| Address of Site: | 229 PERSSE RD RUNCORN QLD 4113 |
| Real Property Description of Site: | L12 RP.88054 |
| Aspects of development and type of approval: | DA - PA - Building Work Development Permit - multiple dwelling DA - PA - Material Change of Use Development Permit - multiple dwelling |
| Council File Reference: | A006978357 Permit Reference Number/s: DABW424805322; DAMC424805422. |
| Package Status: | APPROVED - Version 3 (7th of May, 2026 5:19:05 PM) |
| Package Generated: | 07/05/2026 |
| Ryan CASEY Senior Urban Planner Planning Services South Ryan.Casey@brisbane.qld.gov.au 07 3178 6818 |
Kathryn KELLY Principal Urban Planner Planning Services South kathryn.kelly@brisbane.qld.gov.au 07 3407 1308 |
Hayley STEEL Team Manager (Acting) Planning Services Special Assessment Hayley.Steel@brisbane.qld.gov.au (07) 3178 0022 |
| Joel WAKE Senior Urban Planner Planning Services South joel.wake@brisbane.qld.gov.au (07) 3178 7467 |
Samuel GAY Senior Engineer Engineering Services South samuel.gay@brisbane.qld.gov.au (07) 3407 1801 |
Bella FAULKNER Landscape Architect Landscape Architecture Team Isabella.Faulkner@brisbane.qld.gov.au 07 3403 8888 |
| Emma MEZZINA Team Manager Planning Services South Emma.Mezzina@brisbane.qld.gov.au 3178 0049 |
Jolanta KRAWUS Principal Engineer, Development Assessment Engineering Scoping jolanta.krawus@brisbane.qld.gov.au 34036190 |
Renee SILVESTER Senior Ecologist Ecology Services Renee.Silvester@brisbane.qld.gov.au (07) 3178 5834 |
| Jacqueline PATON Senior Architect Architecture Team Jacqueline.Paton@brisbane.qld.gov.au 07 3178 0389 |
Glen PORTER Principal Technical Officer Engineering Services Traffic Glen.Porter@brisbane.qld.gov.au 0734035200 |
Binu JOSE Network Planning Binu.Jose@brisbane.qld.gov.au |
| Tim DWYER WaRRS Assessment Tim.Dwyer@brisbane.qld.gov.au |
Andrew TSAI Senior Engineer Engineering Services South andrew.tsai@brisbane.qld.gov.au (07) 3407 0366 |
Kathryn KELLY Principal Urban Planner Planning Services South kathryn.kelly@brisbane.qld.gov.au 07 3407 1308 |
| Ryan CASEY Senior Urban Planner Planning Services South Ryan.Casey@brisbane.qld.gov.au 07 3178 6818 |
DRAWINGS AND DOCUMENTS
| Drawing or Document | Number | Plan Date |
|---|---|---|
| Detailed Landscape Plan Landscape Schedules | L003 Rev G | 06-MAR-2026 (Received) |
| Detailed Landscape Plan Planting Plan - Sheet 1 | L100 Rev G (Amended In Red 07-MAY-2026) | 06-MAR-2026 (Received) |
| Detailed Landscape Plan Planting Plan - Sheet 2 | L101 Rev G (Amended In Red 07-MAY-2026) | 06-MAR-2026 (Received) |
| Detailed Landscape Plan Planting Plan - Sheet 3 | L102 Rev G | 06-MAR-2026 (Received) |
| Detailed Landscape Plan Sitewide Fencing Plan | L200 Rev G | 06-MAR-2026 (Received) |
| Detailed Landscape Plan Details - Sheet 3 | L302 Rev G (Amended In Red 07-MAY-2026) | 06-MAR-2026 (Received) |
| Detailed Landscape Plan Details - Sheet 4 | L303 Rev G (Amended In Red 07-MAY-2026) | 06-MAR-2026 (Received) |
| Proposed Site Plan | DA_100.02 - Rev. 4 (Amended In Red 07-MAY-2026) | 06-MAR-2026 (Received) |
| Proposed Site Roof Plan | DA_100.03 - Rev. 5 | 06-MAR-2026 (Received) |
| Proposed Site Elevations | DA_300.01 - Rev. 3 (Amended In Red 07-MAY-2026) | 06-MAR-2026 (Received) |
| Proposed Site Elevations | DA_300.02 - Rev. 3 (Amended In Red 07-MAY-2026) | 06-MAR-2026 (Received) |
| Typical 4 Bed Unit | DA_500.01 - Rev. 3 | 06-MAR-2026 (Received) |
| Typical 4 Bed (Mirrored) Unit | DA_500.02 - Rev. 3 | 06-MAR-2026 (Received) |
| Typical 3 Bed Unit | DA_500.03 - Rev. 3 | 06-MAR-2026 (Received) |
| Typical Screen Layout + Sectional Details | DA_600.01 - Rev. 3 | 06-MAR-2026 (Received) |
| Typical Elevations - Cluster of 3 Units | DA_600.02 - Rev. 3 | 06-MAR-2026 (Received) |
| Stormwater Quality Management Plan Report | Revision B | 28-OCT-2022 (Received) |
| Vegetation Retention Plan | S522012_VRP_001 (Amended In Red 14-NOV-2022) | 28-OCT-2022 (Received) |
| Vegetation Retention Plan Schedule | S522012_VRP_002 (Amended In Red 14-NOV-2022) | 28-OCT-2022 (Received) |
| Road Widening Plan | RC16005 Issue 1 | 08-DEC-2021 |
APPROVAL CONDITIONS
| Permit to Which These Conditions Relate: | DA - PA - Building Work |
| Activity(ies): | multiple dwelling |
| Stage: | Building work in the Flood overlay and Waterway corridor overlay |
| 1) Maintain the Approved Development Maintain the approved development in accordance with the approved DRAWINGS AND DOCUMENTS, and any other relevant Council approval required by the conditions. |
At all times |
| 2) Approved Drawings and Documents A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers. Note: This condition is imposed to ensure compliance with the conditions of development approval. |
While site/operational/building work is occurring |
| 3) Carry Out the Approved Development Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS. Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks). Permission to enter neighbouring properties must be obtained from the relevant property owners. |
While site/operational/building work is occurring |
| 4) Complete All Building Work Complete all building work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such building work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS. Note: Building work must also be completed in accordance with any other current development approval. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 5) Minimum Flood Planning Levels Design and construct all building pad levels, floor levels and ancillary structures to the appropriate flood planning level with freeboard (where required) in accordance with the relevant Brisbane Planning Scheme Codes and the approved drawings and documents. The minimum habitable floor level must be 60.36 metres AHD. The minimum non-habitable floor level must be 60.16 metres AHD. The minimum carpark level and vehicle manoeuvring level must be 60.16 metres AHD. The minimum level for essential electrical services must be 60.36 metres AHD. PROOF OF FULFILMENT As-Constructed drawings prepared by a Registered Surveyor (Qld). The Registered Surveyor (Qld) must certify that the development has been constructed in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 6) Construction Noise and Dust Emissions Pursuant to the Environmental
Protection Act 1994, all development involving the emission of noise and dust
from building and/or construction activities, must ensure that the emissions
are in accordance with the requirements of the Act. |
As indicated |
| 7) Further Development Permit Required Further Development Permit(s) to carry out assessable building work under the Building Act may be required. |
As indicated |
| 8) Currency Period The currency period for this development approval is stated in the Decision Notice and is expressed as a date. This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016. |
As indicated |
| 9) Cultural Heritage Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage. The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care. For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships). |
As indicated |
| 10) Damage to Trees on Adjoining Land Please note that any damage caused to vegetation on adjoining land as a result of exercising this development approval may result in an offence under other legislation (e.g. Natural Assets Local Law) and/or civil action |
As indicated |
| 11) Fire Ant Movement Controls To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected. These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products. Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014. For further information contact the relevant Queensland State Government department on 13 QGOV. |
As indicated |
| 12) Flood Resilience and Awareness This advice is provided for buildings that are on sites that are subject to the flood overlay, as shown within City Plan 2014.
Council makes decisions to minimise flood risk based on the best information available at the time of the development application. Flood studies and applicable flood levels may be updated by Council overtime where new flood information is available or changes to engineering standards/methodology have occurred. Flood levels for various flood events and flooding types are outlined in Councils Floodwise Property Reports available from Councils website.
The minimum flood planning levels that apply to new development do not necessarily mean that the development will never flood. Therefore, when choosing materials for building on sites that are known to be affected by flooding, regardless of whether it is constructed to the minimum flood planning level, it is recommended that flood resilient materials are used to improve the speed of recovery and reduce the cost of repairs if required.
For more information refer to: Council's website at https://www.brisbane.qld.gov.au/community-and-safety/community- safety/disasters-and-emergencies/be-prepared/flooding-in-brisbane/flooding- support-for-residents/flood-resilient-homes-program Queensland Reconstruction Authority "Flood Resilient Building Guidance for Queensland Homes"https://www.qra.qld.gov.au/resilient- homes/flood-resilient-building-guidance-queensland-homes |
As indicated |
| Permit to Which These Conditions Relate: | DA - PA - Material Change of Use |
| Activity(ies): | multiple dwelling |
| Stage: | Multiple Dwelling (24 units) |
| 13) Maintain the Approved Development Maintain the approved development in accordance with the approved DRAWINGS AND DOCUMENTS, and any other relevant Council approval required by the conditions. |
At all times |
| 14) Approved Drawings and Documents A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers. Note: This condition is imposed to ensure compliance with the conditions of development approval. |
While site/operational/building work is occurring |
| 15) Carry Out the Approved Development Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS. Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks). Permission to enter neighbouring properties must be obtained from the relevant property owners. |
While site/operational/building work is occurring |
| 16) Erect Screen Fence Erect a screen fence along the side and rear boundaries of the site as shown on the approved DRAWINGS AND DOCUMENTS. The screen fence must be 1.8 metres in height. |
Prior to the commencement of the use or prior to the endorsement of a Community Management Statement, whichever is sooner |
| 17) Complete All Building Work Complete all building work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such building work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS. Note: Building work must also be completed in accordance with any other current development approval. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 18) Visitor Parking Visitor car parking spaces are to be located as per
the APPROVED Proposed Site Plan DA_100.02 - Rev. 4, received 06-MAR-2026 and
amended in red 07-MAY-2026 and must: |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 19) Car Parking The car parking within the premises must be maintained exclusively for the ancillary use of the development. The parking must not be made available to the general public and there must not be signage erected on or in the vicinity of the site advertising the availability of car parking to the general public. |
At all times |
| 20) External Details External details of the building, facade treatment and external materials and finishes must be consistent with the approved DRAWINGS AND DOCUMENTS. Note: The requirement to use particular materials and finishes is imposed only for the purpose of achieving a built form outcome that displays architectural merit. Council has not assessed the materials and finishes for compliance with the Building Act, the Building Fire Safety Regulation, the Building Regulation, the Building Code of Australia, the Queensland Development Code, relevant Australian Standards, fire safety standards or any other relevant requirement of a statutory authority with regard to building work. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 21) Overall Height The overall height of the building(s) must be in accordance with the floor and roof levels and overall height shown on the APPROVED DRAWINGS AND DOCUMENTS. NOTE: This condition should be read in conjunction with any other relevant condition requiring minimum height clearances for basement or undercover car parking and manoeuvring areas. |
While site/operational/building work is occurring and then to be maintained |
21(a) Submit Certification Submit to Development Services certification from a registered surveyor confirming that the 'as constructed' floor and roof levels and overall height are in accordance with the requirements of this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
| 22) Driveway Material and Finishes Provide materials and
finishes to the driveway and external carparking
surfaces that reduce the visual impact of these areas when viewed from the
street. One or a combination of the following must be used: |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 23) Provide Pedestrian Prioritised Pathway Provide a pedestrian prioritised pathway from the street frontage to the front door of each townhouse. The pathway must be differentiated in colour and texture from the driveway surface. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 24) Screen Air Conditioning and Other Plant
Enclosures Install and maintain suitable screening to all air conditioning, lift motor rooms, plant and service facilities located at the top of or on the external face of the building and within the Private Open Spaces. The screening structures must be constructed from materials that are consistent with materials used elsewhere on the facade of the building. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 25) Screening Provide suitable privacy screening to windows of habitable rooms, balconies, landings, terraces and decks of the proposed dwelling(s) in accordance with the approved DRAWINGS AND DOCUMENTS. Suitable screening options must be: For windows: For balconies,
landings, terraces and decks: Note: Screening devices must be either solid translucent screens, perforated or slatted panels, or fixed louvres that are permanent, be durable and fixed. Screening devices must have a maximum of 25% openings, with a maximum opening of 50mm. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 26) Fauna Management - Fauna Spotter Catcher Engage a licensed Fauna Spotter Catcher (qualified by the relevant Queensland State Government Authority) to manage the protection and relocation of any fauna prior to and during vegetation/ecological feature clearing. |
While site/operational/building work is occurring |
26(a) Prior to Vegetation/ Ecological Feature
Clearing Submit to Development Services certification from the licensed Fauna Spotter Catcher that the site has been fully inspected and any necessary fauna protection measures or relocation procedures have been implemented. Timing: Prior to vegetation/ecological feature clearing commencing. |
As indicated |
26(b) During Vegetation/ Ecological Feature
Clearing The licensed Fauna Spotter Catcher must be present on site during all clearing operations to monitor works and to respond to any fauna situations that may arise. If any fauna is identified in vegetation or ecological features to be removed during clearing operations, work must cease immediately on that vegetation or ecological feature. The licensed Fauna Spotter Catcher must supervise the relocation of any identified fauna prior to vegetation/ ecological feature clearing recommencing. Timing: While vegetation/ ecological feature clearing is occurring. |
As indicated |
26(c) Submit Certification Submit to Development Services certification from the licensed Fauna Spotter Catcher that vegetation/ecological feature clearing was carried out in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/ Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
| 27) Vegetation Retention (Approved Plan) Manage vegetation on the site in accordance with the APPROVED Vegetation Retention Plan S522012_VRP_001 received 28-OCT-2022 and amended in red 14-NOV-2022 and Vegetation Retention Plan Schedule S522012_VRP_002 received 28-OCT-2022 and amended in red 14-NOV-2022. |
While site/operational/building work is occurring |
27(a) Project Arborist Appoint as Project Arborist, a qualified Arborist (minimum AQF Level 5 in Arboriculture with a minimum of 5 years' experience in arboricultural principles and practices, including tree risk hazard assessment and reporting with current public liability insurance to $20 million, and a professional indemnity of $2 million). Provide evidence of this appointment to the Ecologist Development Services. Timing: Prior site / operational / building work occurring. |
As indicated |
27(b) Implement Approved Vegetation Retention
Plan Carry out the works in accordance with the approved Vegetation Retention Plan. Protection of vegetation and habitat features to be retained must be in accordance with Australian Standard - AS4970 Protection Of Trees On Development Sites. Timing: While site / operational / building work is occurring. |
As indicated |
27(c) Submit Certification Submit to Development Services, certification from a qualified and experienced environmental practitioner, certifying that the work(s) have been carried out in accordance with the approved Vegetation Retention Plan. Timing: Upon completion of each phase of the approved Vegetation Retention Plan and prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
27(d) Retain and Protect
Vegetation Retain and protect vegetation in accordance with the approved Vegetation Retention Plan. Timing: To be maintained. |
As indicated |
| 28) Environmental Protection Zone Retain, protect and maintain all vegetation and ecological features within the approved Environmental Protection Zone shown on APPROVED DRAWINGS AND DOCUMENTS. The following requirements must be met and maintained to support the approved Environmental Protection Zone. |
While site/operational/building work is occurring and then to be maintained |
28(a) Restrictions Within Approved
Environmental Protection Zone No part of any building or structure (including but not limited to swimming pools, tennis courts, retaining walls, tanks), no facilities associated with the development, no open space, no recreation areas, no landscaping, no on-site stormwater drainage, no on-site wastewater treatment, no areas of disturbance (including excavation and filling), no storage/stockpiles of materials, no on-site parking, no access and no manoeuvring areas and no bushfire management measures must be located on any part of the site within the approved Environmental Protection Zone whether for temporary, short-term or long-term periods unless approved in this Development Approval or subsequent approvals from Council. Timing: To be maintained. |
As indicated |
28(b) Environmental Protection Zone Set
Out A Registered Surveyor must survey and peg the approved Environmental Protection Zone. Timing: Prior to site/operational/building work commencing and to be maintained |
As indicated |
28(c) Fences Any fences erected within or to the northern, southern or western perimeters of the Environmental Protection Zone must be constructed to allow the free movement of native fauna. Timing: To be maintained. |
As indicated |
28(d) Pet Exclusion Fencing Fences must be erected to the perimeter of the Development Footprint to contain pets. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first and to be maintained. |
As indicated |
28(e) Notification to Prospective
Purchasers Notify all prospective purchasers of the site(s) of the requirements and effects of this condition. Timing: At the time of marketing a lot for sale. |
As indicated |
| 29) Statutory Environmental Covenant Enter an environmental covenant with Brisbane City Council pursuant to Section 97A of the Land Title Act 1994 to ensure the appropriate management of the identified vegetation and ecological features within the Environmental Protection Zone identified on the APPROVED DRAWINGS AND DOCUMENTS. |
Prior to commencement of use |
29(a) Submit Plan of Survey Submit to Development Services, and obtain approval for, a plan of survey showing the land to be covered by the covenant to demonstrate compliance with the requirements of this condition. Timing: Prior to building work commencing. |
As indicated |
29(b) Request Preparation of
Covenant Submit a request for Council to prepare the necessary covenant documentation to demonstrate compliance with the requirements of this condition. The covenant must detail the responsibilities, liabilities, measures, remedies and intents as necessary to ensure the management of the identified vegetation and ecological features on the land and must address the following: 1. Maintenance of vegetation and
ecological features including: 2. Exclusion from the covenant area of all buildings and structures (including swimming pools, tennis courts, retaining walls), open space, all associated facilities, landscaping, on-site stormwater infrastructure, on-site wastewater treatment, all areas of disturbance (including excavation and filling), on-site parking, access and manoeuvring areas, unless otherwise specified in this development approval or subsequent approvals from Council. Note: Covenants to be entered into with the Brisbane City Council must have the necessary covenant documentation prepared by the Brisbane City Council, free of cost to Council. Timing: Prior to building work commencing. |
As indicated |
29(c) Lodge Notated Plan and
Covenant Lodge the plan of survey notated by Council and the necessary covenant documentation prepared by Council with the Registrar of Titles for the relevant Queensland State Government Authority. Timing: Prior to commencement of use. |
As indicated |
29(d) Submit Evidence of
Registration Submit to Development Services evidence of the registration of the plan of survey and the necessary covenant documentation prepared by Council. Timing: Within one month of the registration of the covenant. |
As indicated |
29(e) Maintain Covenant Retain, protect and maintain the environmental covenant in accordance with the terms and conditions of the covenant. Timing: At all times |
As indicated |
| 30) Rehabilitation (Submit Plan) Rehabilitate the site in accordance with a Rehabilitation Plan approved pursuant to this condition. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
30(a) Submit Rehabilitation
Plan Submit and obtain approval for a Rehabilitation Plan from Development Services. This plan must be prepared by a qualified and experienced environmental practitioner. The Rehabilitation Plan must be in the form of scaled drawings and supporting documentation and includes the following information for the area identified for rehabilitation (Environmental Protection Zone): Existing Site conditions: - Topography and land cover - including location and details of stored/stockpiled materials, etc.; - Vegetation communities (trees, shrubs and groundcovers) including species and Tree Protection Zones (in accordance with AS497) and invasive pest plant status; - Location of existing services. Site Preparation: - Removal of deleterious matter and redundant structures; - Exclusion fencing; - Maintenance access. New Works: - Description of rehabilitation objectives, Regional Ecosystems being restored, rehabilitation zones, stabilisation works; - Details of the rehabilitation schedule, including staging of works; - Surface treatments including soil treatment, imported material, mulch and stabilisation treatments; - Finished levels, including sections at critical points; - Services and stormwater outlet work including cross sections - Pest plant and animal control requirements for species identified in the Biosecurity Act 2014, and Council's Biosecurity Plan; - Plant species including the botanical name, stock size and densities; - Planting establishment requirements including planting procedures, mulching and watering; - Details of new habitat features; - Location and specifications of fauna movement / pet exclusion/fauna exclusion fencing; - Exclusion fencing, access/cross overs, vehicle exclusion bollards etc.; - Monitoring and reporting protocols for all rehabilitation works, including nest boxes. Maintenance and Costing: - Maintenance schedule for the establishment period and the 24-month On Maintenance period; - Owner's maintenance manual for after completion of the 24-month On Maintenance period; Timing: Prior to site/operational/building work commencing. |
As indicated |
30(b) Implement Approved Rehabilitation
Plan Carry out the rehabilitation works in accordance with the approved Rehabilitation Plan. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
30(c) Submit Implement
Certification Submit to Development Services, certification from a qualified and experienced environmental professional, certifying that the rehabilitation works have been carried out in accordance with the approved Rehabilitation Plan. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
30(d) Submit Final
Certification Submit to Development Services, certification from a qualified and experienced environmental professional, certifying that the rehabilitation maintenance works have been carried out in accordance with the approved Rehabilitation Plan and are now complete.
Timing: At completion of maintenance period |
As indicated |
| 31) Streetscape Works - Neighbourhood Street
Minor Carry out streetscape improvement works including concrete path (where required by this condition), turf and street trees to the verge to a Neighbourhood Street Minor standard in accordance with the relevant Brisbane Planning Scheme Codes, Brisbane Standard Drawings (BSD), the requirements of this condition and the Infrastructure Design Planning Scheme Policy including sections 3.7.4.4 and 3.7.5. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
31(a) Concrete Path Install a 1.2m wide broom finished standard Portland grey concrete path. The edge of the path is to be setback 1300mm from the back of kerb.
Where the path cannot be installed on this alignment due to conflicts such as
street trees, or power poles, ensure the path is installed a minimum distance
of: If the above requirements cannot be achieved, contact the Landscape Architecture Team via email: specialistservices@brisbane.qld.gov.au. Transition to existing paths on verges that adjoin the development. The transition is to occur fronting the adjoining developments, not the subject site. Note: standard path alignments are shown on Brisbane Standard Drawing BSD-5201 sheet 2 but will vary depending on verge width and location. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT Photographic evidence of concrete path. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
31(b) Submit As-Constructed
Drawings Submit to Development Services As Constructed plans including an asset register, checked by a Registered Professional Engineer Queensland, certifying that the concrete path works have been completed in accordance with relevant Brisbane Planning Scheme Codes/Policies. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT As constructed drawings signed by an RPEQ. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
31(c) Turf Install turf to the full width of the verge excluding any concrete path required by this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT Photographic evidence of installed turf. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
31(d) Street Tree(s) Enter into and implement an arrangement with the Program Planning and Integration Regional Coordinator Arboriculture in relation to the required provision of the street tree planting in accordance with the above sections of the Infrastructure Design Planning Scheme Policy, including the number, species, location, installation and maintenance of the required street tree(s) as determined by Program Planning and Integration. Note: Street trees should not be planted until all utilities have been installed. Timing: Prior to issue of Certificate of Occupancy / Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT A copy of the agreement with Program Planning and Integration and/or photographic evidence of installed trees. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
| 32) Landscape the Site Landscape the site as indicated on the approved DRAWINGS AND DOCUMENTS and in accordance with the requirements of this condition. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
32(a) Submit Building Layout
Details Submit to Development Services, and obtain approval from for, details of the final building layout below and at ground level to demonstrate that provision has been made for deep planting, perimeter planting, services and existing trees that are required to be retained. The details must be provided by a qualified Landscape Architect or RPEQ. Timing: Prior to building works commencing. |
As indicated |
32(b) Submit Detailed Landscape
Plan Submit to Development Services, and obtain approval for, a detailed Landscape Plan for all on-site landscape works identified on the approved DRAWINGS AND DOCUMENTS. The plan must be prepared at a scale of 1:100 by a qualified Landscape Architect and must comply with the relevant Brisbane Planning Scheme Codes. The plan must include the following: Siteworks Planting Deep Planting Timing: Prior to building work above ground level commencing. |
As indicated |
32(c) Additional Requirements - Multi-Unit
Dwelling/Single Unit Dwelling In addition to the requirements listed above, the plan must include the following: Planting Amenity Containerised
Planters Terraced Retaining Walls Specifications Timing: Prior to building work above ground level commencing. |
As indicated |
32(d) Additional Requirements - Terraced
Retaining Walls In addition to the requirements listed above, the plan must include the
following: Timing: Prior to building work above ground level commencing. |
As indicated |
32(e) Additional Requirements -
Irrigation In addition to the requirements listed above, the plan must include the
following: Timing: Prior to building work above ground level commencing. |
As indicated |
32(f) Construct Approved Works Carry out the landscaping and associated works in accordance with the approved detailed Landscape Plan. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
32(g) Certify Works On completion of the works, provide Development Services with a copy of the as-constructed detailed Landscape Plan together with certification from a qualified Landscape Architect or qualified Landscape Contractor that the completed landscape work complies with the approved detailed Landscape Plan (Brisbane City Council Form CC10613 Landscape Works Certificate). Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
32(h) Maintain the Landscape
Works Maintain the landscape generally in accordance with the approved detailed Landscape Plan. Timing: Prior to commencement of use, whichever comes first. |
As indicated |
| 33) Mechanical Plant or Equipment - Acoustically
Screened Mechanical plant or equipment is to be acoustically screened from an adjoining sensitive use. Mechanical plant includes generators, motors, compressors and pumps such as air-conditioning, refrigeration and cold room motors. Acoustically screened is defined in City Plan 2014. NOTE: This condition does not authorise environmental nuisance under the Environmental Protection Act 1994. PROOF OF FULFILMENT Submit to Development Services, certification that all mechanical plant or equipment, is acoustically screened. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 34) Grant Easements Grant the following easement(s) as may be
required: Timing: Prior to commencement of use and then to be maintained. |
As indicated |
34(a) Submit Plan of Subdivision and
Documentation (Council Easement in Gross) Submit to, and obtain approval from, Development Services a plan of subdivision showing the easement and a request for Council to prepare the necessary easement documentation to demonstrate compliance with the requirements of this condition. Note: Easements in favour of the Brisbane City Council must have the necessary easement documentation prepared by the Brisbane City Council, free of cost to Council. Timing: Prior to submission of the request pursuant to Schedule 18 of the Planning Regulation 2017 for Council's notation on the plan of subdivision necessary to comply with this condition. |
As indicated |
34(b) Submit Plan of Subdivision and
Documentation (Other Easement) Submit to, and obtain approval from, Development Services, a plan of subdivision showing the easement and the necessary easement documentation to demonstrate compliance with the requirements of this condition. Note: Easements not in favour of the Brisbane City Council must have the necessary documentation prepared by the applicant's private solicitors. Timing: As part of the submission of the request pursuant to Schedule 18 of the Planning Regulation 2017 for Council's notation on the plan of subdivision necessary to comply with this condition. |
As indicated |
34(c) Lodge Notated Plan and
Documentation Lodge the plan of subdivision notated by Council pursuant to Schedule 18 of the Planning Regulation 2017 and the necessary easement documentation with the Registrar of Titles for the relevant Queensland State Government Authority. Timing: Prior to commencement of use. PROOF OF FULFILMENT Evidence of the registration of the necessary easement documentation. Timing: Within one month of the registration of the easement documentation. |
As indicated |
| 35) On-site Erosion (Medium Risk) Manage on-site erosion and the release of sediment or sediment laden water from the site at all times by implementing best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version). Timing: Prior to commencement of any land disturbing activities and until all exposed soil areas are permanently stabilised against erosion. |
As indicated |
35(a) Manage earth disturbance on-
site (i) Drainage control measures must be implemented and maintained to minimise water flow onto areas of exposed earth. (ii) Sediment and erosion control measures must be implemented and maintained to prevent soil loss from earth disturbance areas and prevent deposition beyond earth disturbance areas. (iii) No release of contaminants to land beyond on-site area of earth disturbance other than releases that achieve water pollutant concentration release limits of: A. 50mg/L TSS (Total Suspended Solids); B. Turbidity, Nephelometric Turbidity Units (NTU) value less than 10% above background, 75 NTU, or as agreed in writing by an Officer from Councils Erosion and Sediment Control (ESC) Team in Compliance and Regulatory Services; C. pH between 6.5 and 8.5 at all times. (iv) Maintain a written record to demonstrate that water discharges from the site, including any dewatering operations, meet the release limits as detailed in (iii) for water discharge(s) from the site that occur during or immediately after a rainfall event, and during normal business hours. The water quality of the discharge flows must be measured at each discharge point from the site, including but not limited to sediment basin outlets, other applicable sediment control devices, the site water drainage system, and recorded against the release limits at least once on each calendar day until such discharge stops. Timing: Prior to commencement of any earth disturbing activities and until all exposed soil areas are permanently stabilised against erosion. |
As indicated |
35(b) Provide Land Occupier Notification to
Council (i) Notify Council's ESC Team of proposed land occupier/s by sending an email to CARS-ESC@Brisbane.qld.gov.au (ii) If the land is to be occupied by any person other than the registered landowner then advice must be provided to Council that confirms the name, contact information and the duration of any proposed occupation of the land. Timing: Prior to commencement of any earth disturbing activities. |
As indicated |
35(c) Prepare Erosion and Sediment Control
Plan Prepare an Erosion and Sediment Control Plan (ESCP) in accordance with best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version) and, to the extent of any inconsistency, relevant Brisbane Planning Scheme Codes and Policies. Obtain a design certificate in accordance with the relevant Brisbane Planning Scheme Codes and Policies. The ESCP and design certificate must be certified by a Certified Professional in Erosion and Sediment Control (CPESC) or a Registered Professional Engineer Qld (RPEQ) with suitable qualifications and experience in erosion and sediment control. Documentary evidence demonstrating appropriate qualifications in erosion and sediment control must be provided to the Council upon request. Timing: Prior to the commencement of any earth disturbing activities. |
As indicated |
35(d) Attend a pre-start
meeting Arrange and attend a pre-start meeting for ESC with an Officer from Councils ESC Team in Compliance and Regulatory Services (CARS). Note: To request a pre-start meeting from Council's ESC Team send an email to CARS-ESC@Brisbane.qld.gov.au. All relevant documentation, including both the certified ESCP and the certified design certificate, must be attached to this email. Please allow up to 10 business days for your request to be processed. Timing: Attend the pre- start meeting prior to the commencement of any earth disturbing activities. |
As indicated |
35(e) Implement Certified Erosion and
Sediment Control Plan Implement the certified ESCP and maintain all ESC measures in accordance with best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version) and, to the extent of any inconsistency, relevant Brisbane Planning Scheme Codes and Policies. The ESCP and design certificate must be available on site at all times for inspection by Council officers. Any alteration to supplementary or Type 3 ESC measures must be reflected in the certified ESCP. Any alteration to Type 2 or Type 1 ESC measures will require a revised ESCP and design certificate that has been certified by either the CPESC or RPEQ. Timing: While earth disturbing activities are occurring and until all exposed soil areas are permanently stabilised against erosion. |
As indicated |
| 36) Information Signage Erect an information sign on the subject property in
accordance with Council's general requirements for signage and in accordance
with the requirements outlined below: Timing: Prior to site works commencing and then to be maintained until completion of the development for all stages. |
As indicated |
| 37) Engineering Pre-Start Meeting Arrange and attend a pre-start meeting with Development Services and Program Planning and Integration. Applicable compliance and inspection fees must be paid, in full, to Council prior to the meeting being held. Note: To arrange an engineering pre-start meeting with Development Services an email supported by a completed copy of the Pre-Start Meeting Guidelines - Civil Engineering Works kit (https://www.brisbane.qld.gov.au/sites/default/files/20191008-cc11207-pre- start-meeting-guidelines-civil-engineering-works.pdf) must be sent to dalodgement@brisbane.qld.gov.au. Details include (but
are not limited too) the following: Note: Timing: Prior to site/operational/building work commencing. |
As indicated |
| 38) Filling and / or Excavation All earthworks must be carried out in accordance with the relevant Brisbane Planning Scheme Codes. |
Prior to building work commencing |
38(a) Submit Earthworks
Drawings Submit to, and obtain approval from, Development Services earthworks drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the approved DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes. The Earthworks Drawings
must include the following: Note: If the earthworks impact on the road reserve, the Developer must obtain applicable footpath and road permits prior to commencing any works. Such impacts may include footpath occupation, road closures, re-profiling, ground anchors and/or relocation of services. If the excavation has to be stabilised using ground anchors or similar, then the submitted plans must show the location of these in relation to all services. The cost of moving services, utilities and assets is the responsibility of the Developer. The permission of the service/utility/asset owner is required. Note: Irrespective of final earthworks, it is the responsibility of the RPEQ to manage any staged works associated with Erosion & Sediment Control. Timing: Prior to site/operational/building work commencing. |
As indicated |
38(b) Fill Material, Placement, Compaction
and Testing All fill material placed on the site must comprise only natural earth and rock and must be free of contaminants (as defined by Part 3, Division 2, Subdivision 2 Environmental contamination, Section 11 of the Environmental Protection Act 1994) and noxious, hazardous, deleterious and organic materials. Fill material, placement, compaction and testing must comply with the requirements of Australian Standard - AS 3798, Guidelines on Earthworks for Commercial and Residential Developments. Timing: While site/operational/building work is occurring. |
As indicated |
38(c) Implement Approved Earthworks
Drawings Construct and maintain the earthworks in accordance with the requirements of AS3798 and the approved earthworks drawings. Timing: While site/operational/building work is occurring and then to be maintained. |
As indicated |
38(d) Submit As Constructed
Drawings Submit to Development Services As Constructed drawings prepared by a Registered Surveyor. Timing: Prior to building work above ground commencing. |
As indicated |
38(e) Submit Certification Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the approved earthworks drawings. Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that all fill material used complies with the quality requirements of this condition and that placement, compaction and testing has been carried out in accordance with AS3798. Timing: Prior to building work above ground commencing. |
As indicated |
| 39) Construction Management Plan - Major Carry out development in a method consistent with a Construction Management Plan (CMP) prepared in accordance with the requirements of this condition. |
While site/operational/building work is occurring |
39(a) Construction Management Plan - Submit
Plan Submit to, and obtain compliance approval from, Development Services a detailed Construction Management Plan for the site preparation, demolition, excavation and construction phases of the approved development. The Construction Management Plan must be in accordance with the relevant Brisbane Planning Scheme Codes and address the following matters, both internal to and external to the development site: (i) Location of and
impacts to any Council vegetation (i.e. street trees/park trees/garden
beds) (vi) Details of all
proposed work zones and/or lane closures, including justification; Note: Pre-approval of work zones and/or lane closures associated with construction of the development will be managed by Development Services however the Construction Management Plan must be supported by "approval in principle" or written approvals from other relevant Council sections or other governing bodies responsible for any other potentially impacted infrastructure. The list of relevant infrastructure and contacts is available on Council's website - Search 'Constructions Management Plan'. Timing: Prior to site/operational/building work commencing. |
As indicated |
39(b) Construction Management Plan -
Dilapidation Report Submit a dilapidation report to engineeringservices@brisbane.qld.gov.au detailing the pre-existing condition of the roadway, both footways, both verges and Council infrastructure, including vegetation, for 100m from the site entry in both directions or to the next street intersection (if less than 100m from the site entry) in both directions. Timing: Prior to the pre-start meeting. |
As indicated |
39(c) Construction Management Plan -
Documentation on Site Legible copies of the approved Construction Management Plan and current permits must be kept on site and be made available on request by Council, at all times. The requirements of the CMP must be included in all induction of principal and subcontractors utilised in the development. An outline of the induction provided to contractors may be requested by Council to confirm compliance with this condition. Timing: While site/operational/building work is occurring. |
As indicated |
39(d) Construction Management Plan - Works to
be Performed Out of Hours Obtain an approval from Development Services for any
work that is proposed to be undertaken outside of normal business hours -
6:30am to 6:30pm, Monday to Saturday. |
As indicated |
39(e) Construction Management Plan -
Implement Plan Carry out the development in accordance with the approved Construction
Management Plan. |
As indicated |
| 40) Protect Existing Infrastructure Where there is existing infrastructure in the vicinity of the proposed work, the new work must not damage or compromise the working ability of the existing infrastructure. Where alterations to public utility mains, existing mains, services or installations are necessitated by the development, prior to alterations commencing, the developer must notify Council or the relevant infrastructure provider and obtain agreement to the alterations. The developer must meet the costs of the alterations. The alterations must be carried out in accordance with the relevant Brisbane Planning Scheme Codes or infrastructure providers requirements. |
While site/operational/building work is occurring |
40(a) As Constructed Drawings - Alterations
to Existing Infrastructure Submit to Development Services As Constructed drawings showing all new and/or rectification works and an asset register, prepared by a Registered Professional Engineer Queensland. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that the alterations have been completed in accordance with the relevant Brisbane Planning Scheme Codes and any other relevant infrastructure requirements. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
| 41) Retaining Walls Design and construct all retaining walls and associated fences, in accordance with the relevant Brisbane Planning Scheme Codes and the following: - All retaining walls including the footings, must be located wholly within the property boundaries of the site where works are occurring - Runoff from surface drains and subsoil drainage associated with the retaining walls must be collected and connected to a lawful point of discharge (LPD) where possible. If no LPD is available the surface drains and sub-soil drainage must be designed, installed and discharged to ensure there is no ponding, nuisance or concentration of stormwater discharge to adjacent properties. - Retaining walls to stabilise excavation must be set back from property boundaries to accommodate subsoil drainage without encroachment into the neighbouring property. This set back may vary depending on the height, structure and design of the retaining wall, surcharge loadings from neighbouring properties, and to provide a surface drain along the top of the retaining wall - For retaining walls in excess of
1.0m in height: NOTE: Refer to City Plan 2014; Infrastructure Design Planning Scheme Policy (IDPSP) for Council’s definition of a LPD. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
41(a) Certification of Retaining
Walls For retaining walls over 1.0m in height, obtain certification from a Registered Professional Engineer Queensland that the design and construction of the retaining walls and ancillary drainage are in accordance with the requirements of this condition. |
As indicated |
| 42) Access, Grades, Manoeuvring, Carparks, Signs and
Line Marking Construct and maintain access, parking and manoeuvring for vehicles on site in accordance with the relevant Brisbane Planning Scheme Codes, as indicated on the approved DRAWINGS AND DOCUMENTS, including the following: i. A pavement of minimum Local road standard or equivalent surface material (including associated drainage) to the area on which motor vehicles will be driven and/or parked. ii. Manoeuvring on site for a RCV and for the loading and unloading of vehicle(s); iii. Parking on the site for 57 resident cars, 6 visitor cars including 1 parking space for people with disabilities and for the loading and unloading of vehicle(s) within the site. There must a minimum number of 63 spaces provided on site. iv. Provide and maintain 24 secure bicycle parking spaces and 6 visitor spaces; v. A minimum of 2.3 metres height clearance to all undercover parking areas and a minimum of 2.5 metres above parking spaces for people with disabilities. The minimum clear height must be measured to the lowest protrusion from the ceiling (e.g. fire sprinklers, services, lighting fixtures, signs, etc). vi. A height clearance sign located at the entrance(s) to undercover car parking areas and a directional visitor parking sign clearly visible from the vehicle entrance to the site. vii. Prepare and implement signs and line markings drawings that show the internal paved areas signed and delineated in accordance with the approved drawings and documents. The drawings must be prepared and certified by a Registered Professional Engineer Queensland in accordance with the relevant Brisbane Planning Scheme Codes and the Manual of Uniform Traffic Control Devices.
PROOF OF FULFILMENT Certification from a Registered Professional Engineer Queensland, that the above requirements have been implemented in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 43) Repair Damage to Kerb, Footpath or Road Repair any damage to the existing kerb and channel, footpath or roadway (including removal of concrete slurry from footways, roads, kerb and channel, stormwater gullies and drainlines) and re-instate existing traffic signs and pavement markings that have been removed or damaged during any works carried out in association with the approved development. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
43(a) Interim Repairs If at any time during the construction phase of the approved development, damage to the existing kerb and channel, footpath or roadway creates unsafe, unreasonable and/or not fit for purpose conditions as assessed by Council, interim repairs must be undertaken as directed by Program Planning and Integration. Note: Any interim repairs required to be undertaken shall not be considered to satisfy the requirements of this condition for the permanent repair of the infrastructure prior to the issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. Timing: While site / operational / building works is occurring. |
As indicated |
| 44) Minimum Flood Planning Levels Design and construct all building pad levels, floor levels and ancillary structures to the appropriate flood planning level with freeboard (where required) in accordance with the relevant Brisbane Planning Scheme Codes and the approved drawings and documents. The minimum habitable floor level must be 60.36 metres AHD. The minimum non-habitable floor level must be 60.16 metres AHD. The minimum carpark level and vehicle manoeuvring level must be 60.16 metres AHD. The minimum level for essential electrical services must be 60.36 metres AHD. PROOF OF FULFILMENT As-Constructed drawings prepared by a Registered Surveyor (Qld). The Registered Surveyor (Qld) must certify that the development has been constructed in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 45) Refuse Collection - On Site Provide for the installation and collection of refuse/recycling bins by Brisbane City Council's Waste and Resource Recovery Services or a private waste contractor. |
At all times |
45(a) Arrange Refuse Collection Arrange for the installation of refuse/recycling bins and for the subsequent collection of refuse including recycling from the site by Brisbane City Council's Waste and Resource Recovery Services or a private waste contractor. Timing: A minimum of four weeks prior to the commencement of use and then to be maintained. PROOF OF FULFILMENT Where a private waste contractor is engaged, provide written confirmation from the proposed waste collection contractor of the agreement to service the property. The written agreement must be submitted to Council's Waste and Resource Recovery Services and include full details of the proposed system, bin sizes, number of bins, frequency of collection and the refuse collection vehicle size. Timing: Prior to commencement of use. |
As indicated |
45(b) Indemnify Council The owner and any subsequent owner must, by approved form to Waste and Resource Recovery Services, indemnify Council and its agents in respect of any damage to the pavement and other driving surfaces. Timing: When an arrangement for refuse/recycling collection services is made with Brisbane City Council. |
As indicated |
45(c) Notify Future Owner Where Council is engaged as the waste contractor, the owner must notify any future owner/body corporate that the development has been approved on the basis that an indemnity must be provide for refuse collection vehicles to enter the property. Timing: At time of a change of ownership. |
As indicated |
| 46) Refuse Storage - On Site Collection Provide a roofed and wholly screened refuse enclosure utilising materials consistent with the development or a dedicated refuse storage room, as shown on the approved plans and documents. The enclosure/refuse storage room must be of a design to accommodate the quantity of refuse and recycling including source separation to allow for low servicing collection of the development. Bins must be located in an area which allows them to be manoeuvred from the bin storage area to the designated internal collection point. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 47) Future Road Widening The development must not prejudice the future road reserve widening along the Persse Road frontage. Keep the area clear of improvements and structures. The extent of the land to be set aside for a future road reserve widening is 4.9 metres at the southern boundary and 5.3 metres at the northern boundary for the full frontage of the site and set out on the drawing titled Road Widening Plan, RC16005 Issue 1 dated 8/12/2021 forming part of the approved DRAWINGS AND DOCUMENTS. |
At all times |
| 48) Site Drainage - Major Provide an internal drainage system to collect stormwater run-off from all proposed lots, roofed and developed surface areas and any run-off onto the site from adjacent areas and convey the collected run- off to a lawful point of discharge, in accordance with the relevant Brisbane Planning Scheme Codes. Notes: -
Where external works are required and infrastructure will be handed over to
Council (e.g. Stormwater pipes 375mm or greater and/or manholes within the road
reserve, etc), the applicant will be required to request an on-site Pre-Start
with Council and ensure all future owned Council assets follow the On/Off
Maintenance process in accordance with Councils Infrastructure Installation
& Construction Requirements Manual. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
48(a) Submit Site Drainage
Drawings Submit to, and obtain approval from, Development Services, site drainage drawings and engineering calculations, prepared and certified by a Registered Professional Engineer Queensland, in accordance with the relevant Brisbane Planning Scheme Codes. Notes: -
Queensland Building and Construction Commission licensed hydraulic consultants
may design the stormwater system for sites less than 2000m2 with an upstream
catchment servicing no more than 4 residential lots. This excludes stormwater
drainage design (including subsoil drainage) of basements in flood planning
areas and the design of any onsite stormwater detention system Timing: Prior to site/operational/building work commencing |
As indicated |
48(b) Implement Approved
Drawings Carry out the works in accordance with the approved site drainage drawings. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
48(c) Submit As Constructed
Drawings Submit to Development Services As Constructed drawings prepared and certified by a Registered Professional Engineer Queensland or a Queensland Building and Construction Commission licensed hydraulic consultants (where applicable). Note: To be submitted via DA- ComplianceEngineering@brisbane.qld.gov.au and include the site address, A00 reference and Condition number in the subject line. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT Certification from a Registered Professional Engineer Queensland or Queensland Building or Construction Commission licensed hydraulic consultants (where applicable) confirming that the works have been completed in accordance with the above stormwater drawings. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
| 49) Ponding of Stormwater Carry out the approved development to ensure that adjoining properties and roads are protected from ponding or nuisance from stormwater during construction. Notes: If remedial works are necessary to comply with this condition, prior approval must be obtained from Development Services. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 50) Stormwater Quality Manage stormwater quality in accordance with the APPROVED Stormwater Quality Management Plan Report Revision B received 28-OCT-2022 and this condition. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
50(a) Implement Stormwater Quality
Management Implement the stormwater quality treatment strategy outlined within the APPROVED DRAWINGS AND DOCUMENTS and any engineering drawings and documents approved pursuant to conditions contained in this development approval. Where a proprietary stormwater quality improvement device has been used to meet the water quality objectives, ensure the device has been approved by Brisbane City Council for use in achieving the water quality targets and meets the required manufacturers specifications (in terms of number and size of units and any pre-treatment requirements). Note: This condition does not require any further approval from Council. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained. |
As indicated |
50(b) Water Quality Maintenance Management
Plan Prepare and implement a Water Quality Maintenance Management Plan in accordance with the Water by Design 'WSUD Technical Design Guidelines for South East Queensland'. The plan must be prepared and certified by a Registered Professional Engineer Queensland. Note: This condition does not require any further approval from Council. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained. |
As indicated |
50(c) Submit Certification Submit to Development Services certification from a Registered Professional Engineer Queensland confirming that the stormwater quality treatments strategy required pursuant to part (a) of this condition has been implemented and where a proprietary stormwater quality improvement device has been used to meet the water quality objectives, the device has been approved by Brisbane City Council for use in achieving the water quality targets and meets the required manufacturers specifications (in terms of number and size of units and any pre-treatment requirements). Note: Manufacturers that have approved devices by Brisbane City Council will be able to provide evidence of Council approval for use. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
50(d) Maintain Management Plans Maintain the certified Water Quality Maintenance Plan and the stormwater quality treatment strategy required pursuant to part (a) of this condition. Include the Water Quality Maintenance Plan in any building management strategy, building management statement or community management statement. Timing: At all times |
As indicated |
| 51) Service Conduits and Mains Provide and install all
service conduits and meet the cost of any alterations to public utility mains,
existing mains, services, street lighting or installations that are required to
carry out the approved development. These works must be in accordance with the
relevant Brisbane Planning Scheme Codes, and include the following, where
applicable: Note: |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
51(a) Submit As Constructed
Drawings Submit to Development Services As Constructed drawings, including an asset register, prepared and certified by a Registered Professional Engineer Queensland. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the requirements of this condition. Note: Civil works are to be certified by a RPEQ(Civil) and electrical works are to be certified by a RPEQ (Electrical). |
As indicated |
| 52) Telecommunications Submit to Development Services, certification from
an authorised telecommunications carrier/contractor, that the following works
and infrastructure have been undertaken and installed in accordance with
telecommunications industry standards: |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 53) Agreement with Electricity Supplier Submit to Development Services, evidence of an agreement with an electricity supplier to provide necessary services to the development in accordance with the relevant Brisbane Planning Scheme Codes. Where development is within an established area of overhead electricity supply and the electricity supplier determines that a property pole is the appropriate solution to supply electricity to the development, the developer must be responsible for the installation of the property pole(s). In the above circumstances, submit to Development Services, certification from the developer's electrical consultant confirming that the above installation has been completed in accordance with the relevant AS/NZS Standards and the Queensland Electricity Connection Manual (QECM) and Queensland Electricity Metering Manual (QEMM). |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 54) Construct Private Internal Fire Main and
Hydrant(s) Construct a private internal water main with fire hydrant(s) to serve the development where any point of a possible building envelope is or will be more than 80 metres (when the distance is measured around the perimeter of the building envelope) from a Urban Utilities (UU) hydrant. The main is to be designed and constructed in accordance with the current version of the 'Fire Hydrant and Vehicle Access Guidelines for Residential, Commercial and Industrial Lots' (GuRCIL) by the Queensland Fire and Emergency Services and the relevant Brisbane Planning Scheme Codes. Where the unassisted water supply cannot meet the flow & pressure requirements of the GuRCIL, the design & installation of a Fire Hydrant System is to be in accordance with the current version of AS2419. Accessible hardstand is to be provided for emergency vehicles within 20m of a fire hydrant(s) and the design and installation is to satisfy the requirements for feed hydrants of the current version of GuRCIL. Where emergency vehicles cannot be located within 20m of a fire hydrant(s), the design & installation of the Fire Hydrant System is to be in accordance with the current version of AS2419. The private main shall be supplied from a Urban Utilities (UU) water service and meter. This water service requirement is to be included in the development's Water Approval. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
54(a) Access and Ownership of
Main The hydrants must be located to allow 24 hour access for emergency and maintenance vehicles. Ownership and maintenance responsibility for the private main and hydrant(s) must exist and remain with a single legal entity, which represents the owner(s) of any property served by the private main and hydrant(s). This legal entity is to be to the satisfaction of UU for billing purposes and is to be a requirement of the development's Water Approval. This legal entity must remain in place for the life of the development, be responsible for the cost of water consumption charges at the UU boundary meter and be responsible for maintaining the private main and hydrant(s), for the life of the development. The responsibilities of the legal entity must remain in effect on transfer of the property title. Timing: at all times. |
As indicated |
54(b) Submit Hydraulic Plan Submit detailed hydraulic plans to and obtain Compliance Permit from Plumbing Services for regulated work (Plumbing and Drainage Installation) under the Plumbing and Drainage Act 2018. Timing: Prior to site/operational/building work commencing. |
As indicated |
54(c) Implement Approved Plans Construct the works in accordance with the approved hydraulics plan. Obtain a Compliance Certificate for the constructed works from the Manager, Plumbing Services Group. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
54(d) Notify Future Owners The developer must notify all future and potential property owners of the private fire main and hydrants, and ownership responsibilities for the private fire main and fire hydrant. Timing: At the time of marketing the lot for sale. PROOF OF
FULFILMENT Submit the following documentation to Development Services: - Copy of UU Connection Certificate, indicating all requirements of the developer's Water Approval have been satisfied. - Provide a Statutory Declaration that future and potential property owners will be advised of the private fire fighting infrastructure, who owns that infrastructure and the maintenance responsibilities for the infrastructure. |
As indicated |
| 55) Water and Wastewater Pursuant to Schedule 18 of the Planning Regulation 2017 submit to Development Services, documentary evidence, issued by the relevant distributor-retailer, to verify that the conditions of any necessary connection certificate under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009, have been complied with. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 56) Permanent Driveway Crossover Provide a 6.5 metre wide Type B2 permanent driveway crossover with a modified splay on the southern side to ensure it does not encroach past the property boundary to the Persse Road frontage of the site in accordance with the relevant Brisbane Planning Scheme Codes and located as shown on the approved DRAWINGS AND DOCUMENTS. Written consent must be obtained from Program, Planning and Integration Arboriculture (PPI Arb) prior to any works occurring that will either impact on or require removal of a street tree (this includes pruning, excavation or fill within the root zone/canopy of the tree) At all times during construction of the crossover, safe pedestrian access along the site frontage must be maintained. Note: No further driveway permit is required however additional footway permits or lane closure permits may be required for footpath/verge closures and/or lane closures. These permits must be obtained prior to construction of the crossover. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 57) Redundant Driveway Crossover Remove the redundant existing driveway crossover(s) on the frontage(s) of the site and reinstate the kerb and channel, road pavement, footways and footpaths in accordance with the relevant Brisbane Planning Scheme Codes. Note: Additional footway permits or lane closure permits may be required for footpath/verge closures and/or lane closures. These permits must be obtained prior to construction of the crossover. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 58) Construction Noise and Dust Emissions Pursuant to the Environmental
Protection Act 1994, all development involving the emission of noise and dust
from building and/or construction activities, must ensure that the emissions
are in accordance with the requirements of the Act. |
As indicated |
| 59) Natural Assets Local Law (NALL) - Protected
Vegetation On Site Work on or around protected vegetation may require a permit under the Natural Assets Local Law 2003 (NALL). Permits under the NALL are issued by Development Services. To apply for a permit to work on protected vegetation go to Council's website or contact the call centre on 3403 8888 |
As indicated |
| 60) Further Development Permit Required Further Development Permit(s) to carry out assessable building work under the Building Act may be required. |
As indicated |
| 61) Currency Period The currency period for this development approval is stated in the Decision Notice and is expressed as a date. This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016. |
As indicated |
| 62) Buildings in Transport Noise Corridors - Acoustic
Treatments (State Roads) All new houses, townhouses, units, hotels and motels (Class 1-4 buildings) on sites located in a designated transport noise corridor are required to comply with the requirements of the Queensland Development Code Mandatory Part 4.4 - Buildings in Transport Noise Corridors. The buildings will need to achieve specific levels of noise mitigation through the use of appropriate materials for floors, walls, roofs, windows and doors for the relevant noise category. |
As indicated |
| 63) Cultural Heritage Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage. The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care. For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships). |
As indicated |
| 64) Damage to Trees on Adjoining Land Please note that any damage caused to vegetation on adjoining land as a result of exercising this development approval may result in an offence under other legislation (e.g. Natural Assets Local Law) and/or civil action |
As indicated |
| 65) Fire Ant Movement Controls To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected. These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products. Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014. For further information contact the relevant Queensland State Government department on 13 QGOV. |
As indicated |
| 66) Flood Resilience and Awareness This advice is provided for buildings that are on sites that are subject to the flood overlay, as shown within City Plan 2014.
Council makes decisions to minimise flood risk based on the best information available at the time of the development application. Flood studies and applicable flood levels may be updated by Council overtime where new flood information is available or changes to engineering standards/methodology have occurred. Flood levels for various flood events and flooding types are outlined in Councils Floodwise Property Reports available from Councils website.
The minimum flood planning levels that apply to new development do not necessarily mean that the development will never flood. Therefore, when choosing materials for building on sites that are known to be affected by flooding, regardless of whether it is constructed to the minimum flood planning level, it is recommended that flood resilient materials are used to improve the speed of recovery and reduce the cost of repairs if required.
For more information refer to: Council's website at https://www.brisbane.qld.gov.au/community-and-safety/community- safety/disasters-and-emergencies/be-prepared/flooding-in-brisbane/flooding- support-for-residents/flood-resilient-homes-program Queensland Reconstruction Authority "Flood Resilient Building Guidance for Queensland Homes"https://www.qra.qld.gov.au/resilient- homes/flood-resilient-building-guidance-queensland-homes |
As indicated |