BRISBANE CITY COUNCIL'S APPROVAL PACKAGE.



APPLICATION DETAILS

This package relates to the application detailed below
Address of Site: 59 COLLINGS ST BALMORAL QLD 4171
Real Property Description of Site: L398 SL.1835
Aspects of development and type of approval: DA - PA - Material Change of Use Development Permit - multiple dwelling
DA - PA - Building Work Development Permit - multiple dwelling
Council File Reference: A006992901
Permit Reference Number/s: DAMC449880924; DABW449880824.
Package Status: APPROVED - Version 3 (21st of May, 2026 11:47:54 AM)
Package Generated: 21/05/2026


PROJECT TEAM

The assessment of this application has been undertaken by:
Alessio ZANCOLICH
Principal Urban Planner
Planning Services South
alessio.zancolich@brisbane.qld.gov.au
(07) 3407 8514
Dane HOFFMANN
Senior Urban Planner
Planning Services South
Dane.Hoffmann@brisbane.qld.gov.au
07 3178 5678
Timothy BYRNE
Principal Urban Planner
Planning Services South
Timothy.Byrne@brisbane.qld.gov.au
(07) 3403 0314
Zarndra PIPER
Principal Urban Planner
Planning Services South
Zarndra.Piper@brisbane.qld.gov.au
0731780370
Dane HOFFMANN
Senior Urban Planner
Planning Services South
Dane.Hoffmann@brisbane.qld.gov.au
07 3178 5678
Julie BONFIELD
Senior Architect
Architecture Team
Julie.Bonfield@brisbane.qld.gov.au
31782575
Craig SLACK
Engineer
Engineering Scoping
craig.slack@brisbane.qld.gov.au
(07) 3403 8888
Kim ROGERS
Principal Urban Planner
Planning Services South
kim.rogers@brisbane.qld.gov.au
34071304
Zarndra PIPER
Principal Urban Planner
Planning Services South
Zarndra.Piper@brisbane.qld.gov.au
0731780370
JOANNE LOVE-SLOMAN
Landscape Architect
Landscape Architecture Team
joanne.lovesloman@brisbane.qld.gov.au
(07) 3403 8888
Julie BONFIELD
Senior Architect
Architecture Team
Julie.Bonfield@brisbane.qld.gov.au
31782575
Sham NABI
Senior Engineer
Engineering Services South
Sham.Nabi@brisbane.qld.gov.au
(07)31785009
Tom GIBBS
Principal Engineer
Engineering Services Traffic
Tom.Gibbs@brisbane.qld.gov.au


DRAWINGS AND DOCUMENTS



The term 'drawings and documents' or similar expressions mean:
Drawing or Document Number Plan Date
Landscape Schedules DA-802 Revision No. DA-09 13-MAY-2026 (Received)
Site Plan DA-101 Revision No. DA-09 27-MAR-2026 (Received)
Basement Floor Plan DA-201 Revision No. DA-09 27-MAR-2026 (Received)
Ground Floor Plan DA-202 Revision No. DA-09 12-MAY-2026 (Received)
First Floor Plan DA-203 Revision No. DA-08 27-MAR-2026 (Received)
Second Floor Plan DA-204 Revision No. DA-08 27-MAR-2026 (Received)
Third Floor Plan DA-205 Revision No. DA-09 27-MAR-2026 (Received)
Roof Plan DA-211 Revision No. DA-09 (Amended In Red 13-MAY-2026) 27-MAR-2026 (Received)
Elevations 1 of 3 DA-301 Revision No. DA-09 27-MAR-2026 (Received)
Elevations 2 of 3 DA-302 Revision No. DA-09 (Amended In Red 13-MAY-2026) 27-MAR-2026 (Received)
Elevations 3 of 3 DA-303 Revision No. DA-09 (Amended In Red 13-MAY-2026) 27-MAR-2026 (Received)
Long Section DA-401 Revision No. DA-09 (Amended In Red 13-MAY-2026) 27-MAR-2026 (Received)
Long Section DA-402 Revision No. DA-09 (Amended In Red 13-MAY-2026) 27-MAR-2026 (Received)
Long Section DA-403 Revision No. DA-09 (Amended In Red 13-MAY-2026) 27-MAR-2026 (Received)
Cross Section DA-411 Revision No. DA-09 27-MAR-2026 (Received)
Cross Section DA-412 Revision No. DA-08 27-MAR-2026 (Received)
Landscape Concept Schematic 24003_ARD Rev E (Amended In Red 29-APR-2026) 08-OCT-2024 (Received)
Collings St Rooftop Landscape Plan 26024 1 (Amended In Red 13-MAY-2026) 27-MAR-2026 (Received)
Collings St Rooftop Pool & Plant Palette 26024 2 27-MAR-2026 (Received)


Advice

Please see the attached document(s) for any advices.

APPROVAL CONDITIONS



Permit to Which These Conditions Relate: DA - PA - Material Change of Use
Activity(ies): multiple dwelling
Stage: Multiple Dwelling (6 units)

General/Planning Requirements
 
Timing
1)   Building Format Plan

Where the timing of a condition, or part thereof , states 'Prior to issue of Certificate of Occupancy/Final Inspection Certificate' or 'Prior to commencement of use' and the development involves the creation of a Building Format Plan, the timing of the condition, or part thereof, is taken to mean 'prior to Council's endorsement of any plan of subdivision'.

 
As indicated
 
2)   Maintain the Approved Development

Maintain the approved development in accordance with the approved DRAWINGS AND DOCUMENTS, and any other relevant Council approval required by the conditions.

 
At all times
 
3)   Approved Drawings and Documents

A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers.

Note: This condition is imposed to ensure compliance with the conditions of development approval.

 
While site/operational/building work is occurring
 
4)   Carry Out the Approved Development

Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks). Permission to enter neighbouring properties must be obtained from the relevant property owners.

 
While site/operational/building work is occurring
 
5)   Complete All Building Work

Complete all building work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such building work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: Building work must also be completed in accordance with any other current development approval.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
6)   Visitor Parking

Visitor car parking spaces must:
- Be clearly labelled as 'Visitor Parking';
- Remain unimpeded by landscaping, water tanks, storage (temporary or otherwise), gates or any other fitting, fixture or structure; and
- Access to the visitor parking beyond the security gate as shown on the approved drawings and documents must be in accordance with the following:

  • Remain open during the hours between 6:00am and 6:00pm daily.
  • Allow bona fide visitors 24-hour unrestricted access to the visitor parking spaces via the electronic access control system as identified on the approved drawings and documents.
  • The electronic access control system is to be identifiable in a position which can be easily and efficiently accessed whilst a vehicle is standing.
 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
7)   Security Lighting - On Site

Install and maintain a suitable system of security lighting to operate from dusk to dawn within all areas where the public may gain access, including car parking areas, internal pathways, building entrances and vegetated areas. Lighting of publicly accessible internal areas is in accordance with Australian Standard - AS/NZS 1158.3.1 Lighting for roads and public spaces - Pedestrian area lighting - Performance and design requirements.

All external lighting within the site is in accordance with Australian Standard - AS4282- Control of the Obtrusive Effects of Outdoor Lighting.

Lighting must be maintained in safe and good working order.

Timing: 'Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained’.

 
As indicated
 
8)   Attend a pre-start meeting

Arrange and attend a pre-start meeting with Building and Construction Management Team, Development Services.

Council will only attend the pre-start meeting once all applicable compliance fees have been paid.

Note: To request a pre-start meeting and associated lodgement requirements, refer to Council's website and search 'Pre-start meeting'.

Timing: Prior to site/operational/building work commencing.

 
As indicated
 
9)   Car Parking

The car parking within the premises must be maintained exclusively for the ancillary use of the development. The parking must not be made available to the general public and there must not be signage erected on or in the vicinity of the site advertising the availability of car parking to the general public.

 
At all times
 
10)   Erect Screen Fence

Erect a screen fence along the northern and southern boundary of the site as shown on the approved DRAWINGS AND DOCUMENTS.

The screen fence must be maximum 1.8 metres in height, and be constructed from solid material.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
Architecture
 
Timing
11)   External Details

External details of the building, facade treatment and external materials and finishes must be consistent with the approved DRAWINGS AND DOCUMENTS.

Note: The requirement to use particular materials and finishes is imposed only for the purpose of achieving a built form outcome that displays architectural merit. Council has not assessed the materials and finishes for compliance with the Building Act, the Building Fire Safety Regulation, the Building Regulation, the Building Code of Australia, the Queensland Development Code, relevant Australian Standards, fire safety standards or any other relevant requirement of a statutory authority with regard to building work.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
12)   Overall Height

The overall height of the building(s) must be in accordance with the floor and roof levels and overall height shown on the APPROVED DRAWINGS AND DOCUMENTS.

 
While site/operational/building work is occurring and then to be maintained
12(a) Submit Certification

Submit to Development Services certification from a Registered Surveyor (Qld) confirming that the 'as constructed' floor and roof levels and overall height are in accordance with the requirements of this condition.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
13)   Light Reflectivity and Solar (Heat) Reflectivity

Submit to Development Services documentary evidence that the level of light reflectivity from the glazing incorporated in the approved development does not exceed 20%.

Timing: Prior to building work above ground level commencing.

 
As indicated
13(a) Install Glazing

Install and maintain glazing in accordance with the above specification.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained.

 
As indicated
 
14)   Driveway Material and Finishes

Provide materials and finishes to the driveway and external carparking surfaces that reduce the visual impact of these areas when viewed from the street. One or a combination of the following must be used:

-  Coloured aggregate;

-   Concrete pavers; and/or

-  Banding and patterns in the surface design.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
15)   Balconies/Verandahs/Terraces

No balconies/verandahs/terraces may be enclosed with solid balustrades, solid walls, fixed and/or operable, moveable or adjustable screening unless these features are clearly shown on the APPROVED DRAWINGS AND DOCUMENTS.

Note: Any Community Management Statement that may apply to this approval must contain a by-law which reflects the requirements of this condition.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
16)   Screen Air Conditioning and Other Plant Enclosures

Install and maintain suitable screening to all air conditioning units, lift motor rooms, hot water systems plant and service facilities where externally visible or located on top of the building including where visible and/or located within private open space areas, communal open space areas, adjoining properties or public land. The screening structures must be constructed from durable materials that are consistent with materials used elsewhere on the facade of the building.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
17)   Screening

Provide suitable privacy screening to windows of balconies, landings, terraces and decks of the proposed dwelling(s) in accordance with the approved DRAWINGS AND DOCUMENTS.

Suitable screening options must be:

For windows:
- Sill heights of 1.5m above floor level; or
- Fixed obscure glazing in any part of the window below 1.5m above floor level; or
- Fixed external screens to any part of the window below 1.5m above floor level, or
- Fencing to a minimum 1.8m above ground floor level (only applies to overlooking from windows at ground floor level).

For balconies, landings, terraces and decks:
- Fixed screening from floor level to a height of 1.5m above floor level.

Note: Screening devices must be either solid translucent screens, perforated or slatted panels, or fixed louvres that are permanent, be durable and fixed. Screening devices must have a maximum of 25% openings, with a maximum opening of 50mm.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
Landscape Architecture and Open Space Planning
 
Timing
18)   Streetscape Works - Neighbourhood Street Minor

Carry out streetscape improvement works to the Collings Street verge to a Neighbourhood Street Minor standard in accordance with the relevant Brisbane Planning Scheme Codes, Brisbane Standard Drawings (BSD), the requirements of this condition and the Infrastructure Design Planning Scheme Policy including sections 3.7.4.4 and 3.7.5.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
18(a) Concrete Path

Install a 1.2m wide broom finished standard Portland grey concrete path.

The edge of the path is to be setback approximately 850mm from the back of kerb. Where the path cannot be installed on this alignment due to conflicts such as street trees, or power poles, ensure the path is installed a minimum distance of:

- approximately 350mm from the property boundary
- 600mm from the edge of the conflict

If the above requirements cannot be achieved, contact the Landscape Architecture Team via email: specialistservices@brisbane.qld.gov.au.

Transition to existing paths on verges that adjoin the development. The transition is to occur fronting the adjoining developments, not the subject site.

Note: standard path alignments are shown on Brisbane Standard Drawing BSD-5201 sheet 2 but will vary depending on verge width and location.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Photographic evidence of concrete path. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
18(b) Submit As-Constructed Drawings

Submit to Development Services As Constructed plans including an asset register, checked by a Registered Professional Engineer Queensland, certifying that the concrete path works have been completed in accordance with relevant Brisbane Planning Scheme Codes/Policies.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Asset register and As constructed drawings signed by an RPEQ. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
18(c) Turf

Install turf to the full width of the verge excluding any concrete path required by this condition.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Photographic evidence of installed turf. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
19)   Landscape the Site - Self Certification

Landscape the site in accordance with the requirements of this condition.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
19(a) Detailed Landscape Plan for Self- Certification

Prepare a Detailed Landscape Plan at a scale of 1:100 for all on-site landscape works including planting areas identified on the approved DRAWINGS AND DOCUMENTS. The plan must be prepared by a qualified Landscape Architect and must comply with the relevant Brisbane Planning Scheme Codes.

The plan must include the following:

- A 20,000L water storage tank/s for landscaping irrigation purposes.
- Planting media and mulch in accordance with AS4454 Composts, soil conditioners and mulches and AS 4419-2003 Soils for landscaping and garden use.
- Unless otherwise specified, trees provided as 45 litre stock or larger, staked and tied, and complying with Australian Standards.
- Plant selection and densities to achieve full surface coverage of garden beds within 2 years of planting.
- All podium/container planting is to be designed in accordance with the Landscape design planning scheme policy requirements including the minimum plant growing media environment and irrigation.
- A reticulated drip irrigation system to all planting areas, with drainage connected to the stormwater system; the irrigation system must be connected to a non-mains water source.
- Trees required to be retained are documented, integrated into landscape design, and protected in accordance with the relevant sections of Australian Standard AS4970 Protection of trees on development sites.
- Details of a 12 week establishment period.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
A detailed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
19(b) Multiple Unit Dwelling

In addition to the requirements listed above, the plan must include the following:
- Deep planting areas as shown on the approved drawings planted with trees capable of growing to a minimum canopy diameter of 5m and a minimum height of 5m within 5 years of planting noting that this is a minimum requirement and trees are expected to grow beyond these measurements.
- Columnar canopy form or screening tree/shrub species planted at suitable spacings alongside and rear boundaries in planting areas shown on the approved drawings.
- Shade and/or round canopy trees planted at suitable spacings along front boundaries in planting areas shown on the approved drawings.
- Shade and/or round canopy trees in car parking areas in planting areas shown on the approved drawings.
- One hose cock within any private landscape and recreation area.
Container planting:
- The container planting design must be undertaken by an experienced local (Queensland) firm accredited in this speciality.
- The container planting design is to include suitable plant species, soil depths/growing media, weekly watering consumption for irrigation and annual maintenance schedule as outlined in the Landscape design planning scheme policy requirements.

- All vertical screening structures are to be integrated into the building structural design and are to include at least two different plant species types to ensure long term coverage and screening to adjoining.


Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
A detailed landscape plan and detailed container planting design plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
19(c) Certify Detailed Landscape Plan

On completion of the Detailed Landscape Plan and Detailed Container Planting Plan, submit to Development Services:
- Brisbane City Council Form CC10616 - Landscape Design Certificate prepared by a qualified Landscape Architect to certify that the Detailed Landscape Plan and Container planting design complies with the requirements of this condition
- A copy of the certified Detailed Landscape Plan/Detailed Container Planting Plan.

Timing: Prior to building work commencing.

PROOF OF FULFILMENT
A detailed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to building work commencing.

 
As indicated
19(d) Implement Certified Detailed Landscape Plan

Carry out the landscape work in accordance with the above certified detailed Landscape Plan and detailed container planting.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
19(e) Certify Work

On completion of the landscape work, submit to Development Services:
- Brisbane City Council Form CC10613 - Landscape Works Certificate prepared by a qualified Landscape Architect or licensed Landscape Contractor to certify the completed landscape work and construction complies with the certified Detailed Landscape Plan/Detailed Container Planting.
- Certification of irrigation design including irrigation tank size by an Irrigation Association of Australia certified irrigation designer, holding a Diploma of Irrigation
Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
An as constructed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
19(f) Maintain Landscape Work

Maintain the landscape work, including deep planting and container planting, in accordance with the certified Detailed Landscape Plan and Container planting design.

Timing: To be maintained.

 
As indicated
 
Engineering
 
Timing
20)   On-site Erosion (Medium Risk)

Manage on-site erosion and the release of sediment or sediment laden water from the site at all times by implementing best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version).

Timing: Prior to commencement of any land disturbing activities and until all exposed soil areas are permanently stabilised against erosion.

 
As indicated
20(a) Manage earth disturbance on- site

(i) Drainage control measures must be implemented and maintained to minimise water flow onto areas of exposed earth.

(ii) Sediment and erosion control measures must be implemented and maintained to prevent soil loss from earth disturbance areas and prevent deposition beyond earth disturbance areas.

(iii) No release of contaminants to land beyond on-site area of earth disturbance other than releases that achieve water pollutant concentration release limits of:

A. 50mg/L TSS (Total Suspended Solids);

B. Turbidity, Nephelometric Turbidity Units (NTU) value less than 10% above background, 75 NTU, or as agreed in writing by an Officer from Councils Erosion and Sediment Control (ESC) Team in Compliance and Regulatory Services;

C. pH between 6.5 and 8.5 at all times.

(iv) Maintain a written record to demonstrate that water discharges from the site, including any dewatering operations, meet the release limits as detailed in (iii) for water discharge(s) from the site that occur during or immediately after a rainfall event, and during normal business hours. The water quality of the discharge flows must be measured at each discharge point from the site, including but not limited to sediment basin outlets, other applicable sediment control devices, the site water drainage system, and recorded against the release limits at least once on each calendar day until such discharge stops.

Timing: Prior to commencement of any earth disturbing activities and until all exposed soil areas are permanently stabilised against erosion.

 
As indicated
20(b) Provide Land Occupier Notification to Council

(i) Notify Council's ESC Team of proposed land occupier/s by sending an email to CARS-ESC@Brisbane.qld.gov.au

(ii) If the land is to be occupied by any person other than the registered landowner then advice must be provided to Council that confirms the name, contact information and the duration of any proposed occupation of the land.

Timing: Prior to commencement of any earth disturbing activities.

 
As indicated
20(c) Prepare Erosion and Sediment Control Plan

Prepare an Erosion and Sediment Control Plan (ESCP) in accordance with best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version) and, to the extent of any inconsistency, relevant Brisbane Planning Scheme Codes and Policies.

Obtain a design certificate in accordance with the relevant Brisbane Planning Scheme Codes and Policies.

The ESCP and design certificate must be certified by a Certified Professional in Erosion and Sediment Control (CPESC) or a Registered Professional Engineer Qld (RPEQ) with suitable qualifications and experience in erosion and sediment control.

Documentary evidence demonstrating appropriate qualifications in erosion and sediment control must be provided to the Council upon request.

Timing: Prior to the commencement of any earth disturbing activities.

 
As indicated
20(d) Attend a pre-start meeting

Arrange and attend a pre-start meeting for Erosion and Sediment Team, Compliance and Regulatory Services (CARS).

All relevant documentation, including the certified erosion and sediment control plan and the certified design certificate must be submitted with the request.

Note: To request a pre-start meeting refer to Council's website and search 'Pre-start meeting'.

- A minimum 10 working days' notice is required.

Timing: Prior to the commencement of any earth disturbing activities.

 
As indicated
20(e) Implement Certified Erosion and Sediment Control Plan

Implement the certified ESCP and maintain all ESC measures in accordance with best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version) and, to the extent of any inconsistency, relevant Brisbane Planning Scheme Codes and Policies.

The ESCP and design certificate must be available on site at all times for inspection by Council officers. Any alteration to supplementary or Type 3 ESC measures must be reflected in the certified ESCP. Any alteration to Type 2 or Type 1 ESC measures will require a revised ESCP and design certificate that has been certified by either the CPESC or RPEQ.

Timing: While earth disturbing activities are occurring and until all exposed soil areas are permanently stabilised against erosion.

 
As indicated
 
21)   Information Signage

Erect an information sign on the subject property in accordance with Council's general requirements for signage and in accordance with the requirements outlined below:
a) The sign should provide a brief description of the development proposed;
b) The sign is to list the name, postal and/or email address and a contact telephone number for the following parties (where relevant) that are undertaking work on the site:
- Developer;
- Project Coordinator;
- Architect/Building Designer;
- Builder;
- Civil Engineer;
- Civil Contractor/s; and
- Landscape Architect;
c) The lettering on the sign is to be at least 25 millimetres in height, be of regular weight and in sentence case;
d) The sign is to be a minimum size of 1,200 millimetres by 900 millimetres;
e) The maximum area of the sign is to be 2.0m2;
f) The sign is to be positioned as follows:
- located centrally along road frontage of the site to Collings Street;
- located on or within 1.5 metres of the road frontage;
- mounted at least 300 millimetres above ground level; and
- clearly visible from the street for a pedestrian;
g) The sign is to contain no commercial or corporate advertising other than the name, logo or slogan of the parties outlined in part (b) of this condition;
h) The sign is to be non-illuminated; and
i) Both the sign and the supporting structure are to be made of weatherproof material and to be properly maintained at all times;

Timing: Prior to site works commencing and then to be maintained until completion of the development for all stages.

 
As indicated
 
22)   Engineering Pre-Start Meeting

Arrange and attend a pre-start meeting with Engineering Services, Development Services.

Council will only attend the pre-start meeting once all applicable compliance and inspection fees have been paid.

Note: Prior to arranging an engineering pre-start meeting, review the Pre-start Meeting Guidelines - Civil Engineering Works kit.

To request a pre-start meeting and associated lodgement requirements, refer to Council's website and search 'Pre- start meeting'.

Timing: Prior to site/operational/building work commencing.

 
As indicated
 
23)   Filling and / or Excavation

All earthworks must be carried out in accordance with the relevant Brisbane Planning Scheme Codes.

 
Prior to building work commencing
23(a) Submit Earthworks Drawings

Submit to, and obtain approval from, Development Services earthworks drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the approved DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes.

The Earthworks Drawings must include the following:
- The location of any cut and/or fill;
- The quantity of fill to be deposited and finished fill levels;
- Maintenance of access roads to and from the site such that they remain free of all fill material and are cleaned as necessary;
- The existing and future finished levels in reference to the Australian Height Datum (including cross- sections or long sections into the adjacent properties);
- Preservation of all drainage structures from the effects of structural loading generated by the earthworks;
- Protection of adjoining properties and roads from adverse impacts as a result of the works;
- That all vehicles exiting from the site will be cleaned and treated so as to prevent material being tracked or deposited on public roads.

Note: If the earthworks impact on the road reserve, the Developer must obtain applicable footpath and road permits prior to commencing any works. Such impacts may include footpath occupation, road closures, re-profiling, ground anchors and/or relocation of services. If the excavation has to be stabilised using ground anchors or similar, then the submitted plans must show the location of these in relation to all services. The cost of moving services, utilities and assets is the responsibility of the Developer. The permission of the service/utility/asset owner is required.

Note: Irrespective of final earthworks, it is the responsibility of the RPEQ to manage any staged works associated with Erosion & Sediment Control.

Timing: Prior to site/operational/building work commencing.

 
As indicated
23(b) Fill Material, Placement, Compaction and Testing

All fill material placed on the site must comprise only natural earth and rock and must be free of contaminants (as defined by Part 3, Division 2, Subdivision 2 Environmental contamination, Section 11 of the Environmental Protection Act 1994) and noxious, hazardous, deleterious and organic materials.

Fill material, placement, compaction and testing must comply with the requirements of Australian Standard - AS 3798, Guidelines on Earthworks for Commercial and Residential Developments.

Timing: While site/operational/building work is occurring.

 
As indicated
23(c) Implement Approved Earthworks Drawings

Construct and maintain the earthworks in accordance with the requirements of AS3798 and the approved earthworks drawings.

Timing: While site/operational/building work is occurring and then to be maintained.

 
As indicated
23(d) Submit As Constructed Drawings

Submit to Development Services As Constructed drawings prepared by a Registered Surveyor.

Timing: Prior to building work above ground commencing.

 
As indicated
23(e) Submit Certification

Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the approved earthworks drawings.

Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that all fill material used complies with the quality requirements of this condition and that placement, compaction and testing has been carried out in accordance with AS3798.

Timing: Prior to building work above ground commencing.

 
As indicated
 
24)   Basement Excavation and Support

Basement excavation and support of all exposed walls must be carried out in accordance with the relevant Brisbane Planning Scheme Codes and the requirements of this condition.

 
Prior to building work commencing
24(a) Prepare Engineering Drawings

Engineering drawings for the work required by this condition must be prepared and certified by a Registered Professional Engineer Queensland (Structural), in accordance with the relevant Brisbane Planning Scheme Codes detailing the design of the proposed excavation as well as proposed temporary and permanent support (if no temporary proposed) systems.

The design must include at least the following:
- The location (in plan and section) of the proposed excavation;
- Detailed design of proposed temporary support of the excavation;
- If no temporary support is proposed then detail design of the proposed permanent support of the excavation;
- Any retention system, including associated drainage, is to be wholly contained within the site unless written approval has been obtained from the affected neighbouring property owner;
- The existing and proposed finished levels in reference to the Australian Height Datum (including cross-sections or long sections into the adjacent properties);
- Preservation of all drainage structures from the effects of structural loading generated by the excavation;
- Protection of adjoining properties and roads from adverse impacts as a result of Building Works;
- All existing Brisbane City Council stormwater lines and Maintenance Holes, including depths of Maintenance Holes and clearances to retention structures is to be shown.
Where ground or rock anchors are proposed as a temporary support (Note: permanent anchors are not acceptable) the design must include the following in addition to the above:
- Anchor position/s and length/s (in elevation view and sectional view);
- Where the anchoring system is proposed to encroach into a neighbouring property, written approval is to be obtained from the affected property owner;
- Plans must show the location of the ground anchors in relation to all existing services and public utilities. The cost of relocating any existing services, public utilities or BCC assets is the responsibility of the Developer.

Notes:
- The Earthworks drawings are not required to be submitted for Council approval.
- Where any ground anchors or rock bolts are proposed within 10metres in the vertical plane of a UU sewer, UU water main, BCC stormwater line or combined sanitary drain, assessment will be required against the QDC section MP1.4 by the building certifier.
- Ground anchors are not to be located closer than 1.0m vertically or 1.0m horizontally from existing or proposed Council Infrastructure.
- If the basement excavation impacts on the road reserve, the developer must obtain applicable footpath and road permits prior to commencing any works. Such impacts may include footpath occupation, road closures, re-profiling, ground anchors and/or relocation of services.
- Where public utilities such as UU sewer or water infrastructure, electricity, telecommunication or gas infrastructure will be affected advice must be obtained from the respective utility owner.

Timing: Prior to site/operational/building work commencing.

 
As indicated
24(b) Implement Certified Engineering Drawings

Construct and maintain the basement excavation and proposed support system in accordance with the above certified engineering drawings.

Note: A copy of the certified engineering drawings must be available on- site for inspection by Council Officers during these works.

Timing: While basement excavation and support system installation is occurring.

 
As indicated
24(c) Submit Post Construction Certification

Submit certification by a Registered Professional Engineer Queensland that the basement excavation and support have been installed in compliance with the certified engineering drawings, the relevant Brisbane Planning Scheme Codes and the requirements of this condition.

Where ground or rock anchors have been installed, submit certification by a Registered Professional Engineer Queensland (Geo-technical) that all anchors have been de- stressed.

Timing: Prior to building work commencing above ground.

 
As indicated
 
25)   Construction Management Plan - Major

Carry out development in a method consistent with a Construction Management Plan (CMP) prepared in accordance with the requirements of this condition.

 
While site/operational/building work is occurring
25(a) Construction Management Plan - Submit Plan

Submit to, and obtain compliance approval from, Development Services a detailed Construction Management Plan for the site preparation, demolition, excavation and construction phases of the approved development. The Construction Management Plan must be in accordance with the relevant Brisbane Planning Scheme Codes and address the following matters, both internal to and external to the development site:

(i) Location of and impacts to any Council vegetation (i.e. street trees/park trees/garden beds)
(ii) Location of and impact to any trees/vegetation on adjoining properties, including mitigation of potential impacts;
(iii) Provision for DDA compliant pedestrian management;
(iv) Existing and proposed kerbside allocation signs and line marking (such as bus stops, loading zones and parking meters and/or ticket dispensers);
(v) Location of and impacts to any Council or other public utility assets;

(vi) Details of all proposed work zones and/or lane closures, including justification;
(vii) Location and design of temporary vehicular construction access points, including frequency of use;
(viii) Management and mitigation strategies for the impact of dust, noise and vibration upon adjoining and nearby properties;
(ix) Provision for loading and unloading materials including the location of any remote loading sites / truck layby sites;
(x) Location of materials, structures, plant and equipment to be stored or placed on the construction site;
(xi) Location of proposed external hoardings and/or gantries, and the impacts on existing street furniture and other assets located within the verge as well as impacts on any existing advertising signage located either along or adjacent to the site frontage - this includes any potential obstruction of sight lines for such advertising (e.g. bus stops with advertising);
(xii) Anticipated staging and programming;
(xiii) Complaint management processes to be implemented; and
(xiv) Compliance with the Management Plans Planning Scheme Policy and other relevant Planning Scheme Policies.

Note: Pre-approval of work zones and/or lane closures associated with construction of the development will be managed by Development Services however the Construction Management Plan must be supported by "approval in principle" or written approvals from other relevant Council sections or other governing bodies responsible for any other potentially impacted infrastructure.

The list of relevant infrastructure and contacts is available on Council's website - Search 'Constructions Management Plan'.

Timing: Prior to site/operational/building work commencing.

 
As indicated
25(b) Construction Management Plan - Dilapidation Report

Submit a dilapidation report to engineeringservices@brisbane.qld.gov.au detailing the pre-existing condition of the roadway, both footways, both verges and Council infrastructure, including vegetation, for 100m from the site entry in both directions or to the next street intersection (if less than 100m from the site entry) in both directions.

Timing: Prior to the pre-start meeting.

 
As indicated
25(c) Construction Management Plan - Documentation on Site

Legible copies of the approved Construction Management Plan and current permits must be kept on site and be made available on request by Council, at all times.

The requirements of the CMP must be included in all induction of principal and subcontractors utilised in the development. An outline of the induction provided to contractors may be requested by Council to confirm compliance with this condition.

Timing: While site/operational/building work is occurring.

 
As indicated
25(d) Construction Management Plan - Works to be Performed Out of Hours

Obtain an approval from Development Services for any work that is proposed to be undertaken outside of normal business hours - 6:30am to 6:30pm, Monday to Saturday.

Timing: Prior to site/operational/building work commencing.

 
As indicated
25(e) Construction Management Plan - Implement Plan

Carry out the development in accordance with the approved Construction Management Plan.

Timing: While site/operational/building work is occurring.

 
As indicated
 
26)   Protect Existing Infrastructure

Where there is existing infrastructure in the vicinity of the proposed work, the new work must not damage or compromise the working ability of the existing infrastructure.

Where alterations to public utility mains, existing mains, services or installations are necessitated by the development, prior to alterations commencing, the developer must notify Council or the relevant infrastructure provider and obtain agreement to the alterations.

The developer must meet the costs of the alterations. The alterations must be carried out in accordance with the relevant Brisbane Planning Scheme Codes or infrastructure providers requirements.

 
While site/operational/building work is occurring
26(a) As Constructed Drawings - Alterations to Existing Infrastructure

Submit to Development Services As Constructed drawings showing all new and/or rectification works and an asset register, prepared by a Registered Professional Engineer Queensland.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that the alterations have been completed in accordance with the relevant Brisbane Planning Scheme Codes and any other relevant infrastructure requirements. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
27)   Repair Damage to Kerb, Footpath or Road

Repair any damage to the existing kerb and channel, footpath or roadway (including removal of concrete slurry from footways, roads, kerb and channel, stormwater gullies and drainlines) and re-instate existing traffic signs and pavement markings that have been removed or damaged during any works carried out in association with the approved development.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
27(a) Interim Repairs

If at any time during the construction phase of the approved development, damage to the existing kerb and channel, footpath or roadway creates unsafe, unreasonable and/or not fit for purpose conditions as assessed by Council, interim repairs must be undertaken as directed by Program Planning and Integration.

Note: Any interim repairs required to be undertaken shall not be considered to satisfy the requirements of this condition for the permanent repair of the infrastructure prior to the issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

Timing: While site / operational / building works is occurring.

 
As indicated
 
28)   Retaining Walls

Design and construct all retaining walls and associated fences, in accordance with the relevant Brisbane Planning Scheme Codes and the following:

- All retaining walls including the footings, must be located wholly within the property boundaries of the site where works are occurring

- Runoff from surface drains and subsoil drainage associated with the retaining walls must be collected and connected to a lawful point of discharge (LPD) where possible. If no LPD is available the surface drains and sub-soil drainage must be designed, installed and discharged to ensure there is no ponding, nuisance or concentration of stormwater discharge to adjacent properties.

- Retaining walls to stabilise excavation must be set back from property boundaries to accommodate subsoil drainage without encroachment into the neighbouring property. This set back may vary depending on the height, structure and design of the retaining wall, surcharge loadings from neighbouring properties, and to provide a surface drain along the top of the retaining wall

- For retaining walls in excess of 1.0m in height:
- walls must be vertically and horizontally tiered by a ratio of 1:1 unless an alternative has been approved by Development Services
- walls must be designed and certified by a Registered Professional Engineer Queensland
- walls facing onto Council property (including the road reserve and parkland) must not be constructed from timber.

NOTE: Refer to City Plan 2014; Infrastructure Design Planning Scheme Policy (IDPSP) for Council’s definition of a LPD.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
28(a) Certification of Retaining Walls

For retaining walls over 1.0m in height, obtain certification from a Registered Professional Engineer Queensland that the design and construction of the retaining walls and ancillary drainage are in accordance with the requirements of this condition.

 
As indicated
 
29)   Access, Grades, Manoeuvring, Carparks, Signs and Line Marking

Construct and maintain access, parking and manoeuvring for vehicles on site in accordance with the relevant Brisbane Planning Scheme Codes, as indicated on the approved DRAWINGS AND DOCUMENTS, including the following:

i. A pavement of minimum Local road standard or equivalent surface material (including associated drainage) to the area on which motor vehicles will be driven and/or parked.

ii. Manoeuvring on site for an MRV and for the loading and unloading of vehicle(s);

iii. Parking on the site for 13 resident/tenant cars, 2 visitor cars and for the loading and unloading of vehicle(s) within the site. There must a minimum number of 15 spaces provided on site.

iv. Provide and maintain 6 residential secure bicycle parking spaces and 2 visitor bicycles spaces;

v. A minimum of 2.3 metres height clearance to all undercover parking areas, including the entry and access to these areas, and a minimum of 2.5 metres above parking spaces for people with disabilities. The minimum clear height must be measured to the lowest protrusion from the ceiling (e.g. fire sprinklers, services, lighting fixtures, signs, etc).

vi. A height clearance sign located at the entrance(s) to undercover car parking areas and a directional visitor parking sign clearly visible from the vehicle entrance to the site.

vii. An appropriate area for the storage and collection of refuse, including recyclables, in a position which is accessible to service vehicles on the site.

viii. Prepare and implement signs and line markings drawings that show the internal paved areas signed and delineated in accordance with the approved drawings and documents. The drawings must be prepared and certified by a Registered Professional Engineer Queensland in accordance with the relevant Brisbane Planning Scheme Codes and the Manual of Uniform Traffic Control Devices.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland, that the above requirements have been implemented in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first and then to be maintained.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
30)   Refuse Collection - Kerb Side (external road or internal private road)

Refuse and recycling bins for the development must be collected from the kerb side as shown on the APPROVED DRAWINGS AND DOCUMENTS.

Arrange for the installation of refuse/recycling bins and for the subsequent collection of refuse including recycling from the site by Brisbane City Council's Waste and Resource Recovery Services.

Timing: At the commencement of use and then to be maintained.

 
As indicated
 
31)   Refuse Storage - Kerb Side Collection

Provide a refuse storage area to accommodate the type and quantity of refuse and recycling bins required to service the development, as shown on the APPROVED DRAWINGS AND DOCUMENTS.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
32)   Ponding of Stormwater

Carry out the approved development to ensure that adjoining properties and roads are protected from ponding or nuisance from stormwater during construction.

Notes: If remedial works are necessary to comply with this condition, prior approval must be obtained from Development Services.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
33)   On Site Drainage - Minor

Provide a stormwater connection to all new or existing allotments and provide drainage infrastructure to ensure stormwater run-off from all roof and developed surface areas will be collected internally and piped in accordance with the relevant Brisbane Planning Scheme Codes to Collings Street.

Note:
- Guidance for the preparation of drawings and/or documents to comply with this condition is provided in the Brisbane Planning Scheme Policies.
- Queensland Building and Construction Commission licensed hydraulic consultants may design the stormwater system for sites less than 2000m2 with an upstream catchment servicing no more than 4 residential lots. This excludes stormwater drainage design (including subsoil drainage) of basements in flood planning areas and the design of any onsite stormwater detention system
- Where external works are required and infrastructure will be handed over to Council (e.g. Stormwater pipes 375mm or greater and/or manholes within the road reserve, etc), the applicant will be required to request a Pre-Start with Council and ensure all future owned Council assets follow the On/Off Maintenance process in accordance with Council's Infrastructure Installation & Construction Requirements Manual.

- Guidance for requesting a pre-start and co-ordinating the On/Off Maintenance process can be found on Council's website (https://www.brisbane.qld.gov.au/planning-and-building/applying-and-post- approval/on-and-off-maintenance-approvals).

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
34)   Service Conduits and Mains

Provide and install all service conduits and meet the cost of any alterations to public utility mains, existing mains, services, street lighting or installations that are required to carry out the approved development. These works must be in accordance with the relevant Brisbane Planning Scheme Codes, and include the following, where applicable:
- the provision of all services and/or conduits along the full length of any rear allotment access or access easement.
- the breaking and/or relocation of any existing sewer combine drains.
- the relocation of any fire hydrant and/or valves from the development's vehicular footway crossings.
- the retention and/or relocation of any existing foul water lines that currently exist within the site.
- any new or existing installations of electrical pillar boxes, pad mounted transformers (PMTs), water reticulation mains, water meters and the like, must be installed/relocated to their ultimate alignment relative to the new property boundary and clear of the usable footpath areas irrespective of the alignment of the existing services/conduits.

Note:
- The cost of moving services, utilities and assets is the responsibility of the Developer. The permission of the service, utility or asset owner will be required. Council permission is required if street trees, stormwater gullies/drains, and swales are affected. Urban Utilities permission is required if water supply and sewerage services are affected.
- Standard utility alignments may be found on Council's 'Brisbane Standard Drawings' 1013 to 1016 inclusive.
- Applicants must liaise with the appropriate service authorities. Typical underground services and/or conduits to be constructed include power, phone, telecommunications, sewer (including private combine drains) stormwater and gas, if applicable.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
34(a) Submit As Constructed Drawings

Submit to Development Services As Constructed drawings, including an asset register, prepared and certified by a Registered Professional Engineer Queensland.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the requirements of this condition. Note: Civil works are to be certified by a RPEQ(Civil) and electrical works are to be certified by a RPEQ (Electrical).

 
As indicated
 
35)   Telecommunications

Submit to Development Services, certification from an authorised telecommunications carrier/contractor, that the following works and infrastructure have been undertaken and installed in accordance with telecommunications industry standards:
- Provide telecommunications to the subject buildings, lead-in conduits and equipment space in a suitable location within the buildings, to suit the carrier of choice.
- If new pits and conduit infrastructure are required to be installed within the road reserve fronting the site, it must be suitably sized to cater for future installation of fibre optic cables.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
36)   Agreement with Electricity Supplier

Submit to Development Services, evidence of an agreement with an electricity supplier to provide necessary services to the development in accordance with the relevant Brisbane Planning Scheme Codes.

Where development is within an established area of overhead electricity supply and the electricity supplier determines that a property pole is the appropriate solution to supply electricity to the development, the developer must be responsible for the installation of the property pole(s).

In the above circumstances, submit to Development Services, certification from the developer's electrical consultant confirming that the above installation has been completed in accordance with the relevant AS/NZS Standards and the Queensland Electricity Connection Manual (QECM) and Queensland Electricity Metering Manual (QEMM).

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
37)   Redundant Driveway Crossover

Remove the redundant existing driveway crossover(s) on the frontage(s) of the site and reinstate the kerb and channel, road pavement, footways and footpaths in accordance with the relevant Brisbane Planning Scheme Codes.

Note:
For kerb and channel reinstatement, the existing channel is required to be removed and the kerb and channel reinstated in one pour.

Additional footway permits or lane closure permits may be required for footpath/verge closures and/or lane closures. These permits must be obtained prior to construction of the crossover.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
38)   Permanent Driveway Crossover

Provide a 6.3 metre wide modified Type B1 permanent driveway crossover to the Collings Street frontage of the site in accordance with the relevant Brisbane Planning Scheme Codes and located as shown on the approved DRAWINGS AND DOCUMENTS.

Written consent must be obtained from Program, Planning and Integration Arboriculture (PPI Arb) prior to any works occurring that will either impact on or require removal of a street tree (this includes pruning, excavation or fill within the root zone/canopy of the tree)

At all times during construction of the crossover, safe pedestrian access along the site frontage must be maintained.

Note: No further driveway permit is required however additional footway permits or lane closure permits may be required for footpath/verge closures and/or lane closures. These permits must be obtained prior to construction of the crossover.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
Standard Advice
 
Timing
39)   Construction Noise and Dust Emissions

Pursuant to the Environmental Protection Act 1994, all development involving the emission of noise and dust from building and/or construction activities, must ensure that the emissions are in accordance with the requirements of the Act.
The Environmental Protection Act 1994 prescribes that:

1. A person must not carry out building work in a way that makes an audible noise-
-  on a business day or Saturday, before 6.30a.m. or after 6.30p.m; or
-   on any other day, at any time. 
2. The reference in subsection (1) to a person carrying out building work-
-  includes a person carrying out building work under an owner-builder permit; and
-  otherwise does not include a person carrying out building work at premises used by the person only for residential purposes.

Note: A request can be made to work outside of these hours by submitting an Environmental Management Plan for assessment and obtaining an endorsed decision from the Environmental Management delegate Development Services.

 
As indicated
 
40)   Further Development Permit Required

Further Development Permit(s) to carry out assessable building work under the Building Act may be required.

 
As indicated
 
41)   Plumbing and Drainage Work

Pursuant to the Plumbing and Drainage Act 2018, any plumbing and drainage work must be carried out in compliance with the Plumbing and Drainage Regulation 2019.

Note: All new and existing plumbing services should be located within the lot that they serve.

Compliance assessable plumbing and drainage work requires approval by Brisbane City Council prior to the work being carried out.

 
As indicated
 
42)   Currency Period

The currency period for this development approval is stated in the Decision Notice and is expressed as a date.

This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016.

 
As indicated
 
43)   Damage to Trees on Adjoining Land

Please note that any damage caused to vegetation on adjoining land as a result of exercising this development approval may result in an offence under other legislation (e.g. Natural Assets Local Law) and/or civil action

 
As indicated
 
44)   Fire Ant Movement Controls

To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected.

These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products.

Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014.

For further information contact the relevant Queensland State Government department on 13 QGOV.

 
As indicated
 
45)   Water and Wastewater

Services for water and wastewater (sewerage) are not under the jurisdiction of Brisbane City Council. Authorisation to connect the approved development to the water/wastewater networks and for property service connections required a Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009.

For further information about any necessary Water Approvals contact Urban Utilities.

 
As indicated
 
46)   Cultural Heritage

Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage.

 

The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care.

 

For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships).

 
As indicated
 



Permit to Which These Conditions Relate: DA - PA - Building Work
Activity(ies): multiple dwelling
Stage: Multiple Dwelling (6 units)

General/Planning Requirements
 
Timing
47)   Building Format Plan

Where the timing of a condition, or part thereof , states 'Prior to issue of Certificate of Occupancy/Final Inspection Certificate' or 'Prior to commencement of use' and the development involves the creation of a Building Format Plan, the timing of the condition, or part thereof, is taken to mean 'prior to Council's endorsement of any plan of subdivision'.

 
As indicated
 
48)   Maintain the Approved Development

Maintain the approved development in accordance with the approved DRAWINGS AND DOCUMENTS, and any other relevant Council approval required by the conditions.

 
At all times
 
49)   Approved Drawings and Documents

A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers.

Note: This condition is imposed to ensure compliance with the conditions of development approval.

 
While site/operational/building work is occurring
 
50)   Carry Out the Approved Development

Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks). Permission to enter neighbouring properties must be obtained from the relevant property owners.

 
While site/operational/building work is occurring
 
51)   Complete All Building Work

Complete all building work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such building work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: Building work must also be completed in accordance with any other current development approval.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
52)   Visitor Parking

Visitor car parking spaces must:
- Be clearly labelled as 'Visitor Parking';
- Remain unimpeded by landscaping, water tanks, storage (temporary or otherwise), gates or any other fitting, fixture or structure; and
- Access to the visitor parking beyond the security gate as shown on the approved drawings and documents must be in accordance with the following:

  • Remain open during the hours between 6:00am and 6:00pm daily.
  • Allow bona fide visitors 24-hour unrestricted access to the visitor parking spaces via the electronic access control system as identified on the approve drawings and documents.
  • The electronic access control system is to be identifiable in a position which can be easily and efficiently accessed whilst a vehicle is standing.
 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
53)   Security Lighting - On Site

Install and maintain a suitable system of security lighting to operate from dusk to dawn within all areas where the public may gain access, including car parking areas, internal pathways, building entrances and vegetated areas. Lighting of publicly accessible internal areas is in accordance with Australian Standard - AS/NZS 1158.3.1 Lighting for roads and public spaces - Pedestrian area lighting - Performance and design requirements.

All external lighting within the site is in accordance with Australian Standard - AS4282- Control of the Obtrusive Effects of Outdoor Lighting.

Lighting must be maintained in safe and good working order.

Timing: 'Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained’.

 
As indicated
 
54)   Attend a pre-start meeting

Arrange and attend a pre-start meeting with Building and Construction Management Team, Development Services.

Council will only attend the pre-start meeting once all applicable compliance fees have been paid.

Note: To request a pre-start meeting and associated lodgement requirements, refer to Council's website and search 'Pre-start meeting'.

Timing: Prior to site/operational/building work commencing.

 
As indicated
 
55)   Car Parking

The car parking within the premises must be maintained exclusively for the ancillary use of the development. The parking must not be made available to the general public and there must not be signage erected on or in the vicinity of the site advertising the availability of car parking to the general public.

 
At all times
 
56)   Erect Screen Fence

Erect a screen fence along the northern and southern boundary of the site as shown on the approved DRAWINGS AND DOCUMENTS.

The screen fence must be maximum 1.8 metres in height, and be constructed from solid material.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
Architecture
 
Timing
57)   External Details

External details of the building, facade treatment and external materials and finishes must be consistent with the approved DRAWINGS AND DOCUMENTS.

Note: The requirement to use particular materials and finishes is imposed only for the purpose of achieving a built form outcome that displays architectural merit. Council has not assessed the materials and finishes for compliance with the Building Act, the Building Fire Safety Regulation, the Building Regulation, the Building Code of Australia, the Queensland Development Code, relevant Australian Standards, fire safety standards or any other relevant requirement of a statutory authority with regard to building work.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
58)   Overall Height

The overall height of the building(s) must be in accordance with the floor and roof levels and overall height shown on the APPROVED DRAWINGS AND DOCUMENTS.

 
While site/operational/building work is occurring and then to be maintained
58(a) Submit Certification

Submit to Development Services certification from a Registered Surveyor (Qld) confirming that the 'as constructed' floor and roof levels and overall height are in accordance with the requirements of this condition.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
59)   Light Reflectivity and Solar (Heat) Reflectivity

Submit to Development Services documentary evidence that the level of light reflectivity from the glazing incorporated in the approved development does not exceed 20%.

Timing: Prior to building work above ground level commencing.

 
As indicated
59(a) Install Glazing

Install and maintain glazing in accordance with the above specification.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained.

 
As indicated
 
60)   Driveway Material and Finishes

Provide materials and finishes to the driveway and external carparking surfaces that reduce the visual impact of these areas when viewed from the street. One or a combination of the following must be used:

-  Coloured aggregate;

-   Concrete pavers; and/or

-  Banding and patterns in the surface design.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
61)   Balconies/Verandahs/Terraces

No balconies/verandahs/terraces may be enclosed with solid balustrades, solid walls, fixed and/or operable, moveable or adjustable screening unless these features are clearly shown on the APPROVED DRAWINGS AND DOCUMENTS.

Note: Any Community Management Statement that may apply to this approval must contain a by-law which reflects the requirements of this condition.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
62)   Screen Air Conditioning and Other Plant Enclosures

Install and maintain suitable screening to all air conditioning units, lift motor rooms, hot water systems plant and service facilities where externally visible or located on top of the building including where visible and/or located within private open space areas, communal open space areas, adjoining properties or public land. The screening structures must be constructed from durable materials that are consistent with materials used elsewhere on the facade of the building.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
63)   Screening

Provide suitable privacy screening to windows of balconies, landings, terraces and decks of the proposed dwelling(s) in accordance with the approved DRAWINGS AND DOCUMENTS.

Suitable screening options must be:

For windows:
- Sill heights of 1.5m above floor level; or
- Fixed obscure glazing in any part of the window below 1.5m above floor level; or
- Fixed external screens to any part of the window below 1.5m above floor level, or
- Fencing to a minimum 1.8m above ground floor level (only applies to overlooking from windows at ground floor level).

For balconies, landings, terraces and decks:
- Fixed screening from floor level to a height of 1.5m above floor level.

Note: Screening devices must be either solid translucent screens, perforated or slatted panels, or fixed louvres that are permanent, be durable and fixed. Screening devices must have a maximum of 25% openings, with a maximum opening of 50mm.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
Landscape Architecture and Open Space Planning
 
Timing
64)   Streetscape Works - Neighbourhood Street Minor

Carry out streetscape improvement works to the Collings Street verge to a Neighbourhood Street Minor standard in accordance with the relevant Brisbane Planning Scheme Codes, Brisbane Standard Drawings (BSD), the requirements of this condition and the Infrastructure Design Planning Scheme Policy including sections 3.7.4.4 and 3.7.5.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
64(a) Concrete Path

Install a 1.2m wide broom finished standard Portland grey concrete path.

The edge of the path is to be setback approximately 850mm from the back of kerb. Where the path cannot be installed on this alignment due to conflicts such as street trees, or power poles, ensure the path is installed a minimum distance of:

- approximately 350mm from the property boundary
- 600mm from the edge of the conflict

If the above requirements cannot be achieved, contact the Landscape Architecture Team via email: specialistservices@brisbane.qld.gov.au.

Transition to existing paths on verges that adjoin the development. The transition is to occur fronting the adjoining developments, not the subject site.

Note: standard path alignments are shown on Brisbane Standard Drawing BSD-5201 sheet 2 but will vary depending on verge width and location.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Photographic evidence of concrete path. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
64(b) Submit As-Constructed Drawings

Submit to Development Services As Constructed plans including an asset register, checked by a Registered Professional Engineer Queensland, certifying that the concrete path works have been completed in accordance with relevant Brisbane Planning Scheme Codes/Policies.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Asset register and As constructed drawings signed by an RPEQ. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
64(c) Turf

Install turf to the full width of the verge excluding any concrete path required by this condition.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Photographic evidence of installed turf. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
65)   Landscape the Site - Self Certification

Landscape the site in accordance with the requirements of this condition.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
65(a) Detailed Landscape Plan for Self- Certification

Prepare a Detailed Landscape Plan at a scale of 1:100 for all on-site landscape works including planting areas identified on the approved DRAWINGS AND DOCUMENTS. The plan must be prepared by a qualified Landscape Architect and must comply with the relevant Brisbane Planning Scheme Codes.

The plan must include the following:
- Planting media and mulch in accordance with AS4454 Composts, soil conditioners and mulches and AS 4419-2003 Soils for landscaping and garden use.
- Unless otherwise specified, trees provided as 45 litre stock or larger, staked and tied, and complying with Australian Standards.
- Plant selection and densities to achieve full surface coverage of garden beds within 2 years of planting.
- All podium/container planting is to be designed in accordance with the Landscape design planning scheme policy requirements including the minimum plant growing media environment and irrigation.
- A reticulated drip irrigation system to all planting areas, with drainage connected to the stormwater system; the irrigation system must be connected to a non-mains water source.
- Trees required to be retained are documented, integrated into landscape design, and protected in accordance with the relevant sections of Australian Standard AS4970 Protection of trees on development sites.
- Details of a 12 week establishment period.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
A detailed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
65(b) Multiple Unit Dwelling

In addition to the requirements listed above, the plan must include the following:
- Deep planting areas as shown on the approved drawings planted with trees capable of growing to a minimum canopy diameter of 5m and a minimum height of 5m within 5 years of planting noting that this is a minimum requirement and trees are expected to grow beyond these measurements.
- Columnar canopy form or screening tree/shrub species planted at suitable spacings alongside and rear boundaries in planting areas shown on the approved drawings.
- Shade and/or round canopy trees planted at suitable spacings along front boundaries in planting areas shown on the approved drawings.
- Shade and/or round canopy trees in car parking areas in planting areas shown on the approved drawings.
- One hose cock within any private landscape and recreation area.
Container planting:
- The container planting design must be undertaken by an experienced local (Queensland) firm accredited in this speciality.
- The container planting design is to include suitable plant species, soil depths/growing media, weekly watering consumption for irrigation and annual maintenance schedule as outlined in the Landscape design planning scheme policy requirements.

- All vertical screening structures are to be integrated into the building structural design and are to include at least two different plant species types to ensure long term coverage and screening to adjoining.


Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
A detailed landscape plan and detailed container planting design plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
65(c) Certify Detailed Landscape Plan

On completion of the Detailed Landscape Plan and Detailed Container Planting Plan, submit to Development Services:
- Brisbane City Council Form CC10616 - Landscape Design Certificate prepared by a qualified Landscape Architect to certify that the Detailed Landscape Plan and Container planting design complies with the requirements of this condition
- A copy of the certified Detailed Landscape Plan/Detailed Container Planting Plan.

Timing: Prior to building work commencing.

PROOF OF FULFILMENT
A detailed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to building work commencing.

 
As indicated
65(d) Implement Certified Detailed Landscape Plan

Carry out the landscape work in accordance with the above certified detailed Landscape Plan and detailed container planting.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
65(e) Certify Work

On completion of the landscape work, submit to Development Services:
- Brisbane City Council Form CC10613 - Landscape Works Certificate prepared by a qualified Landscape Architect or licensed Landscape Contractor to certify the completed landscape work and construction complies with the certified Detailed Landscape Plan/Detailed Container Planting.
- Certification of irrigation design including irrigation tank size by an Irrigation Association of Australia certified irrigation designer, holding a Diploma of Irrigation
Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
An as constructed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
65(f) Maintain Landscape Work

Maintain the landscape work, including deep planting and container planting, in accordance with the certified Detailed Landscape Plan and Container planting design.

Timing: To be maintained.

 
As indicated
 
Engineering
 
Timing
66)   On-site Erosion (Medium Risk)

Manage on-site erosion and the release of sediment or sediment laden water from the site at all times by implementing best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version).

Timing: Prior to commencement of any land disturbing activities and until all exposed soil areas are permanently stabilised against erosion.

 
As indicated
66(a) Manage earth disturbance on- site

(i) Drainage control measures must be implemented and maintained to minimise water flow onto areas of exposed earth.

(ii) Sediment and erosion control measures must be implemented and maintained to prevent soil loss from earth disturbance areas and prevent deposition beyond earth disturbance areas.

(iii) No release of contaminants to land beyond on-site area of earth disturbance other than releases that achieve water pollutant concentration release limits of:

A. 50mg/L TSS (Total Suspended Solids);

B. Turbidity, Nephelometric Turbidity Units (NTU) value less than 10% above background, 75 NTU, or as agreed in writing by an Officer from Councils Erosion and Sediment Control (ESC) Team in Compliance and Regulatory Services;

C. pH between 6.5 and 8.5 at all times.

(iv) Maintain a written record to demonstrate that water discharges from the site, including any dewatering operations, meet the release limits as detailed in (iii) for water discharge(s) from the site that occur during or immediately after a rainfall event, and during normal business hours. The water quality of the discharge flows must be measured at each discharge point from the site, including but not limited to sediment basin outlets, other applicable sediment control devices, the site water drainage system, and recorded against the release limits at least once on each calendar day until such discharge stops.

Timing: Prior to commencement of any earth disturbing activities and until all exposed soil areas are permanently stabilised against erosion.

 
As indicated
66(b) Provide Land Occupier Notification to Council

(i) Notify Council's ESC Team of proposed land occupier/s by sending an email to CARS-ESC@Brisbane.qld.gov.au

(ii) If the land is to be occupied by any person other than the registered landowner then advice must be provided to Council that confirms the name, contact information and the duration of any proposed occupation of the land.

Timing: Prior to commencement of any earth disturbing activities.

 
As indicated
66(c) Prepare Erosion and Sediment Control Plan

Prepare an Erosion and Sediment Control Plan (ESCP) in accordance with best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version) and, to the extent of any inconsistency, relevant Brisbane Planning Scheme Codes and Policies.

Obtain a design certificate in accordance with the relevant Brisbane Planning Scheme Codes and Policies.

The ESCP and design certificate must be certified by a Certified Professional in Erosion and Sediment Control (CPESC) or a Registered Professional Engineer Qld (RPEQ) with suitable qualifications and experience in erosion and sediment control.

Documentary evidence demonstrating appropriate qualifications in erosion and sediment control must be provided to the Council upon request.

Timing: Prior to the commencement of any earth disturbing activities.

 
As indicated
66(d) Attend a pre-start meeting

Arrange and attend a pre-start meeting for Erosion and Sediment Team, Compliance and Regulatory Services (CARS).

All relevant documentation, including the certified erosion and sediment control plan and the certified design certificate must be submitted with the request.

Note: To request a pre-start meeting refer to Council's website and search 'Pre-start meeting'.

- A minimum 10 working days' notice is required.

Timing: Prior to the commencement of any earth disturbing activities.

 
As indicated
66(e) Implement Certified Erosion and Sediment Control Plan

Implement the certified ESCP and maintain all ESC measures in accordance with best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version) and, to the extent of any inconsistency, relevant Brisbane Planning Scheme Codes and Policies.

The ESCP and design certificate must be available on site at all times for inspection by Council officers. Any alteration to supplementary or Type 3 ESC measures must be reflected in the certified ESCP. Any alteration to Type 2 or Type 1 ESC measures will require a revised ESCP and design certificate that has been certified by either the CPESC or RPEQ.

Timing: While earth disturbing activities are occurring and until all exposed soil areas are permanently stabilised against erosion.

 
As indicated
 
67)   Information Signage

Erect an information sign on the subject property in accordance with Council's general requirements for signage and in accordance with the requirements outlined below:
a) The sign should provide a brief description of the development proposed;
b) The sign is to list the name, postal and/or email address and a contact telephone number for the following parties (where relevant) that are undertaking work on the site:
- Developer;
- Project Coordinator;
- Architect/Building Designer;
- Builder;
- Civil Engineer;
- Civil Contractor/s; and
- Landscape Architect;
c) The lettering on the sign is to be at least 25 millimetres in height, be of regular weight and in sentence case;
d) The sign is to be a minimum size of 1,200 millimetres by 900 millimetres;
e) The maximum area of the sign is to be 2.0m2;
f) The sign is to be positioned as follows:
- located centrally along road frontage of the site to Collings Street;
- located on or within 1.5 metres of the road frontage;
- mounted at least 300 millimetres above ground level; and
- clearly visible from the street for a pedestrian;
g) The sign is to contain no commercial or corporate advertising other than the name, logo or slogan of the parties outlined in part (b) of this condition;
h) The sign is to be non-illuminated; and
i) Both the sign and the supporting structure are to be made of weatherproof material and to be properly maintained at all times;

Timing: Prior to site works commencing and then to be maintained until completion of the development for all stages.

 
As indicated
 
68)   Engineering Pre-Start Meeting

Arrange and attend a pre-start meeting with Engineering Services, Development Services.

Council will only attend the pre-start meeting once all applicable compliance and inspection fees have been paid.

Note: Prior to arranging an engineering pre-start meeting, review the Pre-start Meeting Guidelines - Civil Engineering Works kit.

To request a pre-start meeting and associated lodgement requirements, refer to Council's website and search 'Pre- start meeting'.

Timing: Prior to site/operational/building work commencing.

 
As indicated
 
69)   Filling and / or Excavation

All earthworks must be carried out in accordance with the relevant Brisbane Planning Scheme Codes.

 
Prior to building work commencing
69(a) Submit Earthworks Drawings

Submit to, and obtain approval from, Development Services earthworks drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the approved DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes.

The Earthworks Drawings must include the following:
- The location of any cut and/or fill;
- The quantity of fill to be deposited and finished fill levels;
- Maintenance of access roads to and from the site such that they remain free of all fill material and are cleaned as necessary;
- The existing and future finished levels in reference to the Australian Height Datum (including cross- sections or long sections into the adjacent properties);
- Preservation of all drainage structures from the effects of structural loading generated by the earthworks;
- Protection of adjoining properties and roads from adverse impacts as a result of the works;
- That all vehicles exiting from the site will be cleaned and treated so as to prevent material being tracked or deposited on public roads.

Note: If the earthworks impact on the road reserve, the Developer must obtain applicable footpath and road permits prior to commencing any works. Such impacts may include footpath occupation, road closures, re-profiling, ground anchors and/or relocation of services. If the excavation has to be stabilised using ground anchors or similar, then the submitted plans must show the location of these in relation to all services. The cost of moving services, utilities and assets is the responsibility of the Developer. The permission of the service/utility/asset owner is required.

Note: Irrespective of final earthworks, it is the responsibility of the RPEQ to manage any staged works associated with Erosion & Sediment Control.

Timing: Prior to site/operational/building work commencing.

 
As indicated
69(b) Fill Material, Placement, Compaction and Testing

All fill material placed on the site must comprise only natural earth and rock and must be free of contaminants (as defined by Part 3, Division 2, Subdivision 2 Environmental contamination, Section 11 of the Environmental Protection Act 1994) and noxious, hazardous, deleterious and organic materials.

Fill material, placement, compaction and testing must comply with the requirements of Australian Standard - AS 3798, Guidelines on Earthworks for Commercial and Residential Developments.

Timing: While site/operational/building work is occurring.

 
As indicated
69(c) Implement Approved Earthworks Drawings

Construct and maintain the earthworks in accordance with the requirements of AS3798 and the approved earthworks drawings.

Timing: While site/operational/building work is occurring and then to be maintained.

 
As indicated
69(d) Submit As Constructed Drawings

Submit to Development Services As Constructed drawings prepared by a Registered Surveyor.

Timing: Prior to building work above ground commencing.

 
As indicated
69(e) Submit Certification

Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the approved earthworks drawings.

Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that all fill material used complies with the quality requirements of this condition and that placement, compaction and testing has been carried out in accordance with AS3798.

Timing: Prior to building work above ground commencing.

 
As indicated
 
70)   Basement Excavation and Support

Basement excavation and support of all exposed walls must be carried out in accordance with the relevant Brisbane Planning Scheme Codes and the requirements of this condition.

 
Prior to building work commencing
70(a) Prepare Engineering Drawings

Engineering drawings for the work required by this condition must be prepared and certified by a Registered Professional Engineer Queensland (Structural), in accordance with the relevant Brisbane Planning Scheme Codes detailing the design of the proposed excavation as well as proposed temporary and permanent support (if no temporary proposed) systems.

The design must include at least the following:
- The location (in plan and section) of the proposed excavation;
- Detailed design of proposed temporary support of the excavation;
- If no temporary support is proposed then detail design of the proposed permanent support of the excavation;
- Any retention system, including associated drainage, is to be wholly contained within the site unless written approval has been obtained from the affected neighbouring property owner;
- The existing and proposed finished levels in reference to the Australian Height Datum (including cross-sections or long sections into the adjacent properties);
- Preservation of all drainage structures from the effects of structural loading generated by the excavation;
- Protection of adjoining properties and roads from adverse impacts as a result of Building Works;
- All existing Brisbane City Council stormwater lines and Maintenance Holes, including depths of Maintenance Holes and clearances to retention structures is to be shown.
Where ground or rock anchors are proposed as a temporary support (Note: permanent anchors are not acceptable) the design must include the following in addition to the above:
- Anchor position/s and length/s (in elevation view and sectional view);
- Where the anchoring system is proposed to encroach into a neighbouring property, written approval is to be obtained from the affected property owner;
- Plans must show the location of the ground anchors in relation to all existing services and public utilities. The cost of relocating any existing services, public utilities or BCC assets is the responsibility of the Developer.

Notes:
- The Earthworks drawings are not required to be submitted for Council approval.
- Where any ground anchors or rock bolts are proposed within 10metres in the vertical plane of a UU sewer, UU water main, BCC stormwater line or combined sanitary drain, assessment will be required against the QDC section MP1.4 by the building certifier.
- Ground anchors are not to be located closer than 1.0m vertically or 1.0m horizontally from existing or proposed Council Infrastructure.
- If the basement excavation impacts on the road reserve, the developer must obtain applicable footpath and road permits prior to commencing any works. Such impacts may include footpath occupation, road closures, re-profiling, ground anchors and/or relocation of services.
- Where public utilities such as UU sewer or water infrastructure, electricity, telecommunication or gas infrastructure will be affected advice must be obtained from the respective utility owner.

Timing: Prior to site/operational/building work commencing.

 
As indicated
70(b) Implement Certified Engineering Drawings

Construct and maintain the basement excavation and proposed support system in accordance with the above certified engineering drawings.

Note: A copy of the certified engineering drawings must be available on- site for inspection by Council Officers during these works.

Timing: While basement excavation and support system installation is occurring.

 
As indicated
70(c) Submit Post Construction Certification

Submit certification by a Registered Professional Engineer Queensland that the basement excavation and support have been installed in compliance with the certified engineering drawings, the relevant Brisbane Planning Scheme Codes and the requirements of this condition.

Where ground or rock anchors have been installed, submit certification by a Registered Professional Engineer Queensland (Geo-technical) that all anchors have been de- stressed.

Timing: Prior to building work commencing above ground.

 
As indicated
 
71)   Construction Management Plan - Major

Carry out development in a method consistent with a Construction Management Plan (CMP) prepared in accordance with the requirements of this condition.

 
While site/operational/building work is occurring
71(a) Construction Management Plan - Submit Plan

Submit to, and obtain compliance approval from, Development Services a detailed Construction Management Plan for the site preparation, demolition, excavation and construction phases of the approved development. The Construction Management Plan must be in accordance with the relevant Brisbane Planning Scheme Codes and address the following matters, both internal to and external to the development site:

(i) Location of and impacts to any Council vegetation (i.e. street trees/park trees/garden beds)
(ii) Location of and impact to any trees/vegetation on adjoining properties, including mitigation of potential impacts;
(iii) Provision for DDA compliant pedestrian management;
(iv) Existing and proposed kerbside allocation signs and line marking (such as bus stops, loading zones and parking meters and/or ticket dispensers);
(v) Location of and impacts to any Council or other public utility assets;

(vi) Details of all proposed work zones and/or lane closures, including justification;
(vii) Location and design of temporary vehicular construction access points, including frequency of use;
(viii) Management and mitigation strategies for the impact of dust, noise and vibration upon adjoining and nearby properties;
(ix) Provision for loading and unloading materials including the location of any remote loading sites / truck layby sites;
(x) Location of materials, structures, plant and equipment to be stored or placed on the construction site;
(xi) Location of proposed external hoardings and/or gantries, and the impacts on existing street furniture and other assets located within the verge as well as impacts on any existing advertising signage located either along or adjacent to the site frontage - this includes any potential obstruction of sight lines for such advertising (e.g. bus stops with advertising);
(xii) Anticipated staging and programming;
(xiii) Complaint management processes to be implemented; and
(xiv) Compliance with the Management Plans Planning Scheme Policy and other relevant Planning Scheme Policies.

Note: Pre-approval of work zones and/or lane closures associated with construction of the development will be managed by Development Services however the Construction Management Plan must be supported by "approval in principle" or written approvals from other relevant Council sections or other governing bodies responsible for any other potentially impacted infrastructure.

The list of relevant infrastructure and contacts is available on Council's website - Search 'Constructions Management Plan'.

Timing: Prior to site/operational/building work commencing.

 
As indicated
71(b) Construction Management Plan - Dilapidation Report

Submit a dilapidation report to engineeringservices@brisbane.qld.gov.au detailing the pre-existing condition of the roadway, both footways, both verges and Council infrastructure, including vegetation, for 100m from the site entry in both directions or to the next street intersection (if less than 100m from the site entry) in both directions.

Timing: Prior to the pre-start meeting.

 
As indicated
71(c) Construction Management Plan - Documentation on Site

Legible copies of the approved Construction Management Plan and current permits must be kept on site and be made available on request by Council, at all times.

The requirements of the CMP must be included in all induction of principal and subcontractors utilised in the development. An outline of the induction provided to contractors may be requested by Council to confirm compliance with this condition.

Timing: While site/operational/building work is occurring.

 
As indicated
71(d) Construction Management Plan - Works to be Performed Out of Hours

Obtain an approval from Development Services for any work that is proposed to be undertaken outside of normal business hours - 6:30am to 6:30pm, Monday to Saturday.

Timing: Prior to site/operational/building work commencing.

 
As indicated
71(e) Construction Management Plan - Implement Plan

Carry out the development in accordance with the approved Construction Management Plan.

Timing: While site/operational/building work is occurring.

 
As indicated
 
72)   Protect Existing Infrastructure

Where there is existing infrastructure in the vicinity of the proposed work, the new work must not damage or compromise the working ability of the existing infrastructure.

Where alterations to public utility mains, existing mains, services or installations are necessitated by the development, prior to alterations commencing, the developer must notify Council or the relevant infrastructure provider and obtain agreement to the alterations.

The developer must meet the costs of the alterations. The alterations must be carried out in accordance with the relevant Brisbane Planning Scheme Codes or infrastructure providers requirements.

 
While site/operational/building work is occurring
72(a) As Constructed Drawings - Alterations to Existing Infrastructure

Submit to Development Services As Constructed drawings showing all new and/or rectification works and an asset register, prepared by a Registered Professional Engineer Queensland.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that the alterations have been completed in accordance with the relevant Brisbane Planning Scheme Codes and any other relevant infrastructure requirements. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
73)   Repair Damage to Kerb, Footpath or Road

Repair any damage to the existing kerb and channel, footpath or roadway (including removal of concrete slurry from footways, roads, kerb and channel, stormwater gullies and drainlines) and re-instate existing traffic signs and pavement markings that have been removed or damaged during any works carried out in association with the approved development.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
73(a) Interim Repairs

If at any time during the construction phase of the approved development, damage to the existing kerb and channel, footpath or roadway creates unsafe, unreasonable and/or not fit for purpose conditions as assessed by Council, interim repairs must be undertaken as directed by Program Planning and Integration.

Note: Any interim repairs required to be undertaken shall not be considered to satisfy the requirements of this condition for the permanent repair of the infrastructure prior to the issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

Timing: While site / operational / building works is occurring.

 
As indicated
 
74)   Retaining Walls

Design and construct all retaining walls and associated fences, in accordance with the relevant Brisbane Planning Scheme Codes and the following:

- All retaining walls including the footings, must be located wholly within the property boundaries of the site where works are occurring

- Runoff from surface drains and subsoil drainage associated with the retaining walls must be collected and connected to a lawful point of discharge (LPD) where possible. If no LPD is available the surface drains and sub-soil drainage must be designed, installed and discharged to ensure there is no ponding, nuisance or concentration of stormwater discharge to adjacent properties.

- Retaining walls to stabilise excavation must be set back from property boundaries to accommodate subsoil drainage without encroachment into the neighbouring property. This set back may vary depending on the height, structure and design of the retaining wall, surcharge loadings from neighbouring properties, and to provide a surface drain along the top of the retaining wall

- For retaining walls in excess of 1.0m in height:
- walls must be vertically and horizontally tiered by a ratio of 1:1 unless an alternative has been approved by Development Services
- walls must be designed and certified by a Registered Professional Engineer Queensland
- walls facing onto Council property (including the road reserve and parkland) must not be constructed from timber.

NOTE: Refer to City Plan 2014; Infrastructure Design Planning Scheme Policy (IDPSP) for Council’s definition of a LPD.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
74(a) Certification of Retaining Walls

For retaining walls over 1.0m in height, obtain certification from a Registered Professional Engineer Queensland that the design and construction of the retaining walls and ancillary drainage are in accordance with the requirements of this condition.

 
As indicated
 
75)   Access, Grades, Manoeuvring, Carparks, Signs and Line Marking

Construct and maintain access, parking and manoeuvring for vehicles on site in accordance with the relevant Brisbane Planning Scheme Codes, as indicated on the approved DRAWINGS AND DOCUMENTS, including the following:

i. A pavement of minimum Local road standard or equivalent surface material (including associated drainage) to the area on which motor vehicles will be driven and/or parked.

ii. Manoeuvring on site for an MRV and for the loading and unloading of vehicle(s);

iii. Parking on the site for 13 resident/tenant cars, 2 visitor cars and for the loading and unloading of vehicle(s) within the site. There must a minimum number of 15 spaces provided on site.

iv. Provide and maintain 6 residential secure bicycle parking spaces and 2 visitor bicycles spaces;

v. A minimum of 2.3 metres height clearance to all undercover parking areas, including the entry and access to these areas, and a minimum of 2.5 metres above parking spaces for people with disabilities. The minimum clear height must be measured to the lowest protrusion from the ceiling (e.g. fire sprinklers, services, lighting fixtures, signs, etc).

vi. A height clearance sign located at the entrance(s) to undercover car parking areas and a directional visitor parking sign clearly visible from the vehicle entrance to the site.

vii. An appropriate area for the storage and collection of refuse, including recyclables, in a position which is accessible to service vehicles on the site.

viii. Prepare and implement signs and line markings drawings that show the internal paved areas signed and delineated in accordance with the approved drawings and documents. The drawings must be prepared and certified by a Registered Professional Engineer Queensland in accordance with the relevant Brisbane Planning Scheme Codes and the Manual of Uniform Traffic Control Devices.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland, that the above requirements have been implemented in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first and then to be maintained.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
76)   Refuse Collection - Kerb Side (external road or internal private road)

Refuse and recycling bins for the development must be collected from the kerb side as shown on the APPROVED DRAWINGS AND DOCUMENTS.

Arrange for the installation of refuse/recycling bins and for the subsequent collection of refuse including recycling from the site by Brisbane City Council's Waste and Resource Recovery Services.

Timing: At the commencement of use and then to be maintained.

 
As indicated
 
77)   Refuse Storage - Kerb Side Collection

Provide a refuse storage area to accommodate the type and quantity of refuse and recycling bins required to service the development, as shown on the APPROVED DRAWINGS AND DOCUMENTS.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
78)   Ponding of Stormwater

Carry out the approved development to ensure that adjoining properties and roads are protected from ponding or nuisance from stormwater during construction.

Notes: If remedial works are necessary to comply with this condition, prior approval must be obtained from Development Services.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
79)   On Site Drainage - Minor

Provide a stormwater connection to all new or existing allotments and provide drainage infrastructure to ensure stormwater run-off from all roof and developed surface areas will be collected internally and piped in accordance with the relevant Brisbane Planning Scheme Codes to Collings Street.

Note:
- Guidance for the preparation of drawings and/or documents to comply with this condition is provided in the Brisbane Planning Scheme Policies.
- Queensland Building and Construction Commission licensed hydraulic consultants may design the stormwater system for sites less than 2000m2 with an upstream catchment servicing no more than 4 residential lots. This excludes stormwater drainage design (including subsoil drainage) of basements in flood planning areas and the design of any onsite stormwater detention system
- Where external works are required and infrastructure will be handed over to Council (e.g. Stormwater pipes 375mm or greater and/or manholes within the road reserve, etc), the applicant will be required to request a Pre-Start with Council and ensure all future owned Council assets follow the On/Off Maintenance process in accordance with Council's Infrastructure Installation & Construction Requirements Manual.

- Guidance for requesting a pre-start and co-ordinating the On/Off Maintenance process can be found on Council's website (https://www.brisbane.qld.gov.au/planning-and-building/applying-and-post- approval/on-and-off-maintenance-approvals).

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
80)   Service Conduits and Mains

Provide and install all service conduits and meet the cost of any alterations to public utility mains, existing mains, services, street lighting or installations that are required to carry out the approved development. These works must be in accordance with the relevant Brisbane Planning Scheme Codes, and include the following, where applicable:
- the provision of all services and/or conduits along the full length of any rear allotment access or access easement.
- the breaking and/or relocation of any existing sewer combine drains.
- the relocation of any fire hydrant and/or valves from the development's vehicular footway crossings.
- the retention and/or relocation of any existing foul water lines that currently exist within the site.
- any new or existing installations of electrical pillar boxes, pad mounted transformers (PMTs), water reticulation mains, water meters and the like, must be installed/relocated to their ultimate alignment relative to the new property boundary and clear of the usable footpath areas irrespective of the alignment of the existing services/conduits.

Note:
- The cost of moving services, utilities and assets is the responsibility of the Developer. The permission of the service, utility or asset owner will be required. Council permission is required if street trees, stormwater gullies/drains, and swales are affected. Urban Utilities permission is required if water supply and sewerage services are affected.
- Standard utility alignments may be found on Council's 'Brisbane Standard Drawings' 1013 to 1016 inclusive.
- Applicants must liaise with the appropriate service authorities. Typical underground services and/or conduits to be constructed include power, phone, telecommunications, sewer (including private combine drains) stormwater and gas, if applicable.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
80(a) Submit As Constructed Drawings

Submit to Development Services As Constructed drawings, including an asset register, prepared and certified by a Registered Professional Engineer Queensland.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the requirements of this condition. Note: Civil works are to be certified by a RPEQ(Civil) and electrical works are to be certified by a RPEQ (Electrical).

 
As indicated
 
81)   Telecommunications

Submit to Development Services, certification from an authorised telecommunications carrier/contractor, that the following works and infrastructure have been undertaken and installed in accordance with telecommunications industry standards:
- Provide telecommunications to the subject buildings, lead-in conduits and equipment space in a suitable location within the buildings, to suit the carrier of choice.
- If new pits and conduit infrastructure are required to be installed within the road reserve fronting the site, it must be suitably sized to cater for future installation of fibre optic cables.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
82)   Agreement with Electricity Supplier

Submit to Development Services, evidence of an agreement with an electricity supplier to provide necessary services to the development in accordance with the relevant Brisbane Planning Scheme Codes.

Where development is within an established area of overhead electricity supply and the electricity supplier determines that a property pole is the appropriate solution to supply electricity to the development, the developer must be responsible for the installation of the property pole(s).

In the above circumstances, submit to Development Services, certification from the developer's electrical consultant confirming that the above installation has been completed in accordance with the relevant AS/NZS Standards and the Queensland Electricity Connection Manual (QECM) and Queensland Electricity Metering Manual (QEMM).

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
83)   Redundant Driveway Crossover

Remove the redundant existing driveway crossover(s) on the frontage(s) of the site and reinstate the kerb and channel, road pavement, footways and footpaths in accordance with the relevant Brisbane Planning Scheme Codes.

Note:
For kerb and channel reinstatement, the existing channel is required to be removed and the kerb and channel reinstated in one pour.

Additional footway permits or lane closure permits may be required for footpath/verge closures and/or lane closures. These permits must be obtained prior to construction of the crossover.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
84)   Permanent Driveway Crossover

Provide a 6.3 metre wide modified Type B1 permanent driveway crossover to the Collings Street frontage of the site in accordance with the relevant Brisbane Planning Scheme Codes and located as shown on the approved DRAWINGS AND DOCUMENTS.

Written consent must be obtained from Program, Planning and Integration Arboriculture (PPI Arb) prior to any works occurring that will either impact on or require removal of a street tree (this includes pruning, excavation or fill within the root zone/canopy of the tree)

At all times during construction of the crossover, safe pedestrian access along the site frontage must be maintained.

Note: No further driveway permit is required however additional footway permits or lane closure permits may be required for footpath/verge closures and/or lane closures. These permits must be obtained prior to construction of the crossover.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
Standard Advice
 
Timing
85)   Construction Noise and Dust Emissions

Pursuant to the Environmental Protection Act 1994, all development involving the emission of noise and dust from building and/or construction activities, must ensure that the emissions are in accordance with the requirements of the Act.
The Environmental Protection Act 1994 prescribes that:

1. A person must not carry out building work in a way that makes an audible noise-
-  on a business day or Saturday, before 6.30a.m. or after 6.30p.m; or
-   on any other day, at any time. 
2. The reference in subsection (1) to a person carrying out building work-
-  includes a person carrying out building work under an owner-builder permit; and
-  otherwise does not include a person carrying out building work at premises used by the person only for residential purposes.

Note: A request can be made to work outside of these hours by submitting an Environmental Management Plan for assessment and obtaining an endorsed decision from the Environmental Management delegate Development Services.

 
As indicated
 
86)   Further Development Permit Required

Further Development Permit(s) to carry out assessable building work under the Building Act may be required.

 
As indicated
 
87)   Plumbing and Drainage Work

Pursuant to the Plumbing and Drainage Act 2018, any plumbing and drainage work must be carried out in compliance with the Plumbing and Drainage Regulation 2019.

Note: All new and existing plumbing services should be located within the lot that they serve.

Compliance assessable plumbing and drainage work requires approval by Brisbane City Council prior to the work being carried out.

 
As indicated
 
88)   Currency Period

The currency period for this development approval is stated in the Decision Notice and is expressed as a date.

This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016.

 
As indicated
 
89)   Damage to Trees on Adjoining Land

Please note that any damage caused to vegetation on adjoining land as a result of exercising this development approval may result in an offence under other legislation (e.g. Natural Assets Local Law) and/or civil action

 
As indicated
 
90)   Fire Ant Movement Controls

To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected.

These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products.

Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014.

For further information contact the relevant Queensland State Government department on 13 QGOV.

 
As indicated
 
91)   Water and Wastewater

Services for water and wastewater (sewerage) are not under the jurisdiction of Brisbane City Council. Authorisation to connect the approved development to the water/wastewater networks and for property service connections required a Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009.

For further information about any necessary Water Approvals contact Urban Utilities.

 
As indicated
 
92)   Cultural Heritage

Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage.

 

The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care.

 

For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships).

 
As indicated
 

** End of Package **