| Address of Site: | 30 WOODSTOCK AVE TARINGA QLD 4068 U 1 PLATINUM ON WOODSTOCK 30 WOODSTOCK AVE TARINGA QLD 4068 U 2 PLATINUM ON WOODSTOCK 30 WOODSTOCK AVE TARINGA QLD 4068 U 3 PLATINUM ON WOODSTOCK 30 WOODSTOCK AVE TARINGA QLD 4068 |
| Real Property Description of Site: | L2 RP.77554 L1 SP.273514 L2 SP.273514 L3 SP.273514 |
| Aspects of development and type of approval: | DA - SPA - Carry out Building Work Preliminary Approval under s241 - Multi-
Unit Dwelling DA - SPA - Material Change of Use Development Permit - Multi-Unit Dwelling |
| Council File Reference: | A006983296 Permit Reference Number/s: DABW278402713; DAMC278402813. |
| Package Status: | APPROVED - Version 3 (9th of June, 2026 8:03:38 AM) |
| Package Generated: | 09/06/2026 |
| Selen TEAR Senior Urban Planner Planning Application Review Service selen.tear@brisbane.qld.gov.au 3403 4083 |
Darrell CZISLOWSKI Senior Engineering Officer, Development Assessment Engineering Services North darrell.czislowski@brisbane.qld.gov.au (07) 3403 6603 |
Sonia VENTURA Development Officer, Engineering Engineering Services South sonia.ventura@brisbane.qld.gov.au (07) 3403 4811 |
| Phil EASTGATE Principal Technical Officer Engineering Compliance philip.eastgate@brisbane.qld.gov.au (07) 3403 9432 |
Christine GRAY Principal Urban Planner Planning Services North christine.gray@brisbane.qld.gov.au 3407 0160 |
Mohammed ASLAM Urban Planner Planning Services North mohammed.aslam@brisbane.qld.gov.au (07) 34037240 |
| MAISIE TANG Principal Urban Planner Planning Services North maisie.tang@brisbane.qld.gov.au (07) 31789048 |
Mohammed ASLAM Urban Planner Planning Services North mohammed.aslam@brisbane.qld.gov.au (07) 34037240 |
Joe MCSHANE Principal Urban Planner Planning Services North CPAS-DS-PS-North@brisbane.qld.gov.au (07) 3407 1306 |
DRAWINGS AND DOCUMENTS
| Drawing or Document | Number | Plan Date |
|---|---|---|
| Survey/Existing Site Plan | DA 01-02 | 20-JUN-2013 (Received) |
| Proposed Ground/Site Plan | DA 01-03 (Amended In Red 03-JUN-2026) | 20-JUN-2013 (Received) |
| First Floor Plan | DA 01-04 (Amended In Red 03-JUN-2026) | 20-JUN-2013 (Received) |
| Post Location Plan | DA 01-05 | 20-JUN-2013 (Received) |
| Crossover Plan | DA 01-06 | 20-JUN-2013 (Received) |
| Car Parking Plan | DA 01-07 | 20-JUN-2013 (Received) |
| Front/Rear Elevations | DA 02-01 (Amended In Red 03-JUN-2026) | 20-JUN-2013 (Received) |
| Side Elevations | DA 02-02 (Amended In Red 03-JUN-2026) | 20-JUN-2013 (Received) |
| Retaining Wall Details | DA 03-01 | 20-JUN-2013 (Received) |
| Landscape Concept Plan | SK001 rev. No. C (Amended In Red 03-JUN-2026) | 25-APR-2013 (Received) |
| Site Plan (Unit 3/30) | Dwg No. 001 A | 04-JUL-2022 (Received) |
| Roof Plan & Section (Unit 3/30) | Dwg No. 002 B | 04-JUL-2022 (Received) |
| Front Elevation (Unit 3/30) | Dwg No. 003 C | 04-JUL-2022 (Received) |
| Side Elevation (Unit 3/30) | Dwg No. 004 D | 04-JUL-2022 (Received) |
| Site Plan - Proposed (Unit 2) | Dwg 03 of 05 | 17-MAR-2026 (Received) |
| Patio Floor & Elevations - Proposed | Dwg 05 of 05 | 17-MAR-2026 (Received) |
| Overland Flow Path Investigation | Project No. 9625 Issue 4 | 22-APR-2013 |
APPROVAL CONDITIONS
| Permit to Which These Conditions Relate: | DA - SPA - Carry out Building Work |
| Activity(ies): | Multi-Unit Dwelling |
| Stage: | Request to change the development approval under s81 of the Planning Act 2016: Multi Unit Dwelling (Roof addition over rear deck of Unit 2) |
| 1) Noise and Dust Emissions All development involving the emission of noise
and dust from building/construction activities requires that the emission be in
accordance with the requirements of the Environmental Protection Act 1994. |
As indicated |
| 2) Further Development Permit Required This approval does not include assessment
against the Building Code of Australia and does not permit building work to
occur. |
As indicated |
| Permit to Which These Conditions Relate: | DA - SPA - Material Change of Use |
| Activity(ies): | Multi-Unit Dwelling |
| Stage: | Request to change the development approval under s81 of the Planning Act 2016: Multi Unit Dwelling (Roof addition over rear deck of Unit 2) |
| 3) Time for Completion of Development The approved roof addition over rear
deck of Unit 3 must be completed within two (2) years from the day the approval
takes effect. The approved roof addition over rear deck of Unit 2 must be completed within two (2) years from the day the approval takes effect. Note: If the development is started but not completed within the time specified above, the approval (to the extent it relates to any development not completed) lapses. Timing: Development to be completed within two (2) years. |
As indicated |
| 4) Approved Drawings & Documents A legible copy of the approved
drawings and documents bearing "Council Approval" and the Development
Approval Conditions package is to be available on site. |
While site/operational/building work is occurring |
| 5) Carry Out The Approved Development Carry out the approved development generally in
accordance with the approved drawing(s) and/or document(s). |
While site/operational/building work is occurring and then to be maintained |
| 6) Complete All Building Work Complete all building work associated with this
development approval, including work required by any of the conditions included
in the Conditions Package. Such building work is to be carried out generally in
accordance with the approved drawing(s), and/or documents and, where the
building work is assessable development, in accordance with a current
development permit. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL), and then to be maintained |
| 7) Maintain the Approved Development Maintain the approved development
(including landscaping, parking, driveways and other external spaces) generally
in accordance with the approved drawing(s) and/or documents, and any relevant
Council engineering or other approval required by the conditions. |
To be maintained |
| 8) Overall Height - Survey Certification The overall height of the proposed building(s)
is to be constructed in accordance with the floor and roof levels on the
approved drawings. |
While site/operational/building work is occurring and then to be maintained |
8(a) Submit Certification Submit certification from a licensed surveyor that the as constructed floor and roof levels are in accordance with this condition. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 9) Erect Screen Fence Erect a screen fence along the eastern, southern and northern
boundary(s) of the site as shown on the approved drawings. Unless an
alternative design for the fence is agreed to with the owner of adjoining land,
the screen fence is to be 1.8metres in height. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL) |
| 10) Visitor Parking Visitor car
parking spaces must: |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 11) External Details External details of the building, facade treatment
and external materials, colours and finishes are to be generally consistent
with the approved drawings. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 12) Balconies and Terraces to Remain Unenclosed All balconies and terraces shown on the approved
drawings and documents, are to remain unenclosed with
no shutters, glazing, louvres or similar permanent
fixtures other than those consistent with the relevant Brisbane Planning Scheme
Codes/Policies and clearly depicted on the approved drawings. Any Community Management Statement is to contain a
by-law which reflects the requirements of this condition. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 13) Driveway Material and Finishes Provide materials and finishes to the driveway
and external carparking surfaces that reduce the
visual impact of these areas when viewed from the street. In order to achieve
this outcome, one or a combination of the following is to be used: |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 14) Front Fence Materials and Design Where a front fence is to be erected, the fence
to the road frontage is to be constructed by one of the following means: |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 15) Screen A/C and Other Plant Enclosures Install and maintain suitable screening to all
air conditioning, lift motor rooms, plant and service facilities located at the
top of or on the external face of the building. The screening structures must
be constructed from materials that are consistent with materials used elsewhere
on the facade of the building. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 16) Screening Provide screening in accordance with the following: |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 17) Landscape the Site - Self Certification Landscape the site in accordance with the
requirements of this condition. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL) |
17(a) Prepare a detailed Landscape Plan for
Self Certification Prepare a
detailed Landscape Plan for areas nominated on the approved drawings, in
accordance with the approved Site Plan the relevant Brisbane Planning Scheme
Codes/Policies and the following conditions: |
Prior to site/operational/building work commencing |
17(b) Construct Approved Work Construct landscaping in accordance with the
prepared detailed Landscape Plan. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first |
17(c) Certify Work On completion of works, submit to Development
Assessment certification from: |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
17(d) Maintain Landscape Work Maintain the landscape generally in accordance
with the detailed plans. |
To be maintained |
| 18) Protection of Adjoining Trees Protect from construction damage those parts of
neighbouring trees located above and below the development site. If unable to
comply with the above, submit to the Landscape Architect, Development
Assessment certification by a qualified Arborist
trained to a minimum AQF Level 5 in Arboriculture with a minimum of 5 years'
experience justifying any works on neighbouring trees. |
While site/operational/building work is occurring |
| 19) On-site Erosion (Low Risk) Minimise on-site erosion and the release of
sediment or sediment-laden stormwater from the site at all
times. |
While site/operational/building work is occurring |
19(a) Prepare an Erosion and Sediment Control
(ESC) Management Plan - On-site Erosion (Low Risk) Prepare an Erosion and Sediment Control (ESC)
Management Plan for the site in accordance with the Healthy Waterways document
Controlling Stormwater Pollution on Your
Building Site 2006 (or later version) and in accordance with the relevant
Brisbane Planning Scheme Codes/Policies. |
Prior to site/operational/building work commencing |
19(b) Implement and Maintain the ESC
Management Plan - On-site Erosion (low Risk) Implement and maintain the ESC Management Plan
on-site for the duration of the operational or building works, and until all
exposed soil areas are permanently stabilised (e.g. turfed, hydro-mulched, concreted, landscaped). The prepared ESC Management Plan must be
available on-site for inspection by Council Officers during these
works. |
While site/operational/building work is occurring |
| 20) Filling and excavation (Minor) Undertake the works on the site in accordance
with the relevant Brisbane Planning Scheme
Codes/Policies. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL) |
20(a) Prepare Earthworks Plan A suitably qualified person is to prepare
earthworks drawings in accordance with the relevant Brisbane Planning Scheme
Codes/Policies. The drawings are to
ensure the following: |
Prior to site/operational/building work commencing |
20(b) Implement and Maintain the Earthworks
Plan Implement and
maintain the earthworks plan in accordance with the relevant Brisbane Planning
Scheme Codes/Policies. A copy
of the Earthworks Plan must be available on-site for inspection by Council
Officers during these works. |
While site/operational/building work is occurring and then to be maintained |
| 21) Retaining Walls Design and construct all retaining walls and associated fences,
in accordance with the relevant Brisbane Planning Scheme Codes/Policies and to
ensure the following: |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL) |
21(a) Certification of Retaining
Walls For retaining
walls over 1.0 metre in height, provide certification from a Registered
Professional Engineer Queensland that the design and construction of the
retaining wall and ancillary drainage comply with this
condition. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL) |
| 22) Granting Easements Grant the following easement(s): i.
Easements for underground drainage and overland flow and access
purposes as required over that part of the site within the Waterway Corridor
and/or that part of the site affected by 100 year Average Recurrence Interval
(ARI) flooding as shown in the submitted Overland Flow Path Investigation
report by Intelara date received 25th
April 2013 Project No. 9625 Issue 4 (and Plan No 9625-C01 A) in favour of
Brisbane City Council. Note:-This condition is imposed to provide access, maintenance of
services and to protect drainage paths if required. Easements in favour of the
Brisbane City Council are required to have the necessary easement documentation
prepared (free of costs and compensation to Council) by the Brisbane City
Council. Easements not in favour of the Brisbane City Council are required to
have the necessary documentation prepared by the applicant's private
solicitors. Easements are to be shown on a Survey Plan and lodged with the Plan
Sealing Unit. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL) |
| 23) Access, Grades, Manoeuvring, Carparks, Signs, and
Lines Provide access, parking and
manoeuvring for vehicles on-site in accordance with the relevant Brisbane
Planning Scheme Codes/Policies, as indicated on the approved drawing(s), and
including to the following: |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
23(a) Provide certification Submit to Development Assessment, certification
from a relevant discipline Registered Professional Engineer |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 24) Minimum Floor or Pad Levels Design and construct all proposed pad levels,
building levels, floor levels and ancillary structures to have the appropriate
freeboard in accordance with Brisbane Planning Scheme Codes/Policies to ensure
they will not be flooded during a 50 year ARI local flood event or a 100 year
ARI Creek, River or Storm Tide flood event, whichever is the higher flood
level. The minimum building/habitable floor
level and the minimum non habitable floor level is to
be as shown on the approved plans. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL) |
24(a) Certification Provide certification and/or As-Constructed
plans from a Registered Surveyor that confirm the
development complies with the requirements of this
condition. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL) |
| 25) Repair Damage To Kerb, Footpath Or Road Repair any damage to existing
kerb and channel, footpath or roadway (including removal of concrete slurry
from footways, roads, kerb and channel and stormwater gullies and drainlines) and re-instatement existing traffic signs and
pavement markings that have been removed or damaged during any works carried
out in association with the approved development. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL) |
| 26) Ponding of stormwater Adjoining
properties and roads are to be protected from ponding
or nuisance from stormwater as a result of the works. Ensure the stormwater runoff from the site does not
adversely impact on flooding or drainage (peak discharge and duration for all
events up to the 100 year Average Recurrence Interval (ARI)) of properties that
are upstream, downstream or adjacent to the site. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL), and then to be maintained |
| 27) On site drainage - Minor Provide a stormwater connection to all
new or existing allotments and provide drainage infrastructure to ensure
stormwater run-off from all roof and developed surface areas will be collected
internally and piped in accordance with the relevant Brisbane Planning Scheme
Codes/Policies to a lawful point of discharge. Note: A lawful point
of discharge is defined in the relevant Brisbane Planning Scheme
Codes/Policies. A soakage pit certified by a Registered Professional Engineer
of Queensland-Civil (RPEQ-Civil) may only be considered as an acceptable
alternative point of discharge for single detached dwellings on existing
lots. If roofwater
reticulation is required for a reconfiguration, provide “As
Constructed” plans prepared by an RPEQ or Registered Surveyor. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL), and then to be maintained |
| 28) Construct Permanent Vehicle Crossover Provide two (2) Type residential permanent
vehicular crossover to the Woodstock Avenue frontage of the site at the
location as shown on approved Plan 2013-159 DA C1-06 by Mayhill dated received
20 June 2013, relevant Brisbane Planning Scheme Codes/Policies and Standard
Drawings.
|
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL) |
| 29) Remove Redundant Crossover Remove the existing vehicular crossing(s) on the
frontage(s) of the site and reinstate the kerb and channel, road pavement,
footways and footpaths in accordance with the relevant Brisbane Planning Scheme
Codes/Policies. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL) |
| 30) Provide / Extend Sewerage Connection(s) - Minor
(MCU) Provide a sewer property connection to serve the
development designed and constructed in accordance with endorsed engineering
plans and the current Central SEQ
Distribution - Retailer Authority, Queensland Urban Utilities (QUU)
(Incorporating WSAA) Standards (formerly BCC Standards). |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 31) General Requirements for Water and Sewerage
Works The following
requirements may apply to this development. It is the developer’s
responsibility to determine where these requirements apply, and meet the cost
of any resulting works. 1)
Construct and/or alter public utilities mains,
existing water and sewerage mains, services or installations required in
connection with the approved development in accordance with the current Central
SEQ Distribution - Retailer Authority, Queensland Urban Utilities
(Incorporating WSAA) Standards (formerly BCC Standards). This includes the relocation of any water
meter, fire hydrant, scours and/or valves and sewer connections from within the
limits of the development's vehicular footway crossings. 2) Where
an existing sewerage property connection is located under a driveway (in the
road reserve) and is unable to be relocated, a 1m x 1m removable slab with
suitable lifting arrangements is to be located centrally over the connection
with the Delegate’s, Development Assessment written
agreement. 3)
Where existing or new
sewerage property connections will be located under reinforced concrete slabs
on private property, a 1m x 1m removable slab with suitable lifting
arrangements is to be located centrally over the connection with the
Delegate’s, Development Assessment written agreement. 4)
Where a proposed
structure is within 2.000 metres of an existing sewer, Permission to Build over/near the sewer will have to be obtained from a
private certifier where the sewer is 225mm diameter or less. Greater than 225
mm diameter sewer needs approval from Council. Structures are not to be located
over manholes or sewer property connections. 5)
Where existing
sewerage maintenance holes do not have the current standard top slab, cover and
frame, or there are changes to the surface levels or there are changes to the
loading conditions, the maintenance holes are to be modified in accordance with
the current Central SEQ Distribution - Retailer Authority, Queensland Urban
Utilities (Incorporating WSAA) Standards (formerly BCC Standards). 6)
Existing water mains
and sewers are to be relocated or raised/lowered to the current Central SEQ
Distribution - Retailer Authority, Queensland Urban Utilities (Incorporating
WSAA) Standards (formerly BCC Standards), if development related works change the depth of cover on these
works. 7)
Where a new road
opening or widening is required and an existing water main is located in the
footpath which will become new roadway, the existing main is to be relocated
clear of the proposed carriage way to the depth specified in the current
Central
SEQ Distribution - Retailer Authority, Queensland Urban Utilities
(Incorporating WSAA) Standards (formerly BCC Standards). 8)
Clear, unobstructed, 24 hour access from the
street frontage is to be maintained to any sewerage maintenance holes and
property connections, on the development site. 9)
Where the property is encumbered by a combined
drain, replacement of the existing combined drain may be a requirement of the
plumbing Approval. It is recommended that contact be made with the Plumbing
Services Group to determine any requirements. 10)
Where a building is demolished on a site the
existing sewer property connection is to be sealed and capped. The existing
water service and meter is to be sealed off and removed if not required for the
future development of the site. 11)
Where a dwelling is located in a declared sewered area then the dwelling is to be provided with an
individual water service and meter and sewerage property
connection. GUIDELINE This condition is imposed to ensure that water and sewer infrastructure is accessible, is protected and can be operated and maintained. The condition also ensures footpaths are kept in a safe condition. This condition has been imposed on behalf of Central SEQ Distribution - Retailer Authority, Queensland Urban Utilities, under the delegated concurrence agency agreement. For any enquiries about this condition, please contact the Water and Sewerage Assessment Team, Development Assessment. PROOF OF FULFILMENT Requirements of this condition are complied with to the satisfaction of the Delegate, Development assessment. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL), and then to be maintained |
| 32) Service, Meter Assembly and Meter Box - Minor
(MCU) Provide a water service with approved meter assembly
and meter box to the front real property boundary of the development and a
water sub meter to each lot or tenement in the development, in accordance with
the current Central SEQ Distribution - Retailer Authority, Queensland Urban
Utilities (QUU) (Incorporating WSAA) Standards (formerly BCC Standards),
Appendix WH; Technical Specification for: Sub-metering of Multi-unit
Properties;. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL) |