| Address of Site: | 23 CASTLEBAR ST KANGAROO POINT QLD 4169 23 CASTLEBAR ST KANGAROO POINT QLD 4169 |
| Real Property Description of Site: | L10 SP.339299 L10 RP.135198 |
| Aspects of development and type of approval: | DA - PA - Building Work Development Permit - Heritage Place (LHP),partial
demolition,Heritage Place (QHP) DA - PA - Material Change of Use Development Permit - Heritage Place (QHP),multiple dwelling DA - PA - Operational Work Development Permit - Heritage Place (QHP),Bulk Earthworks,Landscape Works on Private Land DA - PA - Operational Work Preliminary Approval - Prescribed Tidal Work DA - PA - Operational Work Preliminary Approval - Heritage Place (QHP),Prescribed Tidal Work DA - PA - Building Work Preliminary Approval - Local heritage place,partial demolition,State heritage place |
| Council File Reference: | A006656931 Permit Reference Number/s: DABW417876722; DAMC417876822; DAOW418304322; DAOW418304422; DAOW457150524; DABW471058125. |
| Package Status: | APPROVED - Version 2 (3rd of June, 2026 11:12:22 AM) |
| Package Generated: | 03/06/2026 |
| Annabelle MATTHEWS General Manager Development Services Planning Application Review Service Annabelle.Matthews@brisbane.qld.gov.au 3178 7919 |
Marissa TSOUKAS Team Manager Planning Services Governance marissa.tsoukas@brisbane.qld.gov.au 3403 5590 |
Aidan HARVEY-HALL Senior Urban Planner Planning Services Governance Aidan.Harvey-Hall@brisbane.qld.gov.au 0731787317 |
| Brendan GILLHAM Planning Services Manager Planning Services Brendan.Gillham@brisbane.qld.gov.au (07) 3403 5958 |
Michael PO SAW Technical Officer Trunk Infrastructure & Calculations michael.posaw@brisbane.qld.gov.au 34036167 |
Mario FURLAN Architect Architecture Team Mario.Furlan@brisbane.qld.gov.au (07) 3403 5698 |
| Mark VINEY Team Manager Planning Services North Mark.Viney@brisbane.qld.gov.au (07) 3403 0289 |
George KAITHAKKOTTIL Principal Engineer Engineering Services South George.Kaithakkottil@brisbane.qld.gov.au 3178 0818 |
Michael O'REILLY Environmental Management Officer Environmental Management Services Michael.O'Reilly@brisbane.qld.gov.au 3403 9517 |
| Glyn CHISHOLM Senior Landscape Architect Landscape Architecture Team Glyn.Chisholm@brisbane.qld.gov.au 07 3403 0117 |
Daniel SPILLANE Senior Engineer Engineering Services South Daniel.Spillane@brisbane.qld.gov.au 3403 5285 |
DRAWINGS AND DOCUMENTS
| Drawing or Document | Number | Plan Date |
|---|---|---|
| Land Contribution | DRAWING 1 (Amended In Red 21-MAY-2026) | 21-MAY-2026 |
| Works Contribution and Indicative Pontoon Layout | DRAWING 2 (Amended In Red 21-MAY-2026) | 21-MAY-2026 |
| Demolition Plan | DRAWING 3 (Amended In Red 21-MAY-2026) | 21-MAY-2026 |
| Above Ground Level Works - 1 | DRAWING 4 (Amended In Red 21-MAY-2026) | 21-MAY-2026 |
| Above Ground Level Works - 2 | DRAWING 4 (Amended In Red 21-MAY-2026) | 21-MAY-2026 |
| Landscape Concept Plan and Details | (Amended In Red 21-MAY-2026) | 13-MAR-2025 |
| Shafston House Kangaroo Point - The Ground & Setting Landscape Heritage Assessment | Version 2 | 10-MAR-2025 |
| Report on Geotechnical Investigation | 97616.00 R.002.Rev1 | 18-JAN-2022 |
| Site Based Stormwater Management Plan | B23202-REP-CIV-0001 Revision B | 18-NOV-2024 (Received) |
| Pedestrian Wind Study | 2410315 | 03-OCT-2024 |
| Area Plans - GFA Sheet 2 | A9102 Issue C | 19-MAR-2025 (Received) |
| Area Plans - GFA Sheet 3 | A9103 Issue C | 19-MAR-2025 (Received) |
| Development Schedule Private Open Spaces - Sheet 1 | A9301 Issue B | 19-MAR-2025 (Received) |
| Development Schedule Private Open Spaces - Sheet 2 | A9302 Issue B | 19-MAR-2025 (Received) |
| Development Schedule | A0001 Issue C (Amended In Red 21-MAY-2026) | 19-MAR-2025 (Received) |
| Existing Site Plan | A0010 Issue C | 19-MAR-2025 (Received) |
| Demolition Site Plan | A0020 Issue C | 19-MAR-2025 (Received) |
| Roof Site Plan | A0030 Issue C (Amended In Red 21-MAY-2026) | 19-MAR-2025 (Received) |
| Basement 2 Site Plan | A0040 Issue C | 19-MAR-2025 (Received) |
| Basement 1 Site Plan | A0050 Issue C | 19-MAR-2025 (Received) |
| Lower Ground Site Plan | A0060 Issue C | 19-MAR-2025 (Received) |
| Ground Site Plan | A0070 Issue C | 19-MAR-2025 (Received) |
| Level 1 Site Plan | A0080 Issue C | 19-MAR-2025 (Received) |
| Tower - Lower Ground Plan | A0990 Issue C (Amended In Red 21-MAY-2026) | 19-MAR-2025 (Received) |
| Tower - Ground Floor Plan | A1000 Issue C | 19-MAR-2025 (Received) |
| Tower - Level 1 Plan | A1001 Issue C | 19-MAR-2025 (Received) |
| Tower - Levels 2, 4, 6, 8, 10, 12, 14, 16, 18, 20, 22, 24 Plan | A1002 Issue C | 19-MAR-2025 (Received) |
| Tower - Levels 3, 5, 7, 9, 11, 15, 17, 19, 21, 23, 25 Plan | A1003 Issue C | 19-MAR-2025 (Received) |
| Tower - Level 13 Plan | A1013 Issue C | 19-MAR-2025 (Received) |
| Tower - Level 26 Plan | A1026 Issue C | 19-MAR-2025 (Received) |
| Tower - Level 27 Plan Roof Terrace | A1027 Issue A | 19-MAR-2025 (Received) |
| Tower - Roof Plan | A1029 Issue C | 19-MAR-2025 (Received) |
| Wards Builiding Lower Ground Plan | A1201 Issue C | 19-MAR-2025 (Received) |
| Southern River Home Ground Floor Plan (Site B2) | A1400 Issue C (Amended In Red 21-MAY-2026) | 19-MAR-2025 (Received) |
| Southern River Home Upper Ground Floor Plan (Site B1) | A1401 Issue C (Amended In Red 21-MAY-2026) | 19-MAR-2025 (Received) |
| Southern River Home Level 1 Plan (Site LG) | A1402 Issue C | 19-MAR-2025 (Received) |
| Southern River Home Roof Plan (Site GF) | A1403 Issue C | 19-MAR-2025 (Received) |
| Northern River Home Ground Floor Plan (Site B1) | A1500 Issue C | 19-MAR-2025 (Received) |
| Northern River Home Level 1 Plan (Site LG) | A1501 Issue C (Amended In Red 21-MAY-2026) | 19-MAR-2025 (Received) |
| Northern River Home Roof Plan (Site Ground) | A1502 Issue C | 19-MAR-2025 (Received) |
| Site Section A-A Tower, Wards, Southern RH | A2001 Issue C | 19-MAR-2025 (Received) |
| Site Section B-B Shafston, Pool, Basement | A2002 Issue C | 19-MAR-2025 (Received) |
| Site Section C-C Orderlies, Northern RH | A2003 Issue C | 19-MAR-2025 (Received) |
| Site Section D-D Tower, Shafston | A2004 Issue B | 19-MAR-2025 (Received) |
| Part Section E-E Southern Riverhome | A2401 Issue A | 19-MAR-2025 (Received) |
| Part Section F-F Wards | A2402 Issue A | 19-MAR-2025 (Received) |
| Part Section G-G Shafston House | A2601 Issue A | 19-MAR-2025 (Received) |
| Site Elevation North | A3001 Issue C | 19-MAR-2025 (Received) |
| Site Elevation East | A3002 Issue C | 19-MAR-2025 (Received) |
| Site Elevation South | A3003 Issue C | 19-MAR-2025 (Received) |
| Site Elevation West | A3004 Issue C | 19-MAR-2025 (Received) |
| Tower Elevations North and West | A3101 Issue C | 19-MAR-2025 (Received) |
| Tower Elevations South and East | A3102 Issue C | 19-MAR-2025 (Received) |
| Southern River Home East Elevation | A3401 Issue C | 19-MAR-2025 (Received) |
| Southern River Home North Elevation | A3402 Issue C | 19-MAR-2025 (Received) |
| Northern River Home East Elevation | A3501 Issue C | 19-MAR-2025 (Received) |
| Northern River Home North Elevation | A3502 Issue C | 19-MAR-2025 (Received) |
| Shafston House West Elevation | A3601 Issue A | 19-MAR-2025 (Received) |
| Facade Type 1 Tower GF - Fixed Louvers and Awning | A4201 Issue C | 19-MAR-2025 (Received) |
| Facade Type 2 Tower Apartment East Facade | A4202 Issue C | 19-MAR-2025 (Received) |
| Facade Type 3 Tower Apartment North Facade | A4203 Issue C | 19-MAR-2025 (Received) |
| Facade Type 4 Tower Apartment West Facade | A4204 Issue C | 19-MAR-2025 (Received) |
| Facade Type 5 Tower Apartment South Facade | A4205 Issue C | 19-MAR-2025 (Received) |
| Facade Detail Tower Sections | A4206 Issue C | 19-MAR-2025 (Received) |
| Facade Detail Wards Building Roof Connection | A4207 Issue B | 19-MAR-2025 (Received) |
| Tower - Levels 2, 4, 6, 8, 10, 12, 14, 16, 18, 20, 22, 24 Plan - Screen Analysis Sheet 1 | A4301 Issue A | 19-MAR-2025 (Received) |
| Tower - Levels 3, 5, 7, 9, 11, 15, 17, 19, 21, 23, 25 Plan - Screen Analysis Sheet 2 | A4302 Issue A | 19-MAR-2025 (Received) |
| Tower - Level 13 Plan Screen Analysis - Sheet 3 | A4303 Issue A | 19-MAR-2025 (Received) |
| Tower - Level 26 Plan Screen Analysis - Sheet 4 | A4304 Issue A | 19-MAR-2025 (Received) |
| Tower Roof Terrace Analysis | A4310 Issue A | 19-MAR-2025 (Received) |
| Area Schedule | A9100 Issue C | 19-MAR-2025 (Received) |
| Area Plans - GFA Sheet 1 | A9101 Issue C | 19-MAR-2025 (Received) |
APPROVAL CONDITIONS
| Permit to Which These Conditions Relate: | DA - PA - Building Work |
| Activity(ies): | Heritage Place (LHP) Heritage Place (QHP) partial demolition |
| Stage: | Stage 1 - Multiple Dwelling (50 units) on a Queensland Heritage Place |
| 1) Approved Drawings and Documents A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers. Note: This condition is imposed to ensure compliance with the conditions of development approval. |
While site/operational/building work is occurring |
| 2) Carry Out the Approved Development Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS. Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks). Permission to enter neighbouring properties must be obtained from the relevant property owners. |
While site/operational/building work is occurring |
| 3) Complete All Building Work Complete all building work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such building work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS. Note: Building work must also be completed in accordance with any other current development approval. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 4) Infrastructure Agreement Comply with the Infrastructure
Agreement for 23 Castlebar Street, Kangaroo Point 2026, to the extent the
responsibilities under the infrastructure agreement attach to, and bind the
owner of, the premises. |
At all times |
| 5) Construction Noise and Dust Emissions Pursuant to the Environmental
Protection Act 1994, all development involving the emission of noise and dust
from building and/or construction activities, must ensure that the emissions
are in accordance with the requirements of the Act. |
As indicated |
| 6) Natural Assets Local Law (NALL) - Protected
Vegetation On Site Work on or around protected vegetation may require a permit under the Natural Assets Local Law 2003 (NALL). Permits under the NALL are issued by Development Services. To apply for a permit to work on protected vegetation go to Council's website or contact the call centre on 3403 8888. |
As indicated |
| 7) Further Development Permit Required Further Development Permit(s) to carry out assessable building work under the Building Act may be required. |
As indicated |
| 8) Currency Period The currency period for this development approval is stated in the Decision Notice and is expressed as a date. This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016. |
As indicated |
| 9) Referral Agency Requirements The State Assessment and Referral Agency as concurrence agency has imposed the requirements contained in the letter dated 12 September 2025, reference 2412-43793 SRA. |
As indicated |
| 10) Cultural Heritage Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage. The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care. For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships). |
As indicated |
| 11) Damage to Trees on Adjoining Land Please note that any damage caused to vegetation on adjoining land as a result of exercising this development approval may result in an offence under other legislation (e.g. Natural Assets Local Law) and/or civil action |
As indicated |
| 12) Fire Ant Movement Controls To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected. These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products. Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014. For further information contact the relevant Queensland State Government department on 13 QGOV. |
As indicated |
| 13) Flood Resilience and Awareness This advice is provided for buildings that are on sites that are subject to the flood overlay, as shown within City Plan 2014.
Council makes decisions to minimise flood risk based on the best information available at the time of the development application. Flood studies and applicable flood levels may be updated by Council overtime where new flood information is available or changes to engineering standards/methodology have occurred. Flood levels for various flood events and flooding types are outlined in Councils Floodwise Property Reports available from Councils website.
The minimum flood planning levels that apply to new development do not necessarily mean that the development will never flood. Therefore, when choosing materials for building on sites that are known to be affected by flooding, regardless of whether it is constructed to the minimum flood planning level, it is recommended that flood resilient materials are used to improve the speed of recovery and reduce the cost of repairs if required.
For more information refer to: Council's website at https://www.brisbane.qld.gov.au/community-support- and-safety/natural-disasters-and-emergencies/flooding-in-brisbane/flood- resilient-design-and-building-requirements- Queensland Reconstruction Authority "Flood Resilient Building Guidance for Queensland Homes"https://www.qra.qld.gov.au/resilient-homes/flood- resilient-building-guidance-queensland-homes |
As indicated |
| Permit to Which These Conditions Relate: | DA - PA - Material Change of Use |
| Activity(ies): | Heritage Place (QHP) multiple dwelling |
| Stage: | Stage 1 - Multiple Dwelling (50 units) on a Queensland Heritage Place |
| 14) Information Signage Erect an information sign on the subject property in
accordance with Council's general requirements for signage and in accordance
with the requirements outlined below: Timing: Prior to site works commencing and then to be maintained until completion of the development for all stages. |
As indicated |
| 15) Commencement of Use Use for the development authorised by this Material Change of Use
component (Stage 1 multiple dwelling) shall not commence until all works
required under Council approval A006786527, including but not limited to, the
replanting of Weeping Fig Tree and 23 x 100L tree replanting, have been
undertaken. Note: This condition has been imposed to ensure the replanting required under Council approval (Council reference: A006786527) is undertaken. |
As indicated |
| 16) Car Parking The car parking within the premises must be maintained exclusively for the ancillary use of the development. The parking must not be made available to the general public and there must not be signage erected on or in the vicinity of the site advertising the availability of car parking to the general public. |
At all times |
| 17) Maintain the Approved Development Maintain the approved development in accordance with the approved DRAWINGS AND DOCUMENTS, and any other relevant Council approval required by the conditions. |
At all times |
| 18) Approved Drawings and Documents A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers. Note: This condition is imposed to ensure compliance with the conditions of development approval. |
While site/operational/building work is occurring |
| 19) Carry Out the Approved Development Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS. Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks). Permission to enter neighbouring properties must be obtained from the relevant property owners. |
While site/operational/building work is occurring |
| 20) Complete All Operational Work Complete all operational work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such operational work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS or, if requiring a further approval from the Council, in accordance with the relevant further approval(s). NOTE: This approval does not constitute permission to enter neighbouring properties to carry out the construction (including associated drainage and earthworks) or maintenance activities. Permission to enter neighbouring properties must be obtained from relevant property owners. |
While site/operational/building work is occurring |
| 21) Erect Screen Fence Erect a screen fence along part of the south-western and south-eastern boundaries of the site as shown on the approved DRAWINGS AND DOCUMENTS, as amended in red. The screen fence must be 1.8 metres in height and be constructed from wood unless otherwise agreed to with the adjoining owner/s i.e. body corporate where applicable. |
Prior to the commencement of the use or prior to the endorsement of a Community Management Statement, whichever is sooner |
| 22) Complete All Building Work Complete all building work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such building work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS. Note: Building work must also be completed in accordance with any other current development approval. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 23) Security Lighting Install and maintain a suitable system of security
lighting to operate from dusk to dawn within all areas where the public may
gain access, including car parking areas, building entrances and vegetated
areas |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 24) Visitor Parking Visitor car parking spaces must: |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 25) Infrastructure Agreement Comply with the Infrastructure
Agreement for 23 Castlebar Street, Kangaroo Point 2026, to the extent the
responsibilities under the infrastructure agreement attach to, and bind the
owner of, the premises.
|
At all times |
| 26) Limitation of Use - Must not be used as a
separate dwelling unit for income generation, rental, or
sale. - Must not be subject to separate
titling or subdivision under any
circumstances. - May only be used by residents of
the approved multiple dwelling and their
guests. - Must not include separate
metering, kitchen facilities, or other features that would enable independent
occupation. - All use of the guest house must
comply with the approved plans and conditions of this development
approval. - Any Community Management
Statement (CMS) or Body Corporate by-laws must expressly reflect and enforce
these requirements, ensuring the guest house cannot be
sold, leased, or otherwise used independently of the approved multiple dwelling
use. - Must not be used as a separate
dwelling unit for income generation, rental, or
sale. - Must not be subject to separate
titling or subdivision under any
circumstances. - May only be used by residents of
the approved northern riverhome and their
guests. - Must not include separate
metering or other features that would enable independent
occupation - All use of the guest house must comply with the
approved plans and conditions of this development
approval. - Any Community Management
Statement (CMS) or Body Corporate by-laws must expressly reflect and enforce
these requirements, ensuring the guest house cannot be sold, leased, or
otherwise used independently of the approved multiple dwelling
use. - Must not be used as a separate
dwelling unit for income generation, rental, or
sale. - Must not be subject to separate
titling or subdivision under any
circumstances. - May only be used by residents of
the approved southern riverhome and their
guests. - Must not include separate
metering or other features that would enable independent
occupation - All use of the guest house must comply with the
approved plans and conditions of this development
approval. - Any Community Management
Statement (CMS) or Body Corporate by-laws must expressly reflect and enforce
these requirements, ensuring the guest house cannot be sold, leased, or
otherwise used independently of the approved multiple dwelling
use. |
At all times |
| 27) Community Management Statement Any Community Management Statement
must include the following
detail: a. The area between the communal swimming pool and the river must be
maintained as a grassed lawn and kept free from development; Advice note: The intent of
this condition is to ensure the lawn area is kept free of permanent
structures. c. All
balconies/verandahs/terraces must remain unenclosed with no shutters, glazing,
louvres or similar permanent fixtures (excluding screening required by the
development approval or shown on the APPROVED DRAWINGS AND DOCUMENTS); d. The guest house (refer APPROVED DRAWING Tower - Lower Ground Plan drawing A0990 Issue C, received 19-MAR-2025 as Amended in Red 21-MAY-2026) cannot be sold, leased, or otherwise used independently of the approved multiple dwelling use; e. The guest house northern riverhome (refer APPROVED DRAWING Northern River Home Level 1 Plan (Site LG) drawing A1501 Issue C, received 19-MAR-2025 as Amended in Red 21-MAY-2026) cannot be sold, leased, or otherwise used independently of the approved multiple dwelling use; f. The staff quarters (refer APPROVED DRAWING Southern River Home Ground Floor Plan (Site B2) drawing A1400 Issue C, received 19-MAR-2025 as Amended in Red 21-MAY-2026, and APPROVED DRAWING Southern River Home Upper Ground Floor Plan (Site B1) drawing A1401 Issue C, received 19-MAR-2025 as Amended in Red 21-MAY-2026) cannot be sold, leased, or otherwise used independently of the approved multiple dwelling use; and g. The common property is subject to any ongoing development
responsibilities under the Infrastructure Agreement for 23 Castlebar Street,
Kangaroo Point 2026.
|
Prior to the commencement of the use and then to be maintained |
| 28) Final External Detailing of Building Construct the development in accordance with architectural drawings approved pursuant to this condition. The architectural drawings must be in accordance with the APPROVED DRAWINGS AND DOCUMENTS, relevant Brisbane Planning Scheme Codes and the requirements of this condition. |
To be maintained |
28(a) Submit Architectural
Drawings Submit to, and obtain approval from, Development Services architectural
drawings prepared and certified by a Registered Architect or Queensland
Building Construction Commission Open Licence Class Building Designer showing
the final developed details of the facade treatment, the ground interface and
the roof top/building capping elements which depict a higher level of
documentation detail than that shown on the APPROVED DRAWINGS AND DOCUMENTS,
including: The architectural
drawings must: Timing: Prior to new building works commencing above ground (works associated with the partial demolition or basement can occur prior to the submission of (a)). |
As indicated |
28(b) Pre-Start Meeting Arrange and attend a pre-start meeting with Development Services. Applicable compliance and inspection fees must be paid to Council, in full, prior to the meeting being held. Note: To arrange a pre- start meeting with Development Services an email must be sent to dalodgement@brisbane.qld.gov.au. Timing: Prior to any work commencing to comply with this condition. |
As indicated |
28(c) Implement Approved Architectural
Drawings Carry out the building work in accordance with the approved architectural drawings. Note: The requirement to use particular materials and finishes is imposed only for the purpose of achieving a built form outcome that displays architectural merit. Council has not assessed the materials and finishes for compliance with the Building Act, the Building Fire Safety Regulation, the Building Regulation, the Building Code of Australia, the Queensland Development Code, relevant Australian Standards, fire safety standards or any other relevant requirement of a statutory authority with regard to building work. Timing: While building work is occurring and then to be maintained. |
As indicated |
28(d) Submit Certification Submit to Development Services certification by a Registered Architect or Queensland Building Construction Commission Open Licence Class Building Designer confirming that the building has been constructed in accordance with the approved architectural drawings. Timing: Prior to the Final Certificate/Certificate of Occupancy or commencement of the use, whichever comes first. |
As indicated |
| 29) Overall Height The overall height of the building(s) must be in accordance with the floor and roof levels and overall height shown on the APPROVED DRAWINGS AND DOCUMENTS. NOTE: This condition should be read in conjunction with any other relevant condition requiring minimum height clearances for basement or undercover car parking and manoeuvring areas. |
While site/operational/building work is occurring and then to be maintained |
29(a) Submit Certification Submit to Development Services certification from a Registered Surveyor (Qld) confirming that the 'as constructed' floor and roof levels and overall height are in accordance with the requirements of this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
| 30) Heritage Place - Best Practice Standards Carry out and maintain all works to the existing heritage place in accordance with heritage best practice and The Burra Charter (Australia ICOMOS Charter for Places of Cultural Significance). Timing: Prior to and during site/operational/building work and ongoing. PROOF OF FULFILMENT Submit to Development Services certification from a Registered Professional Engineer Queensland (Structural) that all surface treatments and heritage fabric on the subject site and the heritage fabric on immediately adjoining sites have not been detrimentally affected by the works. |
As indicated |
| 31) Light Reflectivity and Solar (Heat)
Reflectivity Submit to Development Services documentary evidence that the level of light reflectivity from the glazing incorporated in the approved development does not exceed 20%. Timing: Prior to building work above ground level commencing. |
As indicated |
31(a) Install Glazing Install and maintain glazing in accordance with the above specification. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained. |
As indicated |
| 32) Wind Study Implement and maintain the findings and recommendations of the APPROVED Pedestrian Wind Study prepared by RWDI Australia Pty Ltd and received 18-NOV- 2024. |
While site/operational/building work is occurring and then to be maintained |
32(a) Submit Certification Submit to Development Services certification by a Professional Engineer (registered in Australia and qualified in wind engineering) confirming that the findings and recommendations of the above 'Wind Study Report' have been implemented in accordance with the requirements of this condition. Timing: Prior to the commencement of the use. |
While site/operational/building work is occurring and then to be maintained |
| 33) Driveway Material and Finishes Provide materials and finishes to the
driveway and external carparking surfaces that reduce the visual impact of
these areas when viewed from the street and provide a different material to the
pedestrian pathways. One or a combination of the following must be used: |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 34) Provide Pedestrian Prioritised Pathway Provide a pedestrian prioritised pathway from the street frontage to the lobby entry for the tower component and front doors of the river homes component. The pathway must be differentiated in colour and texture from the driveway surface. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 35) Balconies/Verandahs/Terraces All balconies/verandahs/terraces must remain unenclosed with no
shutters, glazing, louvres or similar permanent fixtures (excluding screening
required by the development approval or shown on the APPROVED DRAWINGS AND
DOCUMENTS). Note: Any Community Management Statement that may apply to this approval must contain a by-law which reflects the requirements of this condition. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 36) Screen Air Conditioning and Other Plant
Enclosures Install and maintain suitable screening to all air conditioning units, lift motor rooms, hot water systems plant and service facilities where externally visible or located on top of the building including where visible and/or located within private open space areas, communal open space areas, adjoining properties or public land. The screening structures must be constructed from durable materials that are consistent with materials used elsewhere on the facade of the building. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 37) Sun Shading Devices Provide sun shading in accordance with the approved DRAWINGS AND DOCUMENTS. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 38) Screening Provide suitable privacy screening to windows of habitable rooms, balconies, landings, terraces and decks of the proposed dwelling(s) in accordance with the approved DRAWINGS AND DOCUMENTS. Suitable screening options must be: For windows: For balconies, landings, terraces and decks: Note: Screening devices must be either solid translucent screens, perforated or slatted panels, or fixed louvres that are permanent, be durable and fixed. Screening devices must have a maximum of 25% openings, with a maximum opening of 50mm. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 39) Provide Detailed and Textured Model Submit to Virtual Brisbane, a digital model for inclusion into the Brisbane City Council Virtual Brisbane 3D model. This must be a high quality, detailed and textured 3D exterior model of the approved development at a standard which can be publicly viewable. This must be of a compatible file format, include property boundaries and show heights in Australian Height Datum (AHD). For information on the submission and a complete list of requirements' visit: www.brisbane.qld.gov.au/virtualbrisbane3Drequirements Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate |
As indicated |
| 40) Land for Community Purposes Network - Park
(Trunk) Transfer to Council in
fee simple on trust for the community purpose of park and other ancillary
public purposes (including essential services) as determined by Council
including but not limited to drainage and sewer, the land shown on the APPROVED
DRAWING Land Contribution plan (reference: DRAWING 1), dated 21 May 2026 as
Amended in Red 21 May 2026 and in accordance with the Infrastructure Agreement
for 23 Castlebar Street, Kangaroo Point 2026 for the Community Purposes Network
(Park) which forms part of LGIP ID: KAN-A8-003 in the Local Government
Infrastructure Plan. - Commencement of use; or -
The approval by the Council
of a plan of subdivision for the
development. |
As indicated |
40(a) Submit Plan of
Subdivision Submit to, and obtain approval from, Development Services, a plan of subdivision showing the land to be transferred for the Community Purposes Network (Park) and other ancillary public purposes (including essential services) as determined by Council to demonstrate compliance with the requirement of this condition. Timing: Prior to submission of the request for compliance assessment pursuant to Schedule 18 of the Planning Regulation 2017 for Council's notation on the plan of subdivision necessary to comply with this condition. |
As indicated |
40(b) Request Preparation of Transfer
Documentation Submit a request for Council to prepare the necessary transfer documentation to demonstrate compliance with the requirements of this condition. Note: Land to be transferred to the Brisbane City Council must have the necessary transfer documentation prepared by the Brisbane City Council, free of cost to Council. Timing: Prior to submission of the request for compliance assessment pursuant to Schedule 18 of the Planning Regulation 2017 for Council's notation on the plan of subdivision necessary to comply with this condition. |
As indicated |
40(c) Lodge Notated Plan and
Documentation Lodge the plan of subdivision notated by Council pursuant to Schedule 18 of the Planning Regulation 2017 and the necessary transfer documentation prepared by Council with the Registrar of Titles for the relevant Queensland State Government Authority. Timing: Prior to commencement of use. PROOF OF FULFILMENT Submit to Development Services, evidence of the registration of the necessary transfer documentation. Timing: Within one month of the registration of the transfer documentation. |
As indicated |
| 41) Retain and Protect Existing Street Tree(s) Identify, retain and protect the existing street trees on the Castlebar Street and Thorn Street frontages of the site unless otherwise agreed in writing with Program Planning and Integration. Note: Street trees are protected under the Natural Assets Local Law. Street trees must not be removed or pruned without prior approval from Program Planning and Integration. Note: Where driveway crossovers occur within the Tree Protection Zone (TPZ) of existing street trees, seek approval from the Arboricultural Team in Program Planning and Integration, City Standards for the final driveway crossover design and construction methodology to ensure the successful retention of the existing street tree(s)
PROOF OF FULFILMENT Contextual photographic evidence that the tree has been retained in equal or greater health than before development commenced. OR, evidence in writing from Asset Services Arboriculture that an alternative arrangement has been made. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
At all times |
41(a) Implement Protection
Measures Install tree protection measures in accordance with Australian Standard - AS4970 Retention of Trees on Development Site. There must be no excavation, filling or storage of materials or plant within the drip line of the tree(s). Where works are within the canopy drip line of existing street trees, contact Program Planning and Integration Regional Coordinator Arboriculture in relation to the required provision of protection measures. Note: If fencing is to protect street trees, a permit to temporarily occupy the footway will be required from Compliance and Regulatory Services. Timing: Prior to site/operational/building work occurring. PROOF OF FULFILMENT Contextual photographic evidence to demonstrate the installation of protection measures prior to building works commencing. Timing: Prior to site / operational / building work occurring. |
As indicated |
41(b) Maintain Protection
Measures Maintain protection measures while development is occurring and remove protection measures prior to commencement of the use. Timing: While to site/operational/building work is occurring. |
As indicated |
| 42) Streetscape Works - Neighbourhood Street
Major Carry out streetscape improvement works (Thorn Street frontage only) including concrete path, turf and street trees to the verge to a Neighbourhood Street Major standard in accordance with the relevant Brisbane Planning Scheme Codes, Brisbane Standard Drawings (BSD), the requirements of this condition and the Infrastructure Design Planning Scheme Policy including sections 3.7.4.4 and 3.7.5. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
42(a) Concrete Path Install a 1.8m wide broom finished standard Portland grey concrete path. The edge of the path is to be setback 1300mm from the back of kerb.
Where the path cannot be installed on this alignment due to conflicts such as
street trees, or power poles, ensure the path is installed a minimum distance
of: If the above requirements cannot be achieved, contact the Landscape Architecture Team via email: specialistservices@brisbane.qld.gov.au. Transition to existing paths on verges that adjoin the development. The transition is to occur fronting the adjoining developments, not the subject site. Note: standard path alignments are shown on Brisbane Standard Drawing BSD-5201 sheet 2 but will vary depending on verge width and location. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT Photographic evidence of concrete path. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
42(b) Submit As-Constructed
Drawings Submit to Development Services As Constructed plans including an asset register, checked by a Registered Professional Engineer Queensland, certifying that the concrete path works have been completed in accordance with relevant Brisbane Planning Scheme Codes/Policies. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT As constructed drawings signed by an RPEQ. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
42(c) Turf Install turf to the full width of the verge excluding any concrete path required by this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT Photographic evidence of installed turf. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
42(d) Street Tree(s) Enter into and implement an arrangement with the Program Planning and Integration Regional Coordinator Arboriculture in relation to the required provision of the street tree planting in accordance with the above sections of the Infrastructure Design Planning Scheme Policy, including the number, species, location, installation and maintenance of the required street tree(s) as determined by Program Planning and Integration. Provide to Development Assessment a copy of the agreement signed by Program Planning and Integration. Note: Street trees should not be planted until all utilities have been installed. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT A copy of the agreement with Program Planning and Integration and/or photographic evidence of installed trees. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
| 43) Retain Existing Tree(s) Retain,
protect and maintain the existing trees shown as being retained on the APPROVED
DRAWINGS AND DOCUMENTS, including the
existing development approval A006786527, all relevant Brisbane Planning Scheme
Codes and in accordance with Australian Standard - AS4970 Protection Of Trees
On Development Sites. Note: All conditions forming part of A006786527 in relation to the tree planting remain relevant unless otherwise amended by this approval or SARA response attached to the decision. PROOF OF FULFILMENT Contextual photographic evidence that the tree(s) has been retained in equal or greater health than before development commenced. Timing: While site/operational/building work is occurring. |
While site/operational/building work is occurring |
43(a) Implement Protection Measures - On-site
Trees Implement protection measures including the erection of a temporary fence around the entire tree protection zone (established pursuant to AS-4970) or as directed by a qualified Arborist. There must be no excavation, filling, storage of materials or plant within the fenced area. Protection fences must be removed prior to the commencement of the use. Timing: Prior to and while site / operational / building works is occurring. PROOF OF
FULFILMENT Contextual photographic evidence to demonstrate the installation of protection measures prior to building works commencing. |
As indicated |
43(b) Certification Submit to Development Services certification from a qualified Arborist (minimum AQF Level 5 in Arboriculture with a minimum of 5 years' experience) certifying that tree protection measures were implemented in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
| 44) Sequence of Riverwalk Construction Development for the Riverwalk authorised by this development permit is to be carried out in the following order: a. Complete the demolition of the existing pontoon, to the satisfaction of Council and in accordance with the prescribed tidal works approval. Timing: Following the approval of the prescribed tidal works approval. b. Complete the works for the Riverwalk and revetment wall, including repair, upgrade or replacement, in accordance with the prescribed tidal works approval prior to the transfer of land to Council in fee simple on trust for the community purpose of park and other ancillary public purposes. The works authorised by this development permit must comply with the Infrastructure Agreement for 23 Castlebar Street, Kangaroo Point 2026, to the extent the responsibilities under the infrastructure agreement attach to, and bind the owner of, the premises. Advice Note: The private pontoon (Stage 2 – Private pontoon) may be developed concurrently with the Riverwalk and revetment wall (Stage 2 – Revetment works, Riverwalk and demolition of existing pontoon). |
As indicated |
| 45) Landscape the site - Container planting for rooftop
gardens and/or green walls Landscape the site through the provision of container planting in accordance with the requirements of this condition. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
45(a) Prepare Detailed Container Planting
Design for self-certification Prepare a Detailed Container Planting Design for all
container planting identified on the approved DRAWINGS AND DOCUMENTS, including
the Approved Document titled Landscape Concept Plan and Details
received 19-MAR-2025 as Amended in Red 21-MAY-2026; and Shaftston House Kangaroo Point - The Grounds and
Setting Landscape Heritage Assessment received 19-MAR-2025. The plan
must be prepared and certified by suitably qualified professionals and must
comply with the relevant Brisbane planning scheme codes. In addition to the
above, the design must include the following: - Shade and aspect studies including: o Sunshade modelling for 9am, noon and 3pm on June 21, September 22 and December 21; |
As indicated |
45(b) Implement certified Detailed Landscape
Container Planting Design Carry out the works in accordance with the above certified Detailed Landscape Container Planting Design. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
45(c) Certify work -
Implementation On completion of the work, submit to Development Services the
following: Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
45(d) Certify work - establishment
period On completion of the 12-month establishment period, submit to Development Services certification that planting has been established in accordance with the certified Detailed Landscape Container Planting Design. Timing: 12 months after implementation of the certified Detailed Landscape Container Planting Design. |
As indicated |
45(e) Maintain container
planting Rooftop gardens and Containerised Planters Maintain the container planting generally in accordance with the certified Detailed Landscape Container Planting Design. Timing: To be maintained. |
As indicated |
| 46) Landscape the Site - Self Certification Landscape the site in
accordance with the requirements of this condition. Advice note: The SARA referral agency response (dated 12 September 2025, reference 2412-43793 SRA) includes requirements relating to detailed landscape plans. The requirements of this SARA response are to prevail, to the extent there is any inconsistency between the requirements of this condition and the requirements of the conditions imposed by SARA as part of the referral agency response. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
46(a) Detailed Landscape Plan for Self-
Certification Prepare a Detailed Landscape Plan at a scale of 1:100 for all on-site landscape works including planting areas identified on the approved DRAWINGS AND DOCUMENTS, including the Approved Document titled Landscape Concept Plan and Details received 19-MAR-2025 as Amended in Red 21-MAY-2026; and Shafston House Kangaroo Point - The Grounds and Setting Landscape Heritage Assessment received 19-MAR-2025. The plan must be prepared by a Qualified Landscape Architect and must comply with the relevant Brisbane Planning Scheme Codes. The plan must include the following: - Planting media and mulch in accordance with AS4454 Composts, soil conditioners and mulches and AS 4419-2003 Soils for landscaping and garden use. - Unless otherwise specified, trees provided as 45 litre stock or larger, staked and tied, and complying with Australian Standards. - Plant selection and densities to achieve full surface coverage of garden beds within 2 years of planting. - A reticulated drip irrigation system to all planting areas, with drainage connected to the stormwater system; the irrigation system must be connected to a non-mains water source. - Trees required to be retained are documented, integrated into landscape design, and protected in accordance with the relevant sections of Australian Standard AS4970 Protection of trees on development sites. - Details of a 12 week establishment period. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT A detailed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
46(b) Multiple Unit Dwelling In addition to the
requirements listed above, the plan must include the following: Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT A detailed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
46(c) Certify Detailed Landscape
Plan On completion of the Detailed Landscape Plan, submit to Development
Services: Timing: Prior to building work commencing. PROOF OF FULFILMENT A detailed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to building work commencing. |
As indicated |
46(d) Implement Certified Detailed Landscape
Plan Carry out the landscape work in accordance with the above certified detailed Landscape Plan. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
46(e) Certify Work On completion of the
landscape work, submit to Development Services: Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT An as constructed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
46(f) Maintain Landscape Work Maintain the landscape work, including deep planting provided in this application and existing development approval (Council reference: A006786527), in accordance with the certified Detailed Landscape Plan. Timing: To be maintained. |
As indicated |
| 47) Mechanical Plant or Equipment - Acoustically
Screened Mechanical plant or equipment is to be acoustically screened from an adjoining sensitive use. Mechanical plant includes generators, motors, compressors and pumps such as air-conditioning, refrigeration and cold room motors. Acoustically screened is defined in City Plan 2014. NOTE: This condition does not authorise environmental nuisance under the Environmental Protection Act 1994. PROOF OF FULFILMENT Submit to Development Services, certification that all mechanical plant or equipment, is acoustically screened. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 48) Acid Sulfate Soils - Management Plan Acid Sulfate Soils must be managed in accordance with this condition. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
48(a) Implement Management Plan Implement and maintain the recommendations of the Report of Geotechnical Investigation, reference 97616.00 R.002.Rev 1, received 25 January 2022. Timing: Prior to building work commencing. |
As indicated |
| 49) Acoustic Fence - General Erect a 2 metre high acoustic
fence, (relative to the finished RL of the building pad) along part of the
south-western boundary. The acoustic fence must: Advice note: Please note that this condition prevails to the extent of any inconsistency with Condition 21. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
49(a) Certification Submit to Development Services certification from a person who is a Member or eligible to be a Member of the Australian Acoustic Society that the constructed acoustic fence complies with the above requirements. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
| 50) Dampening of Grilles and Metal Plates All metal grilles, metal plates or similar located within vehicle parking and manoeuvring areas must be securely fastened and meet the requirements of AS3996:2019, Access covers and grates. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 51) Tyre Noise Reduction The driveways and carpark surfaces are to be appropriately treated/surfaced to reduce tyre noise impacts from the development. PROOF OF
FULFILMENT Provide Certification that appropriate treatments/surfacing has been provided to the driveways and carpark areas to reduce tyre noise impact from the development. Certification must be provided by a Member or professional eligible to be a Member of the Australian Acoustic Society. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 52) Stormwater Quality (Implement Management
Plan) Manage stormwater quality in accordance with this condition. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
52(a) Implement Management Plan Implement the Approved Document titled Site Based Stormwater Management Plan with reference B23202-REP-CIV-0001 Revision B (consisting of 2 OceanGuards, a 7 cartridge StormFilter with Psorb and WaterUps irrigation channels), received 18-NOV-2024. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
52(b) Certification Submit to Development Services certification from a relevant professional that all treatments and measures recommended in the Approved Document titled Site Based Stormwater Management Plan with reference B23202-REP-CIV-0001 Revision B (consisting of 2 OceanGuards, a 7 cartridge StormFilter with Psorb and WaterUps irrigation channels), received 18-NOV-2024 have been implemented. A copy of the as-constructed site based stormwater quality measures must accompany the Certification. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
52(c) Maintain Management Plan Maintain the site in accordance with the Approved Document titled Site Based Stormwater Management Plan with reference B23202-REP-CIV-0001 Revision B (consisting of 2 OceanGuards, a 7 cartridge StormFilter with Psorb and WaterUps irrigation channels), received 18-NOV-2024. |
As indicated |
| 53) Grant Easements Grant the following
easement(s): i. Underground drainage ii. Utility Services to Riverwalk, including water,
electricity and telecommunications in favour of Brisbane City
Council. iii. Maintenance access to
Riverwalk and associated services, to be a minimum 2m width and accessible at all
times, in favour of Brisbane City
Council The alignment of all
easements is to be certified by a qualified Arborist (minimum AQF Level 5 in
Arboriculture with a minimum of 5 years experience), to ensure that the
alignment of the easement/s will enable retention of vegetation as per the
APPROVED DRAWINGS AND DOCUMENTS. Note: These easements include the provision for
Council to obtain
access. iv. If necessary, a
volumetric easement for services and an access easement to the proposed private
pontoon. Timing: Prior to submission of Plan of Subdivision to Council for
dedication of land for park required by part (a) of Condition 40 ‘Land
for Community Purposes Network – Park
(Trunk)’. |
As indicated |
53(a) Submit Plan of Subdivision and
Documentation (Council Easement in Gross) Submit to, and obtain approval from, Development Services a plan of subdivision showing the easement and a request for Council to prepare the necessary easement documentation to demonstrate compliance with the requirements of this condition. Note: Easements in favour of the Brisbane City Council must have the necessary easement documentation prepared by the Brisbane City Council, free of cost to Council. Timing: Prior to submission of the request pursuant to Schedule 18 of the Planning Regulation 2017 for Council's notation on the plan of subdivision necessary to comply with this condition. |
As indicated |
53(b) Submit Plan of Subdivision and
Documentation (Other Easement) Submit to, and obtain approval from, Development Services, a plan of subdivision showing the easement and the necessary easement documentation to demonstrate compliance with the requirements of this condition. Note: Easements not in favour of the Brisbane City Council must have the necessary documentation prepared by the applicant's private solicitors. Timing: As part of the submission of the request pursuant to Schedule 18 of the Planning Regulation 2017 for Council's notation on the plan of subdivision necessary to comply with this condition. |
As indicated |
53(c) Lodge Notated Plan and
Documentation Lodge the plan of subdivision notated by Council pursuant to Schedule 18 of the Planning Regulation 2017 and the necessary easement documentation with the Registrar of Titles for the relevant Queensland State Government Authority. Timing: Prior to commencement of use. PROOF OF FULFILMENT Evidence of the registration of the necessary easement documentation. Timing: Within one month of the registration of the easement documentation. |
As indicated |
53(d) Certification Submit to
Development Services certification by a qualified Arborist (minimum AQF Level 5
in Arboriculture with a minimum of 5 years experience), certifying that the
alignment of the easement/s will enable retention of vegetation as per the
APPROVED DRAWINGS AND DOCUMENTS. Timing: Prior to submission of the request pursuant to Schedule 18 of the Planning Regulation 2017 for Council’s notation on the plan of subdivision necessary to comply with this condition. |
As indicated |
| 54) On-site Erosion (Medium Risk) Manage on-site erosion and the release of sediment or sediment laden water from the site at all times by implementing best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version). Timing: Prior to commencement of any land disturbing activities and until all exposed soil areas are permanently stabilised against erosion. |
As indicated |
54(a) Manage earth disturbance on-
site (i) Drainage control measures must be implemented and maintained to minimise water flow onto areas of exposed earth. (ii) Sediment and erosion control measures must be implemented and maintained to prevent soil loss from earth disturbance areas and prevent deposition beyond earth disturbance areas. (iii) No release of contaminants to land beyond on-site area of earth disturbance other than releases that achieve water pollutant concentration release limits of: A. 50mg/L TSS (Total Suspended Solids); B. Turbidity, Nephelometric Turbidity Units (NTU) value less than 10% above background, 75 NTU, or as agreed in writing by an Officer from Councils Erosion and Sediment Control (ESC) Team in Compliance and Regulatory Services; C. pH between 6.5 and 8.5 at all times. (iv) Maintain a written record to demonstrate that water discharges from the site, including any dewatering operations, meet the release limits as detailed in (iii) for water discharge(s) from the site that occur during or immediately after a rainfall event, and during normal business hours. The water quality of the discharge flows must be measured at each discharge point from the site, including but not limited to sediment basin outlets, other applicable sediment control devices, the site water drainage system, and recorded against the release limits at least once on each calendar day until such discharge stops. Timing: Prior to commencement of any earth disturbing activities and until all exposed soil areas are permanently stabilised against erosion. |
As indicated |
54(b) Provide Land Occupier Notification to
Council (i) Notify Council's ESC Team of proposed land occupier/s by sending an email to CARS-ESC@Brisbane.qld.gov.au (ii) If the land is to be occupied by any person other than the registered landowner then advice must be provided to Council that confirms the name, contact information and the duration of any proposed occupation of the land. Timing: Prior to commencement of any earth disturbing activities. |
As indicated |
54(c) Prepare Erosion and Sediment Control
Plan Prepare an Erosion and Sediment Control Plan (ESCP) in accordance with best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version) and, to the extent of any inconsistency, relevant Brisbane Planning Scheme Codes and Policies. Obtain a design certificate in accordance with the relevant Brisbane Planning Scheme Codes and Policies. The ESCP and design certificate must be certified by a Certified Professional in Erosion and Sediment Control (CPESC) or a Registered Professional Engineer Qld (RPEQ) with suitable qualifications and experience in erosion and sediment control. Documentary evidence demonstrating appropriate qualifications in erosion and sediment control must be provided to the Council upon request. Timing: Prior to the commencement of any earth disturbing activities. |
As indicated |
54(d) Attend a pre-start
meeting Arrange and attend a pre-start meeting for ESC with an Officer from Councils ESC Team in Compliance and Regulatory Services (CARS). Note: To request a pre-start meeting from Council's ESC Team send an email to CARS-ESC@Brisbane.qld.gov.au. All relevant documentation, including both the certified ESCP and the certified design certificate, must be attached to this email. Please allow up to 10 business days for your request to be processed. Timing: Attend the pre- start meeting prior to the commencement of any earth disturbing activities. |
As indicated |
54(e) Implement Certified Erosion and
Sediment Control Plan Implement the certified ESCP and maintain all ESC measures in accordance with best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version) and, to the extent of any inconsistency, relevant Brisbane Planning Scheme Codes and Policies. The ESCP and design certificate must be available on site at all times for inspection by Council officers. Any alteration to supplementary or Type 3 ESC measures must be reflected in the certified ESCP. Any alteration to Type 2 or Type 1 ESC measures will require a revised ESCP and design certificate that has been certified by either the CPESC or RPEQ. Timing: While earth disturbing activities are occurring and until all exposed soil areas are permanently stabilised against erosion. |
As indicated |
| 55) Maintenance Period for Engineering Work Maintain the work required by the Engineering Condition(s) imposed on this development approval, including works required for the Riverwalk and revetment wall, and rectify any defects in accordance with the requirements detailed in this condition and in accordance with the infrastructure Agreement for 23 Castlebar Street, Kangaroo Point 2026. Note: Guidance for requesting a pre-start and co-ordinating the On/Off Maintenance process can be found on Council's website (https://www.brisbane.qld.gov.au/planning-and-building/applying-and-post- approval/on-and-off-maintenance-approvals). Timing: During the on-maintenance period. |
As indicated |
55(a) On-Maintenance Acceptance Arrange an on- maintenance inspection with Development Services and obtain written confirmation from Council that the work has been completed in accordance with the requirements of the condition and is accepted on-maintenance. Provide proof of Public Liability Insurance ($20 million) for the on- maintenance period. Lodge a maintenance security for the on-maintenance period. The security must be calculated as 5% of the value of the constructed work or $10,000.00, whichever is greater. Note: A maintenance security may consist of either a bank guarantee or monetary payment lodged with Council. Refer to Council's Infrastructure Installation and Construction Requirements Manual for further details about the on-maintenance procedure and requirements. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
55(b) On-Maintenance Period Provide a minimum 12 months maintenance to the work from the time the work is accepted on- maintenance by Council. During this period maintain the work and rectify any defects identified at the on-maintenance inspection and those arising during the on-maintenance period. Note: The on-maintenance period may be extended by Council pending concerns and/or unsatisfactory performance during the maintenance period. Timing: A minimum 12 months from acceptance on-maintenance. |
As indicated |
55(c) Off-Maintenance
Acceptance On completion of the maintenance period arrange an off-maintenance inspection with Development Services and obtain written confirmation from Council that the work is accepted off-maintenance. Ensure all defects are rectified prior to making an appointment for off- maintenance Inspection. Note: If the inspection is successful the maintenance security will be released. Timing: On completion of the on-maintenance period. |
As indicated |
| 56) Engineering Pre-Start Meeting Arrange and attend a pre-start meeting with Development Services and Program Planning and Integration. Applicable compliance and inspection fees must be paid, in full, to Council prior to the meeting being held. Note: To arrange an engineering pre-start meeting with Development Services an email supported by a completed copy of the Pre-Start Meeting Guidelines - Civil Engineering Works kit (https://www.brisbane.qld.gov.au/sites/default/files/20191008-cc11207-pre- start-meeting-guidelines-civil-engineering-works.pdf) must be sent to dalodgement@brisbane.qld.gov.au. Details include (but
are not limited too) the following: Note: Timing: Prior to site/operational/building work commencing. |
As indicated |
| 57) Basement Excavation and Support Basement excavation and support of all exposed walls must be carried out in accordance with the relevant Brisbane Planning Scheme Codes and the requirements of this condition. |
Prior to building work commencing |
57(a) Prepare Engineering
Drawings Engineering drawings for the work required by this condition must be prepared and certified by a Registered Professional Engineer Queensland (Structural), in accordance with the relevant Brisbane Planning Scheme Codes detailing the design of the proposed excavation as well as proposed temporary and permanent support (if no temporary proposed) systems. The design must include at least the following: Notes: Timing: Prior to relevant site/operational/building work commencing. |
As indicated |
57(b) Implement Certified Engineering
Drawings Construct and maintain the basement excavation and proposed support system in accordance with the above certified engineering drawings. Note: A copy of the certified engineering drawings must be available on- site for inspection by Council Officers during these works. Timing: While basement excavation and support system installation is occurring. |
As indicated |
57(c) Submit Post Construction
Certification Submit certification by a Registered Professional Engineer Queensland that the basement excavation and support have been installed in compliance with the certified engineering drawings, the relevant Brisbane Planning Scheme Codes and the requirements of this condition. Where ground or rock anchors have been installed, submit certification by a Registered Professional Engineer Queensland (Geo-technical) that all anchors have been de- stressed. Timing: Prior to building work commencing above ground. |
As indicated |
| 58) Construction Management Plan - Major Carry out development in a method consistent with a Construction Management Plan (CMP) prepared in accordance with the requirements of this condition. |
While site/operational/building work is occurring |
58(a) Construction Management Plan - Submit
Plan Submit to, and obtain compliance approval from, Development Services a detailed Construction Management Plan for the site preparation, demolition, excavation and construction phases of the approved development. The Construction Management Plan must be in accordance with the relevant Brisbane Planning Scheme Codes and address the following matters, both internal to and external to the development site: (i)
Location of and impacts to any Council vegetation (i.e. street
trees/park trees/garden beds) The Construction Management Plan must be supported by 'approval in principle' or written approvals from the relevant Council sections or other governing bodies responsible for any potentially impacted infrastructure. The list of relevant infrastructure and contacts is available on Council's website - Search 'Constructions Management Plan'. Timing: Prior to site/operational/building work commencing. |
As indicated |
58(b) Construction Management Plan -
Dilapidation Report Submit a dilapidation report to engineeringservices@brisbane.qld.gov.au detailing the pre-existing condition of the roadway, both footways, both verges and Council infrastructure, including vegetation, for 100m from the site entry in both directions or to the next street intersection (if less than 100m from the site entry) in both directions. Timing: Prior to the pre-start meeting. |
As indicated |
58(c) Construction Management Plan -
Documentation on Site Legible copies of the approved Construction Management Plan and current permits must be kept on site and be made available on request by Council, at all times. The requirements of the CMP must be included in all induction of principal and subcontractors utilised in the development. An outline of the induction provided to contractors may be requested by Council to confirm compliance with this condition. Timing: While site/operational/building work is occurring. |
As indicated |
58(d) Construction Management Plan - Works to
be Performed Out of Hours Obtain an approval from Development Services for any
work that is proposed to be undertaken outside of normal business hours -
6:30am to 6:30pm, Monday to Saturday. |
As indicated |
58(e) Construction Management Plan -
Implement Plan Carry out the development in accordance with the approved Construction
Management Plan. |
As indicated |
| 59) Protect Existing Infrastructure Where there is existing infrastructure in the vicinity of the proposed work, the new work must not damage or compromise the working ability of the existing infrastructure. Where alterations to public utility mains, existing mains, services or installations are necessitated by the development, prior to alterations commencing, the developer must notify Council or the relevant infrastructure provider and obtain agreement to the alterations. The developer must meet the costs of the alterations. The alterations must be carried out in accordance with the relevant Brisbane Planning Scheme Codes or infrastructure providers requirements. |
While site/operational/building work is occurring |
59(a) As Constructed Drawings - Alterations
to Existing Infrastructure Submit to Development Services As Constructed drawings showing all new and/or rectification works and an asset register, prepared by a Registered Professional Engineer Queensland. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that the alterations have been completed in accordance with the relevant Brisbane Planning Scheme Codes and any other relevant infrastructure requirements. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
| 60) Certified Site Survey Levels Submit to Development Services, "As Constructed" drawings prepared by a Registered Surveyor (Qld). The registered surveyor must certify that the "As Constructed" drawings are in accordance with the APPROVED PLANS and the relevant Brisbane Planning Scheme Codes and show finished surface level information over the completed development. Note: The survey information must show surface levels and site contours at 1 metre intervals. All levels must be shown as Reduced Levels to the "Australian Height Datum" (AHD). |
Prior to Council's notation on the plan of subdivision |
| 61) Retaining Walls Design and construct all retaining walls and associated fences, in accordance with the relevant Brisbane Planning Scheme Codes and the following: - All retaining walls including the footings, must be located wholly within the property boundaries of the site where works are occurring - Runoff from surface drains and subsoil drainage associated with the retaining walls (irrespective of the height of the wall) must be collected and conveyed to a lawful point of discharge and must not cause any ponding, nuisance or disturbance to adjacent property owners. - Retaining walls to stabilise excavation must be set back from property boundaries to accommodate subsoil drainage without encroachment into the neighbouring property. This set back may vary depending on the height, structure and design of the retaining wall, surcharge loadings from neighbouring properties, and to provide a surface drain along the top of the retaining wall - For retaining walls in excess of 1.0m in
height: |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
61(a) Certification of Retaining
Walls For retaining walls over 1.0m in height, obtain certification from a Registered Professional Engineer Queensland that the design and construction of the retaining walls and ancillary drainage are in accordance with the requirements of this condition. |
As indicated |
| 62) Access, Grades, Manoeuvring, Carparks, Signs and
Line Marking Construct and maintain access, parking and manoeuvring for vehicles on site in accordance with the relevant Brisbane Planning Scheme Codes, as indicated on the approved DRAWINGS AND DOCUMENTS, including the following: i. A pavement of minimum Local road standard or equivalent surface material (including associated drainage) to the area on which motor vehicles will be driven and/or parked. ii. Suspended concrete parking areas, aisles and driveways are to be designed and certified by an RPEQ to accommodate the required design vehicles/s identified in this condition. iii. Manoeuvring on site for a RCV and for the loading and unloading of vehicle(s); iv. Parking on the site for a minimum 105 resident/tenant cars in addition to 8 visitor cars, including 1 parking spaces for people with disabilities and for the loading and unloading of vehicle(s) within the site. There must a minimum number of 113 total number of spaces provided on site. v. Provide and maintain a minimum 76 secure bicycle parking spaces for residents in addition to 14 bicycle parking spaces for visitors; vi. A minimum of 2.3 metres height clearance to all undercover parking areas and a minimum of 2.5 metres above parking spaces for people with disabilities. The minimum clear height must be measured to the lowest protrusion from the ceiling (e.g. fire sprinklers, services, lighting fixtures, signs, etc). vii. A height clearance sign located at the entrance(s) to undercover car parking areas and a directional visitor parking sign clearly visible from the vehicle entrance to the site. viii. Prepare and implement signs and line markings drawings that show the internal paved areas signed and delineated in accordance with the approved drawings and documents. The drawings must be prepared and certified by a Registered Professional Engineer Queensland in accordance with the relevant Brisbane Planning Scheme Codes and the Manual of Uniform Traffic Control Devices. PROOF OF FULFILMENT Certification from a Registered Professional Engineer Queensland, that the above requirements have been implemented in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 63) Repair Damage to Kerb, Footpath or Road Repair any damage to the existing kerb and channel, footpath or roadway (including removal of concrete slurry from footways, roads, kerb and channel, stormwater gullies and drainlines) and re-instate existing traffic signs and pavement markings that have been removed or damaged during any works carried out in association with the approved development. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
63(a) Interim Repairs If at any time during the construction phase of the approved development, damage to the existing kerb and channel, footpath or roadway creates unsafe, unreasonable and/or not fit for purpose conditions as assessed by Council, interim repairs must be undertaken as directed by Program Planning and Integration. Note: Any interim repairs required to be undertaken shall not be considered to satisfy the requirements of this condition for the permanent repair of the infrastructure prior to the issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. Timing: While site / operational / building works is occurring. |
As indicated |
| 64) Basements in Flood Planning Areas Design and construct
all basements affected by flooding within the Brisbane River and Creek/Waterway
Flood Planning Areas, including stormwater, electrical and sanitary facilities,
in accordance with the following: Note: Basement means a space: |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
64(a) Submit Certification to
Council Submit to Council certification by a Registered Professional Engineer Queensland that the stormwater, subsoil drainage and sewer hydraulic design, specifications and drawings for the basement construction is in accordance with the requirements of this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
64(b) Submit As Constructed Drawings to
Council Submit to development Services As Constructed drawings certified by a Registered Professional Engineer Queensland showing the surveyed basement entry levels, subsoil drainage details and pump design. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
| 65) Essential Services within Basements Where essential services are located within a basement or room located below the highest flood level affecting the site in an area affected by the Brisbane River Flood Planning areas or Creek/Waterway Flood Planning areas, the building is to be designed and constructed to provide either: i) A completely watertight tanked basement with walls and floors designed by a Registered Professional Engineer Queensland (Structural) to resist hydrostatic pressures expected during a defined flood event, OR ii) A subsoil drainage system and pump system
designed by a Registered Professional Engineer Queensland and constructed to
prevent the basement from flooding and meet the following: Notes: Essential electrical services include any area or room used for fire control panel, telephone PABX, sensitive substation equipment including transformers, low voltage switch gear, high voltage switch gear, battery chargers, protection control and communication equipment, low voltage cables, high voltage cables, and lift or pump controls. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
65(a) Certification to the Private Building
Certifier Provide to the Private Building Certifier, certification from a Registered Professional Engineer Queensland (Structural) that the basement has been designed and constructed to ensure structural integrity during a defined flood event. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
65(b) Certification to Council Submit to Council certification by a Registered Professional Engineer Queensland that the stormwater, subsoil drainage, pump and backup power supply has been constructed in accordance with the requirements of this condition. Note: This certification is required to be provided where a subsoil drainage and pump system has been provided in lieu of a tanked, watertight basement. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
| 66) Refuse Collection - On Site Provide for the installation and collection of refuse/recycling bins by Brisbane City Council's Waste and Resource Recovery Services. |
At all times |
66(a) Arrange Refuse Collection Arrange for the installation of refuse/recycling bins and for the subsequent collection of refuse including recycling from the site by Brisbane City Council's Waste and Resource Recovery Services or a private waste contractor. Timing: A minimum of four weeks prior to the commencement of use and then to be maintained. PROOF OF FULFILMENT Where a private waste contractor is engaged, provide written confirmation from the proposed waste collection contractor of the agreement to service the property. The written agreement must be submitted to Council's Waste and Resource Recovery Services and include full details of the proposed system, bin sizes, number of bins, frequency of collection and the refuse collection vehicle size. Timing: Prior to commencement of use. |
As indicated |
66(b) Indemnify Council The owner and any subsequent owner must, by approved form to Waste and Resource Recovery Services, indemnify Council and its agents in respect of any damage to the pavement and other driving surfaces. Timing: When an arrangement for refuse/recycling collection services is made with Brisbane City Council. |
As indicated |
66(c) Notify Future Owner Where Council is engaged as the waste contractor, the owner must notify any future owner/body corporate that the development has been approved on the basis that an indemnity must be provide for refuse collection vehicles to enter the property. Timing: At time of a change of ownership. |
As indicated |
| 67) Refuse Storage - On Site Collection Provide a roofed and wholly screened refuse enclosure utilising materials consistent with the development or a dedicated refuse storage room, as shown on the approved plans and documents. The enclosure/refuse storage room must be of a design to accommodate the quantity of refuse and recycling including source separation to allow for low servicing collection of the development. Bins must be located in an area which allows them to be manoeuvred from the bin storage area to the designated internal collection point. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 68) RiverWalk - Trunk Provide the Riverwalk infrastructure in accordance with the Infrastructure Agreement for 23 Castlebar Street, Kangaroo Point 2026, to the extent the responsibilities under the infrastructure agreement attach to, and bind the owner of, the premises and as generally shown on the APPROVED DRAWING Works Contribution and Indicative Pontoon Layout (reference: DRAWING 2), dated 21- MAY-2026 as Amended in Red 21-MAY-2026. The works form part of LGIP item KAN‑A8‑003 (Transport Network – Road) in the Local Government Infrastructure Plan and must comply with the relevant Brisbane Planning Scheme Codes and the requirements of this condition. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
68(a) Submit Plan for RiverWalk
Works Submit to, and obtain approval from, Development
Services a Landscape Management and Site Works Plan in accordance with the
Infrastructure Agreement for 23 Castlebar Street, Kangaroo Point 2026 prepared
by a qualified Landscape Architect and Registered Professional Engineer
Queensland. The Plan must document the following: A) Certified structural engineering
design for structures including: - design and construction details of the
Riverwalk including finished levels with reference to the Australian Height
datum; -
construction details of the Riverwalk; - paving to the public riverside pathway
in accordance with AUSTROADS Part 14. Construct all pedestrian areas to achieve
a Class V Classification in accordance with Australian Standard -AS4586 Slip
resistance classification of new pedestrian surface materials and all paving must be suitable for public access
and authorised vehicular access; - details of any other structural
components such as balustrades, retaining walls, Riverwalk decking and paving
etc. B)
Riverwalk construction, including the following layout and design
requirements: - construction materials (including tactile paving) compliant with those
detailed in the Infrastructure Design Planning Scheme
Policy; -
landscaping (including vegetation and hard materials) compliant with those
detailed in the Infrastructure Design Planning Scheme
Policy; -
furniture (including balustrades) compliant with those detailed in the
Infrastructure Design Planning Scheme Policy; - suitable for use by emergency and
maintenance vehicles. C) Any Riverwalk Furniture must be located and meet
the following minimum requirements: - seats, drinking fountains and bench
seats must be from the Riverwalk Furniture Suite; - numbers and locations as determined by
Development Services; - pedestrian lighting in accordance with the
following: o Provide electrical reticulation plans certified by
a Registered Professional Engineer Queensland to comply with Australian
Standard - AS/NZS3000 Electrical installations known as the Australian/New
Zealand Wiring Rules and Council's standard drawings BSD-11001-11004 and BSD-
11031-11032. o Provide pedestrian lighting plans certified by a
Registered Professional Engineer Queensland or by a member of the Illuminating
Engineering Society of Australia and New Zealand to comply with Australian
Standard - AS/NZS 1158.3.1 Lighting for roads and public spaces - Pedestrian
Area (Category P) Lighting - Performance and Design
requirements. D) Costing and maintenance program including: - costing of all works indicated on the
Landscape Management and Site Works Plan for Riverwalk;
and -
details of a 12-month maintenance program for all landscaping, including
staging of works and time schedules, methods of establishment and projected
ongoing maintenance costs. E) Program of works and
phasing: - details of the timing for the works; - details of works to be carried out for
the new Riverwalk in relation to other approved aspects of
development. Timing: Prior to building work commencing above ground level for the tower as shown in blue shading on the APPROVED DRAWINGS Above Ground Level Works – 1 and Above Ground Level Works – 2 (reference: DRAWING 4), both dated 21-MAY-2026 as Amended in Red 21-MAY-2026. |
As indicated |
68(b) Implement Approved
Drawings Construct the works in accordance with the above approved drawings. Timing: Prior to on-maintenance acceptance. |
As indicated |
68(c) Submit As Constructed
Drawings Submit
As Constructed drawings including an asset register and a pre-On-Maintenance
Inspection Checklist, prepared by a qualified Landscape Architect or Landscape
Contractor and a Registered Professional Engineer Queensland as appropriate,
certifying that the works have been completed in accordance with the approved
Landscape Management and Site Works Plan. |
As indicated |
| 69) Telecommunications Submit to Development Services, certification from
an authorised telecommunications carrier/contractor, that the following works
and infrastructure have been undertaken and installed in accordance with
telecommunications industry standards: |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 70) Agreement with Electricity Supplier Submit to Development Services, evidence of an agreement with an electricity supplier to provide necessary services to the development in accordance with the relevant Brisbane Planning Scheme Codes. Where development is within an established area of overhead electricity supply and the electricity supplier determines that a property pole is the appropriate solution to supply electricity to the development, the developer must be responsible for the installation of the property pole(s). In the above circumstances, submit to Development Services, certification from the developer's electrical consultant confirming that the above installation has been completed in accordance with the relevant AS/NZS Standards and the Queensland Electricity Connection Manual (QECM) and Queensland Electricity Metering Manual (QEMM). |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 71) Permanent Driveway Crossover Provide a 6.7 metre wide Type B1 (modified) permanent driveway crossovers to the Thorn St frontage(s) of the site in accordance with the relevant Brisbane Planning Scheme Codes and located as shown on the approved DRAWINGS AND DOCUMENTS. Written consent must be obtained from BCC - Field Services, Program Planning and Integration Arborist prior to any works occurring that will either impact on or require removal of a street tree (this includes pruning and excavation within the root zone/canopy of the tree) At all times during construction of the crossover, safe pedestrian access along the site frontage must be maintained. Note: No further driveway permit is required however additional footway permits or lane closure permits may be required for footpath/verge closures and/or lane closures. These permits must be obtained prior to construction of the crossover. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 72) Redundant Driveway Crossover Remove the redundant existing driveway crossover(s) on the Thorn Street frontage of the site and reinstate the kerb and channel, road pavement, footways and footpaths in accordance with the relevant Brisbane Planning Scheme Codes. Note: Additional footway permits or lane closure permits may be required for footpath/verge closures and/or lane closures. These permits must be obtained prior to construction of the crossover. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 73) Construction Noise and Dust Emissions Pursuant to the Environmental
Protection Act 1994, all development involving the emission of noise and dust
from building and/or construction activities, must ensure that the emissions
are in accordance with the requirements of the Act. |
As indicated |
| 74) Management of Asbestos Disposal, handling and restoration of any building materials containing asbestos must be in accordance with current state and federal legislation. |
As indicated |
| 75) Further Development Permit Required Further Development Permit(s) to carry out assessable building work under the Building Act may be required. |
As indicated |
| 76) Currency Period The currency period for this development approval is stated in the Decision Notice and is expressed as a date. This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016. |
As indicated |
| 77) Referral Agency Requirements The State Assessment and Referral Agency as concurrence agency has imposed the requirements contained in the letter dated 12 September 2025, reference 2412-43793 SRA. |
As indicated |
| 78) Cultural Heritage Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage. The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care. For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships). |
As indicated |
| 79) Equitable Access Provision must be made during and after construction
for equitable access for persons with disabilities to and within the site and
on adjoining public areas, in accordance with the following: |
As indicated |
| 80) Eligibility for on-street residential parking
permits in Brisbane Occupiers of the approved development will not be eligible for on-street residential or visitor parking permits. |
As indicated |
| 81) Damage to Trees on Adjoining Land Please note that any damage caused to vegetation on adjoining land as a result of exercising this development approval may result in an offence under other legislation (e.g. Natural Assets Local Law) and/or civil action |
As indicated |
| 82) Fire Ant Movement Controls To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected. These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products. Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014. For further information contact the relevant Queensland State Government department on 13 QGOV. |
As indicated |
| 83) Water and Wastewater Services for water and wastewater (sewerage) are not under the jurisdiction of Brisbane City Council. Authorisation to connect the approved development to the water/wastewater networks and for property service connections required a Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009. For further information about any necessary Water Approvals contact Urban Utilities. |
As indicated |
| 84) Flood Resilience and Awareness This advice is provided for buildings that are on sites that are subject to the flood overlay, as shown within City Plan 2014.
Council makes decisions to minimise flood risk based on the best information available at the time of the development application. Flood studies and applicable flood levels may be updated by Council overtime where new flood information is available or changes to engineering standards/methodology have occurred. Flood levels for various flood events and flooding types are outlined in Councils Floodwise Property Reports available from Councils website.
The minimum flood planning levels that apply to new development do not necessarily mean that the development will never flood. Therefore, when choosing materials for building on sites that are known to be affected by flooding, regardless of whether it is constructed to the minimum flood planning level, it is recommended that flood resilient materials are used to improve the speed of recovery and reduce the cost of repairs if required.
For more information refer to: Council's website at https://www.brisbane.qld.gov.au/community-and-safety/community- safety/disasters-and-emergencies/be-prepared/flooding-in-brisbane/flooding- support-for-residents/flood-resilient-homes-program Queensland Reconstruction Authority "Flood Resilient Building Guidance for Queensland Homes"https://www.qra.qld.gov.au/resilient- homes/flood-resilient-building-guidance-queensland-homes |
As indicated |
| 85) Buildings in Transport Noise Corridors - Acoustic
Treatments All new houses, townhouses, units, hotels and motels (Class 1-4
buildings) on sites located in a designated transport noise corridor are
required to comply with the requirements of the Queensland Development Code
Mandatory Part 4.4 - Buildings in Transport Noise Corridors. The buildings will
need to achieve specific levels of noise mitigation through the use of
appropriate materials for floors, walls, roofs, windows and doors for the
relevant noise category. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| Permit to Which These Conditions Relate: | DA - PA - Operational Work |
| Activity(ies): | Heritage Place (QHP) Landscape Works on Private Land Bulk Earthworks |
| Stage: | Stage 1 - Operational work on a Queensland Heritage Place involving changes to landscaping or natural features |
| 86) Approved Drawings and Documents A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers. Note: This condition is imposed to ensure compliance with the conditions of development approval. |
While site/operational/building work is occurring |
| 87) Carry Out the Approved Development Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS. Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks). Permission to enter neighbouring properties must be obtained from the relevant property owners. |
While site/operational/building work is occurring |
| 88) Complete All Operational Work Complete all operational work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such operational work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS or, if requiring a further approval from the Council, in accordance with the relevant further approval(s). |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 89) Infrastructure Agreement Comply with the Infrastructure
Agreement for 23 Castlebar Street, Kangaroo Point 2026, to the extent the
responsibilities under the infrastructure agreement attach to, and bind the
owner of, the premises.
|
At all times |
| 90) Retain and Protect Existing Street Tree(s) Identify, retain and protect the existing street trees on the Castlebar Street and Thorn Street frontages of the site unless otherwise agreed in writing with Program Planning and Integration. Note: Street trees are protected under the Natural Assets Local Law. Street trees must not be removed or pruned without prior approval from Program Planning and Integration. Note: Where driveway crossovers occur within the Tree Protection Zone (TPZ) of existing street trees, seek approval from the Arboricultural Team in Program Planning and Integration, City Standards for the final driveway crossover design and construction methodology to ensure the successful retention of the existing street tree(s)
PROOF OF FULFILMENT Contextual photographic evidence that the tree has been retained in equal or greater health than before development commenced. OR, evidence in writing from Asset Services Arboriculture that an alternative arrangement has been made. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
At all times |
90(a) Implement Protection
Measures Install tree protection measures in accordance with Australian Standard - AS4970 Retention of Trees on Development Site. There must be no excavation, filling or storage of materials or plant within the drip line of the tree(s). Where works are within the canopy drip line of existing street trees, contact Program Planning and Integration Regional Coordinator Arboriculture in relation to the required provision of protection measures. Note: If fencing is to protect street trees, a permit to temporarily occupy the footway will be required from Compliance and Regulatory Services. Timing: Prior to site/operational/building work occurring. PROOF OF FULFILMENT Contextual photographic evidence to demonstrate the installation of protection measures prior to building works commencing. Timing: Prior to site / operational / building work occurring. |
As indicated |
90(b) Maintain Protection
Measures Maintain protection measures while development is occurring and remove protection measures prior to commencement of the use. Timing: While to site/operational/building work is occurring. |
As indicated |
| 91) Retain Existing Tree(s) Retain,
protect and maintain the existing trees shown as being retained on the APPROVED
DRAWINGS AND DOCUMENTS, including the existing development approval
A006786527, all relevant Brisbane
Planning Scheme Codes and in accordance with Australian Standard - AS4970
Protection Of Trees On
Development Sites. Note: All conditions forming part of A006786527 in relation to the tree planting remain relevant unless otherwise amended by this approval or SARA response attached to the decision. PROOF OF FULFILMENT Contextual photographic evidence that the tree(s) has been retained in equal or greater health than before development commenced. Timing: While site/operational/building work is occurring. |
While site/operational/building work is occurring |
91(a) Implement Protection Measures - On-site
Trees Implement protection measures including the erection of a temporary fence around the entire tree protection zone (established pursuant to AS-4970) or as directed by a qualified Arborist. There must be no excavation, filling, storage of materials or plant within the fenced area. Protection fences must be removed prior to the commencement of the use. Timing: Prior to and while site / operational / building works is occurring. PROOF OF
FULFILMENT Contextual photographic evidence to demonstrate the installation of protection measures prior to building works commencing. |
As indicated |
91(b) Certification Submit to Development Services certification from a qualified Arborist (minimum AQF Level 5 in Arboriculture with a minimum of 5 years' experience) certifying that tree protection measures were implemented in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
| 92) Landscape the site - Container planting for rooftop
gardens and/or green walls Landscape the site through the provision of container planting in accordance with the requirements of this condition. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
92(a) Prepare Detailed Container Planting
Design for self-certification Prepare a Detailed Container Planting Design for all container planting identified on the approved DRAWINGS AND DOCUMENTS, including Approved Document titled Landscape Concept Plan and Details received 19-MAR-2025 as Amended in Red 21-MAY- 2026; and Approved Document titled Shafston House Kangaroo Point - The Grounds and Setting Landscape Heritage Assessment received 19-MAR-2025. The plan must be prepared and certified by suitably qualified professionals and must comply with the relevant Brisbane planning scheme codes. In addition to the above, the design must include the following: - Shade and aspect studies including: o Sunshade modelling for 9am, noon and 3pm on June 21, September 22 and December 21; o Wind report measuring m/s for the container planting location/s; o Detailed estimates of required weekly water consumption for irrigation for each calendar month by an Irrigation Association of Australia certified irrigation designer, holding a Diploma of Irrigation o a dedicated rainwater irrigation tank with green wall drainage return and overflow connected to the stormwater system; o a reticulated drip irrigation system with stand-alone power supply and smart-tech central control and alert; o waterproofing; o adequate fascia protection and drip tray depth to minimize drips onto the footpath or surrounding properties; - for planter boxes: o adequate width, depth and suitability of soil for the planting. Minimum internal depths of planters unless otherwise endorsed by Development Services must be trees minimum 800mm – maximum 1200mm; large shrubs and palms minimum 500mm - maximum 800mm; small shrubs and groundcovers minimum 250mm – maximum 400mm; o a plant schedule that demonstrates planting appropriate to container type, size and location, - considering orientation, shading and wind direction; o structural design by an RPEQ to ensure that the saturated weight of container planting is suitable for the building; o a 12-month establishment period maintenance program for planting; o an ongoing annual maintenance program including clearly defined access plan which demonstrates how accessible, safe and practical maintenance is achieved from within the site. Note: This will include the location/s of the winch point/s located on the roof to access containerised planters on the building facade. Timing: Prior to building work commencing. |
As indicated |
92(b) Implement certified Detailed Landscape
Container Planting Design Carry out the works in accordance with the above certified Detailed Landscape Container Planting Design. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
92(c) Certify work -
Implementation On completion of the work, submit to Development Services the
following: Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
92(d) Certify work - establishment
period On completion of the 12-month establishment period, submit to Development Services certification that planting has been established in accordance with the certified Detailed Landscape Container Planting Design. Timing: 12 months after implementation of the certified Detailed Landscape Container Planting Design. |
As indicated |
92(e) Maintain container
planting Rooftop gardens and Containerised Planters Maintain the container planting generally in accordance with the certified Detailed Landscape Container Planting Design. Timing: To be maintained. |
As indicated |
| 93) Landscape the Site - Self Certification Landscape the site in accordance
with the requirements of this condition. Advice
note: The SARA referral agency response (dated 12
September 2025, reference 2412-43793 SRA) includes requirements relating to
detailed landscape plans. The requirements of this SARA response are to
prevail, to the extent there is any inconsistency between the requirements of
this condition and the requirements of the conditions imposed by SARA as part
of the referral agency response. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
93(a) Detailed Landscape Plan for Self-
Certification Prepare a Detailed Landscape Plan at a scale of 1:100 for all on-site landscape works including planting areas identified on the approved DRAWINGS AND DOCUMENTS, including Approved Document titled Landscape Concept Plan and Details received 19-MAR-2025 as Amended in Red 21- MAY-2026; and Approved Document titled Shafston House Kangaroo Point - The Grounds and Setting Landscape Heritage Assessment received 19-MAR-2025. The plan must be prepared by a Qualified Landscape Architect and must comply with the relevant Brisbane Planning Scheme Codes. The plan must include the following: - Planting media and mulch in accordance with AS4454 Composts, soil conditioners and mulches and AS 4419-2003 Soils for landscaping and garden use. - Unless otherwise specified, trees provided as 45 litre stock or larger, staked and tied, and complying with Australian Standards. - Plant selection and densities to achieve full surface coverage of garden beds within 2 years of planting. - A reticulated drip irrigation system to all planting areas, with drainage connected to the stormwater system; the irrigation system must be connected to a non-mains water source. - Trees required to be retained are documented, integrated into landscape design, and protected in accordance with the relevant sections of Australian Standard AS4970 Protection of trees on development sites. - Details of a 12 week establishment period. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT A detailed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
93(b) Multiple Unit Dwelling In addition to the
requirements listed above, the plan must include the following: Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT A detailed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
93(c) Certify Detailed Landscape
Plan On completion of the Detailed Landscape Plan, submit to Development
Services: Timing: Prior to building work commencing. PROOF OF FULFILMENT A detailed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to building work commencing. |
As indicated |
93(d) Implement Certified Detailed Landscape
Plan Carry out the landscape work in accordance with the above certified detailed Landscape Plan. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
93(e) Certify Work On completion of the
landscape work, submit to Development Services: Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT An as constructed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
93(f) Maintain Landscape Work Maintain the landscape work, including deep planting provided in this application and previous approval (Council reference: A005833578), in accordance with the certified Detailed Landscape Plan. Timing: To be maintained. |
As indicated |
| 94) On-site Erosion (Medium Risk) Manage on-site erosion and the release of sediment or sediment laden water from the site at all times by implementing best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version). Timing: Prior to commencement of any land disturbing activities and until all exposed soil areas are permanently stabilised against erosion. |
As indicated |
94(a) Manage earth disturbance on-
site (i) Drainage control measures must be implemented and maintained to minimise water flow onto areas of exposed earth. (ii) Sediment and erosion control measures must be implemented and maintained to prevent soil loss from earth disturbance areas and prevent deposition beyond earth disturbance areas. (iii) No release of contaminants to land beyond on-site area of earth disturbance other than releases that achieve water pollutant concentration release limits of: A. 50mg/L TSS (Total Suspended Solids); B. Turbidity, Nephelometric Turbidity Units (NTU) value less than 10% above background, 75 NTU, or as agreed in writing by an Officer from Councils Erosion and Sediment Control (ESC) Team in Compliance and Regulatory Services; C. pH between 6.5 and 8.5 at all times. (iv) Maintain a written record to demonstrate that water discharges from the site, including any dewatering operations, meet the release limits as detailed in (iii) for water discharge(s) from the site that occur during or immediately after a rainfall event, and during normal business hours. The water quality of the discharge flows must be measured at each discharge point from the site, including but not limited to sediment basin outlets, other applicable sediment control devices, the site water drainage system, and recorded against the release limits at least once on each calendar day until such discharge stops. Timing: Prior to commencement of any earth disturbing activities and until all exposed soil areas are permanently stabilised against erosion. |
As indicated |
94(b) Provide Land Occupier Notification to
Council (i) Notify Council's ESC Team of proposed land occupier/s by sending an email to CARS-ESC@Brisbane.qld.gov.au (ii) If the land is to be occupied by any person other than the registered landowner then advice must be provided to Council that confirms the name, contact information and the duration of any proposed occupation of the land. Timing: Prior to commencement of any earth disturbing activities. |
As indicated |
94(c) Prepare Erosion and Sediment Control
Plan Prepare an Erosion and Sediment Control Plan (ESCP) in accordance with best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version) and, to the extent of any inconsistency, relevant Brisbane Planning Scheme Codes and Policies. Obtain a design certificate in accordance with the relevant Brisbane Planning Scheme Codes and Policies. The ESCP and design certificate must be certified by a Certified Professional in Erosion and Sediment Control (CPESC) or a Registered Professional Engineer Qld (RPEQ) with suitable qualifications and experience in erosion and sediment control. Documentary evidence demonstrating appropriate qualifications in erosion and sediment control must be provided to the Council upon request. Timing: Prior to the commencement of any earth disturbing activities. |
As indicated |
94(d) Attend a pre-start
meeting Arrange and attend a pre-start meeting for ESC with an Officer from Councils ESC Team in Compliance and Regulatory Services (CARS). Note: To request a pre-start meeting from Council's ESC Team send an email to CARS-ESC@Brisbane.qld.gov.au. All relevant documentation, including both the certified ESCP and the certified design certificate, must be attached to this email. Please allow up to 10 business days for your request to be processed. Timing: Attend the pre- start meeting prior to the commencement of any earth disturbing activities. |
As indicated |
94(e) Implement Certified Erosion and
Sediment Control Plan Implement the certified ESCP and maintain all ESC measures in accordance with best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version) and, to the extent of any inconsistency, relevant Brisbane Planning Scheme Codes and Policies. The ESCP and design certificate must be available on site at all times for inspection by Council officers. Any alteration to supplementary or Type 3 ESC measures must be reflected in the certified ESCP. Any alteration to Type 2 or Type 1 ESC measures will require a revised ESCP and design certificate that has been certified by either the CPESC or RPEQ. Timing: While earth disturbing activities are occurring and until all exposed soil areas are permanently stabilised against erosion. |
As indicated |
| 95) Retaining Walls Design and construct all retaining walls and associated fences, in accordance with the relevant Brisbane Planning Scheme Codes and the following: - All retaining walls including the footings, must be located wholly within the property boundaries of the site where works are occurring - Runoff from surface drains and subsoil drainage associated with the retaining walls must be collected and connected to a lawful point of discharge (LPD) where possible. If no LPD is available the surface drains and sub-soil drainage must be designed, installed and discharged to ensure there is no ponding, nuisance or concentration of stormwater discharge to adjacent properties. - Retaining walls to stabilise excavation must be set back from property boundaries to accommodate subsoil drainage without encroachment into the neighbouring property. This set back may vary depending on the height, structure and design of the retaining wall, surcharge loadings from neighbouring properties, and to provide a surface drain along the top of the retaining wall - For retaining walls in excess of
1.0m in height: NOTE: Refer to City Plan 2014; Infrastructure Design Planning Scheme Policy (IDPSP) for Council’s definition of a LPD. Timing: Upon completion of all operational works. |
As indicated |
95(a) Certification of Retaining
Walls For retaining walls over 1.0m in height, obtain certification from a Registered Professional Engineer Queensland that the design and construction of the retaining walls and ancillary drainage are in accordance with the requirements of this condition. Timing: Upon completion of all operational works. |
As indicated |
| 96) Repair Damage to Kerb, Footpath or Road Repair any damage to the existing kerb and channel, footpath or roadway (including removal of concrete slurry from footways, roads, kerb and channel, stormwater gullies and drainlines) and re-instate existing traffic signs and pavement markings that have been removed or damaged during any works carried out in association with the approved development. Timing: Upon completion of all operational works. |
As indicated |
96(a) Interim Repairs If at any time during the construction phase of the approved development, damage to the existing kerb and channel, footpath or roadway creates unsafe, unreasonable and/or not fit for purpose conditions as assessed by Council, interim repairs must be undertaken as directed by Program Planning and Integration. Note: Any interim repairs required to be undertaken shall not be considered to satisfy the requirements of this condition for the permanent repair of the infrastructure prior to the issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. Timing: While site / operational / building works is occurring. |
As indicated |
| 97) Protect Existing Infrastructure Where there is existing infrastructure in the vicinity of the proposed work, the new work must not damage or compromise the working ability of the existing infrastructure. Where alterations to public utility mains, existing mains, services or installations are necessitated by the development, prior to alterations commencing, the developer must notify Council or the relevant infrastructure provider and obtain agreement to the alterations. The developer must meet the costs of the alterations. The alterations must be carried out in accordance with the relevant Brisbane Planning Scheme Codes or infrastructure providers requirements. |
While site/operational/building work is occurring |
97(a) As Constructed Drawings - Alterations
to Existing Infrastructure Submit to Development Services As Constructed drawings showing all new and/or rectification works and an asset register, prepared by a Registered Professional Engineer Queensland. Timing: Upon completion of all operational works. PROOF OF FULFILMENT Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that the alterations have been completed in accordance with the relevant Brisbane Planning Scheme Codes and any other relevant infrastructure requirements. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
| 98) Construction Noise and Dust Emissions Pursuant to the Environmental
Protection Act 1994, all development involving the emission of noise and dust
from building and/or construction activities, must ensure that the emissions
are in accordance with the requirements of the Act. |
As indicated |
| 99) Currency Period The currency period for this development approval is stated in the Decision Notice and is expressed as a date. This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016. |
As indicated |
| 100) Referral Agency Requirements The State Assessment and Referral
Agency as concurrence agency has imposed the requirements contained in the
letter dated 12 September 2025, reference 2412-43793 SRA. |
As indicated |
| 101) Cultural Heritage Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage. The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care. For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships). |
As indicated |
| 102) Damage to Trees on Adjoining Land Please note that any damage caused to vegetation on adjoining land as a result of exercising this development approval may result in an offence under other legislation (e.g. Natural Assets Local Law) and/or civil action |
As indicated |
| 103) Fire Ant Movement Controls To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected. These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products. Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014. For further information contact the relevant Queensland State Government department on 13 QGOV. |
As indicated |
| 104) Flood Resilience and Awareness This advice is provided for buildings that are on sites that are subject to the flood overlay, as shown within City Plan 2014.
Council makes decisions to minimise flood risk based on the best information available at the time of the development application. Flood studies and applicable flood levels may be updated by Council overtime where new flood information is available or changes to engineering standards/methodology have occurred. Flood levels for various flood events and flooding types are outlined in Councils Floodwise Property Reports available from Councils website.
The minimum flood planning levels that apply to new development do not necessarily mean that the development will never flood. Therefore, when choosing materials for building on sites that are known to be affected by flooding, regardless of whether it is constructed to the minimum flood planning level, it is recommended that flood resilient materials are used to improve the speed of recovery and reduce the cost of repairs if required.
For more information refer to: Council's website at https://www.brisbane.qld.gov.au/community-and-safety/community- safety/disasters-and-emergencies/be-prepared/flooding-in-brisbane/flooding- support-for-residents/flood-resilient-homes-program Queensland Reconstruction Authority "Flood Resilient Building Guidance for Queensland Homes"https://www.qra.qld.gov.au/resilient- homes/flood-resilient-building-guidance-queensland-homes |
As indicated |
| Permit to Which These Conditions Relate: | DA - PA - Operational Work |
| Activity(ies): | Prescribed Tidal Work |
| Stage: | Stage 2 - Preliminary Approval for Prescribed Tidal Works (private pontoon) |
| 105) Limitation of use The pontoon is to be used for mooring purposes only and is limited to use by owners of units subject to the material change of use development permit (DABW417876722). A maximum of six (6) vessels are permitted to be moored at the proposed pontoon at any one time. No habitation, servicing, maintenance or refuelling of vessels is to occur. Advice note: Reference to vessels/berths does not extend to smaller boats such as tenders or personal watercraft (e.g. jet skis, kayaks). Services and utilities provision is to be limited to those contained within the volumetric easement in accordance with Condition 53) Grant Easements. No advertising signs shall be permitted except signage of a maximum of 300mm x 600mm that informs the public of the private nature of the pontoon and its association with the units subject to this material change of use development permit (DABW417876722). |
At all times |
| 106) Infrastructure Agreement Comply with the Infrastructure
Agreement for 23 Castlebar Street, Kangaroo Point 2026, to the extent the
responsibilities under the infrastructure agreement attach to, and bind the
owner of, the premises.
|
At all times |
| 107) Further Approval The Operational Work approved by this Preliminary
Approval does not permit development to be carried out and must not start until
a Development permit issued for the Operational Works has taken effect. |
Prior to site/operational/building work commencing |
| 108) Prescribed Tidal Work The development and surrounding riverbank must be maintained in accordance with the approved drawings and documents. Dry storage of small boats (such as jet skis and kayaks) for use by
residents and guests may be accommodated within the general storage areas of
the development. Any dry storage of small boats located on the prescribed tidal works
must be limited to hoists or lift facilities designed to service a single vessel, and must not include boat sheds or other forms of
dry storage unless identified on the approved plans and
documents. |
At all times |
| 109) Currency Period The currency period for this development approval is stated in the Decision Notice and is expressed as a date. This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016. |
As indicated |
| 110) Referral Agency Requirements The State Assessment and Referral Agency as concurrence agency has imposed the requirements contained in the letter dated 12 September 2025, reference 2412-43793 SRA. |
As indicated |
| 111) Cultural Heritage Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage. The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care. For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships). |
As indicated |
| 112) Damage to Trees on Adjoining Land Please note that any damage caused to vegetation on adjoining land as a result of exercising this development approval may result in an offence under other legislation (e.g. Natural Assets Local Law) and/or civil action |
As indicated |
| 113) Fire Ant Movement Controls To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected. These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products. Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014. For further information contact the relevant Queensland State Government department on 13 QGOV. |
As indicated |
| 114) Flood Resilience and Awareness This advice is provided for buildings that are on sites that are subject to the flood overlay, as shown within City Plan 2014.
Council makes decisions to minimise flood risk based on the best information available at the time of the development application. Flood studies and applicable flood levels may be updated by Council overtime where new flood information is available or changes to engineering standards/methodology have occurred. Flood levels for various flood events and flooding types are outlined in Councils Floodwise Property Reports available from Councils website.
The minimum flood planning levels that apply to new development do not necessarily mean that the development will never flood. Therefore, when choosing materials for building on sites that are known to be affected by flooding, regardless of whether it is constructed to the minimum flood planning level, it is recommended that flood resilient materials are used to improve the speed of recovery and reduce the cost of repairs if required.
For more information refer to: Council's website at https://www.brisbane.qld.gov.au/community-and-safety/community- safety/disasters-and-emergencies/be-prepared/flooding-in-brisbane/flooding- support-for-residents/flood-resilient-homes-program Queensland Reconstruction Authority "Flood Resilient Building Guidance for Queensland Homes"https://www.qra.qld.gov.au/resilient- homes/flood-resilient-building-guidance-queensland-homes |
As indicated |
| Permit to Which These Conditions Relate: | DA - PA - Operational Work |
| Activity(ies): | Heritage Place (QHP) Prescribed Tidal Work |
| Stage: | Stage 2 - Preliminary Approval for Prescribed Tidal Works (Revetment works, Riverwalk and demolition of existing pontoon), |
| 115) Infrastructure Agreement Comply with the Infrastructure Agreement for
23 Castlebar Street, Kangaroo Point 2026, to the extent the responsibilities
under the infrastructure agreement attach to, and bind the owner of, the
premises.
|
At all times |
| 116) Further Approval The Operational Work approved by this Preliminary
Approval does not permit development to be carried out and must not start until
a Development permit issued for the Operational Works has taken effect. |
Prior to site/operational/building work commencing |
| 117) Future Prescribed Tidal Works Application Submit to Council a development application seeking a Development Permit for prescribed tidal works for construction of the Riverwalk and revetment wall, and demolition of the existing pontoon in accordance with the requirements of this condition. A Development Permit must be obtained prior to the commencement of any works on the site, in accordance with the Infrastructure Agreement for 23 Castlebar Street, Kangaroo Point 2026, to the extent the responsibilities under the infrastructure agreement attach to, and bind the owner of, the premises. |
Prior to site/operational/building work commencing |
117(a) Documentation to accompany the
development application The application for a Development Permit for prescribed tidal works must be accompanied by the following documentation, prepared and certified by a suitably qualified and experienced RPEQ as outlined within the Infrastructure Agreement for 23 Castlebar Street, Kangaroo Point 2026: (a) Detailed design drawings and specifications for the Riverwalk and revetment wall consistent with the APPROVED DRAWINGS AND DOCUMENTS and the minimum technical design criteria; (b) Safety in Design documentation, including a written safety report detailing hazards unique to the design of the Prescribed Riverwalk Infrastructure and the Private Pontoon, and identified mitigation measures; (c) Operations and maintenance manual which is to be updated through
design and specification and construction; and (d) Inspection schedule, safe work method statement, safe operating procedure, and proof of maintainability considerations including machinery used and access. |
Prior to site/operational/building work commencing |
117(b) Riverwalk Design
Specifications The Prescribed Riverwalk Work must be designed and constructed to comply with the following minimum technical standards: (a)
Minimum design life: 100 years (b)
Path width: a
5.35m an unobstructed path comprising: (i) a 2.0m wide footpath on the Brisbane river side of the path; and (ii) a 3.35m wide bicycle/scooter path on the freehold
land side of the path. (c)
Design speed:
30km/h desirable, 25km/h minimum (d) Longitudinal grade: 3% maximum (e) Horizontal curve radii: 15m minimum (f) Finished surface level: 2.1m AHD minimum, adjusted to facilitate future tie
in to existing sections of Riverwalk as described
below whilst respecting the longitudinal grade criterion. (g) Design considerations to the north: The design of the Riverwalk Work
Contribution at the northern end must be coordinated with the alignment of the
existing Riverwalk infrastructure located within Lot 900 on SP163172. This
coordination is to ensure seamless physical and functional integration between
the Riverwalk Work Contribution, through the unallocated land fronting Lots 1-3
on SP116789, and existing sections of Riverwalk. (h) Design considerations to the south: The design of the Riverwalk Work
Contribution at the southern end must be coordinated with the alignment of the
existing Riverwalk infrastructure located within Lot 0 on SP134402 (Common
Property). This coordination is to ensure seamless physical and functional
integration between the Riverwalk Work Contribution, through the unallocated
state land fronting Lot 0 on BUP100822, deviating around Lot 100 on
RP96906. (i)
Other requirements where not specified above: as per Chapter 12 of the
Infrastructure Design Planning Scheme Policy under the Brisbane City Plan
2014. |
Prior to site/operational/building work commencing |
| 118) Sequence of Riverwalk Construction Development for the Riverwalk is to be carried out in the following order: a. Complete the demolition of the existing pontoon, to the satisfaction of Council and in accordance with the prescribed tidal works approval. Timing: Following the approval of the prescribed tidal works approval. b. Complete the works for the Riverwalk and revetment wall, including repair, upgrade or replacement, in accordance with the prescribed tidal works approval prior to the transfer of land to Council in fee simple on trust for the community purpose of park and other ancillary public purposes. The works authorised by this development permit must comply with the Infrastructure Agreement for 23 Castlebar Street, Kangaroo Point 2026, to the extent the responsibilities under infrastructure agreement attach to, and bind the owner of, the premises. |
As indicated |
| 119) Prescribed Tidal Work The development and surrounding riverbank must be maintained in accordance with the approved drawings and documents. Dry storage of boats on located on
the prescribed tidal work must be limited to hoists or lift facilities designed
for a single vessel, and must not include boat sheds or any other form of dry
storage, unless otherwise shown on the approved drawings or
documents. |
At all times |
| 120) Currency Period The currency period for this development approval is stated in the Decision Notice and is expressed as a date.
This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016. |
As indicated |
| 121) Cultural Heritage Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage.
The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care.
For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships). |
As indicated |
| 122) Damage to Trees on Adjoining Land Please note that any damage caused to vegetation on adjoining land as a result of exercising this development approval may result in an offence under other legislation (e.g. Natural Assets Local Law) and/or civil action. |
As indicated |
| 123) Referral Agency Requirements The State Assessment and Referral Agency as concurrence agency has imposed the requirements contained in the letter dated 12 September 2025, reference 2412-43793 SRA. |
As indicated |
| Permit to Which These Conditions Relate: | DA - PA - Building Work |
| Activity(ies): | Local heritage place State heritage place partial demolition |
| Stage: | Stage 1 - Building work on a Queensland Heritage Place (Shafston House Proper) |
| 124) Infrastructure Agreement Comply with the Infrastructure
Agreement for 23 Castlebar Street, Kangaroo Point 2026, to the extent the
responsibilities under the infrastructure agreement attach to, and bind the
owner of, the premises.
|
At all times |
| 125) Further Approval The Building Work approved by this Preliminary
Approval does not permit development to be carried out and must not start until
a Development permit issued for the Building Works has
taken effect. |
Prior to site/operational/building work commencing |
| 126) Currency Period The currency period for this development approval is stated in the Decision Notice and is expressed as a date.
This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016. |
As indicated |
| 127) Cultural Heritage Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage.
The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care.
For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships). |
As indicated |
| 128) Damage to Trees on Adjoining Land Please note that any damage caused to vegetation on adjoining land as a result of exercising this development approval may result in an offence under other legislation (e.g. Natural Assets Local Law) and/or civil action. |
As indicated |
| 129) Referral Agency Requirements The State Assessment and Referral Agency as concurrence agency has imposed the requirements contained in the letter dated 12 September 2025, reference 2412-43793 SRA. |
As indicated |