BRISBANE CITY COUNCIL'S APPROVAL PACKAGE.



APPLICATION DETAILS

This package relates to the application detailed below
Address of Site: 232 HARCOURT ST NEW FARM QLD 4005
72 JAMES ST FORTITUDE VALLEY QLD 4006
76 JAMES ST FORTITUDE VALLEY QLD 4006
U 1 76 JAMES STREET 76 JAMES ST FORTITUDE VALLEY QLD 4006
U 2 76 JAMES STREET 76 JAMES ST FORTITUDE VALLEY QLD 4006
Real Property Description of Site: L2 RP.66584
L2 RP.52228
LCommon Property SP.214209
L1 SP.214209
L2 SP.214209
Aspects of development and type of approval: DA - PA - Building Work Development Permit - Commercial Character Building - Partial Demolition
DA - PA - Material Change of Use Development Permit - food and drink outlet,shop,office
DA - PA - Referral Agency for Building Work Referral Response - Flood hazard area
Council File Reference: A006957138
Permit Reference Number/s: DABW399058020; DAMC399058120; DAEB439518823.
Package Status: APPROVED - Version 3 (8th of June, 2026 8:01:13 AM)
Package Generated: 08/06/2026


PROJECT TEAM

The assessment of this application has been undertaken by:
Julie BONFIELD
Senior Architect
Architecture Team
Julie.Bonfield@brisbane.qld.gov.au
31782575
Glyn CHISHOLM
Senior Landscape Architect
Landscape Architecture Team
Glyn.Chisholm@brisbane.qld.gov.au
07 3403 0117
Kaye ATKINS
Team Manager
Planning Application Review Service
Kaye.ATKINS@brisbane.qld.gov.au
(07) 31780015
Jacqueline PATON
Senior Architect
Architecture Team
Jacqueline.Paton@brisbane.qld.gov.au
07 3178 0389
Tim WRAFTER
Principal Engineer
Engineering Services Hydraulics
Tim.Wrafter@brisbane.qld.gov.au
Dominic PERRY
Senior Engineer
Engineering Scoping
dominic.perry@brisbane.qld.gov.au
(07) 3403 8888
Martin MOLLEE
Senior Environmental Management Officer
Environmental Management Services
Martin.Mollee@brisbane.qld.gov.au
(07) 3403 8888
Rhea CONNOLLY
Principal Urban Planner
Planning Services North
Rhea.Connolly@brisbane.qld.gov.au
3178 0651
Patrick LEE
Senior Engineer
Engineering Services South
Patrick.Lee@brisbane.qld.gov.au
0734039050
Peter RICHARDS
Principal Urban Planner
Planning Services Prelodgement
prelodgementservices@brisbane.qld.gov.au
(07) 3403 6302
Kathy BAGULEY
Principal Urban Planner
Planning Services North
DSPlanningSupport@brisbane.qld.gov.au
07 3403 5510
Ken LEOWARDI
Engineer
Engineering Services North
Ken.Leowardi@brisbane.qld.gov.au
(07) 3403 5689
Matthew O'DEA
Principal Landscape Architect
Landscape Architecture Team
Matthew.ODea@brisbane.qld.gov.au
31789513
George KOUPARITSAS
Architect
Architecture Team
George.Kouparitsas@brisbane.qld.gov.au
31787245
Chris.M DIXON
Senior Urban Planner
Planning Services North
chris.m.dixon@brisbane.qld.gov.au
31787264
MAISIE TANG
Principal Urban Planner
Planning Services North
maisie.tang@brisbane.qld.gov.au
(07) 31789048
Chris.M DIXON
Senior Urban Planner
Planning Services North
chris.m.dixon@brisbane.qld.gov.au
31787264
MAISIE TANG
Principal Urban Planner
Planning Services North
maisie.tang@brisbane.qld.gov.au
(07) 31789048


DRAWINGS AND DOCUMENTS



The term 'drawings and documents' or similar expressions mean:
Drawing or Document Number Plan Date
Section C DA-3-013 Revision C 27-APR-2026
Section D DA-3-014 Revision B 27-APR-2026
Section Detail A DA-3-015 Revision A 27-APR-2026
Section Detail B DA-3-016 Revision A 27-APR-2026
Section Detail C DA-3-017 Revision A 27-APR-2026
Section Detail D DA-3-018 Revision A 27-APR-2026
Civil Services Pavement Plan C09-001 Issue C (Amended In Red 20-SEP-2024) 13-AUG-2024
Civil Public Domain Alignment Control Plan C11-501 Issue B (Amended In Red 20-SEP-2024) 07-JUN-2024
Landscape DA 72-76 James Street 19090 Rev. J (Amended In Red 20-MAY-2026) 21-JAN-2026
Civil Services Bulk Earthworks Plan C04-001 Issue B (Amended In Red 20-SEP-2024) 21-JUN-2024
Civil Services Bulk Earthworks Sections C04-101 Issue B 21-JUN-2024
Civil Services General Arrangement Plan C05-001 Issue D (Amended In Red 20-SEP-2024) 13-AUG-2024 (Received)
Floor Plans Mezzanine + Level 1 DA-2-003 Revision A 30-JAN-2026
Ground Floor + Roof Plans - Existing & Demolition A-SD - 111 Issue: I 16-AUG-2024 (Received)
Elevations - Existing & Demolition A-SD - 115 Issue: H 16-AUG-2024 (Received)
Floor Plans Basements 2 + 3 DA-2-001 Revision C 22-APR-2026
Floor Plans Basement 1 + Ground DA-2-002 Revision C 22-APR-2026
Floor Plans Levels 2 + 3 DA-2-004 Revision A 30-JAN-2026
Floor Plans Roof DA-2-005 Revision A 30-JAN-2026
Elevation James Street DA-3-001 Revision A 30-JAN-2026
Elevation Harcourt Street DA-3-002 Revision A 30-JAN-2026
Elevation North-East DA-3-003 Revision A 30-JAN-2026
Elevation North-West DA-3-004 Revision A 30-JAN-2026
Section A DA-3-011 Revision B 27-APR-2026
Section B DA-3-012 Revision B 27-APR-2026


Advice

Please see the attached document(s) for any advices.

APPROVAL CONDITIONS



Permit to Which These Conditions Relate: DA - PA - Building Work
Activity(ies): Commercial Character Building - Partial Demolition
Stage: Partial demolition of a Commercial character building

General/Planning Requirements
 
Timing
1)   Maintain the Approved Development

Maintain the approved development in accordance with the approved DRAWINGS AND DOCUMENTS, and any other relevant Council approval required by the conditions.

 
At all times
 
2)   Approved Drawings and Documents

A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers.

Note: This condition is imposed to ensure compliance with the conditions of development approval.

 
While site/operational/building work is occurring
 
3)   Carry Out the Approved Development

Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks).  Permission to enter neighbouring properties must be obtained from the relevant property owners.

 
While site/operational/building work is occurring
 
4)   Complete All Building Work

Complete all building work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such building work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: Building work must also be completed in accordance with any other current development approval.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
5)   Commercial character building - Submit Evidence of Completion

Submit to Development Services documentary and photographic evidence to demonstrate that the Commercial character building has been reinstated in accordance with the conditions of this component of the approval and is capable of the approved lawful use.

Timing: Within 3 months of the Commercial character building being reinstated or prior to commencement of use, whichever comes first.

 
As indicated
 
6)   Commercial character building - Structural Report

Submit to Development Services a report prepared and certified by a Registered Professional Engineer Queensland (Structural) and suitably experienced in heritage, commercial character building and/or pre-1947 traditional building character assessments to demonstrate:
– that the Commercial character building is structurally sound and capable of being retained in its existing location;
– architectural elements such as chimneys are capable of retention without loss of integrity; and
– the details of measures to be employed to ensure the ongoing structural integrity of the Commercial character building during any works.

 
Prior to site works commencing
 
Architecture
 
Timing
7)   Partial Demolition of Building

Partial demolition resulting from this approval must be in accordance with the APPROVED DRAWINGS AND DOCUMENTS and all building work must comply with this condition.

Provide confirmation from a Building Certifier or appropriately qualified (RPEQ) Fire Engineer that the external timber elements, documented on the APPROVED DRAWINGS AND DOCUMENTS, to be retained on the commercial character building remaining on the site are to be retained and can satisfy the requirements of the National Construction Code. The confirmation should describe how timber framed and timber clad building components can be retained and the method of fire protection.

Timing: Prior to site works and/or building works commencing on site.

 
While site/operational/building work is occurring and then to be maintained
7(a) Adequate Bracing

Provide adequate bracing from the commencement of any demolition work and throughout the demolition and construction phases of the project, to ensure that all parts of the commercial character building not specifically designated for demolition on the APPROVED DRAWINGS AND DOCUMENTS are retained and protected.

The Commercial character building is to be reinforced, braced and protected and is not to be relocated within the site during the course of works for the development.

Timing: While site/operational/building work is occurring.

 
As indicated
7(b) Retain Original Fabric

Retain all existing external original fabric in the sections of the commercial character building which are not being demolished. This will include, but is not limited to, existing decorative detailing, wall cladding, windows, doors, stairs, awnings, floor, floor framing and roof sheeting.
Timing: While site/operational/building work is occurring and then to be maintained.

 
As indicated
7(c) Submit Certification

Submit to Development Services certification by a Registered Architect / Building Designer (holding a Queensland Building and Construction Commission Licence appropriate to the scale of the approved development) confirming that the partial demolition has been carried out in accordance with the requirements of this condition.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use

 
As indicated
7(d) Prepare a Dilapidation Report

Submit to Development Services a dilapidation report for the commercial character building which includes;

-        A set of measured drawings (floor plans, reflected ceiling plans, roof plans, lateral and longitudinal sections, elevations) at a scale of 1:100 or 1:50 which depicts the existing building fabric inclusive of cladding elements, doors and window configurations and building and roof forms.

-        A photographic study of the building which catalogues each building elevation, all internal wall elevations, all door and window elevations and is cross referenced to a key plan showing the location from which the photo was taken and the direction of the view depicted in the photo.

 

Timing: Prior to site works and/or building works commencing on site

 

 
As indicated
 
Engineering
 
Timing
8)   Engineering Pre-Start Meeting

Arrange and attend a pre-start meeting with Development Services and Program Planning and Integration.

Applicable compliance and inspection fees must be paid, in full, to Council prior to the meeting being held.

Note: To arrange an engineering pre-start meeting with Development Services an email supported by a completed copy of the Pre-Start Meeting Guidelines - Civil Engineering Works kit (https://www.brisbane.qld.gov.au/sites/default/files/20191008-cc11207-pre- start-meeting-guidelines-civil-engineering-works.pdf) must be sent to dalodgement@brisbane.qld.gov.au.

Details include (but are not limited too) the following:
-  Site address, Development Approval number (A00) and relevant stage/s (if appropriate);
-  List all Development Approval conditions requiring compliance prior to site/operational/building work commencing and demonstrate compliance with those conditions;
-  Payee details (Name and address) for the issue of a development 'Compliance and Inspection Fee' quote;
-  Superintendent (Consultant) name, address and telephone number (including after-hours contact);
-  Contractor/s and major Sub-Contractor/s, name, address and telephone number (including after-hours contact);
-  Intended date of commencement of works.

Note:
-  All operational works/compliance assessment applications are to be approved prior to requesting the pre-start meeting.
-  A minimum 5 working days' notice is required.
-  Compliance and Inspection fee to be paid prior to undertaking pre-start meeting.
-  All operational works/compliance assessment approved documents and the Development Approval package (conditions and plans) must be available at the pre-start meeting.
-  Further guidance for requesting a pre-start and co-ordinating the On/Off Maintenance process can be found on Council's website (https://www.brisbane.qld.gov.au/planning-and-building/applying-and-post- approval/on-and-off-maintenance-approvals).

Timing: Prior to site/operational/building work commencing.

 
As indicated
 
9)   CBD/City Frame Construction Management Plan

Carry out development in accordance with a Construction Management Plan (CMP) prepared in accordance with the Central Business District and City Frame Development Services Construction Management Guidelines and the requirements set out in this condition.

Note:  This condition imposes restrictions on development construction management to regulate increased truck access, on street work zone and closures and all associated activities in the CBD and City Frame as a result of major State and Local Government infrastructure projects occurring in Brisbane.

 
While site/operational/building work is occurring
9(a) Submit Construction Management Plan

Submit to, and obtain approval from, Development Services a Construction Management Plan for the demolition, excavation and construction phases of the approved development.  Separate Construction Management Plans may be appropriate for the individual components.

The Construction Management Plan must be in accordance with the Central Business District and City Frame Development Services Construction Management Guidelines and the relevant Brisbane Planning Scheme Codes and address the following:
(i)      Provision for pedestrian management including alternative pedestrian routes (adjacent to or surrounding the site);
(ii)     Existing and proposed kerbside allocation signs and line marking (such as bus stops, loading zones and parking meters and/or ticket dispensers);
(iii)    Location of and impacts to any Council or other public utility or local authority's assets on or within external to the site;
(iv)    Location and design of temporary vehicular construction access points, including frequency of use;
(v)     Management and mitigation strategies for the impact of dust, noise and vibration upon adjoining and nearby properties;
(vi)    Provision for loading and unloading of materials including the location of any remote loading sites;
(vii)   Location of materials, structures, plant and equipment to be stored or placed on the construction site;
(viii)  Location of proposed external hoardings and/or gantries, and including clearances to the impacts of this on  existing street furniture and other footpath assets located within the verge as well as impacts on any existing advertising signage located either along or adjacent to the site frontage  - this includes any potential obstruction of sight lines for such advertising  (e.g. 'CityCycle' bicycle stations or bus stops with advertising);
(ix)    Location of proposed employee and visitor parking areas;
(x)     Anticipated staging and programming;
(xi)    Impacts of any actions proposed to address any of the above items or any actions resulting from construction of the development that will impact on existing street trees;
(xii)   Complaint management processes to be implemented; and
(xiii)  Compliance with the Management Plans Planning Scheme Policy and other relevant Planning Scheme Policies.

The Construction Management Plan must be supported by 'approval in principle' or written approvals from the relevant Council sections or other governing bodies responsible for any potentially impacted infrastructure.

Timing: Prior to site/operational/building work commencing.

 
As indicated
9(b) Construction Management Plan - Dilapidation Report

Submit a dilapidation report to engineeringservices@brisbane.qld.gov.au detailing the pre-existing condition of the roadway, both footways, both verges and Council infrastructure, including vegetation, for 100m from the site entry in both directions or to the next street intersection (if less than 100m from the site entry) in both directions.

Timing: Prior to the pre-start meeting.

 
As indicated
9(c) Construction Management Plan - Associated Activities in Road Reserve

Obtain relevant approvals, as listed in part (a) of this condition, to carry out any works within the road reserve required by the approved Construction Management Plan identified in the Central Business District and City Frame Development Services Construction Management Guidelines.

Note:  All fees must be paid in full prior to any permit being granted by Council. Council may revoke any permits at any time for non-compliance with requirements or if it considers that safety, capacity and/or operation of public transport, vehicle and pedestrian traffic are likely to be compromised during the construction phase.

Timing: Prior to site/operational/building work commencing.

 
As indicated
9(d) City Frame Construction Management Plan - Documentation on Site

Legible copies of the approved CBD Construction Management Plan and current permits must be kept on site and be made available on request At all times.

The requirements of the CMP must be included in all induction of principal and subcontractors utilised in the development. An outline of the induction provided to contractors may be requested by Council to confirm compliance with this condition.

Timing: While site/operational/building work is occurring.

 
As indicated
9(e) Construction Management Plan - Works to be Performed Out of Hours

Obtain an approval from Development Services for any work that is proposed to be undertaken outside of normal business hours - 6:30am to 6:30pm, Monday to Saturday.

Timing: Prior to site/operational/building work commencing.

 
As indicated
9(f) Implement Approved Construction Management Plan

Carry out the development in accordance with the approved CBD/City Frame Construction Management Plan.

 
While site/operational/building work is occurring
 
Standard Advice
 
Timing
10)   Construction Noise and Dust Emissions

Pursuant to the Environmental Protection Act 1994, all development involving the emission of noise and dust from building and/or construction activities, must ensure that the emissions are in accordance with the requirements of the Act.
The Environmental Protection Act 1994 prescribes that:

1. A person must not carry out building work in a way that makes an audible noise-
-  on a business day or Saturday, before 6.30a.m. or after 6.30p.m; or
-   on any other day, at any time. 
2. The reference in subsection (1) to a person carrying out building work-
-  includes a person carrying out building work under an owner-builder permit; and
-  otherwise does not include a person carrying out building work at premises used by the person only for residential purposes.

Note: A request can be made to work outside of these hours by submitting an Environmental Management Plan for assessment and obtaining an endorsed decision from the Environmental Management delegate Development Services.

 
As indicated
 
11)   Contaminated Materials and Soils

Any contaminated materials or soils encountered during siteworks, must be handled, stored and disposed of in accordance with the requirements of the relevant authority of the Queensland Government. A person must not dispose of contaminated soil or a hazardous substance at a place other than at a place approved by the relevant authority of the Queensland Government.

 
As indicated
 
12)   Management of Asbestos

Disposal, handling and restoration of any building materials containing asbestos must be in accordance with current state and federal legislation.

 
As indicated
 
13)   Further Development Permit Required

Further Development Permit(s) to carry out assessable building work under the Building Act may be required.

 
As indicated
 
14)   Currency Period

The currency period for this development approval is stated in the Decision Notice and is expressed as a date.

This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016.

 
As indicated
 
15)   Damage to Trees on Adjoining Land

Please note that any damage caused to vegetation on adjoining land as a result of exercising this development approval may result in an offence under other legislation (e.g. Natural Assets Local Law) and/or civil action

 
As indicated
 
16)   Fire Ant Movement Controls

To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected.

These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products.

Breaches of these controls can potentially impact the community, economy and the environment.  Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014.

For further information contact the relevant Queensland State Government department on 13 QGOV.

 
As indicated
 



Permit to Which These Conditions Relate: DA - PA - Material Change of Use
Activity(ies): food and drink outlet
office
shop
Stage: Food and Drink Outlet, Office, Shop

General/Planning Requirements
 
Timing
17)   Landscaping of Vacant Site

If construction for the approved development does not commence within 3 months of the demolition of the existing building(s) on site, the site must be covered in grass.

Timing: Within 3 months of the demolition of the existing building(s).

 
As indicated
 
18)   Security Lighting - On Site

Install and maintain a suitable system of security lighting to operate from dusk to dawn within all areas where the public may gain access, including car parking areas, building entrances and vegetated areas.

Ensure that all external lighting is in accordance with Australian Standard - AS4282- Control of the Obtrusive Effects of Outdoor Lighting.

Ensure lighting over publicly accessible internal pathways covered by permanent awnings is in accordance with Australian Standard - AS/NZS 1158.3.1 Lighting for roads and public spaces - Pedestrian area (Category P) lighting - Performance and design requirements.

Lighting must be maintained in safe and good working order.

Timing: 'Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first', and then to be maintained.

 
As indicated
 
19)   Car Parking

The car parking within the premises must be maintained exclusively for the ancillary use of the development. The parking must not be made available to the general public and there must not be signage erected on or in the vicinity of the site advertising the availability of car parking to the general public.

 
At all times
 
20)   Maintain the Approved Development

Maintain the approved development in accordance with the approved DRAWINGS AND DOCUMENTS, and any other relevant Council approval required by the conditions.

 
At all times
 
21)   Limitation of Use

All upper level terraces are for the ancillary use of Tenants/staff of the site only and not to be accessible to Patrons/visitors of the site.

 

 
At all times
 
22)   Approved Drawings and Documents

A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers.

Note: This condition is imposed to ensure compliance with the conditions of development approval.

 
While site/operational/building work is occurring
 
23)   Carry Out the Approved Development

Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks).  Permission to enter neighbouring properties must be obtained from the relevant property owners.

 
While site/operational/building work is occurring
 
24)   Complete All Building Work

Complete all building work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such building work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: Building work must also be completed in accordance with any other current development approval.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
Architecture
 
Timing
25)   Final External Detailing of Building

Construct the development in accordance with architectural drawings approved pursuant to this condition. The architectural drawings must be in accordance with the APPROVED DRAWINGS AND DOCUMENTS, relevant Brisbane Planning Scheme Codes and the requirements of this condition.

 
To be maintained
25(a) Submit Architectural Drawings

Submit to, and obtain approval from, Development Services architectural drawings prepared and certified by a Registered Architect or Queensland Building Construction Commission Open Licence Class Building Designer showing the final developed details of the facade treatment, the ground interface and the roof top/building capping elements which depict a higher level of documentation detail than that shown on the APPROVED DRAWINGS AND DOCUMENTS, including:
- Elevation and facade treatment drawings for all ground, podium and typical tower floor levels that demonstrate the final design outcome for all elevations of the built form including:
- Detailed plans, sections and elevations at 1:50 or 1:20 scale for elements at the facade including structural elements and fixed and operable elements such as balustrades, screens, doors, windows, projecting fins and planter beds/trellises
- All servicing and infrastructure, including but not limited to, padmount transformers, pump rooms, fire hydrant boosters etc.
- Roof top or building capping elements, awnings and soffits
- One rendered perspective showing the intended finished built form

The architectural drawings must:
- include dimensions for the extent of projecting elements, balustrade height and door and window/glazing configurations
- nominate materials, colours and finishes
- have title blocks and be cross referenced to larger scaled drawings.

Timing: Prior to works commencing above ground level

 
As indicated
25(b) Pre-Start Meeting

Arrange and attend a pre-start meeting with Development Services.

Applicable compliance and inspection fees must be paid to Council, in full, prior to the meeting being held.

Note: To arrange a pre- start meeting with Development Services an email must be sent to dalodgement@brisbane.qld.gov.au.

Timing: Prior to any work commencing above ground level.

 
As indicated
25(c) Implement Approved Architectural Drawings

Carry out the building work in accordance with the approved architectural drawings.

Note: The requirement to use particular materials and finishes is imposed only for the purpose of achieving a built form outcome that displays architectural merit. Council has not assessed the materials and finishes for compliance with the Building Act, the Building Fire Safety Regulation, the Building Regulation, the Building Code of Australia, the Queensland Development Code, relevant Australian Standards, fire safety standards or any other relevant requirement of a statutory authority with regard to building work.

Timing: While building work is occurring and then to be maintained.

 
As indicated
25(d) Submit Certification

Submit to Development Services certification by a Registered Architect or Queensland Building Construction Commission Open Licence Class Building Designer confirming that the building has been constructed in accordance with the approved architectural drawings.

Timing: Prior to the Final Certificate/Certificate of Occupancy or commencement of the use, whichever comes first.

 
As indicated
 
26)   Overall Height

The overall height of the building(s) must be in accordance with the floor and roof levels and overall height shown on the APPROVED DRAWINGS AND DOCUMENTS.

NOTE: This condition should be read in conjunction with any other relevant condition requiring minimum height clearances for basement or undercover car parking and manoeuvring areas.

 
While site/operational/building work is occurring and then to be maintained
26(a) Submit Certification

Submit to Development Services certification from a registered surveyor confirming that the 'as constructed' floor and roof levels and overall height are in accordance with the requirements of this condition.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
27)   Awning Lighting System

Install a lighting system to the underside of the awning over the footpath in accordance with the requirements of this condition.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
27(a) Submit Lighting Plan

Submit to, and obtain approval, from Program Planning and Integration (City Lighting) a detailed Lighting Plan demonstrating that the under awning lighting complies with Australian Standard - AS/NZS 1158.3.1 - sub category P6, within - Road Lighting Part 3.1: Pedestrian area (Category P) lighting - Performance and installation design requirements and achieves glare control to ensure zero candelas (cd) at 90 degrees.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
27(b) Implement Approved Lighting Plan

Carry out the works in accordance with the approved Lighting Plan.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
27(c) Certification

Submit to Program Planning and Intergration (City Lighting) certification from a licensed electrical contractor that the awning lighting has been installed in accordance with the approved Lighting Plan.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first

 
As indicated
27(d) Maintain the Work

Maintain the awning lighting, (including operating costs) in accordance with the approved Lighting Plan from dusk to dawn.

Timing: To be maintained.

 
As indicated
 
28)   Screen Air Conditioning and Other Plant Enclosures

Install and maintain suitable screening to all air conditioning, lift motor rooms, plant and service facilities located at the top of or on the external face of the building. The screening structures must be constructed from materials that are consistent with materials used elsewhere on the facade of the building. There must be no individual external air conditioning units.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
Landscape Architecture and Open Space Planning
 
Timing
29)   Retain and Protect Existing Street Tree(s)

Identify, retain and protect the two (x2) existing street trees on the James Street frontage including the roots unless otherwise agreed in writing with Program, Planning and Integration Arboriculture (PPI Arb).

Note: Street trees are protected under the Natural Assets Local Law. Street trees must not be removed or pruned without prior approval from PPI Arb.

Where driveway crossovers occur within the Tree Protection Zone (TPZ) of existing street trees, seek approval from the Arboricultural Team in Program Planning and integration, City Standards for the final driveway crossover design and construction methodology to ensure the successful retention of the existing street tree(s)

 

PROOF OF FULFILMENT
Contextual photographic evidence that the tree has been retained in equal or greater health than before development commenced. OR, evidence in writing from Asset Services Arboriculture that an alternative arrangement has been made. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
At all times
29(a) Implement Protection Measures

Install tree protection measures in accordance with Australian Standard - AS4970 Retention of Trees on Development Site.

There must be no excavation, filling or storage of materials or plant within the drip line of the tree(s).

Where works are within the canopy drip line of existing street trees, contact PPI Arb Coordinator in relation to the required provision of protection measures.

Note: If fencing is to protect street trees, a permit to temporarily occupy the footway will be required from Compliance and Regulatory Services.

Timing: Prior to site/operational/building work occurring.

PROOF OF FULFILMENT
Contextual photographic evidence to demonstrate the installation of protection measures prior to building works commencing. Timing: Prior to site / operational / building work occurring.

 
As indicated
29(b) Maintain Protection Measures

Maintain protection measures while development is occurring and remove protection measures prior to commencement of the use.

Timing: While to site/operational/building work is occurring.

 
As indicated
 
30)   Street Tree Replacement

Provide for replacement planting of the two (x2) existing street trees on the Harcourt Street frontage of the development site to accommodate a new driveway crossover.

PROOF OF FULFILMENT
Contextual photographic evidence of installed replacement trees. OR, evidence in writing from Program Planning and Integration Arboriculture that an alternative arrangement has been made. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
30(a) Enter Arrangement

Enter into an arrangement with Program, Planning and Integration Arboriculture (PPI Arb) to pay the cost or undertake works, as agreed with PPI Arb, for the removal and replacement planting of the existing street tree(s) fronting the development site.

Timing: Prior to site/operational/building work commencing.

 
As indicated
30(b) Implement Arrangement

Implement the arrangement agreed with PPI Arb.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
31)   Streetscape Works - Centre Street

Carry out streetscape improvement works to the James Street and Harcourt Street verges to a City Street Minor standard in accordance with the relevant Brisbane Planning Scheme Codes, Brisbane Standard Drawings (BSD), the requirements of this condition and the Infrastructure Design Planning Scheme Policy including section 3.7.4.3.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
31(a) Submit Level Details

Submit to Development Services, and obtain approval for, details of the future finished levels of the site and building entries (both pedestrian and vehicular) to demonstrate verge levels and crossfalls complying with the Infrastructure Design Planning Scheme Policy including section 3.7.3.5. The details must be provided by an RPEQ in consultation with a qualified Landscape Architect and include the following:
- finished surface levels at the site/lot boundary;
- finished ground floor levels;
- Existing kerb heights; and
- crossfall and longitudinal grades.

Timing: Prior to site/operational/building work occurring.

 
As indicated
31(b) Submit Plan for Works in Verge

Submit, to an obtain approval from, Development Services, a detailed Landscape Works in Streetscape Plan for the required improvement works in accordance with the requirements of the relevant Brisbane Planning Scheme Codes, Brisbane Standard Drawings (BSD) and the Infrastructure Design Planning Scheme Policy including section 3.7.4.3. The detailed Landscape Works in Streetscape Plan must be prepared at a scale of 1:100 by a qualified Landscape Architect and include the following:

DOCUMENTATION REQUIREMENTS

- Finished surface levels at lot boundary and kerb.
- Cross-fall demonstrating compliance with Brisbane Standard Drawings (BSD), including a maximum crossfall of 1:50.
- Longitudinal grades consistent along the frontage including along the property boundary, and no steeper than the existing gradient of the road at any point.
- Existing and future kerb materials and heights.
- Location of underground and above- ground services.
- Location of service pits.
- Conceptual location of pedestrian lighting where under awning lighting is not provided.
- Location and description of street furniture.
- Existing and future street trees.
- Tree trench complying with Brisbane Standard Drawings (BSD) as required to ensure that topsoil extends at least 2m, measured along the kerb line, from either side of any tree.
- Hazard and/or directional tactile ground surface indicators (TGSIs).
- Reconstruction of kerb and channel.
- Reconstruction of kerb ramps.
- road use adjacent to the kerb (e.g. bus stops, parking bays).
-  Details of awnings including location, height, materials. A minimum clearance of 1.5m must be provided between tree trunk and the awning.
- Balustrades or any other structures.
- Location and details of any artwork.

Timing: Prior to building work above ground level commencing.

 
As indicated
31(c) Pre-Start Meeting

Arrange and attend a pre-start meeting with Development Services.

Applicable compliance and inspection fees must be paid to Council, in full, prior to the meeting being held.

Note: To arrange a pre- start meeting with Development Services an email must be sent to dalodgement@brisbane.qld.gov.au.

Timing: Prior to any work commencing to comply with this condition.

 
As indicated
31(d) Implement Streetscape Works

Remove the existing footway including affected street signage for the full length of the frontage.

Carry out the works in accordance with the approved detailed Landscape Works in Streetscape Plan and to a standard and using materials in accordance with the requirements of the relevant Brisbane Planning Scheme Codes, Brisbane Standard Drawings (BSD) and the Infrastructure Design Planning Scheme Policy section 3.7.4.3.

Note: All existing artworks and regulatory signage must be secured and repositioned as agreed with Program Planning and Integration.

Note: Any existing Brisbane Tuff or granite kerbing that is surplus to requirements must be returned to Program Planning and Integration.

Note: At all times during construction provision must be made for people with a visual impairment.

Where it is unavoidable that a section of an existing Braille trail is to be blocked, or an object temporarily located to intrude within the 1000 mm clearway on either side of the Braille trail, the following actions must be undertaken to comply with the current version of AS1428:
- Warning tactile ground surface indicators (TGSIs) must be installed around any temporary obstructions and intrusions to comply with the current version of AS1428 and Brisbane Standard Drawings (BSD), and must remain in place until the temporary obstructions and intrusions are removed; and
- Brisbane City Council's Community Development Officer - Disability must be informed so that email alerts can be sent out to Vision Impairment agencies. At least one week's notice must be given.

Note: Lodge with and receive approval from Development Services for an 'Application for Permits Relating to Roads and Footway' prior to carrying out the approved works.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to the commencement of use, whichever comes first.

 
As indicated
31(e) Submit As-Constructed Drawings

Submit to Development Services Specialist Services As Constructed drawings including an asset register, prepared by a Registered Professional Engineer Queensland, certifying that the streetscape works have been completed in accordance with the approved detailed Landscape Works in Streetscape

Plan and to a standard and using materials in accordance with the requirements of the relevant Brisbane Planning Scheme Codes, Brisbane Standard Drawings (BSD) and the Infrastructure Design Planning Scheme Policy section 3.7.4.3.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
31(f) On-Maintenance Acceptance

Arrange an on- maintenance inspection with Development Services and obtain written confirmation that the works have been accepted on-maintenance.

Provide proof of Public Liability Insurance ($20 million) for the on- maintenance period.

Lodge a bond for the streetscape works maintenance period of the works. The bond must be calculated in accordance with the relevant Brisbane Planning Scheme Codes (5% of total value of the landscape works or minimum of $5,000.00 whichever is greater).

Note: To arrange an on-maintenance inspection with Development Services an email must be sent to specialistservices@brisbane.qld.gov.au.

Note: A maintenance bond can consist of either a bank guarantee or monetary payment lodged with Council.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
31(g) On-Maintenance Period

Provide a minimum of 12 months maintenance to the streetscape works and rectify any defects identified at the on-maintenance inspection and those arising during the on-maintenance period.

Timing: Minimum 12 months from acceptance on- maintenance AND until the works are approved off-maintenance by Council.

 
As indicated
31(h) Off-Maintenance Acceptance

On completion of the on-maintenance period, arrange an off-maintenance inspection with Development Services and obtain written confirmation from Council that the work is accepted off-maintenance.

Ensure all defects are rectified prior to making an appointment for off- maintenance inspection.

Note: To arrange an off-maintenance inspection with Development Services an email must be sent to specialistservices@brisbane.qld.gov.au.

Note: If the off- maintenance inspection is successful the maintenance bond will be released.

Timing: On completion of the on-maintenance period.

 
As indicated
 
32)   Pedestrian and/or Awning Lighting

Install Pedestrian and/or Awning Lighting to the James Street and Harcourt Street frontages in accordance with the requirements of this condition.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
32(a) Submit a Pedestrian and Awning Lighting Design

Submit to Program Planning and Integration (City Lighting), and obtain approval for, a detailed Pedestrian Lighting Design for the full street frontage of the development, and/or Awning Lighting Design to the underside of the proposed awning over the verge in accordance with the following:

Pedestrian Lighting:

Provide electrical reticulation plans prepared by a Registered Professional Engineer Queensland certifying that the design complies with Australian Standard - AS/NZS3000 Electrical installations known as the Australian/New Zealand Wiring Rules and Council's standard drawings (BSD-11000 series).

Provide pedestrian and cycle lighting plans prepared by a Registered Professional Engineer Queensland or a member of the Illuminating Engineering Society of Australia and New Zealand certifying that the design complies with Australian Standard - AS/NZS 1158.3.1 Lighting for roads and public spaces - Pedestrian area (Lighting Sub- category PP3) lighting - Performance and Design requirements.

And/Or

Awning Lighting:

Submit to Program Planning and Integration (City Lighting), and obtain approval for, a detailed Awning Lighting Plan demonstrating that the under awning lighting complies with Australian Standard - AS/NZS 1158.3.1 - sub category P6, within - Road Lighting Part 3.1: Pedestrian area (Lighting Sub- category PA3) lighting - Performance and installation design requirements and achieves glare control to ensure zero candelas (cd) at 90 degrees.

Timing: Prior to commencing building work above ground level and prior to or concurrently with the submission of Landscape Works in Streetscape Plans for approval.

 
As indicated
32(b) Obtain an Electrical Connection

Obtain an electrical connection from the electricity supplier / Enter into an arrangement with the electricity supplier to service the approved pedestrian lighting.

Timing: Prior to commencing building work above ground level.

 
As indicated
32(c) Implement Approved Pedestrian and/or Awning Lighting Design

Install the lighting in accordance with the approved detailed Pedestrian Lighting Design and the approved Landscape Works in Streetscape Plan and/or Awning Lighting Design.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
32(d) Provide Certification of Connection and Operation

Provide to Program Planning and Integration (City Lighting) certification from a licensed electrical contractor that the electrical connection has been installed in accordance with the approved detailed Pedestrian Lighting Design and/or Awning Lighting Design and that the lighting is fully operational. The certification must specify that the electrical installation has been tested to ensure it is electrically safe and in accordance with the requirements of Australian Standard - AS/NZS3000 Electrical installations known as the Australian/New Zealand Wiring Rules and any other standard applying to the electrical installation under the Electrical Safety Regulation 2002.

A copy of the as-constructed Pedestrian Lighting Design Drawings must be included with the above certification.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
32(e) On-Maintenance Acceptance

Arrange an on- maintenance inspection with Program Planning and Integration (City Lighting) and obtain written confirmation from Council that the work has been completed in accordance with the requirements of the condition and is accepted on- maintenance.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
32(f) On-Maintenance Period

Provide a minimum 12 months maintenance to the works from the time the works are accepted on- maintenance by Council. During this period maintain the lighting and rectify any defects identified at the on-maintenance inspection and those arising during the on-maintenance period.

Timing: Minimum 12 months from acceptance on-maintenance AND until the works are approved off- maintenance by Council.

 
As indicated
32(g) Off-Maintenance Acceptance

On completion of the on-maintenance period arrange an off-maintenance inspection with Program Planning and Integration (City Lighting) and obtain written confirmation from Council that the work is accepted off- maintenance.

Ensure all defects are rectified prior to making an appointment for off-maintenance inspection.

Timing: On completion of the on-maintenance period.

 
As indicated
32(h) Maintain the Work (Awning Lighting)

Maintain the awning lighting (including operating costs) in accordance with the approved Lighting Plan from dusk to dawn.

Timing: To be maintained.

 
As indicated
 
33)   Landscape the site - Container planting for rooftop gardens and/or green walls

Landscape the site through the provision of container planting in accordance with the requirements of this condition.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
33(a) Prepare Detailed Container Planting Design for self-certification

Prepare a Detailed Container Planting Design for all container planting identified on the approved DRAWINGS AND DOCUMENTS. The plan must be prepared and certified by suitably qualified professionals and must comply with the relevant Brisbane planning scheme codes.

In addition to the above, the design must include the following:
- Shade and aspect studies including:
- Sunshade modelling for 9am, noon and 3pm on June 21, September 22 and December 21;
- Wind report measuring m/s for the container planting location/s;
- Detailed estimates of required weekly water consumption for irrigation for each calendar month by an Irrigation Association of Australia certified irrigation designer, holding a Diploma of Irrigation
- A dedicated rainwater irrigation tank with green wall drainage return and overflow connected to the stormwater system;
- A reticulated drip irrigation system with stand-alone power supply and smart-tech central control and alert;
- Waterproofing; and,
- Adequate fascia protection and drip tray depth to minimize drips onto the footpath or surrounding properties.

For planter boxes:
- Adequate width, depth and suitability of soil for the planting. Minimum internal depths of planters unless otherwise endorsed by Development Services must be trees 1200mm; large shrubs and palms; 800mm; small shrubs and groundcovers; 600mm;
- A plant schedule that demonstrates planting appropriate to container type, size and location, - considering orientation, shading and wind direction;
- Structural design by an RPEQ to ensure that the saturated weight of container planting is suitable for the building;
- A 12-month establishment period maintenance program for planting;
- An ongoing annual maintenance program including clearly defined access plan.

Timing: Prior to building work commencing.

 
As indicated
33(b) Implement certified Detailed Landscape Container Planting Design

Carry out the works in accordance with the above certified Detailed Landscape Container Planting Design.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
33(c) Certify work - Implementation

On completion of the work, submit to Development Services the following:
- For planter boxes including vegetation supported by trellises and screens, certification by a Qualified Landscape Architect that construction and planting has been carried out in accordance with the conditions of development approval and the approved drawings
- Certification of irrigation design including irrigation tank size by an Irrigation Association of Australia certified irrigation designer, holding a Diploma of Irrigation
- Certification by a Registered Professional Engineer Queensland that stormwater drainage and structural design have been provided in accordance with the conditions of development approval.
- As-constructed drawings showing:
- The extent and internal dimensions of planter boxes; and,
- Planting layout and species.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
33(d) Certify work - establishment period

On completion of the 12-month establishment period, submit to Development Services certification that planting has been established in accordance with the certified Detailed Landscape Container Planting Design.

Timing: 12 months after implementation of the certified Detailed Landscape Container Planting Design.

 
As indicated
33(e) Maintain container planting

Planting.

Maintain the container planting generally in accordance with the certified Detailed Landscape Container Planting Design.

Timing: To be maintained.

 
As indicated
 
34)   Landscape the Site - Self Certification

Landscape the site in accordance with the requirements of this condition.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
34(a) Detailed Landscape Plan for Self- Certification

Prepare a Detailed Landscape Plan at a scale of 1:100 for all on-site landscape works including planting areas identified on the approved DRAWINGS AND DOCUMENTS including ‘Landscape DA 72-76 James Street’, Drawing no. 19090 Rev. J, dated 21/01/2026, received 06/02/2026 and amended in red 20/05/2026. The plan must be prepared by a Qualified Landscape Architect and must comply with the relevant Brisbane Planning Scheme Codes.

The plan must include the following:
- Planting media and mulch in accordance with AS4454 Composts, soil conditioners and mulches and AS 4419-2003 Soils for landscaping and garden use.
- Unless otherwise specified, trees provided as 45 litre stock or larger, staked and tied, and complying with Australian Standards.
- Plant selection and densities to achieve full surface coverage of garden beds within 2 years of planting.
- A reticulated drip irrigation system to all planting areas, with drainage connected to the stormwater system; the irrigation system must be connected to a minimum combined 40,000L onsite water storage tank(s) to provide non-mains water source.
- Details of a 12 week establishment period.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
A detailed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
34(b) Centre or Mixed Use

In addition to the requirements listed above, the plan must include the following:
- Deep planting areas with dimensions and areas at ground level as shown on the approved drawings planted with trees to providing shading and amenity between the development and neighbouring site to the north.

- A minimum of 25% of all trees as 200L stock or larger.
- Columnar canopy form or screening tree/shrub species planted at suitable spacings alongside and rear boundaries in planting areas shown on the approved drawings.
Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
A detailed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
34(c) Certify Detailed Landscape Plan

On completion of the Detailed Landscape Plan, submit to Development Services:
- Brisbane City Council Form CC10616 - Landscape Design Certificate prepared by a Qualified Landscape Architect to certify that the Detailed Landscape Plan complies with the requirements of this condition
- A copy of the certified Detailed Landscape Plan.

Timing: Prior to building work commencing.

PROOF OF FULFILMENT
A detailed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to building work commencing.

 
As indicated
34(d) Implement Certified Detailed Landscape Plan

Carry out the landscape work in accordance with the above certified detailed Landscape Plan.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
34(e) Certify Work

On completion of the landscape work, submit to Development Services:
- Brisbane City Council Form CC10613 - Landscape Works Certificate prepared by a Qualified Landscape Architect or licensed Landscape Contractor to certify the completed landscape work complies with the certified Detailed Landscape Plan
- A copy of the as-constructed certified Detailed Landscape Plan.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
An as constructed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
34(f) Maintain Landscape Work

Maintain the landscape work, including deep planting, in accordance with the certified Detailed Landscape Plan.

Timing: To be maintained.

 
As indicated
 
Pollution
 
Timing
35)   Kitchen exhaust vents - (emitters)

Kitchen and food preparation area exhaust vent outlets are discharged vertically, directed away from any sensitive use and separated by a minimum of 6m from a sensitive use, including any outdoor air intake of a sensitive use.

Note: This condition does not authorise environmental nuisance under the Environmental Protection Act 1994.

 
At all times
 
36)   Car park and bus station exhaust vents - (emitters)

Car park and bus station exhaust vent outlets are separated from any sensitive use by a minimum of 15m.

Note: This condition does not authorise environmental nuisance under the Environmental Protection Act 1994.

 
At all times
 
37)   Power Generator

A power generator or standby generator for the operational phase of the development does not form part of this approval.

 
To be maintained
 
38)   Hours of Operation

Hours of operation for the approved uses, must be in accordance with the following:

-  Trading Hours (including deliveries) - 06:00am to 22:00pm 

 
At all times
 
39)   Mechanical Plant or Equipment - Acoustically Screened

Mechanical plant or equipment is to be acoustically screened from an adjoining sensitive use. Mechanical plant includes generators, motors, compressors and pumps such as air-conditioning, refrigeration and cold room motors. Acoustically screened is defined in City Plan 2014.

NOTE: This condition does not authorise environmental nuisance under the Environmental Protection Act 1994.

PROOF OF FULFILMENT
Submit to Development Services, certification that all mechanical plant or equipment, is acoustically screened. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
40)   Dampening of Grilles and Metal Plates

All metal grilles, metal plates or similar located on the ramp from the ground level to basement 1 must be securely fastened and meet the requirements of AS3996:2019, Access covers and grates.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
41)   Tyre Noise Reduction

The driveways and carpark surfaces are to be appropriately treated/surfaced to reduce tyre noise impacts from the development.

PROOF OF FULFILMENT
Provide Certification that appropriate treatments/surfacing has been provided to the driveways and carpark areas to reduce tyre noise impact from the development. Certification must be provided by a Member or professional eligible to be a Member of the Australian Acoustic Society. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
42)   Acid Sulfate Soils - Management Plan

Submit an Acid Sulfate Soils (ASS) Investigation Report and Management Plan for approval by Development Assessment.  The Investigation Report and Management Plan are to detail management measures of possible impacts of soil disturbance and filling if disturbance (e.g. Filling, excavation, drainage works, stripping of topsoil) is greater than 100m3. The ASS Management Plan must be consistent with the:

- Guidelines for sampling and analysis of lowland acid sulfate soils (ASS) in Queensland 1998 (Ahem et al, 1998);
- State Planning Policy 2/02: Planning and Managing Development Involving Acid Sulfate Soils;
- State Planning Policy 2/02 Guidelines: Acid Sulfate Soils Qld Govt., 2002); and
- Queensland Acid Sulfate Soil Technical Manual: Soil Management Guidelines.

The Management Plan is to be prepared by a suitably qualified and experienced professional, with the following qualifications:
- qualifications in agricultural or environmental soils science with specialisation in soil chemistry and hydrology;
- at least 2 years experience in acid sulfate soil management; and
- accreditation by a professional organisation such as the Australian Society of Soil Science.

 
Prior to site/operational/building work commencing
42(a) Implement Plan

Implement and maintain the provisions of the approved 'Acid Sulfate Soil Management Plan'.

 
While site/operational/building work is occurring
 
Engineering
 
Timing
43)   Grant Easements

Grant the following easement(s) as may be required:
(i) Easements, in favour of Brisbane City Council for:
- Underground drainage. Provide minimum 3.0m wide underground drainage easement over proposed stormwater pit/s and pipes.
Note: the easement plan is to be supported by a plan prepared by a Registered Surveyor (QLD) showing the location and size of the underground drainage, ensuring the infrastructure is fully contained within the easement.

- Overland Flow and Open Cut as shown on the Approved Civil Services General Arrangement Plan Drawing Number C05-001 Issue D prepared by ACOR Consultants (amended in red 20/09/2024).

Note: These easements include the provision for Council to obtain access.

Timing: Prior to commencement of use and then to be maintained.

 
As indicated
43(a) Submit Plan of Subdivision and Documentation (Council Easement in Gross)

Submit to, and obtain approval from, Development Services a plan of subdivision showing the easement and a request for Council to prepare the necessary easement documentation to demonstrate compliance with the requirements of this condition.

Note: Easements in favour of the Brisbane City Council must have the necessary easement documentation prepared by the Brisbane City Council, free of cost to Council.

Timing: Prior to submission of the request pursuant to Schedule 18 of the Planning Regulation 2017 for Council's notation on the plan of subdivision necessary to comply with this condition.

 
As indicated
43(b) Submit Plan of Subdivision and Documentation (Other Easement)

Submit to, and obtain approval from, Development Services, a plan of subdivision showing the easement and the necessary easement documentation to demonstrate compliance with the requirements of this condition.

Note: Easements not in favour of the Brisbane City Council must have the necessary documentation prepared by the applicant's private solicitors.

Timing: As part of the submission of the request pursuant to Schedule 18 of the Planning Regulation 2017 for Council's notation on the plan of subdivision necessary to comply with this condition.

 
As indicated
43(c) Lodge Notated Plan and Documentation

Lodge the plan of subdivision notated by Council pursuant to Schedule 18 of the Planning Regulation 2017 and the necessary easement documentation with the Registrar of Titles for the relevant Queensland State Government Authority.

Timing: Prior to commencement of use.

PROOF OF FULFILMENT
Evidence of the registration of the necessary easement documentation. Timing: Within one month of the registration of the easement documentation.

 
As indicated
 
44)   On-site Erosion (Medium Risk)

Manage on-site erosion and the release of sediment or sediment laden water from the site at all times by implementing best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version).

Timing: Prior to commencement of any land disturbing activities and until all exposed soil areas are permanently stabilised against erosion.

 
As indicated
44(a) Manage earth disturbance on- site

(i) Drainage control measures must be implemented and maintained to minimise water flow onto areas of exposed earth.

(ii) Sediment and erosion control measures must be implemented and maintained to prevent soil loss from earth disturbance areas and prevent deposition beyond earth disturbance areas.

(iii) No release of contaminants to land beyond on-site area of earth disturbance other than releases that achieve water pollutant concentration release limits of:

A. 50mg/L TSS (Total Suspended Solids);

B. Turbidity, Nephelometric Turbidity Units (NTU) value less than 10% above background, 75 NTU, or as agreed in writing by an Officer from Councils Erosion and Sediment Control (ESC) Team in Compliance and Regulatory Services;

C. pH between 6.5 and 8.5 at all times.

(iv) Maintain a written record to demonstrate that water discharges from the site, including any dewatering operations, meet the release limits as detailed in (iii) for water discharge(s) from the site that occur during or immediately after a rainfall event, and during normal business hours. The water quality of the discharge flows must be measured at each discharge point from the site, including but not limited to sediment basin outlets, other applicable sediment control devices, the site water drainage system, and recorded against the release limits at least once on each calendar day until such discharge stops.

Timing: Prior to commencement of any earth disturbing activities and until all exposed soil areas are permanently stabilised against erosion.

 
As indicated
44(b) Provide Land Occupier Notification to Council

(i) Notify Council's ESC Team of proposed land occupier/s by sending an email to CARS-ESC@Brisbane.qld.gov.au

(ii) If the land is to be occupied by any person other than the registered landowner then advice must be provided to Council that confirms the name, contact information and the duration of any proposed occupation of the land.

Timing: Prior to commencement of any earth disturbing activities.

 
As indicated
44(c) Prepare Erosion and Sediment Control Plan

Prepare an Erosion and Sediment Control Plan (ESCP) in accordance with best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version) and, to the extent of any inconsistency, relevant Brisbane Planning Scheme Codes and Policies.

Obtain a design certificate in accordance with the relevant Brisbane Planning Scheme Codes and Policies.

The ESCP and design certificate must be certified by a Certified Professional in Erosion and Sediment Control (CPESC) or a Registered Professional Engineer Qld (RPEQ) with suitable qualifications and experience in erosion and sediment control.

Documentary evidence demonstrating appropriate qualifications in erosion and sediment control must be provided to the Council upon request.

Timing: Prior to the commencement of any earth disturbing activities.

 
As indicated
44(d) Attend a pre-start meeting

Arrange and attend a pre-start meeting for ESC with an Officer from Councils ESC Team in Compliance and Regulatory Services (CARS).

Note: To request a pre-start meeting from Council's ESC Team send an email to CARS-ESC@Brisbane.qld.gov.au. All relevant documentation, including both the certified ESCP and the certified design certificate, must be attached to this email.

Please allow up to 10 business days for your request to be processed.

Timing: Attend the pre- start meeting prior to the commencement of any earth disturbing activities.

 
As indicated
44(e) Implement Certified Erosion and Sediment Control Plan

Implement the certified ESCP and maintain all ESC measures in accordance with best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version) and, to the extent of any inconsistency, relevant Brisbane Planning Scheme Codes and Policies.

The ESCP and design certificate must be available on site at all times for inspection by Council officers. Any alteration to supplementary or Type 3 ESC measures must be reflected in the certified ESCP. Any alteration to Type 2 or Type 1 ESC measures will require a revised ESCP and design certificate that has been certified by either the CPESC or RPEQ.

Timing: While earth disturbing activities are occurring and until all exposed soil areas are permanently stabilised against erosion.

 
As indicated
 
45)   Maintenance Period for Engineering Work

Maintain the work required by the Engineering condition(s) imposed on this development approval and rectify any defects in accordance with the requirements detailed in this condition.

Note: Guidance for requesting a pre-start and co- ordinating the On/Off Maintenance process can be found on Council's website (https://www.brisbane.qld.gov.au/planning-and-building/applying-and-post- approval/on-and-off-maintenance-approvals).

Timing: During the on-maintenance period.

 
As indicated
45(a) On-Maintenance Acceptance

Arrange an on- maintenance inspection with Development Services and obtain written confirmation from Council that the work has been completed in accordance with the requirements of the condition and is accepted on-maintenance.

Provide proof of Public Liability Insurance ($20 million) for the on- maintenance period.

Lodge a maintenance security for the on-maintenance period. The security must be calculated as 5% of the value of the constructed work or $10,000.00, whichever is greater.

Note: A maintenance security may consist of either a bank guarantee or monetary payment lodged with Council. Refer to Council's Infrastructure Installation and Construction Requirements Manual for further details about the on-maintenance procedure and requirements.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
45(b) On-Maintenance Period

Provide a minimum 12 months maintenance to the work from the time the work is accepted on- maintenance by Council. During this period maintain the work and rectify any defects identified at the on-maintenance inspection and those arising during the on-maintenance period.

Note: The on-maintenance period may be extended by Council pending concerns and/or unsatisfactory performance during the maintenance period.

Timing: A minimum 12 months from acceptance on-maintenance.

 
As indicated
45(c) Off-Maintenance Acceptance

On completion of the maintenance period arrange an off-maintenance inspection with Development Services and obtain written confirmation from Council that the work is accepted off-maintenance.

Ensure all defects are rectified prior to making an appointment for off- maintenance Inspection.

Note: If the inspection is successful the maintenance security will be released.

Timing: On completion of the on-maintenance period.

 
As indicated
 
46)   Information Signage

Erect an information sign on the subject property in accordance with Council's general requirements for signage and in accordance with the requirements outlined below:
a) The sign should provide a brief description of the development proposed;
b) The sign is to list the name, postal and/or email address and a contact telephone number for the following parties (where relevant) that are undertaking work on the site:
 - Developer;
 - Project Coordinator;
 - Architect/Building Designer;
 - Builder;
 - Civil Engineer;
 - Civil Contractor/s; and
 - Landscape Architect;
c) The lettering on the sign is to be at least 25 millimetres in height, be of regular weight and in sentence case;
d) The sign is to be a minimum size of 1,200 millimetres by 900 millimetres;
e) The maximum area of the sign is to be 2.0m2;
f) The sign is to be positioned as follows:
 - located centrally along each road frontage of the site;
 - located on or within 1.5 metres of the road frontage;
 - mounted at least 300 millimetres above ground level; and
 - clearly visible from the street for a pedestrian;
g) The sign is to contain no commercial or corporate advertising other than the name, logo or slogan of the parties outlined in part (b) of this condition;
h) The sign is to be non-illuminated; and
i) Both the sign and the supporting structure are to be made of weatherproof material and to be properly maintained at all times;

Timing: Prior to site works commencing and then to be maintained until completion of the development for all stages.

 
As indicated
 
47)   Engineering Pre-Start Meeting

Arrange and attend a pre-start meeting with Development Services and Program Planning and Integration.

Applicable compliance and inspection fees must be paid, in full, to Council prior to the meeting being held.

Note: To arrange an engineering pre-start meeting with Development Services an email supported by a completed copy of the Pre-Start Meeting Guidelines - Civil Engineering Works kit (https://www.brisbane.qld.gov.au/sites/default/files/20191008-cc11207-pre- start-meeting-guidelines-civil-engineering-works.pdf) must be sent to dalodgement@brisbane.qld.gov.au.

Details include (but are not limited too) the following:
- Site address, Development Approval number (A00) and relevant stage/s (if appropriate);
- List all Development Approval conditions requiring compliance prior to site/operational/building work commencing and demonstrate compliance with those conditions;
- Payee details (Name and address) for the issue of a development 'Compliance and Inspection Fee' quote;
- Superintendent (Consultant) name, address and telephone number (including after-hours contact);
- Contractor/s and major Sub-Contractor/s, name, address and telephone number (including after-hours contact);
- Intended date of commencement of works.

Note:
- All operational works/compliance assessment applications are to be approved prior to requesting the pre-start meeting.
- A minimum 5 working days' notice is required.
- Compliance and Inspection fee to be paid prior to undertaking pre-start meeting.
- All operational works/compliance assessment approved documents and the Development Approval package (conditions and plans) must be available at the pre-start meeting.
- Further guidance for requesting a pre-start and co-ordinating the On/Off Maintenance process can be found on Council's website (https://www.brisbane.qld.gov.au/planning-and-building/applying-and-post- approval/on-and-off-maintenance-approvals).

Timing: Prior to site/operational/building work commencing.

 
As indicated
 
48)   Basement Excavation and Support

Basement excavation and support of all exposed walls must be carried out in accordance with the relevant Brisbane Planning Scheme Codes and the requirements of this condition, and generally in accordance with the Approved Civil Services Bulk Earthworks Plan C04-001 Issue B (amended in red 20/09/2024).

The Commercial character building is to be reinforced, braced and protected and not is not to be relocated within the site during the course of earthworks being carried out on the site, other than temporarily lifted vertically to enable footings to be installed and relocation of services, and reinstated prior to commencement of use. The design of the protective measures is to be prepared by RPEQ and approved by Council prior to the commencement of earthworks.

 
Prior to commencement of site works
48(a) Prepare Engineering Drawings

Engineering drawings for the work required by this condition must be prepared and certified by a Registered Professional Engineer Queensland (Structural), in accordance with the relevant Brisbane Planning Scheme Codes detailing the design of the proposed excavation as well as proposed temporary and permanent support (if no temporary proposed) systems.

The design must include at least the following:
- The location (in plan and section) of the proposed excavation;
- Detailed design of proposed temporary support of the excavation;
- If no temporary support is proposed then detail design of the proposed permanent support of the excavation;
- Any retention system, including associated drainage, is to be wholly contained within the site unless written approval has been obtained from the affected neighbouring property owner;
- The existing and proposed finished levels in reference to the Australian Height Datum (including cross-sections or long sections into the adjacent properties);
- Preservation of all drainage structures from the effects of structural loading generated by the excavation;
- Protection of adjoining properties and roads from adverse impacts as a result of Building Works;
- All existing Brisbane City Council stormwater lines and Maintenance Holes, including depths of Maintenance Holes and clearances to retention structures is to be shown.
Where ground or rock anchors are proposed as a temporary support (Note: permanent anchors are not acceptable) the design must include the following in addition to the above:
- Anchor position/s and length/s (in elevation view and sectional view);
- Where the anchoring system is proposed to encroach into a neighbouring property, written approval is to be obtained from the affected property owner;
- Plans must show the location of the ground anchors in relation to all existing services and public utilities. The cost of relocating any existing services, public utilities or BCC assets is the responsibility of the Developer.

Notes:
- The Earthworks drawings are not required to be submitted for Council approval.
- Where any ground anchors or rock bolts are proposed within 10metres in the vertical plane of a UU sewer, UU water main, BCC stormwater line or combined sanitary drain, assessment will be required against the QDC section MP1.4 by the building certifier.
- Ground anchors are not to be located closer than 1.0m vertically or 1.0m horizontally from existing or proposed Council Infrastructure.
- If the basement excavation impacts on the road reserve, the developer must obtain applicable footpath and road permits prior to commencing any works. Such impacts may include footpath occupation, road closures, re-profiling, ground anchors and/or relocation of services.
- Where public utilities such as UU sewer or water infrastructure, electricity, telecommunication or gas infrastructure will be affected advice must be obtained from the respective utility owner.

Timing: Prior to site/operational/building work commencing.

 
As indicated
48(b) Implement Certified Engineering Drawings

Construct and maintain the basement excavation and proposed support system in accordance with the above certified engineering drawings.

Note: A copy of the certified engineering drawings must be available on- site for inspection by Council Officers during these works.

Timing: While basement excavation and support system installation is occurring.

 
As indicated
48(c) Submit Post Construction Certification

Submit certification by a Registered Professional Engineer Queensland that the basement excavation and support have been installed in compliance with the certified engineering drawings, the relevant Brisbane Planning Scheme Codes and the requirements of this condition.

Where ground or rock anchors have been installed, submit certification by a Registered Professional Engineer Queensland (Geo-technical) that all anchors have been de- stressed.

Timing: Prior to building work commencing above ground.

 
As indicated
 
49)   Filling and / or Excavation

All earthworks must be carried out in accordance with the relevant Brisbane Planning Scheme Codes.

The existing Commercial Character Building (CCB) to remain in place and to be protected during all phases of the development including demolition, excavation and construction.

Suitable basement excavation and construction methodology is to be used in order that the CCB remains in its current location during works.

 
Prior to building work commencing
49(a) Submit Earthworks Drawings

Submit to, and obtain approval from, Development Services earthworks drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the approved DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes.

The Earthworks Drawings must include the following:
- The location of any cut and/or fill;
- The quantity of fill to be deposited and finished fill levels;
- Maintenance of access roads to and from the site such that they remain free of all fill material and are cleaned as necessary;
- The existing and future finished levels in reference to the Australian Height Datum (including cross- sections or long sections into the adjacent properties);
- Preservation of all drainage structures from the effects of structural loading generated by the earthworks;
- Protection of adjoining properties and roads from adverse impacts as a result of the works;
- That all vehicles exiting from the site will be cleaned and treated so as to prevent material being tracked or deposited on public roads.

Note: If the earthworks impact on the road reserve, the Developer must obtain applicable footpath and road permits prior to commencing any works. Such impacts may include footpath occupation, road closures, re-profiling, ground anchors and/or relocation of services. If the excavation has to be stabilised using ground anchors or similar, then the submitted plans must show the location of these in relation to all services. The cost of moving services, utilities and assets is the responsibility of the Developer. The permission of the service/utility/asset owner is required.

Note: Irrespective of final earthworks, it is the responsibility of the RPEQ to manage any staged works associated with Erosion & Sediment Control.

Timing: Prior to site/operational/building work commencing.

 
As indicated
49(b) Fill Material, Placement, Compaction and Testing

All fill material placed on the site must comprise only natural earth and rock and must be free of contaminants (as defined by Part 3, Division 2, Subdivision 2 Environmental contamination, Section 11 of the Environmental Protection Act 1994) and noxious, hazardous, deleterious and organic materials.

Fill material, placement, compaction and testing must comply with the requirements of Australian Standard - AS 3798, Guidelines on Earthworks for Commercial and Residential Developments.

Timing: While site/operational/building work is occurring.

 
As indicated
49(c) Implement Approved Earthworks Drawings

Construct and maintain the earthworks in accordance with the requirements of AS3798 and the approved earthworks drawings.

Timing: While site/operational/building work is occurring and then to be maintained.

 
As indicated
49(d) Submit As Constructed Drawings

Submit to Development Services As Constructed drawings prepared by a Registered Surveyor.

Timing: Prior to building work above ground commencing.

 
As indicated
49(e) Submit Certification

Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the approved earthworks drawings.

Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that all fill material used complies with the quality requirements of this condition and that placement, compaction and testing has been carried out in accordance with AS3798.

Timing: Prior to building work above ground commencing.

 
As indicated
 
50)   Construction Management Plan - Major

Carry out development in a method consistent with a Construction Management Plan (CMP) prepared in accordance with the requirements of this condition.

 
While site/operational/building work is occurring
50(a) Construction Management Plan - Submit Plan

Submit to, and obtain compliance approval from, Development Services a detailed Construction Management Plan for the site preparation, demolition, excavation and construction phases of the approved development. The Construction Management Plan must be in accordance with the relevant Brisbane Planning Scheme Codes and address the following matters, both internal to and external to the development site:

(i) Location of and impacts to any Council vegetation (i.e. street trees/park trees/garden beds)
(ii) Location of and impact to any trees/vegetation on adjoining properties, including mitigation of potential impacts;
(iii) Provision for DDA compliant pedestrian management;
(iv) Existing and proposed kerbside allocation signs and line marking (such as bus stops, loading zones and parking meters and/or ticket dispensers);
(v) Location of and impacts to any Council or other public utility assets;

(vi) Details of all proposed work zones and/or lane closures, including justification;
(vii) Location and design of temporary vehicular construction access points, including frequency of use;
(viii) Management and mitigation strategies for the impact of dust, noise and vibration upon adjoining and nearby properties;
(ix) Provision for loading and unloading materials including the location of any remote loading sites / truck layby sites;
(x) Location of materials, structures, plant and equipment to be stored or placed on the construction site;
(xi) Location of proposed external hoardings and/or gantries, and the impacts on existing street furniture and other assets located within the verge as well as impacts on any existing advertising signage located either along or adjacent to the site frontage - this includes any potential obstruction of sight lines for such advertising (e.g. bus stops with advertising);
(xii) Anticipated staging and programming;
(xiii) Complaint management processes to be implemented; and
(xiv) Compliance with the Management Plans Planning Scheme Policy and other relevant Planning Scheme Policies.
(xv) The existing Commercial Character Building (CCB) is to remain in place and be protected during all phases of the development, including demolition, excavation and construction. Excavation and construction methodology is to be determined and implemented based on the professional expertise of a Registered Professional Engineer of Queensland (RPEQ) structural engineer, ensuring that the CCB remains protected at all times during construction.

Note: Pre-approval of work zones and/or lane closures associated with construction of the development will be managed by Development Services however the Construction Management Plan must be supported by "approval in principle" or written approvals from other relevant Council sections or other governing bodies responsible for any other potentially impacted infrastructure.

The list of relevant infrastructure and contacts is available on Council's website - Search 'Constructions Management Plan'.

Timing: Prior to site/operational/building work commencing.

 
As indicated
50(b) Construction Management Plan - Dilapidation Report

Submit a dilapidation report to engineeringservices@brisbane.qld.gov.au detailing the pre-existing condition of the roadway, both footways, both verges and Council infrastructure, including vegetation, for 100m from the site entry in both directions or to the next street intersection (if less than 100m from the site entry) in both directions.

Timing: Prior to the pre-start meeting.

 
As indicated
50(c) Construction Management Plan - Documentation on Site

Legible copies of the approved Construction Management Plan and current permits must be kept on site and be made available on request by Council, at all times.

The requirements of the CMP must be included in all induction of principal and subcontractors utilised in the development. An outline of the induction provided to contractors may be requested by Council to confirm compliance with this condition.

Timing: While site/operational/building work is occurring.

 
As indicated
50(d) Construction Management Plan - Works to be Performed Out of Hours

Obtain an approval from Development Services for any work that is proposed to be undertaken outside of normal business hours - 6:30am to 6:30pm, Monday to Saturday.

Timing: Prior to site/operational/building work commencing.

 
As indicated
50(e) Construction Management Plan - Implement Plan

Carry out the development in accordance with the approved Construction Management Plan.

Timing: While site/operational/building work is occurring.

 
As indicated
 
51)   Protect Existing Infrastructure

Where there is existing infrastructure in the vicinity of the proposed work, the new work must not damage or compromise the working ability of the existing infrastructure.

Where alterations to public utility mains, existing mains, services or installations are necessitated by the development, prior to alterations commencing, the developer must notify Council or the relevant infrastructure provider and obtain agreement to the alterations.

The developer must meet the costs of the alterations. The alterations must be carried out in accordance with the relevant Brisbane Planning Scheme Codes or infrastructure providers requirements.

 
While site/operational/building work is occurring
51(a) As Constructed Drawings - Alterations to Existing Infrastructure

Submit to Development Services As Constructed drawings showing all new and/or rectification works and an asset register, prepared by a Registered Professional Engineer Queensland.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that the alterations have been completed in accordance with the relevant Brisbane Planning Scheme Codes and any other relevant infrastructure requirements. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
52)   Retaining Walls

Design and construct all retaining walls and associated fences, in accordance with the relevant Brisbane Planning Scheme Codes and the following:

- All retaining walls including the footings, must be located wholly within the property boundaries of the site where works are occurring

- Runoff from surface drains and subsoil drainage associated with the retaining walls must be collected and connected to a lawful point of discharge (LPD) where possible. If no LPD is available the surface drains and sub-soil drainage must be designed, installed and discharged to ensure there is no ponding, nuisance or concentration of stormwater discharge to adjacent properties.

- Retaining walls to stabilise excavation must be set back from property boundaries to accommodate subsoil drainage without encroachment into the neighbouring property. This set back may vary depending on the height, structure and design of the retaining wall, surcharge loadings from neighbouring properties, and to provide a surface drain along the top of the retaining wall

- For retaining walls in excess of 1.0m in height:
- walls must be vertically and horizontally tiered by a ratio of 1:1 unless an alternative has been approved by Development Services
- walls must be designed and certified by a Registered Professional Engineer Queensland
- walls facing onto Council property (including the road reserve and parkland) must not be constructed from timber.

NOTE: Refer to City Plan 2014; Infrastructure Design Planning Scheme Policy (IDPSP) for Council’s definition of a LPD.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
52(a) Certification of Retaining Walls

For retaining walls over 1.0m in height, obtain certification from a Registered Professional Engineer Queensland that the design and construction of the retaining walls and ancillary drainage are in accordance with the requirements of this condition.

 
As indicated
 
53)   Access, Grades, Manoeuvring, Carparks, Signs and Line Marking

Construct and maintain access, parking and manoeuvring for vehicles on site in accordance with the relevant Brisbane Planning Scheme Codes, as indicated on the approved DRAWINGS AND DOCUMENTS, including the following:

i. A pavement of minimum Local road standard or equivalent surface material (including associated drainage) to the area on which motor vehicles will be driven and/or parked.

ii. Suspended concrete parking areas, aisles and driveways are to be designed and certified by an RPEQ to accommodate the required design vehicles/s identified in this condition.

iii. Manoeuvring on site for a RCV and for the loading and unloading of vehicle(s);

iv. Parking on the site for 91 cars including 2 PWD parking spaces for people with disabilities, 2 VAN spaces, 8 motorcycle spaces, and provision for the loading and unloading of vehicle(s) within the site.

v. Provide and maintain minimum 34 secure bicycle parking spaces (i.e. 26 employee and 8 visitor spaces) and 36 lockers and 3 shower cubicles with ancillary change rooms for both females and males;

vi. A minimum of 2.3 metres height clearance to all undercover parking areas, including the entry and access to these areas, and a minimum of 2.5 metres above parking spaces for people with disabilities. The minimum clear height must be measured to the lowest protrusion from the ceiling (e.g. fire sprinklers, services, lighting fixtures, signs, etc).

vii. A minimum of 4.2 metres height clearance to the on-site service vehicle area/s, including the entry and access to these areas. The minimum clear height must be measured to the lowest protrusion from the ceiling (e.g. fire sprinklers, services, lighting fixtures, signs, etc).

viii. A height clearance sign located at the entrance(s) to undercover car parking areas.

ix. A height clearance sign located at the entrance of the servicing area / loading dock, to notify drivers of the 4.2m height clearance available.

ix. An appropriate area for the storage and collection of refuse, including recyclables, in a position which is accessible to service vehicles on the site.

x. Prepare and implement signs and line markings drawings that show the internal paved areas signed and delineated in accordance with the approved drawings and documents. The drawings must be prepared and certified by a Registered Professional Engineer Queensland in accordance with the relevant Brisbane Planning Scheme Codes and the Manual of Uniform Traffic Control Devices.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland, that the above requirements have been implemented in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
54)   Repair Damage to Kerb, Footpath or Road

Repair any damage to the existing kerb and channel, footpath or roadway (including removal of concrete slurry from footways, roads, kerb and channel, stormwater gullies and drainlines) and re-instate existing traffic signs and pavement markings that have been removed or damaged during any works carried out in association with the approved development.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
54(a) Interim Repairs

If at any time during the construction phase of the approved development, damage to the existing kerb and channel, footpath or roadway creates unsafe, unreasonable and/or not fit for purpose conditions as assessed by Council, interim repairs must be undertaken as directed by Program Planning and Integration.

Note: Any interim repairs required to be undertaken shall not be considered to satisfy the requirements of this condition for the permanent repair of the infrastructure prior to the issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

Timing: While site / operational / building works is occurring.

 
As indicated
 
55)   Minimum Flood Planning Levels

Design and construct all building pad levels, floor levels and ancillary structures to the appropriate flood planning level with freeboard (where required) in accordance with the relevant Brisbane Planning Scheme Codes and the approved drawings and documents.

The minimum basement parking entry level must be 12.30 metres AHD.

The flood barrier treatment along the frontage of Harcourt Street, and at the corner of Harcourt Street and James Street is to be provided as shown on the Approved Civil Services General Arrangement Plan Drawing No. C05-001 Issue D (amended in red 20/09/2024) and must be certified by an RPEQ to confirm that:

1. Suitable flood immunity is achieved for ground floor areas.

2. The structure(s) are designed to withstand hydrostatic and hydrodynamic forces up to and including the defined flood event.

PROOF OF FULFILMENT
As-Constructed drawings prepared by a Registered Surveyor (Qld). The Registered Surveyor (Qld) must certify that the development has been constructed in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
56)   Refuse Collection - On Site

Provide for the installation and collection of refuse/recycling bins by Brisbane City Council's Waste and Resource Recovery Services or a private waste contractor.

Prepare and implement an On-site Waste Management Plan outlining the functional requirements of the waste storage and collection facilities, including:

-        monitoring and rotation of full and empty bins,

-       transfer of bins between basement bin store and ground floor waste collection area,

-       equipment required (e.g. bin-tug) and training required,

-       nomination and responsibilities of authorised person/s regard waste facilities management,

-       any other reasonable requirement involved in ensuring the provision of safe and efficient on-site waste management.

 
At all times
56(a) Arrange Refuse Collection

Arrange for the installation of refuse/recycling bins and for the subsequent collection of refuse including recycling from the site by Brisbane City Council's Waste and Resource Recovery Services or a private waste contractor.

Timing: A minimum of four weeks prior to the commencement of use and then to be maintained.

PROOF OF FULFILMENT
Where a private waste contractor is engaged, provide written confirmation from the proposed waste collection contractor of the agreement to service the property. The written agreement must be submitted to Council's Waste and Resource Recovery Services and include full details of the proposed system, bin sizes, number of bins, frequency of collection and the refuse collection vehicle size. Timing: Prior to commencement of use.

 
As indicated
56(b) Indemnify Council

The owner and any subsequent owner must, by approved form to Waste and Resource Recovery Services, indemnify Council and its agents in respect of any damage to the pavement and other driving surfaces.

Timing: When an arrangement for refuse/recycling collection services is made with Brisbane City Council.

 
As indicated
56(c) Notify Future Owner

Where Council is engaged as the waste contractor, the owner must notify any future owner/body corporate that the development has been approved on the basis that an indemnity must be provide for refuse collection vehicles to enter the property.

Timing: At time of a change of ownership.

 
As indicated
 
57)   Refuse Storage - On Site Collection

Provide a roofed and wholly screened refuse enclosure utilising materials consistent with the development or a dedicated refuse storage room, as shown on the approved plans and documents.

The enclosure/refuse storage room must be of a design to accommodate the quantity of refuse and recycling including source separation to allow for low servicing collection of the development.

Bins must be located in an area which allows them to be manoeuvred from the bin storage area to the designated internal collection point.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
58)   Work for Transport Network - Road (Non-trunk) - External

Construct the following roadwork with any associated drainage, verge, site access and services including street lighting for the Transport Network (Road) shown on the Approved Civil Service Pavement Plan Drawing No. C09-001 Issue C (amended in red 20/09/2024) and the Approved Civil Public Domain Alignment Control Plan Drawing No. C11-501 Issue B (amended in red 20/09/2024) in accordance with the relevant Brisbane Planning Scheme Codes, the Queensland Manual of Uniform Traffic Control Devices and the AUSTROADS design standards:

- New type E concrete kerb and channel and associated drainage to provide a kerb build-out and approximately 5.0 metre wide verge along the James Street site frontage for a distance of approximately 12 metres, measured from the site boundary at the intersection with Harcourt Street. If available, construct the new kerb using Porphry.

- Regrade road pavement areas to interface with the new kerb invert level, whilst directing flows to the stormwater infrastructure and flow paths, and provide a consistent road cross-fall gradient from the kerb invert to the road crown where practical and possible.

- Provide / maintain / reinstate any required signs and pavement markings along the James Street and Harcourt Street frontages;

Note: This condition is imposed under section 145 of the Planning Act 2016.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
58(a) Submit Functional Layout Drawings

Submit to, and obtain approval from, Development Services functional layout drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes.

Note: This approval must be obtained prior to the submission of drawings for Roadwork and Stormwater Drainage and Signs and Pavement Marking.

Timing: Prior to site/operational/building work commencing.

 
As indicated
58(b) Submit Roadworks and Stormwater Drainage Drawings

Submit to, and obtain approval from, Development Services Roadworks and Stormwater Drainage Drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes.

Timing: Prior to site/operational/building work commencing.

 
As indicated
58(c) Implement Approved Drawings

Construct the works in accordance with the above approved drawings.

Timing: Prior to on-maintenance acceptance.

 
As indicated
58(d) Submit As Constructed Drawings

Submit to Development Services As Constructed drawings including an asset register and a pre-On-Maintenance Inspection Checklist, prepared by a Registered Professional Engineer Queensland.

Timing: Prior to on-maintenance inspection.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the above approved drawings.

 
As indicated
 
59)   Remove Redundant Drainage Outlets

Remove any redundant drainage outlets from the kerb and channel including any associated pipe work across the footway and reinstate the kerb and channel and the footway area in accordance with the relevant Brisbane Planning Scheme Codes.

Note: Guidance for the preparation of drawings and/or documents to comply with this condition is provided in the Brisbane Planning Scheme Policies.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
60)   All Basements - Stormwater Runoff

Design and construct basements to manage stormwater runoff in accordance with the relevant Brisbane Planning Scheme Codes and the following:

(i) All stormwater pump systems must be designed to gravity drain to a Council stormwater system.

(ii) The driveway into a basement must be designed and constructed to minimise local driveway stormwater runoff entering the basement. The drainage must be designed to capture runoff from a 10% AEP rainfall event and gravity drain to a lawful point of discharge.

(iii) Vehicle access into any basement from a Council road will require the basement driveway to ramp up a minimum of 200mm, above adjacent road channel invert, to maintain road major flow capacity.

(iv) All roofwater drainage is to be directed to a lawful point of discharge via gravity drainage, not directed into the basement.

(v) Any stormwater within a basement that connects via gravity drainage directly to a council pipe or manhole must incorporate backflow prevention devices.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
61)   Site Drainage - Major

Provide an internal drainage system to collect stormwater run-off from all proposed lots, roofed and developed surface areas and any run-off onto the site from adjacent areas and convey the collected run- off to a lawful point of discharge, in accordance with the relevant Brisbane Planning Scheme Codes, and generally in accordance with the Approved Civil Services General Arrangement Plan C05-001 Issue D (amended in red 20/09/2024).

Stormwater drainage outcomes shown on the Approved Civil Services General Arrangement Plan C05-001 Issue D (amended in red 20/09/2024) are conceptual only and are subject to further amendments as required within the subsequent Drainage Compliance Assessment Application. The alignment of stormwater drainage, and the design and location of stormwater gully pits are subject to further changes.

Notes:

- All upslope stormwater connections to existing private properties must extend to the property boundary of all relevant properties being ultimately serviced by that connection.
- Guidance for the preparation of drawings and/or documents to comply with this condition is provided in the Brisbane Planning Scheme Policies.
- The stormwater design must ensure the stormwater runoff from the site does not adversely impact on flooding or drainage (peak discharge and duration for all storm events up to the 1% AEP event) of properties that are upstream, downstream or adjacent to the site. Where a development has not specifically addressed this issue, the development may require implementation of one or more mitigation measures to offset adverse impacts, (e.g. stormwater detention or upgrade of existing stormwater drainage infrastructure).
- Where external works are required and infrastructure will be handed over to Council (e.g. Stormwater pipes 375mm or greater and/or manholes within the road reserve, etc), the applicant will be required to request an on-site Pre-Start with Council and ensure all future owned Council assets follow the On/Off Maintenance process in accordance with Council's Infrastructure Installation & Construction Requirements Manual.
- Guidance for requesting a pre-start and co-ordinating the On/Off Maintenance process can be found on Council's website (https://www.brisbane.qld.gov.au/planning-and- building/applying-and-post-approval/on-and-off-maintenance-approvals.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
61(a) Submit Site Drainage Drawings

Submit to, and obtain approval from, Development Services, site drainage drawings and engineering calculations, prepared and certified by a Registered Professional Engineer Queensland, in accordance with the relevant Brisbane Planning Scheme Codes.

Notes:

- Queensland Building and Construction Commission licensed hydraulic consultants may design the stormwater system for sites less than 2000m2 with an upstream catchment servicing no more than 4 residential lots. This excludes stormwater drainage design (including subsoil drainage) of basements in flood planning areas and the design of any onsite stormwater detention system
- Guidance for the preparation of drawings and/or documents to comply with this condition is provided in the Brisbane Planning Scheme Policies.

Timing: Prior to site/operational/building work commencing

 
As indicated
61(b) Implement Approved Drawings

Carry out the works in accordance with the approved site drainage drawings.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
61(c) Submit As Constructed Drawings

Submit to Development Services As Constructed drawings prepared and certified by a Registered Professional Engineer Queensland or a Queensland Building and Construction Commission licensed hydraulic consultants (where applicable).

Note: To be submitted via DA- ComplianceEngineering@brisbane.qld.gov.au and include the site address, A00 reference and Condition number in the subject line.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland or Queensland Building or Construction Commission licensed hydraulic consultants (where applicable) confirming that the works have been completed in accordance with the above stormwater drawings. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
62)   Work for Stormwater Network (Non-Trunk)

Construct stormwater drainage to service the development in accordance with the relevant Brisbane Planning Scheme Codes, ensuring that the works are connected to a lawful point of discharge, and generally in accordance with the Approved Civil Services General Arrangement Plan C05-001 Issue D (amended in red 20/09/2024).

A minimum of two stormwater gully pits are to be provided to the Harcourt Street frontage of the site.

Stormwater drainage outcomes shown on the Approved Civil Services General Arrangement Plan C05-001 Issue D (amended in red 20/09/2024) are conceptual only, and are subject to further amendments as required within the subsequent Drainage Compliance Assessment Application. The alignment of stormwater drainage, and the design and location of stormwater gully pits are subject to further changes.

Note: Guidance for the preparation of drawings and/or documents to comply with this condition is provided in the Brisbane Planning Scheme Policies.

Note: This condition is imposed under section 145 of the Planning Act 2016.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
62(a) Submit Stormwater Drawings

Submit to, and obtain approval from, Development Services, stormwater drawings and engineering calculations, prepared and certified by a Registered Professional Engineer Queensland in accordance with the relevant Brisbane Planning Scheme Codes.

Timing: Prior to site/operational/building work commencing.

 
As indicated
62(b) Implement Approved Drawings

Construct the works in accordance with the above approved stormwater drawings.

Timing: Prior to On-Maintenance Acceptance.

 
As indicated
62(c) Submit As Constructed Drawings

Submit to Development Services As Constructed drawings including an asset register and a pre-On Maintenance Inspection Checklist, prepared and certified by a Registered Professional Engineer Queensland.

Timing: Prior to On-Maintenance Inspection.

 
As indicated
62(d) Submit Certification

Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the above approved stormwater drawings.

Timing: Prior to on-maintenance inspection.

 
As indicated
 
63)   Ponding of Stormwater

Carry out the approved development to ensure that adjoining properties and roads are protected from ponding or nuisance from stormwater during construction.

Notes: If remedial works are necessary to comply with this condition, prior approval must be obtained from Development Services.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
64)   Service Conduits and Mains

Provide and install all service conduits and meet the cost of any alterations to public utility mains, existing mains, services, street lighting or installations that are required to carry out the approved development. These works must be in accordance with the relevant Brisbane Planning Scheme Codes, and include the following, where applicable:
- the provision of all services and/or conduits along the full length of any rear allotment access or access easement.
- the breaking and/or relocation of any existing sewer combine drains.
- the relocation of any fire hydrant and/or valves from the development's vehicular footway crossings.
- the retention and/or relocation of any existing foul water lines that currently exist within the site.
- any new or existing installations of electrical pillar boxes, pad mounted transformers (PMTs), water reticulation mains, water meters and the like, must be installed/relocated to their ultimate alignment relative to the new property boundary and clear of the usable footpath areas irrespective of the alignment of the existing services/conduits.

Note:
- The cost of moving services, utilities and assets is the responsibility of the Developer. The permission of the service, utility or asset owner will be required. Council permission is required if street trees, stormwater gullies/drains, and swales are affected. Urban Utilities permission is required if water supply and sewerage services are affected.
- Standard utility alignments may be found on Council's 'Brisbane Standard Drawings' 1013 to 1016 inclusive.
- Applicants must liaise with the appropriate service authorities. Typical underground services and/or conduits to be constructed include power, phone, telecommunications, sewer (including private combine drains) stormwater and gas, if applicable.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
64(a) Submit As Constructed Drawings

Submit to Development Services As Constructed drawings, including an asset register, prepared and certified by a Registered Professional Engineer Queensland.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the requirements of this condition. Note: Civil works are to be certified by a RPEQ(Civil) and electrical works are to be certified by a RPEQ (Electrical).

 
As indicated
 
65)   Telecommunications

Submit to Development Services, certification from an authorised telecommunications carrier/contractor, that the following works and infrastructure have been undertaken and installed in accordance with telecommunications industry standards:
- Provide telecommunications to the subject buildings, lead-in conduits and equipment space in a suitable location within the buildings, to suit the carrier of choice.
- If new pits and conduit infrastructure are required to be installed within the road reserve fronting the site, it must be suitably sized to cater for future installation of fibre optic cables.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
66)   Agreement with Electricity Supplier

Submit to Development Services, evidence of an agreement with an electricity supplier to provide necessary services to the development in accordance with the relevant Brisbane Planning Scheme Codes.

Where development is within an established area of overhead electricity supply and the electricity supplier determines that a property pole is the appropriate solution to supply electricity to the development, the developer must be responsible for the installation of the property pole(s).

In the above circumstances, submit to Development Services, certification from the developer's electrical consultant confirming that the above installation has been completed in accordance with the relevant AS/NZS Standards and the Queensland Electricity Connection Manual (QECM) and Queensland Electricity Metering Manual (QEMM).

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
67)   Water and Wastewater

Pursuant to Schedule 18 of the Planning Regulation 2017 submit to Development Services, documentary evidence, issued by the relevant distributor-retailer, to verify that the conditions of any necessary connection certificate under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009, have been complied with.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
68)   Permanent Driveway Crossover

Provide a 10.40 metre wide modified Type B1 permanent driveway crossover to the Harcourt Street frontage(s) of the site in accordance with the relevant Brisbane Planning Scheme Codes and located as shown on the Approved Civil Services Pavement Plan C09-001 Issue C (amended in red 20/09/2024). Ensure the driveway splay/tapers are located minimum 600mm clear of the lintel/s of the adjacent proposed stormwater gullies. The grid crossing must be constructed in accordance with BSD-2023 and must not obstruct overland flows from being conveyed along the Harcourt Street frontage of the site.

Written consent must be obtained from Program, Planning and Integration Arboriculture (PPI Arb) prior to any works occurring that will either impact on or require removal of a street tree (this includes pruning, excavation or fill within the root zone/canopy of the tree)

At all times during construction of the crossover, safe pedestrian access along the site frontage must be maintained.

Note: No further driveway permit is required however additional footway permits or lane closure permits may be required for footpath/verge closures and/or lane closures. These permits must be obtained prior to construction of the crossover.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
69)   Redundant Driveway Crossover

Remove the redundant existing driveway crossover(s) on the frontage(s) of the site and reinstate the kerb and channel, road pavement, footways and footpaths in accordance with the relevant Brisbane Planning Scheme Codes.

Note:
For kerb and channel reinstatement, the existing channel is required to be removed and the kerb and channel reinstated in one pour.

Additional footway permits or lane closure permits may be required for footpath/verge closures and/or lane closures. These permits must be obtained prior to construction of the crossover.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
Standard Advice
 
Timing
70)   Construction Noise and Dust Emissions

Pursuant to the Environmental Protection Act 1994, all development involving the emission of noise and dust from building and/or construction activities, must ensure that the emissions are in accordance with the requirements of the Act.
The Environmental Protection Act 1994 prescribes that:

1. A person must not carry out building work in a way that makes an audible noise-
-  on a business day or Saturday, before 6.30a.m. or after 6.30p.m; or
-   on any other day, at any time. 
2. The reference in subsection (1) to a person carrying out building work-
-  includes a person carrying out building work under an owner-builder permit; and
-  otherwise does not include a person carrying out building work at premises used by the person only for residential purposes.

Note: A request can be made to work outside of these hours by submitting an Environmental Management Plan for assessment and obtaining an endorsed decision from the Environmental Management delegate Development Services.

 
As indicated
 
71)   Contaminated Materials and Soils

Any contaminated materials or soils encountered during siteworks, must be handled, stored and disposed of in accordance with the requirements of the relevant authority of the Queensland Government. A person must not dispose of contaminated soil or a hazardous substance at a place other than at a place approved by the relevant authority of the Queensland Government.

 
As indicated
 
72)   Management of Asbestos

Disposal, handling and restoration of any building materials containing asbestos must be in accordance with current state and federal legislation.

 
As indicated
 
73)   Further Development Permit Required

Further Development Permit(s) to carry out assessable building work under the Building Act may be required.

 
As indicated
 
74)   Currency Period

The currency period for this development approval is stated in the Decision Notice and is expressed as a date.

This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016.

 
As indicated
 
75)   Equitable Access

Provision must be made during and after construction for equitable access for persons with disabilities to and within the site and on adjoining public areas, in accordance with the following:
- Queensland Anti-Discrimination Act 1991;
- Federal Disability Discrimination Act 1992;
- Australian Standards AS1428 Parts 1-4;
- Australian Standard for Access and Mobility; and
- National Construction Code.

 
As indicated
 
76)   Damage to Trees on Adjoining Land

Please note that any damage caused to vegetation on adjoining land as a result of exercising this development approval may result in an offence under other legislation (e.g. Natural Assets Local Law) and/or civil action

 
As indicated
 
77)   Fire Ant Movement Controls

To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected.

These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products.

Breaches of these controls can potentially impact the community, economy and the environment.  Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014.

For further information contact the relevant Queensland State Government department on 13 QGOV.

 
As indicated
 



Permit to Which These Conditions Relate: DA - PA - Referral Agency for Building Work
Activity(ies): Flood hazard area
Stage: Early referral agency response for Flood hazard area

Standard Advice
 
Timing
78)   Early Referral Agency Response (Flood hazard area)

Council has chosen to issue an early referral agency response under section 57 of the Planning Act 2016 for the proposed building work located within a Flood hazard area (Planning Regulation 2017, Schedule 9, Part 3, Division 2, Table 12). The response is attached to this decision notice.

 
As indicated
 

** End of Package **