engineer Queensland in accordance with the relevant Brisbane Planning Scheme Codes.

The drawings must include the following:
-  The location of any cut and/or fill;
-  The quantity of fill to be deposited and finished fill levels;
-  The existing and future finished levels in reference to the Australian Height Datum (including cross-sections or long sections into the adjacent properties);
-   maintenance of access roads to and from the site such that they remain free of all fill material and are cleaned as necessary
-  preservation of all drainage structures from the effects of structural loading generated by the earthworks
-  protection of adjoining properties and roads from adverse impacts as a result of proposed works.
-  That all vehicles exiting from the site will be cleaned and treated so as to prevent material being tracked or deposited on public roads.

Timing: Prior to site/operational/building work commencing.

Note: The Earthworks drawings are not required to be submitted for Council approval.

 
As indicated
22(b) Implement and Maintain the Earthworks

Carry out and maintain the earthworks in accordance with the certified drawings.

Note: A copy of the certified Earthworks Drawings must be available on-site for inspection by Council Officers during these works.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
23)   Retaining Walls

Design and construct all retaining walls and associated fences, in accordance with the relevant Brisbane Planning Scheme Codes and the following:
-  All retaining walls including the footings, must be located wholly within the property boundaries of the site where works are occurring
-  Runoff from surface drains and subsoil drainage associated with the retaining walls (irrespective of the height of the wall) must be collected and conveyed to a lawful point of discharge and must not cause any ponding, nuisance or disturbance to adjacent property owners.
-  Retaining walls to stabilise excavation must be set back from property boundaries to accommodate subsoil drainage without encroachment into the neighbouring property. This set back may vary depending on the height, structure and design of the retaining wall, surcharge loadings from neighbouring properties, and to provide a surface drain along the top of the retaining wall
-  Retaining walls that are greater than 1.0m in height must be vertically and horizontally tiered by a ratio of 1:1 unless an alternative has been approved by Development Services
-  Retaining walls in excess of 1.0m in height must be designed and certified by a Registered Professional Engineer Queensland
-  Retaining walls facing onto Council property (including the road reserve and parkland) must not be constructed from timber.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
23(a) Certification of Retaining Walls

For retaining walls over 1.0m in height, obtain certification from a Registered Professional Engineer Queensland that the design and construction of the retaining walls and ancillary drainage are in accordance with the requirements of this condition.

 
As indicated
 
24)   Access, Grades, Manoeuvring, Carparks, Signs and Line Marking

Construct and maintain access, parking and manoeuvring for vehicles on site in accordance with the relevant Brisbane Planning Scheme Codes, as indicated on the approved DRAWINGS AND DOCUMENTS, including the following:

i. A pavement of minimum Local road standard or equivalent surface material (including associated drainage) to the area on which motor vehicles will be driven and/or parked.

ii. Manoeuvring on site for an RCV and for the loading and unloading of vehicle(s);

iii. Parking on the site for 30 X resident/tenant cars, 4 X visitor cars including 1 X parking spaces for people with disabilities and for the loading and unloading of vehicle(s) within the site. There must a minimum number of 34 X total number of spaces provided on site.

iv. Provide and maintain 15 resident & 4 visitors secure bicycle parking spaces;

v. A minimum of 2.3 metres height clearance to all undercover parking areas and a minimum of 2.5 metres above parking spaces for people with disabilities.  The minimum clear height must be measured to the lowest protrusion from the ceiling (e.g. fire sprinklers, services, lighting fixtures, signs, etc).

vi. A height clearance sign located at the entrance(s) to undercover car parking areas and a directional visitor parking sign clearly visible from the vehicle entrance to the site.

vii. An appropriate area for the storage and collection of refuse, including recyclables, in a position which is accessible to service vehicles on the site.

viii. Prepare and implement signs and line markings drawings that show the internal paved areas signed and delineated in accordance with the approved drawings and documents.  The drawings must be prepared and certified by a Registered Professional Engineer Queensland in accordance with the relevant Brisbane Planning Scheme Codes and the Manual of Uniform Traffic Control Devices.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland, that the above requirements have been implemented in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
25)   Repair Damage to Kerb, Footpath or Road

Repair any damage to the existing kerb and channel, footpath or roadway (including removal of concrete slurry from footways, roads, kerb and channel, stormwater gullies and drainlines) and re-instate existing traffic signs and pavement markings that have been removed or damaged during any works carried out in association with the approved development.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
25(a) Interim Repairs

If at any time during the construction phase of the approved development, damage to the existing kerb and channel, footpath or roadway creates unsafe, unreasonable and/or not fit for purpose conditions as assessed by Council, interim repairs must be undertaken as directed by Asset Services.

Note: Any interim repairs required to be undertaken shall not be considered to satisfy the requirements of this condition for the permanent repair of the infrastructure prior to the issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

Timing: While site / operational / building works is occurring.

 
As indicated
 
26)   Refuse Collection - On Site

Provide for the installation and collection of refuse/recycling bins by Brisbane City Council's Waste and Resource Recovery Services or a private waste contractor.

 
At all times
26(a) Arrange Refuse Collection

Arrange for the installation of refuse/recycling bins and for the subsequent collection of refuse including recycling from the site by Brisbane City Council's Waste and Resource Recovery Services or a private waste contractor.

Timing: A minimum of four weeks prior to the commencement of use and then to be maintained. 

PROOF OF FULFILMENT
Where a private waste contractor is engaged, provide written confirmation from the proposed waste collection contractor of the agreement to service the property. The written agreement must be submitted to Council's Waste and Resource Recovery Services and include full details of the proposed system, bin sizes, number of bins, frequency of collection and the refuse collection vehicle size. Timing: Prior to commencement of use.

 
As indicated
26(b) Notify Future Owner

Where Council is engaged as the waste contractor, the owner must notify any future owner/body corporate that the development has been approved on the basis that an indemnity must be provide for refuse collection vehicles to enter the property.

Timing:  At time of a change of ownership.

 
As indicated
26(c) Indemnify Council

The owner and any subsequent owner must, by approved form to Waste and Resource Recovery Services, indemnify Council and its agents in respect of any damage to the pavement and other driving surfaces. 

Timing:  When an arrangement for refuse/recycling collection services is made with Brisbane City Council.

 
As indicated
 
27)   Refuse Storage - On Site Collection

Provide a roofed and wholly screened refuse enclosure utilising materials consistent with the development or a dedicated refuse storage room, as shown on the approved plans and documents. 

The enclosure/refuse storage room must be of a design to accommodate the quantity of refuse and recycling including source separation to allow for low servicing collection of the development.

Bins must be located in an area which allows them to be manoeuvred from the bin storage area to the designated internal collection point.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
28)   Ponding of Stormwater

Carry out the approved development to ensure that adjoining properties and roads are protected from ponding or nuisance from stormwater during construction.

Notes: If remedial works are necessary to comply with this condition, prior approval must be obtained from Development Services.

 

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
29)   Site Drainage - Major

Provide an internal drainage system to collect stormwater run-off from all proposed lots, roofed and developed surface areas and any run-off onto the site from adjacent areas and convey the collected run- off to a lawful point of discharge, in accordance with the relevant Brisbane Planning Scheme Codes.

Notes:

- All upslope stormwater connections to existing private properties must extend to the property boundary of all relevant properties being ultimately serviced by that connection.
- Guidance for the preparation of drawings and/or documents to comply with this condition is provided in the Brisbane Planning Scheme Policies.
- The stormwater design must ensure the stormwater runoff from the site does not adversely impact on flooding or drainage (peak discharge and duration for all storm events up to the 1% AEP event) of properties that are upstream, downstream or adjacent to the site. Where a development has not specifically addressed this issue, the development may require implementation of one or more mitigation measures to offset adverse impacts, (e.g. stormwater detention or upgrade of existing stormwater drainage infrastructure).
- Where external works are required and infrastructure will be handed over to Council (e.g. Stormwater pipes 375mm or greater and/or manholes within the road reserve, etc), the applicant will be required to request an on-site Pre-Start with Council and ensure all future owned Council assets follow the On/Off Maintenance process in accordance with Council's Infrastructure Installation & Construction Requirements Manual.
- Guidance for requesting a pre-start and co-ordinating the On/Off Maintenance process can be found on Council's website (https://www.brisbane.qld.gov.au/planning-and-building/applying-and- post-approval/on-and-off-maintenance-approvals.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
29(a) Submit Site Drainage Drawings

Submit to, and obtain approval from, Development Services, site drainage drawings and engineering calculations, prepared and certified by a Registered Professional Engineer Queensland, in accordance with the relevant Brisbane Planning Scheme Codes.

Notes:

- Queensland Building and Construction Commission licensed hydraulic consultants may design the stormwater system for sites less than 2000m2 with an upstream catchment servicing no more than 4 residential lots. This excludes stormwater drainage design (including subsoil drainage) of basements in flood planning areas and the design of any onsite stormwater detention system
- Guidance for the preparation of drawings and/or documents to comply with this condition is provided in the Brisbane Planning Scheme Policies.

Timing: Prior to site/operational/building work commencing

 
As indicated
29(b) Implement Approved Drawings

Carry out the works in accordance with the approved site drainage drawings.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
29(c) Submit As Constructed Drawings

Submit to Development Services As Constructed drawings prepared and certified by a Registered Professional Engineer Queensland or a Queensland Building and Construction Commission licensed hydraulic consultants (where applicable).

Note: To be submitted via DA- ComplianceEngineering@brisbane.qld.gov.au and include the site address, A00 reference and Condition number in the subject line.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland or Queensland Building or Construction Commission licensed hydraulic consultants (where applicable) confirming that the works have been completed in accordance with the above stormwater drawings. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
30)   Stormwater Quality

Manage stormwater quality in accordance with this condition.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
30(a) Implement Stormwater Quality Management

Implement the stormwater quality treatment strategy outlined within the APPROVED DRAWINGS AND DOCUMENTS and any engineering drawings and documents approved pursuant to conditions contained in this development approval.  Where a proprietary stormwater quality improvement device has been used to meet the water quality objectives, ensure the device has been approved by Brisbane City Council for use in achieving the water quality targets and meets the required manufacturers specifications (in terms of number and size of units and any pre-treatment requirements).

Note: This condition does not require any further approval from Council.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained.

 
As indicated
30(b) Water Quality Maintenance Management Plan

Prepare and implement a Water Quality Maintenance Management Plan in accordance with the Water by Design 'WSUD Technical Design Guidelines for South East Queensland'.  The plan must be prepared and certified by a Registered Professional Engineer Queensland.

Note: This condition does not require any further approval from Council.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained.

 
As indicated
30(c) Submit Certification

Submit to Development Services certification from a Registered Professional Engineer Queensland confirming that the stormwater quality treatments strategy required pursuant to part (a) of this condition has been implemented and where a proprietary stormwater quality improvement device has been used to meet the water quality objectives, the device has been approved by Brisbane City Council for use in achieving the water quality targets and meets the required manufacturers specifications (in terms of number and size of units and any pre-treatment requirements).

Note: Manufacturers that have approved devices by Brisbane City Council will be able to provide evidence of Council approval for use.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
30(d) Maintain Management Plans

Maintain the certified Water Quality Maintenance Plan and the stormwater quality treatment strategy required pursuant to part (a) of this condition. Include the Water Quality Maintenance Plan in any building management strategy, building management statement or community management statement.

Timing: At all times

 
As indicated
 
31)   Service Conduits and Mains

Provide and install all service conduits and meet the cost of any alterations to public utility mains, existing mains, services, street lighting or installations that are required to carry out the approved development. These works must be in accordance with the relevant Brisbane Planning Scheme Codes, and include the following, where applicable:
-  the provision of all services and/or conduits along the full length of any rear allotment access or access easement.
-  the breaking and/or relocation of any existing sewer combine drains.
-  the relocation of any fire hydrant and/or valves from the development's vehicular footway crossings.
-  the retention and/or relocation of any existing foul water lines that currently exist within the site.
-  any new or existing installations of electrical pillar boxes, pad mounted transformers (PMTs), water reticulation mains, water meters and the like, must be installed/relocated to their ultimate alignment relative to the new property boundary and clear of the usable footpath areas irrespective of the alignment of the existing services/conduits.

Note:
-  The cost of moving services, utilities and assets is the responsibility of the Developer. The permission of the service, utility or asset owner will be required. Council permission is required if street trees, stormwater gullies/drains, and swales are affected. Urban Utilities permission is required if water supply and sewerage services are affected.
-  Standard utility alignments may be found on Council's 'Brisbane Standard Drawings' 1013 to 1016 inclusive.
-  Applicants must liaise with the appropriate service authorities. Typical underground services and/or conduits to be constructed include power, phone, telecommunications, sewer (including private combine drains) stormwater and gas, if applicable.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
31(a) Submit As Constructed Drawings

Submit to Development Services As Constructed drawings, including an asset register, prepared and certified by a Registered Professional Engineer Queensland.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the requirements of this condition. Note: Civil works are to be certified by a RPEQ(Civil) and electrical works are to be certified by a RPEQ (Electrical).

 
As indicated
 
32)   Conduit for Brisbane City Council

Provide a single underground conduit (100mm diameter UPVC class PN9) in favour of Brisbane City Council on at least one side of all Neighbourhood Access Roads (Bus Route only), Primary Freight Access Roads and Major Roads. The works must be in accordance with the relevant Brisbane Planning Scheme Codes and the following:
-  The conduit must be laid in the telecommunication alignment of the footpath, on the kerb side of the Telecommunication Carrier conduit or in an agreed shared trench arrangement with the Telecommunication Carrier and other Utilities as may be relevant, subject to the approval of Development Services.
-  The conduit must bypass the Telecommunication Carrier pits.
-  Pits (minimum size, Type 4 as per BCC Standard Drawing BSD-1011) with lids (as per Drawing BSD-1012 but Class B instead of Class C) must be installed at the "dead ends" of the conduit, both sides of road crossings, at intersections and at other locations that may be specified by Council.
-  The conduit must be plugged at each pit.
-  The conduit must be located and installed in such a way that facilitates the installation of cable and additional pits in the future.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
32(a) Submit As Constructed Drawings

Submit to Development Services, As Constructed drawings, including an asset register, prepared and certified by a Registered Professional Engineer Queensland.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the requirements of this condition.

 
As indicated
 
33)   Telecommunications

Submit to Development Services, certification from an authorised telecommunications carrier/contractor, that the following works and infrastructure have been undertaken and installed in accordance with telecommunications industry standards:
- Provide telecommunications to the subject buildings, lead-in conduits and equipment space in a suitable location within the buildings, to suit the carrier of choice.
- If new pits and conduit infrastructure are required to be installed within the road reserve fronting the site, it must be suitably sized to cater for future installation of fibre optic cables.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
34)   Agreement with Electricity Supplier

Submit to Development Services, evidence of an agreement with an electricity supplier to provide necessary services to the development in accordance with the relevant Brisbane Planning Scheme Codes.

Where development is within an established area of overhead electricity supply and the electricity supplier determines that a property pole is the appropriate solution to supply electricity to the development, the developer must be responsible for the installation of the property pole(s).

In the above circumstances, submit to Development Services, certification from the developer's electrical consultant confirming that the above installation has been completed in accordance with the relevant AS/NZS Standards and the Queensland Electricity Connection Manual (QECM) and Queensland Electricity Metering Manual (QEMM).

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
35)   Permanent Driveway Crossover

Provide two permanent cross overs:

·         5 metre wide modified Type B2 entry cross over towards south

·         5.5 metre wide modified Type B2 exit driveway crossovers towards east

to the proposed new road frontages of the site in accordance with the relevant Brisbane Planning Scheme Codes and located as shown on the approved DRAWINGS AND DOCUMENTS.

Written consent must be obtained from BCC - Field Services, Asset Services Arborist prior to any works occurring that will either impact on or require removal of a street tree (this includes pruning and excavation within the root zone/canopy of the tree)

At all times during construction of the crossover, safe pedestrian access along the site frontage must be maintained.

Note: No further driveway permit is required however additional footway permits or lane closure permits may be required for footpath/verge closures and/or lane closures. These permits must be obtained prior to construction of the crossover.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
Standard Advice
 
Timing
36)   Construction Noise and Dust Emissions

Pursuant to the Environmental Protection Act 1994, all development involving the emission of noise and dust from building and/or construction activities, must ensure that the emissions are in accordance with the requirements of the Act.
The Environmental Protection Act 1994 prescribes that:

1. A person must not carry out building work in a way that makes an audible noise-
-  on a business day or Saturday, before 6.30a.m. or after 6.30p.m; or
-   on any other day, at any time. 
2. The reference in subsection (1) to a person carrying out building work-
-  includes a person carrying out building work under an owner-builder permit; and
-  otherwise does not include a person carrying out building work at premises used by the person only for residential purposes.

Note: A request can be made to work outside of these hours by submitting an Environmental Management Plan for assessment and obtaining an endorsed decision from the Environmental Management delegate Development Services.

 
As indicated
 
37)   Natural Assets Local Law (NALL) - Protected Vegetation On Site

Work on or around protected vegetation may require a permit under the Natural Assets Local Law 2003 (NALL).  Permits under the NALL are issued by Development Services.

To apply for a permit to work on protected vegetation go to Council's website or contact the call centre on 3403 8888

 
As indicated
 
38)   Natural Asset Local Law (NALL) - Protected Vegetation on Public Land, Road or Park

Work on or around protected vegetation on public land, road or park may require a permit under the Natural Assets Local Law (NALL).

Arrangements must be made with Asset Services in relation to the works carried out on protected vegetation on public land, road or park including provision for costs and replacement planting as determined by Asset Services.

Timing: Prior to carrying out any works on protected vegetation.

 
As indicated
 
39)   Currency Period

The currency period for this development approval is stated in the Decision Notice and is expressed as a date.

 

This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016.

 
As indicated
 
40)   Cultural Heritage

Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003.  This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage.

The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care.

For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships).

 
As indicated
 
41)   Fire Ant Movement Controls

To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected.

These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products.

Breaches of these controls can potentially impact the community, economy and the environment.  Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014.

For further information contact the relevant Queensland State Government department on 13 QGOV.

 
As indicated
 
42)   Water and Wastewater

Services for water and wastewater (sewerage) are not under the jurisdiction of Brisbane City Council.  Authorisation to connect the approved development to the water/wastewater networks and for property service connections required a Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009.

For further information about any necessary Water Approvals contact Urban Utilities.

 
As indicated
 

** End of Package **