BRISBANE CITY COUNCIL'S APPROVAL PACKAGE.



APPLICATION DETAILS

This package relates to the application detailed below
Address of Site: 10 WYANDRA ST NEWSTEAD QLD 4006
18 WYANDRA ST NEWSTEAD QLD 4006
20 WYANDRA ST NEWSTEAD QLD 4006
Real Property Description of Site: L1 RP.170117
L101 SP.292337
LCommon Property SP.274453
Aspects of development and type of approval: DA - PA - Material Change of Use Development Permit - Extension,multiple dwelling
DA - PA - Building Work Development Permit - multiple dwelling,Extension
Council File Reference: A006989639
Permit Reference Number/s: DAMC449394424; DABW450026324.
Package Status: APPROVED - Version 2 (17th of June, 2026 4:40:33 PM)
Package Generated: 17/06/2026


PROJECT TEAM

The assessment of this application has been undertaken by:
Shirley MILLS
Senior Urban Planner
Planning Services North
Shirley.Mills@brisbane.qld.gov.au
3403 6117
Rhea CONNOLLY
Principal Urban Planner
Planning Services North
Rhea.Connolly@brisbane.qld.gov.au
3178 0651
Luke HADRICK
Urban Planner
Planning Services North
Luke.Hadrick@brisbane.qld.gov.au
(07) 3178 9403
Callan BENNETT
Principal Architect
Architecture Team
Callan.Bennett@brisbane.qld.gov.au
07 31780595
Carina FIESELER
Landscape Architect
Landscape Architecture Team
carina.fieseler@brisbane.qld.gov.au
3403 5235
Craig SLACK
Engineer
Engineering Scoping
craig.slack@brisbane.qld.gov.au
(07) 3403 8888
Rhea CONNOLLY
Principal Urban Planner
Planning Services North
Rhea.Connolly@brisbane.qld.gov.au
3178 0651
Llewellyn BATSON
Principal Urban Planner
Planning Services Special Assessment
Llewellyn.Batson@brisbane.qld.gov.au
(07) 340 34980
Scott RUHLAND
Technical Officer
Engineering Services North
scott.ruhland@brisbane.qld.gov.au
(07) 3403 9459
Carina FIESELER
Landscape Architect
Landscape Architecture Team
carina.fieseler@brisbane.qld.gov.au
3403 5235


DRAWINGS AND DOCUMENTS



The term 'drawings and documents' or similar expressions mean:
Drawing or Document Number Plan Date
Services Level Plan DA002 Issue C 26-MAR-2026 (Received)
Roof Terrace Plan DA003 Issue C 26-MAR-2026 (Received)
Roof Plan DA004 Issue C 26-MAR-2026 (Received)
Roof Terrace Section B-B DA007 Issue C 26-MAR-2026 (Received)
Elevation DA008 Issue A 26-MAR-2026 (Received)
Rooftop Landscape Concept Plan DA01 (Amended In Red 04-JUN-2026) 26-MAR-2026 (Received)


Advice

Please see the attached document(s) for any advices.

APPROVAL CONDITIONS



Permit to Which These Conditions Relate: DA - PA - Material Change of Use
Activity(ies): Extension
multiple dwelling
Stage: Multiple Dwelling (Extension to Multiple Dwelling)

General/Planning Requirements
 
Timing
1)   Maintain the Approved Development

Maintain the approved development in accordance with the approved DRAWINGS AND DOCUMENTS, and any other relevant Council approval required by the conditions.

 
At all times
 
2)   Original Condition Package

All conditions relating to the approval issued 24/02/2023 (A005729756), remain applicable, unless varied by this approval.

 
At all times
 
3)   Approved Drawings and Documents

A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers.

Note: This condition is imposed to ensure compliance with the conditions of development approval.

 
While site/operational/building work is occurring
 
4)   Carry Out the Approved Development

Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks). Permission to enter neighbouring properties must be obtained from the relevant property owners.

 
While site/operational/building work is occurring
 
5)   Complete All Building Work

Complete all building work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such building work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: Building work must also be completed in accordance with any other current development approval.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
Architecture
 
Timing
6)   Overall Height

The overall height of the building(s) must be in accordance with the floor and roof levels and overall height shown on the APPROVED DRAWINGS AND DOCUMENTS.

 
While site/operational/building work is occurring and then to be maintained
6(a) Submit Certification

Submit to Development Services certification from a Registered Surveyor (Qld) confirming that the 'as constructed' floor and roof levels and overall height are in accordance with the requirements of this condition.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
Standard Advice
 
Timing
7)   Construction Noise and Dust Emissions

Pursuant to the Environmental Protection Act 1994, all development involving the emission of noise and dust from building and/or construction activities, must ensure that the emissions are in accordance with the requirements of the Act.
The Environmental Protection Act 1994 prescribes that:

1. A person must not carry out building work in a way that makes an audible noise-
-  on a business day or Saturday, before 6.30a.m. or after 6.30p.m; or
-   on any other day, at any time. 
2. The reference in subsection (1) to a person carrying out building work-
-  includes a person carrying out building work under an owner-builder permit; and
-  otherwise does not include a person carrying out building work at premises used by the person only for residential purposes.

Note: A request can be made to work outside of these hours by submitting an Environmental Management Plan for assessment and obtaining an endorsed decision from the Environmental Management delegate Development Services.

 
As indicated
 
8)   Further Development Permit Required

Further Development Permit(s) to carry out assessable building work under the Building Act may be required.

 
As indicated
 
9)   Currency Period

The currency period for this development approval is stated in the Decision Notice and is expressed as a date.

This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016.

 
As indicated
 
10)   Equitable Access

Provision must be made during and after construction for equitable access for persons with disabilities to and within the site and on adjoining public areas, in accordance with the following:
- Queensland Anti-Discrimination Act 1991;
- Federal Disability Discrimination Act 1992;
- Australian Standards AS1428 Parts 1-4;
- Australian Standard for Access and Mobility; and
- National Construction Code.

 
As indicated
 



Permit to Which These Conditions Relate: DA - PA - Building Work
Activity(ies): multiple dwelling
Extension
Stage: Multiple Dwelling (Extension to Multiple Dwelling)

General/Planning Requirements
 
Timing
11)   Maintain the Approved Development

Maintain the approved development in accordance with the approved DRAWINGS AND DOCUMENTS, and any other relevant Council approval required by the conditions.

 
At all times
 
12)   Original Condition Package

All conditions relating to the approval issued 24/02/2023 (A005729756), remain applicable, unless varied by this approval.

 
At all times
 
13)   Approved Drawings and Documents

A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers.

Note: This condition is imposed to ensure compliance with the conditions of development approval.

 
While site/operational/building work is occurring
 
14)   Carry Out the Approved Development

Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks). Permission to enter neighbouring properties must be obtained from the relevant property owners.

 
While site/operational/building work is occurring
 
15)   Complete All Building Work

Complete all building work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such building work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: Building work must also be completed in accordance with any other current development approval.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
Standard Advice
 
Timing
16)   Construction Noise and Dust Emissions

Pursuant to the Environmental Protection Act 1994, all development involving the emission of noise and dust from building and/or construction activities, must ensure that the emissions are in accordance with the requirements of the Act.
The Environmental Protection Act 1994 prescribes that:

1. A person must not carry out building work in a way that makes an audible noise-
-  on a business day or Saturday, before 6.30a.m. or after 6.30p.m; or
-   on any other day, at any time. 
2. The reference in subsection (1) to a person carrying out building work-
-  includes a person carrying out building work under an owner-builder permit; and
-  otherwise does not include a person carrying out building work at premises used by the person only for residential purposes.

Note: A request can be made to work outside of these hours by submitting an Environmental Management Plan for assessment and obtaining an endorsed decision from the Environmental Management delegate Development Services.

 
As indicated
 
17)   Further Development Permit Required

Further Development Permit(s) to carry out assessable building work under the Building Act may be required.

 
As indicated
 
18)   Currency Period

The currency period for this development approval is stated in the Decision Notice and is expressed as a date.

This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016.

 
As indicated
 
19)   Equitable Access

Provision must be made during and after construction for equitable access for persons with disabilities to and within the site and on adjoining public areas, in accordance with the following:
- Queensland Anti-Discrimination Act 1991;
- Federal Disability Discrimination Act 1992;
- Australian Standards AS1428 Parts 1-4;
- Australian Standard for Access and Mobility; and
- National Construction Code.

 
As indicated
 

** End of Package **