BRISBANE CITY COUNCIL'S APPROVAL PACKAGE.



APPLICATION DETAILS

This package relates to the application detailed below
Address of Site: 43 WAMBOOL ST BULIMBA QLD 4171
Real Property Description of Site: L69 RP.12589
Aspects of development and type of approval: DA - PA - Material Change of Use Development Permit - multiple dwelling
DA - PA - Building Work Development Permit - multiple dwelling
Council File Reference: A006971368
Permit Reference Number/s: DAMC434549223; DABW434549323.
Package Status: APPROVED - Version 2 (10th of April, 2026 1:32:38 PM)
Package Generated: 10/04/2026


PROJECT TEAM

The assessment of this application has been undertaken by:
Kayal CHANDRASEKAR
Senior Urban Planner
Planning Services South
Kayal.Chandrasekar@brisbane.qld.gov.au
34030086
Kim ROGERS
Principal Urban Planner
Planning Services South
kim.rogers@brisbane.qld.gov.au
34071304
Richard DITCHFIELD
Technical Officer
Engineering Services South
richard.ditchfield@brisbane.qld.gov.au
34036751
Scott RUHLAND
Technical Officer
Engineering Services North
scott.ruhland@brisbane.qld.gov.au
(07) 3403 9459
Glyn CHISHOLM
Senior Landscape Architect
Landscape Architecture Team
Glyn.Chisholm@brisbane.qld.gov.au
07 3403 0117
Mario FURLAN
Architect
Architecture Team
Mario.Furlan@brisbane.qld.gov.au
(07) 3403 5698
Tim DWYER

WaRRS Assessment
Tim.Dwyer@brisbane.qld.gov.au
Rodney KING

Plumbing Services
Rodney.King@brisbane.qld.gov.au
Amir POURFARZAD
Principal Engineer
Engineering Services Traffic
Amir.Pourfarzad@brisbane.qld.gov.au
Binu JOSE

Network Planning
Binu.Jose@brisbane.qld.gov.au
Joyce LAW
Architect
Architecture Team
Joyce.Law@brisbane.qld.gov.au
0731781325
Angela CLEARY
Urban Planner
Planning Services Special Assessment
Angela.Cleary@brisbane.qld.gov.au
31785733
Nicola MEWING
Principal Urban Planner
Planning Services Special Assessment
Nicola.Mewing@brisbane.qld.gov.au
31781002


DRAWINGS AND DOCUMENTS



The term 'drawings and documents' or similar expressions mean:
Drawing or Document Number Plan Date
Traffic Impact Assessment Report 001 Revision 01 20-MAR-2023 (Received)
Site Plan DA1.00 Issue 2 (Amended In Red 02-APR-2026) 25-JUL-2023 (Received)
Basement Floor Plan DA1.01 Issue 3 26-FEB-2026 (Received)
Ground Floor Plan DA1.02 Issue 3 (Amended In Red 02-APR-2026) 26-FEB-2026 (Received)
Level 01 Floor Plan DA1.03 Issue 2 25-JUL-2023 (Received)
Level 02 Floor Plan DA1.04 Issue 2 25-JUL-2023 (Received)
Roof Plan DA1.05 Issue 2 25-JUL-2023 (Received)
Front Elevation (West) DA2.00 Issue 3 26-FEB-2026 (Received)
Side Elevation (South) DA2.01 Issue 2 (Amended In Red 02-APR-2026) 25-JUL-2023 (Received)
Side Elevation (North) DA2.02 Issue 2 (Amended In Red 02-APR-2026) 25-JUL-2023 (Received)
Rear Elevation (East) DA2.03 Issue 2 25-JUL-2023 (Received)
Long Section 01 DA3.00 Issue 2 25-JUL-2023 (Received)
Long Section 02 DA3.01 Issue 2 25-JUL-2023 (Received)
Short Section 01 DA3.02 Issue 2 (Amended In Red 02-APR-2026) 25-JUL-2023 (Received)
Short Section 02 DA3.03 Issue 2 (Amended In Red 02-APR-2026) 25-JUL-2023 (Received)
Landscape Concept Plan - Ground Floor 23.035-Sheet 1-Issue E (Amended In Red 02-APR-2026) 25-JUL-2023 (Received)
Landscape Concept Plan - Level 1 23.035-Sheet 2- Issue E 25-JUL-2023 (Received)
Landscape Concept Plan - Level 2 23.035-Sheet 3- Issue E 25-JUL-2023 (Received)
Landscape Sections 23.035-Sheet 5- Issue E (Amended In Red 02-APR-2026) 25-JUL-2023 (Received)
Existing Tree Schedule 23.035 - Sheet 8- Issue E 25-JUL-2023 (Received)
Proposed Planting Schedule 23.035 - Sheet 12- Issue E 25-JUL-2023 (Received)
Proposed Planting Schedule 23.035 - Sheet 10- Issue E 25-JUL-2023 (Received)
Proposed Planting Schedule 23.035 - Sheet 9- Issue E 25-JUL-2023 (Received)
Proposed Planting Schedule 23.035 - Sheet 11- Issue E 25-JUL-2023 (Received)
Concept Services Plan 23012/SK10 Rev A 20-MAR-2023 (Received)


Advice

Please see the attached document(s) for any advices.

APPROVAL CONDITIONS



Permit to Which These Conditions Relate: DA - PA - Material Change of Use
Activity(ies): multiple dwelling
Stage: Multiple Dwelling (8 Units)

General/Planning Requirements
 
Timing
1)   Building Format Plan

Where the timing of a condition, or part thereof , states 'Prior to issue of Certificate of Occupancy/Final Inspection Certificate' or 'Prior to commencement of use' and the development involves the creation of a Building Format Plan, the timing of the condition, or part thereof, is taken to mean 'prior to Council's endorsement of any plan of subdivision'.

 
As indicated
 
2)   Approved Drawings and Documents

A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers.

Note: This condition is imposed to ensure compliance with the conditions of development approval.

 
While site/operational/building work is occurring
 
3)   Carry Out the Approved Development

Carry out the approved development generally in accordance with the approved DRAWINGS AND DOCUMENTS.

Note. This development approval may include the location of fences, retaining walls and/or external walls of buildings on the boundary of a lot. This approval does not imply permission to enter neighbouring properties to carry out the construction (including associated drainage and earthworks) or maintenance activities. Permission to enter neighbouring properties must be obtained from relevant property owners.

 
While site/operational/building work is occurring and then to be maintained
 
4)   Complete All Building Work

Complete all building work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such building work must be carried out generally in accordance with the approved DRAWINGS AND DOCUMENTS, and, where the building work is assessable development, in accordance with a current development approval.

 
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL), and then to be maintained
 
5)   Maintain the Approved Development

Maintain the approved development generally in accordance with the approved DRAWINGS AND DOCUMENTS, and any relevant Council engineering or other approval required by the conditions.

 
To be maintained
 
6)   Visitor Parking

Visitor car parking spaces must:

-  Be clearly labelled as 'Visitor Parking'; and
-  Remain unimpeded by landscaping, water tanks, storage (temporary or otherwise), gates or any other fitting, fixture or structure to provide 24 hour unrestricted access for bona fide visitors.

 
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
Architecture
 
Timing
7)   External Details

External details of the building, facade treatment and external materials, colours and finishes must be consistent with the approved DRAWINGS AND DOCUMENTS.

Note: The requirement to use particular materials and finishes is imposed only for the purpose of achieving a built form outcome that displays architectural merit. Council has not assessed the materials and finishes for compliance with the Building Act, the Building Fire Safety Regulation, the Building Regulation, the Building Code of Australia, the Queensland Development Code, relevant Australian Standards, fire safety standards or any other relevant requirement of a statutory authority with regard to building work.

 
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
8)   Overall Height

The overall height of the proposed building(s) must be in accordance with the floor and roof levels and overall height shown on the APPROVED DRAWINGS AND DOCUMENTS.

 
While site/operational/building work is occurring and then to be maintained
8(a) Submit Certification

Submit to Development Services certification from a registered surveyor confirming that the “as constructed” floor and roof levels and overall height are in accordance with the requirements of this condition.

Timing: Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
9)   Provide Pedestrian Prioritised Pathway

Provide a pedestrian prioritised pathway from the street frontage to the lobby of the building. The pathway must be differentiated in colour and texture from the driveway surface.

 
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
10)   Balconies/Verandahs/Terraces

No balconies/verandahs/terraces may be enclosed with solid balustrades, solid walls, fixed and/or operable, moveable or adjustable screening unless these features are clearly shown on the APPROVED DRAWINGS AND DOCUMENTS.

Note: Any Community Management Statement that may apply to this approval must contain a by-law which reflects the requirements of this condition.

 
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
11)   Driveway Material and Finishes

Provide materials and finishes to the driveway and external carparking surfaces that reduce the visual impact of these areas when viewed from the street. One or a combination of the following must be used:

-  Coloured aggregate;

-  Concrete pavers; and/or

-  Banding and patterns in the surface design.

 
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
12)   Screen Air Conditioning and Other Plant Enclosures

Install and maintain suitable screening to all air conditioning, lift motor rooms, plant and service facilities located at the top of or on the external face of the building. The screening structures must be constructed from materials that are consistent with materials used elsewhere on the facade of the building.

 
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
13)   Screening Multiple Dwelling / Dual Occupancy

Provide screening in accordance with the approved DRAWINGS AND DOCUMENTS and the following:

a) Where any windows of habitable rooms of the proposed dwelling(s) are within 2m at ground floor level or 9m above ground floor level of adjoining neighbouring dwellings' windows to habitable rooms, provide suitable screening in accordance with the following:

-  Sill heights of 1.5m above floor level; or

-  Fixed obscure glazing in any part of the window below 1.5m above floor level; or

-   Fixed external screens, or

-  Fencing to a minimum 1.8m above ground floor level (only applies to overlooking from windows at ground floor level).

b) Where a direct view is available from balconies, landings, terraces and decks of the proposed dwelling(s) into windows, balconies, landings, terraces and decks of an adjacent dwelling house, that view must be screened from floor level to a height 1.5m above floor level.

c) Translucent screens, perforated or slatted panels, or fixed louvres that are permanent, durable and fixed and have a maximum of 25% openings, with a maximum opening of 50mm.

 
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
Landscape Architecture and Open Space Planning
 
Timing
14)   Retain and Protect Existing Street Tree(s)

Identify, retain and protect the one (x1) existing northernmost street tree on the frontage of 43 Wambool Street, Bulimba including the roots unless otherwise agreed in writing with Program, Planning and Integration Arboriculture (PPI Arb).

Note: Street trees are protected under the Natural Assets Local Law. Street trees must not be removed or pruned without prior approval from PPI Arb.

Note: Where driveway crossovers occur within the Tree Protection Zone (TPZ) of existing street trees, seek approval from the Arboricultural Team in Program Planning and integration, City Standards for the final driveway crossover design and construction methodology to ensure the successful retention of the existing street tree(s)

 

PROOF OF FULFILMENT
Contextual photographic evidence that the tree has been retained in equal or greater health than before development commenced. OR, evidence in writing from Asset Services Arboriculture that an alternative arrangement has been made. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
At all times
14(a) Implement Protection Measures

Install tree protection measures in accordance with Australian Standard - AS4970 Retention of Trees on Development Site.

There must be no excavation, filling or storage of materials or plant within the drip line of the tree(s).

Where works are within the canopy drip line of existing street trees, contact PPI Arb Coordinator in relation to the required provision of protection measures.

Note: If fencing is to protect street trees, a permit to temporarily occupy the footway will be required from Compliance and Regulatory Services.

Timing: Prior to site/operational/building work occurring.

PROOF OF FULFILMENT
Contextual photographic evidence to demonstrate the installation of protection measures prior to building works commencing. Timing: Prior to site / operational / building work occurring.

 
As indicated
14(b) Maintain Protection Measures

Maintain protection measures while development is occurring and remove protection measures prior to commencement of the use.

Timing: While to site/operational/building work is occurring.

 
As indicated
 
15)   Street Tree Replacement

Provide replacement planting for the one (x1) existing southernmost street tree on the frontage of 43 Wambool Street, Bulimba to accommodate a new driveway crossover fronting the development site.

PROOF OF FULFILMENT
Contextual photographic evidence of installed replacement trees. OR, evidence in writing from Program Planning and Integration Arboriculture that an alternative arrangement has been made. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
15(a) Enter Arrangement

Enter into an arrangement with Program, Planning and Integration Arboriculture (PPI Arb) to pay the cost or undertake works, as agreed with PPI Arb, for the removal and replacement planting of the existing street tree(s) fronting the development site.

Timing: Prior to site/operational/building work commencing.

 
As indicated
15(b) Implement Arrangement

Implement the arrangement agreed with PPI Arb.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
16)   Streetscape Works - Neighbourhood Street Major

Carry out streetscape improvement works including concrete path (the frontage of 43 Wambool Street, Bulimba) and turf to the verge to a Neighbourhood Street Major standard in accordance with the relevant Brisbane Planning Scheme Codes, Brisbane Standard Drawings (BSD), the requirements of this condition and the Infrastructure Design Planning Scheme Policy including sections 3.7.4.4 and 3.7.5.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
16(a) Concrete Path

Install a 1.8m wide broom finished standard Portland grey concrete path.

The edge of the path is to be setback 1300mm from the back of kerb. Where the path cannot be installed on this alignment due to conflicts such as street trees, or power poles, ensure the path is installed a minimum distance of:
- 1300mm from the back of kerb
- 500mm from the property boundary
- 600mm from the edge of the conflict

If the above requirements cannot be achieved, contact the Landscape Architecture Team via email: specialistservices@brisbane.qld.gov.au.

Transition to existing paths on verges that adjoin the development. The transition is to occur fronting the adjoining developments, not the subject site.

Note: standard path alignments are shown on Brisbane Standard Drawing BSD-5201 sheet 2 but will vary depending on verge width and location.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Photographic evidence of concrete path. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
16(b) Submit As-Constructed Drawings

Submit to Development Services As Constructed plans including an asset register, checked by a Registered Professional Engineer Queensland, certifying that the concrete path works have been completed in accordance with relevant Brisbane Planning Scheme Codes/Policies.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
As constructed drawings signed by an RPEQ. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
16(c) Turf

Install turf to the full width of the verge excluding any concrete path required by this condition.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Photographic evidence of installed turf. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
17)   Landscape the Site - Self Certification

Landscape the site in accordance with the requirements of this condition.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
17(a) Detailed Landscape Plan for Self- Certification

Prepare a Detailed Landscape Plan at a scale of 1:100 for all on-site landscape works including planting areas identified on the approved DRAWINGS AND DOCUMENTS.

The plan must be prepared by a Qualified Landscape Architect and must comply with the relevant Brisbane Planning Scheme Codes.

The plan must include the following:
- Planting media and mulch in accordance with AS4454 Composts, soil conditioners and mulches and AS 4419-2003 Soils for landscaping and garden use.
- Unless otherwise specified, trees provided as 45 litre stock or larger, staked and tied, and complying with Australian Standards.
- Plant selection and densities to achieve full surface coverage of garden beds within 2 years of planting.
- A reticulated drip irrigation system to all planting areas, with drainage connected to the stormwater system; the irrigation system must be connected to a non-mains water source (31,000L rainwater storage tank illustrated on approved architectural plans).
- Details of a 12 week establishment period.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
A detailed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
17(b) Multiple Unit Dwelling

In addition to the requirements listed above, the plan must include the following:
- Deep Planting areas providing dimensions at ground level and areas as shown on the approved drawings and planted with large subtropical tree species.
- Landscape Buffer Planting areas along side and rear boundaries providing dimensions and areas as shown on the approved drawings and planted with suitable screening tree/shrub species.
- Front Boundary Planting areas providing dimensions and areas as shown on the approved drawings and planted with round canopy trees.
- Containerised Planting is provided with internal depths and widths as illustrated on approved plans; OR, with internal depths and widths sufficient to support healthy plant growth, with the following dimensions or other dimensions if achieving the same soil volume; trees - 1200m width x depth, large shrubs and palms - 800mm width x depth, small shrubs and groundcovers - 600mm width x depth.
- One hose cock within any private landscape and recreation area.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
A detailed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
17(c) Certify Detailed Landscape Plan

On completion of the Detailed Landscape Plan, submit to Development Services:
- Brisbane City Council Form CC10616 - Landscape Design Certificate prepared by a Qualified Landscape Architect to certify that the Detailed Landscape Plan complies with the requirements of this condition
- A copy of the certified Detailed Landscape Plan.

Timing: Prior to building work commencing.

PROOF OF FULFILMENT
A detailed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to building work commencing.

 
As indicated
17(d) Implement Certified Detailed Landscape Plan

Carry out the landscape work in accordance with the above certified detailed Landscape Plan.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
17(e) Certify Work

On completion of the landscape work, submit to Development Services:
- Brisbane City Council Form CC10613 - Landscape Works Certificate prepared by a Qualified Landscape Architect or licensed Landscape Contractor to certify the completed landscape work complies with the certified Detailed Landscape Plan
- A copy of the as-constructed certified Detailed Landscape Plan.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
An as constructed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
17(f) Maintain Landscape Work

Maintain the landscape work, including deep planting, in accordance with the certified Detailed Landscape Plan.

Timing: To be maintained.

 
As indicated
 
Engineering
 
Timing
18)   On-site Erosion (Medium Risk)

Manage on-site erosion and the release of sediment or sediment laden water from the site at all times by implementing best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version).

Timing: Prior to commencement of any land disturbing activities and until all exposed soil areas are permanently stabilised against erosion.

 
As indicated
18(a) Manage earth disturbance on- site

(i) Drainage control measures must be implemented and maintained to minimise water flow onto areas of exposed earth.

(ii) Sediment and erosion control measures must be implemented and maintained to prevent soil loss from earth disturbance areas and prevent deposition beyond earth disturbance areas.

(iii) No release of contaminants to land beyond on-site area of earth disturbance other than releases that achieve water pollutant concentration release limits of:

A. 50mg/L TSS (Total Suspended Solids);

B. Turbidity, Nephelometric Turbidity Units (NTU) value less than 10% above background, 75 NTU, or as agreed in writing by an Officer from Councils Erosion and Sediment Control (ESC) Team in Compliance and Regulatory Services;

C. pH between 6.5 and 8.5 at all times.

(iv) Maintain a written record to demonstrate that water discharges from the site, including any dewatering operations, meet the release limits as detailed in (iii) for water discharge(s) from the site that occur during or immediately after a rainfall event, and during normal business hours. The water quality of the discharge flows must be measured at each discharge point from the site, including but not limited to sediment basin outlets, other applicable sediment control devices, the site water drainage system, and recorded against the release limits at least once on each calendar day until such discharge stops.

Timing: Prior to commencement of any earth disturbing activities and until all exposed soil areas are permanently stabilised against erosion.

 
As indicated
18(b) Provide Land Occupier Notification to Council

(i) Notify Council's ESC Team of proposed land occupier/s by sending an email to CARS-ESC@Brisbane.qld.gov.au

(ii) If the land is to be occupied by any person other than the registered landowner then advice must be provided to Council that confirms the name, contact information and the duration of any proposed occupation of the land.

Timing: Prior to commencement of any earth disturbing activities.

 
As indicated
18(c) Prepare Erosion and Sediment Control Plan

Prepare an Erosion and Sediment Control Plan (ESCP) in accordance with best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version) and, to the extent of any inconsistency, relevant Brisbane Planning Scheme Codes and Policies.

Obtain a design certificate in accordance with the relevant Brisbane Planning Scheme Codes and Policies.

The ESCP and design certificate must be certified by a Certified Professional in Erosion and Sediment Control (CPESC) or a Registered Professional Engineer Qld (RPEQ) with suitable qualifications and experience in erosion and sediment control.

Documentary evidence demonstrating appropriate qualifications in erosion and sediment control must be provided to the Council upon request.

Timing: Prior to the commencement of any earth disturbing activities.

 
As indicated
18(d) Attend a pre-start meeting

Arrange and attend a pre-start meeting for ESC with an Officer from Councils ESC Team in Compliance and Regulatory Services (CARS).

Note: To request a pre-start meeting from Council's ESC Team send an email to CARS-ESC@Brisbane.qld.gov.au. All relevant documentation, including both the certified ESCP and the certified design certificate, must be attached to this email.

Please allow up to 10 business days for your request to be processed.

Timing: Attend the pre- start meeting prior to the commencement of any earth disturbing activities.

 
As indicated
18(e) Implement Certified Erosion and Sediment Control Plan

Implement the certified ESCP and maintain all ESC measures in accordance with best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version) and, to the extent of any inconsistency, relevant Brisbane Planning Scheme Codes and Policies.

The ESCP and design certificate must be available on site at all times for inspection by Council officers. Any alteration to supplementary or Type 3 ESC measures must be reflected in the certified ESCP. Any alteration to Type 2 or Type 1 ESC measures will require a revised ESCP and design certificate that has been certified by either the CPESC or RPEQ.

Timing: While earth disturbing activities are occurring and until all exposed soil areas are permanently stabilised against erosion.

 
As indicated
 
19)   Information Signage

Erect an information sign on the subject property in accordance with Council's general requirements for signage and in accordance with the requirements outlined below:
a) The sign should provide a brief description of the development proposed;
b) The sign is to list the name, postal and/or email address and a contact telephone number for the following parties (where relevant) that are undertaking work on the site:
 - Developer;
 - Project Coordinator;
 - Architect/Building Designer;
 - Builder;
 - Civil Engineer;
 - Civil Contractor/s; and
 - Landscape Architect;
c) The lettering on the sign is to be at least 25 millimetres in height, be of regular weight and in sentence case;
d) The sign is to be a minimum size of 1,200 millimetres by 900 millimetres;
e) The maximum area of the sign is to be 2.0m2;
f) The sign is to be positioned as follows:
 - located centrally along each road frontage of the site to Wambool Street;
 - located on or within 1.5 metres of the road frontage;
 - mounted at least 300 millimetres above ground level; and
 - clearly visible from the street for a pedestrian;
g) The sign is to contain no commercial or corporate advertising other than the name, logo or slogan of the parties outlined in part (b) of this condition;
h) The sign is to be non-illuminated; and
i) Both the sign and the supporting structure are to be made of weatherproof material and to be properly maintained at all times;

Timing: Prior to site works commencing and then to be maintained until completion of the development for all stages.

 
As indicated
 
20)   Filling and / or Excavation

All earthworks must be carried out in accordance with the relevant Brisbane Planning Scheme Codes.

 
Prior to building work commencing
20(a) Submit Earthworks Drawings

Submit to, and obtain approval from, Development Services earthworks drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the approved DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes.

The Earthworks Drawings must include the following:
- The location of any cut and/or fill;
- The quantity of fill to be deposited and finished fill levels;
- Maintenance of access roads to and from the site such that they remain free of all fill material and are cleaned as necessary;
- The existing and future finished levels in reference to the Australian Height Datum (including cross- sections or long sections into the adjacent properties);
- Preservation of all drainage structures from the effects of structural loading generated by the earthworks;
- Protection of adjoining properties and roads from adverse impacts as a result of the works;
- That all vehicles exiting from the site will be cleaned and treated so as to prevent material being tracked or deposited on public roads.

Note: If the earthworks impact on the road reserve, the Developer must obtain applicable footpath and road permits prior to commencing any works. Such impacts may include footpath occupation, road closures, re-profiling, ground anchors and/or relocation of services. If the excavation has to be stabilised using ground anchors or similar, then the submitted plans must show the location of these in relation to all services. The cost of moving services, utilities and assets is the responsibility of the Developer. The permission of the service/utility/asset owner is required.

Note: Irrespective of final earthworks, it is the responsibility of the RPEQ to manage any staged works associated with Erosion & Sediment Control.

Timing: Prior to site/operational/building work commencing.

 
As indicated
20(b) Fill Material, Placement, Compaction and Testing

All fill material placed on the site must comprise only natural earth and rock and must be free of contaminants (as defined by Part 3, Division 2, Subdivision 2 Environmental contamination, Section 11 of the Environmental Protection Act 1994) and noxious, hazardous, deleterious and organic materials.

Fill material, placement, compaction and testing must comply with the requirements of Australian Standard - AS 3798, Guidelines on Earthworks for Commercial and Residential Developments.

Timing: While site/operational/building work is occurring.

 
As indicated
20(c) Implement Approved Earthworks Drawings

Construct and maintain the earthworks in accordance with the requirements of AS3798 and the approved earthworks drawings.

Timing: While site/operational/building work is occurring and then to be maintained.

 
As indicated
20(d) Submit As Constructed Drawings

Submit to Development Services As Constructed drawings prepared by a Registered Surveyor.

Timing: Prior to building work above ground commencing.

 
As indicated
20(e) Submit Certification

Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the approved earthworks drawings.

Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that all fill material used complies with the quality requirements of this condition and that placement, compaction and testing has been carried out in accordance with AS3798.

Timing: Prior to building work above ground commencing.

 
As indicated
 
21)   Basement Excavation and Support

Basement excavation and support of all exposed walls must be carried out in accordance with the relevant Brisbane Planning Scheme Codes and the requirements of this condition.

 
Prior to building work commencing
21(a) Prepare Engineering Drawings

Engineering drawings for the work required by this condition must be prepared and certified by a Registered Professional Engineer Queensland (Structural), in accordance with the relevant Brisbane Planning Scheme Codes detailing the design of the proposed excavation as well as proposed temporary and permanent support (if no temporary proposed) systems.

The design must include at least the following:
- The location (in plan and section) of the proposed excavation;
- Detailed design of proposed temporary support of the excavation;
- If no temporary support is proposed then detail design of the proposed permanent support of the excavation;
- Any retention system, including associated drainage, is to be wholly contained within the site unless written approval has been obtained from the affected neighbouring property owner;
- The existing and proposed finished levels in reference to the Australian Height Datum (including cross-sections or long sections into the adjacent properties);
- Preservation of all drainage structures from the effects of structural loading generated by the excavation;
- Protection of adjoining properties and roads from adverse impacts as a result of Building Works;
- All existing Brisbane City Council stormwater lines and Maintenance Holes, including depths of Maintenance Holes and clearances to retention structures is to be shown.
Where ground or rock anchors are proposed as a temporary support (Note: permanent anchors are not acceptable) the design must include the following in addition to the above:
- Anchor position/s and length/s (in elevation view and sectional view);
- Where the anchoring system is proposed to encroach into a neighbouring property, written approval is to be obtained from the affected property owner;
- Plans must show the location of the ground anchors in relation to all existing services and public utilities. The cost of relocating any existing services, public utilities or BCC assets is the responsibility of the Developer.

Notes:
- The Earthworks drawings are not required to be submitted for Council approval.
- Where any ground anchors or rock bolts are proposed within 10metres in the vertical plane of a UU sewer, UU water main, BCC stormwater line or combined sanitary drain, assessment will be required against the QDC section MP1.4 by the building certifier.
- Ground anchors are not to be located closer than 1.0m vertically or 1.0m horizontally from existing or proposed Council Infrastructure.
- If the basement excavation impacts on the road reserve, the developer must obtain applicable footpath and road permits prior to commencing any works. Such impacts may include footpath occupation, road closures, re-profiling, ground anchors and/or relocation of services.
- Where public utilities such as UU sewer or water infrastructure, electricity, telecommunication or gas infrastructure will be affected advice must be obtained from the respective utility owner.

Timing: Prior to site/operational/building work commencing.

 
As indicated
21(b) Implement Certified Engineering Drawings

Construct and maintain the basement excavation and proposed support system in accordance with the above certified engineering drawings.

Note: A copy of the certified engineering drawings must be available on- site for inspection by Council Officers during these works.

Timing: While basement excavation and support system installation is occurring.

 
As indicated
21(c) Submit Post Construction Certification

Submit certification by a Registered Professional Engineer Queensland that the basement excavation and support have been installed in compliance with the certified engineering drawings, the relevant Brisbane Planning Scheme Codes and the requirements of this condition.

Where ground or rock anchors have been installed, submit certification by a Registered Professional Engineer Queensland (Geo-technical) that all anchors have been de- stressed.

Timing: Prior to building work commencing above ground.

 
As indicated
 
22)   Construction Management Plan (Minor)

Carry out development in a method consistent with a Construction Management Plan (Minor) prepared in accordance with the requirements of this condition.

 
While site/operational/building work is occurring
22(a) Construction Management Plan (Minor) - Prepare Plan

Prepare a detailed Construction Management Plan (CMP) for the construction phase of the approved development.The Construction Management Plan must be in accordance with the relevant Brisbane Planning Scheme Codes and address the following:
(i) Provision for pedestrian management including acceptable alternative DDA compliant pedestrian routes (adjacent to or surrounding the site);
(ii) Existing and proposed kerbside allocation signs and line marking (such as bus stops, loading zones and parking meters and/or ticket dispensers);
(iii) Location of and impacts to any Council or other public utility or local authority's assets on or within external to the site;
(iv) Location and design of temporary vehicular construction access points, including frequency of use;
(v) Management and mitigation strategies for the impact of dust, noise and vibration upon adjoining and nearby properties;
(vi) Provision for loading and unloading of materials including the location of any remote loading sites;
(vii) Location of materials, structures, plant and equipment to be stored or placed on the construction site;
(viii) Location of proposed external hoardings and/or gantries, and including clearances to the impacts of this on existing street furniture and other footpath assets located within the verge as well as impacts on any existing advertising signage located either along or adjacent to the site frontage - this includes any potential obstruction of sight lines for such advertising (e.g. bus stops with advertising);
(ix) Location of proposed employee and visitor parking areas;
(x) Anticipated staging and programming;
(xi) Impacts of any actions proposed to address any of the above items or any actions resulting from construction of the development that will impact on existing street trees;
(xii) Complaint management processes to be implemented; and
(xiii) Compliance with the Management Plans Planning Scheme Policy and other relevant Planning Scheme Policies.

The Construction Management Plan must be supported by 'approval in principle' or written approvals from the relevant Council sections or other governing bodies responsible for any potentially impacted infrastructure.

The list of relevant infrastructure and contacts is available on Council's website - Search 'Construction Management Plan'.

Note: The Construction Management Plan is not required to be approved by Development Services.

Timing: Prior to site/operational/building work commencing.

 
As indicated
22(b) Construction Management Plan (Minor) - Submit Plan

Submit a copy of the Construction Management Plan to Council's Development Services Branch at the following mailbox: engineeringservices@brisbane.qld.gov.au quoting the BCC planning development approval reference number.

Timing: At least 10 days prior to site works commencing.

 
As indicated
22(c) Construction Management Plan (Minor) - Documentation on Site

Legible copies of the Construction Management Plan and current permits must be kept on site and be made available on request by Council at all times. The requirements of the CMP must be included in all induction of principal and subcontractors utilised in the development. An outline of the induction provided to contractors may be requested by Council to confirm compliance with this condition.

Timing: While site/operational/building work is occurring.

 
As indicated
22(d) Construction Management Plan - Works to be Performed Out of Hours

Obtain an approval from Development Services for any work that is proposed to be undertaken outside of normal business hours - 6:30am to 6:30pm, Monday to Saturday.

Timing: Prior to site/operational/building work commencing.

 
As indicated
22(e) Implement Construction Management Plan (Minor)

Carry out the development in accordance with the submitted Construction Management Plan.

 
While site/operational/building work is occurring
 
23)   Protect Existing Infrastructure

Where there is existing infrastructure in the vicinity of the proposed work, the new work must not damage or compromise the working ability of the existing infrastructure.

Where alterations to public utility mains, existing mains, services or installations are necessitated by the development, prior to alterations commencing, the developer must notify Council or the relevant infrastructure provider and obtain agreement to the alterations.

The developer must meet the costs of the alterations. The alterations must be carried out in accordance with the relevant Brisbane Planning Scheme Codes or infrastructure providers requirements.

 
While site/operational/building work is occurring
23(a) As Constructed Drawings - Alterations to Existing Infrastructure

Submit to Development Services As Constructed drawings showing all new and/or rectification works and an asset register, prepared by a Registered Professional Engineer Queensland.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that the alterations have been completed in accordance with the relevant Brisbane Planning Scheme Codes and any other relevant infrastructure requirements. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
24)   Remove Improvements & Obstructions from Truncation and Dedication

Remove all improvements (fences, gates, letter boxes, garden beds and plots and other constructed items, etc.) and obstructions (existing earth banks, vegetation, etc.) from the area of the dedicated road and reinstate the area as footway in accordance with the relevant Brisbane Planning Scheme Codes.

Any new or existing installations of electrical pillar boxes, pad mounted transformers (PMTs), water meters and the like, must be installed/relocated to their ultimate alignment relative to the new property boundary and clear of the usable footpath areas irrespective of the alignment of the existing services/conduits.

Note: The cost of moving services, utilities and assets is the responsibility of the Developer. The permission of the service, utility or asset owner will be required. Council permission is required if street trees, stormwater gullies/drains, and swales are affected. Urban Utilities permission is required if water supply and sewerage services are affected.

Standard utility alignments may be found on Council's 'Brisbane Standard Drawings' 1013 to 1016 inclusive.

PROOF OF FULFILMENT
Certification from a Registered Surveyor (Qld) or Registered Professional Engineer Queensland that the above work has been completed in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
25)   Retaining Walls

Design and construct all retaining walls and associated fences, in accordance with the relevant Brisbane Planning Scheme Codes and the following:

- All retaining walls including the footings, must be located wholly within the property boundaries of the site where works are occurring

- Runoff from surface drains and subsoil drainage associated with the retaining walls must be collected and connected to a lawful point of discharge (LPD) where possible. If no LPD is available the surface drains and sub-soil drainage must be designed, installed and discharged to ensure there is no ponding, nuisance or concentration of stormwater discharge to adjacent properties.

- Retaining walls to stabilise excavation must be set back from property boundaries to accommodate subsoil drainage without encroachment into the neighbouring property. This set back may vary depending on the height, structure and design of the retaining wall, surcharge loadings from neighbouring properties, and to provide a surface drain along the top of the retaining wall

- For retaining walls in excess of 1.0m in height:
- walls must be vertically and horizontally tiered by a ratio of 1:1 unless an alternative has been approved by Development Services
- walls must be designed and certified by a Registered Professional Engineer Queensland
- walls facing onto Council property (including the road reserve and parkland) must not be constructed from timber.

NOTE: Refer to City Plan 2014; Infrastructure Design Planning Scheme Policy (IDPSP) for Council’s definition of a LPD.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
25(a) Certification of Retaining Walls

For retaining walls over 1.0m in height, obtain certification from a Registered Professional Engineer Queensland that the design and construction of the retaining walls and ancillary drainage are in accordance with the requirements of this condition.

 
As indicated
 
26)   Access, Grades, Manoeuvring, Carparks, Signs and Line Marking

Construct and maintain access, parking and manoeuvring for vehicles on site in accordance with the relevant Brisbane Planning Scheme Codes, as indicated on the approved DRAWINGS AND DOCUMENTS, including the following:

i. A pavement of minimum Local road standard or equivalent surface material (including associated drainage) to the area on which motor vehicles will be driven and/or parked.

ii. Standing on site for a Rear Loading Refuse Collection Vehicle and for the loading and unloading of vehicle(s).

iii. Parking on the site for 19 resident/tenant cars and two visitor cars, and for the loading and unloading of vehicle(s) within the site.

iv. Provide and maintain eight secure resident/tenant bicycle parking spaces and two visitor bicycle parking spaces.

v. A minimum of 2.3 metres height clearance to all undercover parking areas, including the entry and access to these areas. The minimum clear height must be measured to the lowest protrusion from the ceiling (e.g. fire sprinklers, services, lighting fixtures, signs, etc).

vi. A height clearance sign located at the entrance(s) to undercover car parking areas and a directional visitor parking sign clearly visible from the vehicle entrance to the site.

vii. An appropriate area for the storage and collection of refuse, including recyclables, in a position which is accessible to service vehicles on the site.

viii. Prepare and implement signs and line markings drawings that show the internal paved areas signed and delineated in accordance with the approved drawings and documents. The drawings must be prepared and certified by a Registered Professional Engineer Queensland in accordance with the relevant Brisbane Planning Scheme Codes and the Manual of Uniform Traffic Control Devices.

ix. Install the hold bay and traffic signal system in accordance with the ITE Consulting “Traffic Impact Statement Report”, Report Number 001, Revision Number 01 received 20 March, 2023.

x. Install the sight triangles at the start of the internal driveway, in accordance with the ‘Ground Floor Plan’, Drawing Number DA1.02 Issue 3, received by Council on 26/02/2026 and amended in red on 02/04/2026.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland, that the above requirements have been implemented in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
27)   Repair Damage to Kerb, Footpath or Road

Repair any damage to the existing kerb and channel, footpath or roadway (including removal of concrete slurry from footways, roads, kerb and channel, stormwater gullies and drainlines) and re-instate existing traffic signs and pavement markings that have been removed or damaged during any works carried out in association with the approved development.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
27(a) Interim Repairs

If at any time during the construction phase of the approved development, damage to the existing kerb and channel, footpath or roadway creates unsafe, unreasonable and/or not fit for purpose conditions as assessed by Council, interim repairs must be undertaken as directed by Program Planning and Integration.

Note: Any interim repairs required to be undertaken shall not be considered to satisfy the requirements of this condition for the permanent repair of the infrastructure prior to the issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

Timing: While site / operational / building works is occurring.

 
As indicated
 
28)   Refuse Collection - On Site

Provide for the installation and collection of refuse/recycling bins by Brisbane City Council's Waste and Resource Recovery Services or a private waste contractor.

 
At all times
28(a) Arrange Refuse Collection

Arrange for the installation of refuse/recycling bins and for the subsequent collection of refuse including recycling from the site by Brisbane City Council's Waste and Resource Recovery Services or a private waste contractor.

Timing: A minimum of four weeks prior to the commencement of use and then to be maintained.

PROOF OF FULFILMENT
Where a private waste contractor is engaged, provide written confirmation from the proposed waste collection contractor of the agreement to service the property. The written agreement must be submitted to Council's Waste and Resource Recovery Services and include full details of the proposed system, bin sizes, number of bins, frequency of collection and the refuse collection vehicle size. Timing: Prior to commencement of use.

 
As indicated
28(b) Indemnify Council

The owner and any subsequent owner must, by approved form to Waste and Resource Recovery Services, indemnify Council and its agents in respect of any damage to the pavement and other driving surfaces.

Timing: When an arrangement for refuse/recycling collection services is made with Brisbane City Council.

 
As indicated
28(c) Notify Future Owner

Where Council is engaged as the waste contractor, the owner must notify any future owner/body corporate that the development has been approved on the basis that an indemnity must be provide for refuse collection vehicles to enter the property.

Timing: At time of a change of ownership.

 
As indicated
 
29)   Refuse Storage - On Site Collection

Provide a roofed and wholly screened refuse enclosure utilising materials consistent with the development or a dedicated refuse storage room, as shown on the approved plans and documents.

The enclosure/refuse storage room must be of a design to accommodate the quantity of refuse and recycling including source separation to allow for low servicing collection of the development.

Bins must be located in an area which allows them to be manoeuvred from the bin storage area to the designated internal collection point.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
30)   Land for Transport Network - Road (Non- trunk)

Dedicate as road land shown as new road (non-trunk) on the APPROVED ‘Site Plan’, Drawing no. DA1.00 Issue 2, received by Council on 25/07/2023 and amended in red on 02/04/2026, including the following:

i. A widening along the full length of the Wambool Street frontage of the site to achieve a verge width of 3.75 metres measured from the existing nominal face of the kerb in Wambool Street.

Note: This condition is imposed under section 145 of the Planning Act 2016.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
30(a) Submit Plan of Subdivision

Submit to, and obtain approval from, Development Services, a plan of subdivision showing the land to be dedicated for road to demonstrate compliance with the requirements of this condition.

Timing: As part of the submission of the request pursuant to Schedule 18 of the Planning Regulation 2017 for Council's notation on the plan of subdivision necessary to comply with this condition.

 
As indicated
30(b) Lodge Notated Plan

Lodge the plan of subdivision notated by Council pursuant to Schedule 18 of the Planning Regulation 2017 with the Registrar of Titles for the relevant Queensland State Government Authority.

Timing: Prior to commencement of use.

PROOF OF FULFILMENT
Evidence of the registration of the required plan of subdivision. Timing: Within one month of the registration of the plan of subdivision.

 
As indicated
 
31)   Remove Redundant Drainage Outlets

Remove any redundant drainage outlets from the kerb and channel including any associated pipe work across the footway and reinstate the kerb and channel and the footway area in accordance with the relevant Brisbane Planning Scheme Codes.

Note: Guidance for the preparation of drawings and/or documents to comply with this condition is provided in the Brisbane Planning Scheme Policies.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
32)   All Basements - Stormwater Runoff

Design and construct basements to manage stormwater runoff in accordance with the relevant Brisbane Planning Scheme Codes and the following:

(i) All stormwater pump systems must be designed to gravity drain to a Council stormwater system.

(ii) The driveway into a basement must be designed and constructed to minimise local driveway stormwater runoff entering the basement. The drainage must be designed to capture runoff from a 10% AEP rainfall event and gravity drain to a lawful point of discharge.

(iii) Vehicle access into any basement from a Council road will require the basement driveway to ramp up a minimum of 200mm, above adjacent road channel invert, to maintain road major flow capacity.

(iv) All roofwater drainage is to be directed to a lawful point of discharge via gravity drainage, not directed into the basement.

(v) Any stormwater within a basement that connects via gravity drainage directly to a council pipe or manhole must incorporate backflow prevention devices.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland that the development has been designed and constructed in accordance with this condition.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
33)   Ponding of Stormwater

Carry out the approved development to ensure that adjoining properties and roads are protected from ponding or nuisance from stormwater during construction.

Notes: If remedial works are necessary to comply with this condition, prior approval must be obtained from Development Services.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
34)   On Site Drainage - Minor

Provide a stormwater connection to all new or existing allotments and provide drainage infrastructure to ensure stormwater run-off from all roof and developed surface areas will be collected internally and piped in accordance with the relevant Brisbane Planning Scheme Codes to a lawful point of discharge and as shown on the approved ‘Concept Services Plan’ Drawing reference 23012/SK10, Revision A, received by Council on 20/03/2023.

Note:
- Guidance for the preparation of drawings and/or documents to comply with this condition is provided in the Brisbane Planning Scheme Policies.
- Queensland Building and Construction Commission licensed hydraulic consultants may design the stormwater system for sites less than 2000m2 with an upstream catchment servicing no more than 4 residential lots. This excludes stormwater drainage design (including subsoil drainage) of basements in flood planning areas and the design of any onsite stormwater detention system.
- Where external works are required and infrastructure will be handed over to Council (e.g. Stormwater pipes 375mm or greater and/or manholes within the road reserve, etc), the applicant will be required to request a Pre-Start with Council and ensure all future owned Council assets follow the On/Off Maintenance process in accordance with Council's Infrastructure Installation & Construction Requirements Manual.

- Guidance for requesting a pre-start and co- ordinating the On/Off Maintenance process can be found on Council's website (https://www.brisbane.qld.gov.au/planning-and- building/applying-and-post-approval/on-and-off-maintenance- approvals).

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
35)   Service Conduits and Mains

Provide and install all service conduits and meet the cost of any alterations to public utility mains, existing mains, services, street lighting or installations that are required to carry out the approved development. These works must be in accordance with the relevant Brisbane Planning Scheme Codes, and include the following, where applicable:
- the provision of all services and/or conduits along the full length of any rear allotment access or access easement.
- the breaking and/or relocation of any existing sewer combine drains.
- the relocation of any fire hydrant and/or valves from the development's vehicular footway crossings.
- the retention and/or relocation of any existing foul water lines that currently exist within the site.
- any new or existing installations of electrical pillar boxes, pad mounted transformers (PMTs), water reticulation mains, water meters and the like, must be installed/relocated to their ultimate alignment relative to the new property boundary and clear of the usable footpath areas irrespective of the alignment of the existing services/conduits.

Note:
- The cost of moving services, utilities and assets is the responsibility of the Developer. The permission of the service, utility or asset owner will be required. Council permission is required if street trees, stormwater gullies/drains, and swales are affected. Urban Utilities permission is required if water supply and sewerage services are affected.
- Standard utility alignments may be found on Council's 'Brisbane Standard Drawings' 1013 to 1016 inclusive.
- Applicants must liaise with the appropriate service authorities. Typical underground services and/or conduits to be constructed include power, phone, telecommunications, sewer (including private combine drains) stormwater and gas, if applicable.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
35(a) Submit As Constructed Drawings

Submit to Development Services As Constructed drawings, including an asset register, prepared and certified by a Registered Professional Engineer Queensland.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the requirements of this condition. Note: Civil works are to be certified by a RPEQ(Civil) and electrical works are to be certified by a RPEQ (Electrical).

 
As indicated
 
36)   Telecommunications

Submit to Development Services, certification from an authorised telecommunications carrier/contractor, that the following works and infrastructure have been undertaken and installed in accordance with telecommunications industry standards:
- Provide telecommunications to the subject buildings, lead-in conduits and equipment space in a suitable location within the buildings, to suit the carrier of choice.
- If new pits and conduit infrastructure are required to be installed within the road reserve fronting the site, it must be suitably sized to cater for future installation of fibre optic cables.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
37)   Agreement with Electricity Supplier

Submit to Development Services, evidence of an agreement with an electricity supplier to provide necessary services to the development in accordance with the relevant Brisbane Planning Scheme Codes.

Where development is within an established area of overhead electricity supply and the electricity supplier determines that a property pole is the appropriate solution to supply electricity to the development, the developer must be responsible for the installation of the property pole(s).

In the above circumstances, submit to Development Services, certification from the developer's electrical consultant confirming that the above installation has been completed in accordance with the relevant AS/NZS Standards and the Queensland Electricity Connection Manual (QECM) and Queensland Electricity Metering Manual (QEMM).

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
38)   Permanent Driveway Crossover

Provide a 6.5 metre wide Type B1 permanent driveway crossover to the Wambool Street frontage of the site in accordance with the relevant Brisbane Planning Scheme Codes and located as shown on the approved DRAWINGS AND DOCUMENTS.

Written consent must be obtained from Program, Planning and Integration Arboriculture (PPI Arb) prior to any works occurring that will either impact on or require removal of a street tree (this includes pruning, excavation or fill within the root zone/canopy of the tree).

At all times during construction of the crossover, safe pedestrian access along the site frontage must be maintained.

Note: No further driveway permit is required however additional footway permits or lane closure permits may be required for footpath/verge closures and/or lane closures. These permits must be obtained prior to construction of the crossover.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
39)   Redundant Driveway Crossover

Remove the redundant existing driveway crossover(s) on the frontage(s) of the site and reinstate the kerb and channel, road pavement, footways and footpaths in accordance with the relevant Brisbane Planning Scheme Codes.

Note:
For kerb and channel reinstatement, the existing channel is required to be removed and the kerb and channel reinstated in one pour.

Additional footway permits or lane closure permits may be required for footpath/verge closures and/or lane closures. These permits must be obtained prior to construction of the crossover.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
Standard Advice
 
Timing
40)   Further Development Permit required

This Development Approval to carry out building work made assessable under the planning scheme for Brisbane does not include an assessment of building work against the requirements of the Building Act and does not permit building work to occur unless, prior to the commencement of any building work, a Development Permit(s) to carry out assessable building work under the Building Act has been issued.

 
As indicated
 
41)   Construction Noise and Dust Emissions

Pursuant to the Environmental Protection Act 1994, all development involving the emission of noise and dust from building and/or construction activities, must ensure that the emissions are in accordance with the requirements of the Act.
The Environmental Protection Act 1994 prescribes that:

1. A person must not carry out building work in a way that makes an audible noise-
-  on a business day or Saturday, before 6.30a.m. or after 6.30p.m; or
-   on any other day, at any time. 
2. The reference in subsection (1) to a person carrying out building work-
-  includes a person carrying out building work under an owner-builder permit; and
-  otherwise does not include a person carrying out building work at premises used by the person only for residential purposes.

Note: A request can be made to work outside of these hours by submitting an Environmental Management Plan for assessment and obtaining an endorsed decision from the Environmental Management delegate Development Services.

 
As indicated
 
42)   Currency Period

The currency period for this development approval is stated in the Decision Notice.

The currency period for this development approval is expressed as a date.

This development approval lapses at the end of the currency period (the date stated in the decision notice) if:

  - for a material change of use, the first change of use does not happen;

  - for reconfiguring a lot, the plan of subdivision for the reconfiguration is not given to Council; or

  - for any other development (including building work and operational work), the development does not substantially start.

The currency period is determined by Council pursuant to section 85 of the Planning Act 2016.

 
As indicated
 
43)   Water and Wastewater

Services for water and wastewater (sewerage) are not under the jurisdiction of Brisbane City Council. Authorisation to connect the approved development to the water/wastewater networks and for property service connections required a Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009.

For further information about any necessary Water Approvals contact Urban Utilities.

 
As indicated
 
44)   Advice

Please note that the information contained in this section under the heading Standard Advice has been provided as advice only and does not form part of the development approval conditions.  This information has been provided to advise of other obligations under state legislation or local laws that may require action to be undertaken prior to commencing the activity approved by this development approval.

 
As indicated
 
45)   Cultural Heritage

Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003 This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage. The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care.

If you are unsure of your obligations contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships).

 
As indicated
 
46)   Damage to Trees on Adjoining Lots

Please note that any damage caused to vegetation on adjoining lots as a result of exercising this development approval may result in civil action.

 
As indicated
 
47)   Fire Ant Movement Controls

To prevent the spread of fire ants, the Queensland Government has implemented movement controls in areas of Queensland (biosecurity zones) where this pest species has been detected. These controls apply to individuals and commercial operators, and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products.
Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014.
If you are unsure of your obligations contact the relevant Queensland State Government Department (Biosecurity Queensland, Department of Agriculture and Fisheries).

 
As indicated
 
48)   Water and Wastewater

Services for water and wastewater (sewerage) are no longer under the jurisdiction of Brisbane City Council. Authorisation to connect the approved development to the water/wastewater networks and for property service connections requires a Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009. Any necessary Water Approval must be obtained from the relevant distributor- retailer (currently operating as Queensland Urban Utilities for the Brisbane City Council area).

For the purpose of approving plans of subdivision pursuant to Schedule 18 of the Planning Regulation 2017 (whether in relation to a development permit for Reconfiguring a Lot or a Building Format Plan subsequent to a development permit for a Material Change of Use), documentary evidence, issued by the relevant distributor-retailer, must be provided to Council to verify that the conditions of any necessary Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009, have been complied with.

 
As indicated
 



Permit to Which These Conditions Relate: DA - PA - Building Work
Activity(ies): multiple dwelling
Stage: Multiple Dwelling (8 Units) in Traditional Building Character Overlay

General/Planning Requirements
 
Timing
49)   Building Format Plan

Where the timing of a condition, or part thereof , states 'Prior to issue of Certificate of Occupancy/Final Inspection Certificate' or 'Prior to commencement of use' and the development involves the creation of a Building Format Plan, the timing of the condition, or part thereof, is taken to mean 'prior to Council's endorsement of any plan of subdivision'.

 
As indicated
 
50)   Approved Drawings and Documents

A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers.

Note: This condition is imposed to ensure compliance with the conditions of development approval.

 
While site/operational/building work is occurring
 
51)   Carry Out the Approved Development

Carry out the approved development generally in accordance with the approved DRAWINGS AND DOCUMENTS.

Note. This development approval may include the location of fences, retaining walls and/or external walls of buildings on the boundary of a lot. This approval does not imply permission to enter neighbouring properties to carry out the construction (including associated drainage and earthworks) or maintenance activities. Permission to enter neighbouring properties must be obtained from relevant property owners.

 
While site/operational/building work is occurring and then to be maintained
 
52)   Complete All Building Work

Complete all building work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such building work must be carried out generally in accordance with the approved DRAWINGS AND DOCUMENTS, and, where the building work is assessable development, in accordance with a current development approval.

 
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL), and then to be maintained
 
53)   Maintain the Approved Development

Maintain the approved development generally in accordance with the approved DRAWINGS AND DOCUMENTS, and any relevant Council engineering or other approval required by the conditions.

 
To be maintained
 
Architecture
 
Timing
54)   External Details

External details of the building, facade treatment and external materials, colours and finishes must be consistent with the approved DRAWINGS AND DOCUMENTS.

Note: The requirement to use particular materials and finishes is imposed only for the purpose of achieving a built form outcome that displays architectural merit. Council has not assessed the materials and finishes for compliance with the Building Act, the Building Fire Safety Regulation, the Building Regulation, the Building Code of Australia, the Queensland Development Code, relevant Australian Standards, fire safety standards or any other relevant requirement of a statutory authority with regard to building work.

 
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
55)   Overall Height

The overall height of the proposed building(s) must be in accordance with the floor and roof levels and overall height shown on the APPROVED DRAWINGS AND DOCUMENTS.

 
While site/operational/building work is occurring and then to be maintained
55(a) Submit Certification

Submit to Development Services certification from a registered surveyor confirming that the “as constructed” floor and roof levels and overall height are in accordance with the requirements of this condition.

Timing: Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
Standard Advice
 
Timing
56)   Further Development Permit required

This Development Approval to carry out building work made assessable under the planning scheme for Brisbane does not include an assessment of building work against the requirements of the Building Act and does not permit building work to occur unless, prior to the commencement of any building work, a Development Permit(s) to carry out assessable building work under the Building Act has been issued.

 
As indicated
 
57)   Construction Noise and Dust Emissions

Pursuant to the Environmental Protection Act 1994, all development involving the emission of noise and dust from building and/or construction activities, must ensure that the emissions are in accordance with the requirements of the Act.
The Environmental Protection Act 1994 prescribes that:

1. A person must not carry out building work in a way that makes an audible noise-
-  on a business day or Saturday, before 6.30a.m. or after 6.30p.m; or
-   on any other day, at any time. 
2. The reference in subsection (1) to a person carrying out building work-
-  includes a person carrying out building work under an owner-builder permit; and
-  otherwise does not include a person carrying out building work at premises used by the person only for residential purposes.

Note: A request can be made to work outside of these hours by submitting an Environmental Management Plan for assessment and obtaining an endorsed decision from the Environmental Management delegate Development Services.

 
As indicated
 
58)   Currency Period

The currency period for this development approval is stated in the Decision Notice.

The currency period for this development approval is expressed as a date.

This development approval lapses at the end of the currency period (the date stated in the decision notice) if:

  - for a material change of use, the first change of use does not happen;

  - for reconfiguring a lot, the plan of subdivision for the reconfiguration is not given to Council; or

  - for any other development (including building work and operational work), the development does not substantially start.

The currency period is determined by Council pursuant to section 85 of the Planning Act 2016.

 
As indicated
 
59)   Water and Wastewater

Services for water and wastewater (sewerage) are not under the jurisdiction of Brisbane City Council. Authorisation to connect the approved development to the water/wastewater networks and for property service connections required a Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009.

For further information about any necessary Water Approvals contact Urban Utilities.

 
As indicated
 
60)   Advice

Please note that the information contained in this section under the heading Standard Advice has been provided as advice only and does not form part of the development approval conditions.  This information has been provided to advise of other obligations under state legislation or local laws that may require action to be undertaken prior to commencing the activity approved by this development approval.

 
As indicated
 
61)   Cultural Heritage

Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003 This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage. The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care.

If you are unsure of your obligations contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships).

 
As indicated
 
62)   Damage to Trees on Adjoining Lots

Please note that any damage caused to vegetation on adjoining lots as a result of exercising this development approval may result in civil action.

 
As indicated
 
63)   Fire Ant Movement Controls

To prevent the spread of fire ants, the Queensland Government has implemented movement controls in areas of Queensland (biosecurity zones) where this pest species has been detected. These controls apply to individuals and commercial operators, and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products.
Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014.
If you are unsure of your obligations contact the relevant Queensland State Government Department (Biosecurity Queensland, Department of Agriculture and Fisheries).

 
As indicated
 
64)   Water and Wastewater

Services for water and wastewater (sewerage) are no longer under the jurisdiction of Brisbane City Council. Authorisation to connect the approved development to the water/wastewater networks and for property service connections requires a Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009. Any necessary Water Approval must be obtained from the relevant distributor- retailer (currently operating as Queensland Urban Utilities for the Brisbane City Council area).

For the purpose of approving plans of subdivision pursuant to Schedule 18 of the Planning Regulation 2017 (whether in relation to a development permit for Reconfiguring a Lot or a Building Format Plan subsequent to a development permit for a Material Change of Use), documentary evidence, issued by the relevant distributor-retailer, must be provided to Council to verify that the conditions of any necessary Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009, have been complied with.

 
As indicated
 

** End of Package **