| Address of Site: | 99 HARCOURT RD DARRA QLD 4076 |
| Real Property Description of Site: | L1 SP.261547 |
| Aspects of development and type of approval: | DA - PA - Reconfiguring a Lot Development Permit - Subdivision of Land DA - PA - Material Change of Use Preliminary Approval - Variation Request - medium impact industry,shop,park,warehouse,utility installation,telecommunications facility,service station,car wash,caretaker's accommodation,emergency services,food and drink outlet,service industry,renewable energy facility,research and technology industry,parking station,low impact industry,high impact industry DA - PA - Reconfiguring a Lot Development Permit - Subdivision of Land DA - PA - Reconfiguring a Lot Development Permit - Subdivision of Land |
| Council File Reference: | A007020621 Permit Reference Number/s: DARL422030922; DAMC422776622; DARL471703725; DARL471703825. |
| Package Status: | APPROVED - Version 4 (5th of June, 2026 1:20:47 PM) |
| Package Generated: | 05/06/2026 |
| Emma MEZZINA Team Manager Planning Services South Emma.Mezzina@brisbane.qld.gov.au 3178 0049 |
Justin LYNHAM Senior Urban Planner Planning Services South justin.lynham@brisbane.qld.gov.au 3407 1302 |
Margaret ORR Team Manager Planning Services South margaret.orr@brisbane.qld.gov.au (07) 34070751 |
| Justin LYNHAM Senior Urban Planner Planning Services South justin.lynham@brisbane.qld.gov.au 3407 1302 |
Kim ROGERS Principal Urban Planner Planning Services South kim.rogers@brisbane.qld.gov.au 34071304 |
Samuel GAY Senior Engineer Engineering Services South samuel.gay@brisbane.qld.gov.au (07) 3407 1801 |
| Tim WRAFTER Principal Engineer Engineering Services Hydraulics Tim.Wrafter@brisbane.qld.gov.au |
Glyn CHISHOLM Senior Landscape Architect Landscape Architecture Team Glyn.Chisholm@brisbane.qld.gov.au 07 3403 0117 |
Siobhan REITER Ecologist Ecology Services Siobhan.Reiter@brisbane.qld.gov.au 31782074 |
| Ben COVE Principal Engineer Engineering Services Traffic Ben.Cove@brisbane.qld.gov.au |
Fabrienne Michelle YU Principal Environmental Management Officer - Air Quality Environmental Management Services Michelle.Yu@brisbane.qld.gov.au 07 3403 0258 |
Bronwyn WILLIS Planning Paratech Planning Application Review Service bronwyn.willis@brisbane.qld.gov.au 3403 6710 |
| Alessio ZANCOLICH Principal Urban Planner Planning Services South alessio.zancolich@brisbane.qld.gov.au (07) 3407 8514 |
Samuel GAY Senior Engineer Engineering Services South samuel.gay@brisbane.qld.gov.au (07) 3407 1801 |
Sonia VENTURA Development Officer, Engineering Engineering Services South sonia.ventura@brisbane.qld.gov.au (07) 3403 4811 |
| Tim DWYER WaRRS Assessment Tim.Dwyer@brisbane.qld.gov.au |
Siobhan REITER Ecologist Ecology Services Siobhan.Reiter@brisbane.qld.gov.au 31782074 |
Fabrienne Michelle YU Principal Environmental Management Officer - Air Quality Environmental Management Services Michelle.Yu@brisbane.qld.gov.au 07 3403 0258 |
| Natasha GOULD Planning Paratech Trunk Infrastructure & Calculations natasha.gould@brisbane.qld.gov.au 31781742 |
Michael PICKERILL Network Planning Michael.Pickerill@brisbane.qld.gov.au |
Ben COVE Principal Engineer Engineering Services Traffic Ben.Cove@brisbane.qld.gov.au |
| Tim WRAFTER Principal Engineer Engineering Services Hydraulics Tim.Wrafter@brisbane.qld.gov.au |
Emily LAING Senior Landscape Architect Landscape Architecture Team Emily.Laing@brisbane.qld.gov.au 07 3403 8888 |
Hayley STEEL Team Manager (Acting) Planning Services Special Assessment Hayley.Steel@brisbane.qld.gov.au (07) 3178 0022 |
| Justin LYNHAM Senior Urban Planner Planning Services South justin.lynham@brisbane.qld.gov.au 3407 1302 |
BILJANA DE SOUSA Planning Paratech Planning Application Review Service biljana.desousa@brisbane.qld.gov.au 3403 4737 |
Diana SUN Urban Planner Planning Services South Diana.Sun@brisbane.qld.gov.au 0731785179 |
| Kathryn KELLY Principal Urban Planner Planning Services South kathryn.kelly@brisbane.qld.gov.au 07 3407 1308 |
Kim ROGERS Principal Urban Planner Planning Services South kim.rogers@brisbane.qld.gov.au 34071304 |
DRAWINGS AND DOCUMENTS
| Drawing or Document | Number | Plan Date |
|---|---|---|
| Zoning Plan | 25-0067S-04 Sheet No. 1 of 1 G | 28-MAY-2026 (Received) |
| Road Widening Plan | RC16154 issue 3 | 13-JUL-2022 |
| Harcourt Road Functional Layout Plan | 20058-SK33 Rev C (Amended In Red 02-JUN-2026) | 10-MAR-2023 (Received) |
| Concept Roadworks and Drainage Layout Plan | DA-0200 Revision B | 28-MAY-2026 (Received) |
| Plan of Reconfiguration Stage 3 | 25-0067S-02 3 of 3 H (Amended In Red 02-JUN-2026) | 28-MAY-2026 (Received) |
| Plan of Reconfiguration Stage 1 | 25-0067S-02 1 of 3 D | 16-DEC-2025 (Received) |
| Plan of Reconfiguration Stage 2 | 25-0067S-02 2 of 3 D | 16-DEC-2025 (Received) |
| Stormwater Management Plan | 24-0920SMP02-V4 | 28-MAY-2026 (Received) |
APPROVAL CONDITIONS
| Permit to Which These Conditions Relate: | DA - PA - Reconfiguring a Lot |
| Activity(ies): | Subdivision of Land |
| Stage: | Stage 1 - Reconfiguring a lot (1 into 1 lot) |
| 1) Approved Drawings and Documents A legible copy of the Council approved
DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained
on site and kept available for inspection by site workers and Council
officers. |
While site/operational/building work is occurring |
| 2) Carry Out the Approved Development Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS. Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks). Permission to enter neighbouring properties must be obtained from the relevant property owners. |
While site/operational/building work is occurring |
| 3) Demolish or Relocate Buildings/Structures Demolish or Relocate buildings/structures on the site in accordance with the approved DRAWINGS AND DOCUMENTS and where applicable, the approved Construction Management Plan.
The removal of buildings/structures includes the removal of all existing concrete slabs, foundations and footings. |
Prior to Council's notation on the plan of subdivision |
| 4) Street Naming (Public Roads) Provide street name signs |
Prior to Council's notation on the plan of subdivision |
4(a) Submit Street Names Submit to, and obtain approval from, Development Services for proposed street names. Timing: A minimum of four weeks prior to lodging the request for Council's notation of the plan of subdivision |
As indicated |
4(b) Supply and install Supply and install the street name signs in accordance with the street names approved by Council. Timing: Prior to Council's notation of the plan of subdivision. |
As indicated |
| 5) Complete All Operational Work Complete all operational work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such operational work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS or, if requiring a further approval from the Council, in accordance with the relevant further approval(s). |
Prior to Council's notation on the plan of subdivision and then to be maintained |
| 6) Retain and Protect Existing Street Tree(s) Identify, retain and protect the existing street trees unless otherwise agreed in writing with Public Space Operations Arboriculture Planning (PSO-Arb PLANNING). Note: Street trees are protected under the Natural Assets Local Law. Street trees must not be removed or pruned without prior approval from PSO-Arb PLANNING. Where driveway crossovers occur within the Tree Protection Zone (TPZ) of existing street trees, seek approval from PSO-Arb PLANNING for the final driveway crossover design and construction methodology to ensure the successful retention of the existing street tree(s). PROOF OF FULFILMENT Contextual photographic evidence that the tree has been retained in equal or greater health than before development commenced. OR, evidence in writing from Program Planning and Intergration Arboriculture that an alternative arrangement has been made. |
At all times |
6(a) Implement Protection
Measures Install tree protection measures in accordance with Australian Standard - AS4970 Retention of Trees on Development Site. There must be no excavation, filling or storage of materials or plant within the drip line of the tree(s). Where works are within the canopy drip line of existing street trees, contact Public Space Operations Arboriculture Planning (PSO-Arb PLANNING) in relation to the required provision of protection measures. Note: If fencing is to protect street trees, a permit to temporarily occupy the footway will be required from Compliance and Regulatory Services. Timing: Prior to site/operational work occurring. |
As indicated |
6(b) Maintain Protection
Measures Maintain protection measures while development is occurring and remove protection measures prior to commencement of the use. Timing: While to site/operational work is occurring. PROOF OF FULFILMENT Contextual photographic evidence to demonstrate the installation of protection measures prior to building works commencing. |
As indicated |
| 7) Streetscape Works - Industrial Street Carry out streetscape improvement works to the Harcourt Rd site frontage including concrete path (where required by this condition), turf and street trees to the verge to an Industrial Street standard in accordance with the relevant Brisbane Planning Scheme Codes, Brisbane Standard Drawings (BSD), the requirements of this condition and the Infrastructure Design Planning Scheme Policy including sections 3.7.4.5 and 3.7.5. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL) |
7(a) Turf Install turf to the full width of the verge
excluding any concrete path required by this condition. |
As indicated |
7(b) Street Tree(s) Enter into and implement an arrangement with the Public Space Operations Arboriculture Planning (PSO-Arb PLANNING) in relation to the required provision of the street tree planting in accordance with the above sections of the Infrastructure Design Planning Scheme Policy, including the number, species, location, installation and maintenance of the required street tree(s) as determined by PSO-Arb PLANNING. Provide to Development Assessment a copy of the agreement signed by PSO-Arb PLANNING. Note: Street trees should not be planted until all utilities have been installed.
|
As indicated |
| 8) Maintenance Period for Engineering Work Maintain the work required by the Engineering condition(s) imposed on this development approval and rectify any defects in accordance with the requirements detailed in this condition. NOTE: Guidance for requesting a pre-start and co- ordinating the On/Off Maintenance process can be found on Council's website (https://www.brisbane.qld.gov.au/planning-and-building/applying-and- post-approval/on-and-off-maintenance-approvals) Timing: During the on-maintenance period. |
As indicated |
8(a) On-Maintenance Acceptance Arrange an on- maintenance inspection with Development Services and obtain written confirmation from Council that the work has been completed in accordance with the requirements of the condition and is accepted on-maintenance. Provide proof of Public Liability Insurance ($20 million) for the on- maintenance period. Lodge a maintenance security for the on-maintenance period. The security must be calculated as 5% of the value of the constructed work or $10,000.00, whichever is greater. NOTE: A maintenance security may consist of either a bank guarantee or monetary payment lodged with Council. Refer to Council's Infrastructure Installation and Construction Requirements Manual for further details about the on-maintenance procedure and requirements. Timing: Prior to Council's notation on the plan of subdivision. |
As indicated |
8(b) On-Maintenance Period Provide a minimum 12 months maintenance to the work from the time the work is accepted on- maintenance by Council. During this period maintain the work and rectify any defects identified at the on-maintenance inspection and those arising during the on-maintenance period. NOTE: The on-maintenance period may be extended by Council pending concerns and/or unsatisfactory performance during the maintenance period. Timing: A minimum 12 months from acceptance on-maintenance. |
As indicated |
8(c) Off-Maintenance Acceptance On completion of the maintenance period arrange an off-maintenance inspection with Development Services and obtain written confirmation from Council that the work is accepted off-maintenance. Ensure all defects are rectified prior to making an appointment for off-maintenance Inspection. NOTE: If the inspection is successful the maintenance security will be released. Timing: On completion of the on-maintenance period. |
As indicated |
| 9) Information Signage Erect an information sign on the subject property in accordance with Council's general requirements for signage and in accordance with the requirements outlined below: a) The sign should provide a brief description of the development proposed; b) The sign is to list the name, postal and/or email address and a contact telephone number for the following parties (where relevant) that are undertaking work on the site: -
Developer; c) The lettering on the sign is to be at least 25 millimetres in height, be of regular weight and in sentence case; d) The sign is to be a minimum size of 1,200 millimetres by 900 millimetres; e) The maximum area of the sign is to be 2.0m2; f) The sign is to be positioned as follows: - located centrally along each road frontage of the
site to Kiln Street, Harcourt Road and Ipswich Road; g) The sign is to contain no commercial or corporate advertising other than the name, logo or slogan of the parties outlined in part (b) of this condition; h) The sign is to be non- illuminated; and i) Both the sign and the supporting structure are to be made of weatherproof material and to be properly maintained at all times. Timing: Prior to site works commencing and then to be maintained until completion of the development for all stages. |
As indicated |
| 10) Engineering Pre-Start Meeting Arrange and attend a pre-start meeting with Development Services. Applicable compliance and inspection fees must be paid, in full, to Council prior to the meeting being held. NOTE: To arrange an engineering pre-start meeting with Development Services an email supported by a completed copy of the Pre-Start Meeting Guidelines - Civil Engineering Works kit (https://www.brisbane.qld.gov.au/sites/default/files/20191008- cc11207-pre-start-meeting-guidelines-civil-engineering-works.pdf) is to be sent to dalodgement@brisbane.qld.gov.au a>. Details include (but are not limited too) the following: - Site address, Development Approval number (A00) and relevant stage/s (if appropriate); - List all Development Approval conditions requiring compliance prior to site/operational work commencing and demonstrate compliance with those conditions; - Payee details (Name and address) for the issue of a development "Compliance and Inspection Fee" quote; - Superintendent (Consultant) name, address and telephone number (including after-hours contact); - Contractor/s and major Sub- Contractor/s, name, address and telephone number (including after-hours contact); - Intended date of commencement of works. NOTE: - All operational works applications are to be approved prior to requesting the pre-start meeting. - A minimum 5 working days' notice is required. - Compliance and Inspection fee to be paid prior to undertaking pre-start meeting. - All operational works approved documents and the Development Approval package (conditions and plans) must be available at the pre-start meeting. - Further guidance for requesting a pre-start and co-ordinating the On/Off Maintenance process can be found on Council's website (https://www.brisbane.qld.gov.au/planning-and-building/applying-and- post-approval/on-and-off-maintenance-approvals). Timing: Prior to site/operational work commencing. |
As indicated |
| 11) Construction Management Plan (Minor) Carry out development in a method consistent with a Construction Management Plan (Minor) prepared in accordance with the requirements of this condition. |
While site/operational/building work is occurring |
11(a) Construction Management Plan (Minor) -
Prepare Plan Prepare a detailed Construction Management Plan (CMP) for the construction phase of the approved development. The Construction Management Plan must be in accordance with the relevant Brisbane Planning Scheme Codes and address the following: (i) Provision for pedestrian management including alternative pedestrian routes (adjacent to or surrounding the site); (ii) Existing and proposed kerbside allocation signs and line marking (such as bus stops, loading zones and parking meters and/or ticket dispensers); (iii) Location of and impacts to any Council or other public utility or local authority's assets on or within or external to the site; (iv) Location and design of temporary vehicular construction access points, including frequency of use; (v) Management and mitigation strategies for the impact of dust, noise and vibration upon adjoining and nearby properties; (vi) Provision for loading and unloading of materials including the location of any remote loading sites; (vii) Location of materials, structures, plant and equipment to be stored or placed on the construction site; (viii) Location of proposed external hoardings or gantries, including clearances to the impacts of this on existing street furniture and other footpath assets located within the verge as well as impacts on any existing advertising signage located either along or adjacent to the site frontage this includes any potential obstruction of sight lines for such advertising (e.g. 'CityCycle' bicycle stations or bus stops with advertising); (ix) Location of proposed employee and visitor parking areas; (x) Anticipated staging and programming; (xi) Impacts of any actions proposed to address any of the above items or any actions resulting from construction of the development that will impact on existing street trees; (xii) Complaint management processes to be implemented; and (xiii) Compliance with the Management Plans Planning Scheme Policy and other relevant Planning Scheme Policies. The Construction Management Plan must be supported by "approval in principle" or written approvals from the relevant Council sections or other governing bodies responsible for any potentially impacted infrastructure. The list of relevant infrastructure and contacts is available on Council's website - Search "Constructions Management Plan". Note: The Construction Management Plan is not required to be approved by Development Services. Timing: Prior to site/operational work commencing. |
As indicated |
11(b) Construction Management Plan (Minor) -
Submit Plan Submit a copy of the Construction Management Plan to Council's Development Services Branch at the following mailbox: engineeringservices@brisbane.qld.gov.au quoting the BCC planning development approval reference number. Timing: At least 10 days prior to site works commencing |
As indicated |
11(c) Construction Management Plan (Minor) -
Documentation on Site Legible copies of the Construction Management Plan and current permits must be kept on site and be made available on request by Council at all times. The requirements of the CMP must be included in all induction of principal and subcontractors utilised in the development. An outline of the induction provided to contractors may be requested by Council to confirm compliance with this condition. Timing: While site/operational work is occurring. |
As indicated |
11(d) Construction Management Plan - Works to
be Performed Out of Hours Obtain an approval from Development Services for any
work that is proposed to be undertaken outside of normal business hours -
6:30am to 6:30pm, Monday to Saturday. |
As indicated |
11(e) Implement Construction Management Plan
(Minor) Carry out the development in accordance with the submitted Construction Management Plan. |
While site/operational/building work is occurring |
| 12) Protect Existing Infrastructure Where there is existing infrastructure in the vicinity of the proposed work, the new work must not damage or compromise the working ability of the existing infrastructure. Where alterations to public utility mains, existing mains, services or installations are necessitated by the development, prior to alterations commencing, the developer must notify Council or the relevant infrastructure provider and obtain agreement to the alterations. The developer must meet the costs of the alterations. The alterations must be carried out in accordance with the relevant Brisbane Planning Scheme Codes or infrastructure providers requirements. |
While site/operational/building work is occurring |
12(a) As Constructed Drawings - Alterations
to Existing Infrastructure Submit to Development Services As Constructed drawings showing all new and/or rectification works and an asset register, prepared and certified by a Registered Professional Engineer Queensland. Timing: Prior to Council's notation on the plan of subdivision. PROOF OF
FULFILMENT Certification from a Registered Professional Engineer Queensland, confirming that the alterations have been completed in accordance with the relevant Brisbane Planning Scheme Codes and any other relevant infrastructure requirements. |
As indicated |
| 13) Remove Improvements & Obstructions from Truncation
and Dedication Remove all improvements (fences, gates, letter boxes, garden beds and plots and other constructed items, etc.) and obstructions (existing earth banks, vegetation, etc.) from the area of dedicated road and reinstate the area as footway in accordance with the relevant Brisbane Planning Scheme Codes. Any new or existing installations of electrical pillar boxes, pad mounted transformers (PMTs), water meters and the like, must be installed/relocated to their ultimate alignment relative to the new property boundary and clear of the usable footpath areas irrespective of the alignment of the existing services/conduits. Note: -
The cost of moving services, utilities and assets is the responsibility of the
Developer. The permission of the service, utility or asset owner will be
required. Council permission is required if street trees, stormwater
gullies/drains, and swales are affected. Urban Utilities permission is required
if water supply and sewerage services are affected. PROOF OF
FULFILMENT Certification from a Registered Surveyor (Qld) or Registered Professional Engineer Queensland that the above work has been completed in accordance with this condition. |
Prior to Council's notation on the plan of subdivision |
| 14) Repair Damage to Kerb, Footpath or Road Repair any damage to the existing kerb and channel, footpath or roadway (including removal of concrete slurry from footways, roads, kerb and channel, stormwater gullies and drainlines) and re-instate existing traffic signs and pavement markings that have been removed or damaged during any works carried out in association with the approved development. |
Prior to Council's notation on the plan of subdivision |
14(a) Interim Repairs If at any time during the construction phase of the approved development, damage to the existing kerb and channel, footpath or roadway creates unsafe, unreasonable and/or not fit for purpose conditions as assessed by Council, interim repairs must be undertaken as directed by Program Planning and Integration. Note: Any interim repairs required to be undertaken shall not be considered to satisfy the requirements of this condition for the permanent repair of the infrastructure prior to Council's notation on the plan of subdivision. Timing: While site/operational works is occurring |
As indicated |
| 15) Land for Transport Network - Road (Non-
trunk) Dedicate as road land shown as new road (non-trunk) on the approved drawings titled Plan of Reconfiguration, Drawing No. 25-0067S-02 Rev D sheet 1 of 3 received 16 December 2025 and Road Widening Plan, Drawing No. RC16154 Issue 3 dated 13 July 2022, including the following: i. A 10 metre
dedication to provide for signalised intersection works associated with
vehicular access to the site at Harcourt Road. The width of the dedication must
be the distance between the nominal face of the kerbs for the access road plus
a 4.25 metre verge widening on each side of the access road; NOTE: This condition is imposed under section 145 of the Planning Act 2016. |
Prior to Council's notation on the plan of subdivision |
| 16) Work for Transport Network - Road (Non-trunk) -
Internal Construct the following roadwork with any associated drainage, footpath, pathways and services including street lighting for the Transport Network (Road) shown on the approved drawings titled Plan of Reconfiguration, Drawing No. 25-0067S-02 Rev D sheet 1 of 3 received 16 December 2025 and Harcourt Road Functional Layout Plan, Drawing No. 20058-SK33 rev C received 10 March 2023 for a length of approximately 30 metres from the signalised intersection in accordance with the relevant Brisbane Planning Scheme Codes, the Manual of Uniform Traffic Control Devices and the AUSTROADS design standards: - roads 22.5 metres wide designed and constructed as Primary Freight Accesses (designed for 85 percentile 50 km/hr maximum) and with street lighting category V5; Note: This condition is imposed under section 145 of the Planning Act 2016. |
Prior to Council's notation on the plan of subdivision |
16(a) Submit Roadworks and Stormwater
Drainage Drawings Submit to, and obtain approval from, Development Services Roadworks and Stormwater Drainage Drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes. Timing: Prior to site/operational work commencing. |
As indicated |
16(b) Implement Approved
Drawings Construct the works in accordance with the above approved drawings. Timing: Prior to on-maintenance acceptance. |
As indicated |
16(c) Submit As Constructed
Drawings Submit to Development Services As Constructed drawings including an asset register and a pre-On-Maintenance Inspection Checklist, prepared and certified by a Registered Professional Engineer Queensland. Timing: Prior to on-maintenance inspection. PROOF OF FULFILMENT Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the above approved drawings. |
As indicated |
| 17) Land for Transport Network - Road (Trunk) Dedicate as road the land shown as new road (trunk) on the approved drawing titled Road Widening Plan, Drawing no. RC16154 Issue 3 dated 13 July 2022 for the Transport Network which forms part of LGIP ID DAR-RI-004 in the Local Government Infrastructure Plan 2016 including the following: i. An 8.1 metre widening along the Harcourt Road frontage of the site which then tapers at each end; NOTE: This condition is imposed under section 128 of the Planning Act 2016. |
Prior to commencement of use |
17(a) Submit Plan of
Subdivision Submit for the approval of Development Services, a plan of subdivision showing the land to be dedicated for road to demonstrate compliance with the requirements of this condition. Timing: As part of the submission of request pursuant to Schedule 18 of the Planning Regulation 2017 for Council's notation on the plan of subdivision necessary to comply with this condition. |
As indicated |
17(b) Lodge Notated Plan Lodge the plan of subdivision notated by Council pursuant to Schedule 18 of the Planning Regulation 2017 with the Registrar of Titles for the relevant Queensland State Government Authority. Timing: Prior to commencement of use. PROOF OF FULFILMENT Evidence of the registration of the required plan of subdivision. Timing: Within one month of the registration of the plan of subdivision. |
As indicated |
| 18) Work for Transport Network - Road (Trunk) Construct the following roadwork with any associated drainage, verge and services including street lighting for the Transport Network (Road) shown on the approved drawing titled Harcourt Road Functional Layout Plan, Drawing No. 20058-SK33 rev C received 10 March 2023 as amended in red 2 June 2026 which forms part of LGIP ID DAR-RI-004 in the Local government infrastructure plan 2016 in accordance with the relevant Brisbane Planning Scheme Codes, the Queensland Manual of Uniform Traffic Control Devices and the AUSTROADS design standards: - new type E concrete kerb and channel and associated drainage along the full length of the Harcourt Road frontage of the site on a 6.0 metre alignment (taking into account any road reserve widening if required); - a Primary Freight Access type road pavement from the lip of the new kerb and channel to the existing road pavement with any appropriate tapers (the minimum width of road construction/reconstruction must be 1.2 metres); Note: Irrespective of the actual widening, the finished road pavement crown must be located along the centreline of the final pavement width - a Signalisation of the intersection of Harcourt Road, Gordon Avenue and Winslow Street; - a new median island along the Harcourt Road frontage as shown on the APPROVED DRAWINGS AND DOCUMENTS; - signs and pavement markings along the Harcourt Road frontage Note: This condition is imposed under section 128 of the Planning Act 2016. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
18(a) Submit Functional Layout
Drawings Submit and obtain approval from Development Services, functional layout drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes. Note: This approval must be obtained prior to the submission of drawings for Roadwork and Stormwater Drainage and Signs and Pavement Marking. Timing: Prior to site/operational/building work commencing. |
As indicated |
18(b) Submit Roadworks and Stormwater
Drainage Drawings Submit to, and obtain approval from, Development Services, Roadworks and Stormwater Drainage Drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes. Timing: Prior to site/operational/building work commencing. |
As indicated |
18(c) Submit Traffic Signal Design
Drawings Submit to, and obtain approval from, Development Services, Traffic Signal Design drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with this condition. Note: The Traffic Signal Design drawings must be endorsed by Brisbane Infrastructure -Transport Planning and Operations (TPO), prior to submission of the Traffic Signal Design Drawings. Timing: Prior to site/operational/building work commencing. |
As indicated |
18(d) Submit Signs and Pavement
Drawings Submit to, and obtain approval from, Development Services, Signs and Pavement Marking drawings prepared and certified by a Registered Professional Engineer of Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes. Timing: Prior to site/operational/building work commencing. |
As indicated |
18(e) Submit Street Lighting Design
Drawings Submit to, and obtain approval from, City Lighting, street lighting design drawings prepared and certified by a Registered Professional Engineer of Queensland (Electrical) which show the proposed street lighting system in accordance with the relevant Brisbane Planning Scheme Codes. Timing: Prior to site/operational/building work commencing. |
As indicated |
18(f) Implement Approved
Drawings Construct the works in accordance with the above approved drawings. Timing: Prior to on-maintenance acceptance. |
As indicated |
18(g) Submit As Constructed
Drawings Submit to Development Services As Constructed drawings including an asset register and a pre-On-Maintenance Inspection Checklist, prepared by a Registered Professional Engineer Queensland. Timing: Prior to on-maintenance inspection. PROOF OF FULFILMENT Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the above approved drawings. |
As indicated |
| 19) Ponding of Stormwater Carry out the approved development to
ensure that adjoining properties and roads are protected from ponding or
nuisance from stormwater during construction. |
Prior to Council's notation on the plan of subdivision |
| 20) Street Lighting Provide street lighting in accordance with the requirements of this approval and the relevant Brisbane Planning Scheme Codes. Note: for required lighting categories please refer to the roadworks and/or pathway conditions within this conditions package. PROOF OF FULFILMENT Evidence of an agreement with an electricity supply authority to provide a public lighting system in accordance with the approved street lighting design drawings. |
Prior to Council's notation on the plan of subdivision |
| 21) Service Conduits and Mains Provide and install all service conduits and meet the cost of any alterations to public utility mains, existing mains, services, street lighting or installations that are required to carry out the approved development. These works must be in accordance with the relevant Brisbane Planning Scheme Codes, and include the following, where applicable: - the provision of all services and/or conduits
along the full length of any rear allotment access or access easement. Note: -
The cost of moving services, utilities and assets is the responsibility of the
Developer. The permission of the service, utility or asset owner will be
required. Council permission is required if street trees, stormwater
gullies/drains, and swales are affected. Urban Utilities permission is required
if water supply and sewerage services are affected. PROOF OF FULFILMENT Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the requirements of this condition. Note: Civil works are to be certified by a RPEQ(Civil) and electrical works are to be certified by a RPEQ (Electrical) |
Prior to Council's notation on the plan of subdivision |
21(a) Submit As Constructed
Drawings Submit to Development Services As Constructed drawings, including an asset register, prepared by a Registered Professional Engineer Queensland. Timing: Prior to Council's notation of the plan of subdivision. PROOF OF
FULFILMENT Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the requirements of this condition. Note: Civil works are to be certified by a RPEQ(Civil) and electrical works are to be certified by a RPEQ (Electrical) |
As indicated |
| 22) Redundant Driveway Crossover Remove the redundant existing driveway crossover(s) on the frontage(s) of the site and reinstate the kerb and channel, road pavement, footways and footpaths in accordance with the relevant Brisbane Planning Scheme Codes. Note: |
Prior to Council's notation on the plan of subdivision |
| 23) Natural Assets Local Law (NALL) - Protected
Vegetation On Site Work on or around protected vegetation may require a permit under the Natural Assets Local Law 2003 (NALL). Permits under the NALL are issued by Development Services. To apply for a permit to work on protected vegetation go to Council's website or contact the call centre on 3403 8888. |
As indicated |
| 24) Further Development Permit Required Further Development Permit(s) to carry out assessable building work under the Building Act may be required. |
As indicated |
| 25) Plumbing and Drainage Work Pursuant to the Plumbing and Drainage Act 2018, any plumbing and drainage work must be carried out in compliance with the Plumbing and Drainage Regulation 2019. Plumbing and drainage permit work requires approval by Brisbane City Council prior to the work being carried out. |
As indicated |
| 26) Currency Period The currency period for this development approval is stated in the Decision Notice and is expressed as a date. This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016. |
As indicated |
| 27) Referral Agency Requirements The SARA as a concurrence agency has imposed the requirements contained in the letter dated 3 June 2026 (ref: 2605-52297SPD). |
As indicated |
| 28) Cultural Heritage Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage. The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care. For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships). |
As indicated |
| 29) Contaminated Land The owner or occupier must give notice to the relevant State administering authority of any notifiable activity being carried out on the land, in accordance with the Environmental Protection Act 1994. For further information about Contaminated Land contact the relevant Queensland State Government department on 13 QGOV. |
As indicated |
| 30) Damage to Trees on Adjoining Land Please note that any damage caused to vegetation on adjoining land as a result of exercising this development approval may result in an offence under other legislation (e.g. Natural Assets Local Law) and/or civil action. |
As indicated |
| 31) Fire Ant Movement Controls To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected. These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products. Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014. For further information contact the relevant Queensland State Government department on 13 QGOV. |
As indicated |
| 32) Natural Asset Local Law (NALL) - Protected
Vegetation on Public Land, Road or Park Work on or around protected vegetation on public land, road or park may require a permit under the Natural Assets Local Law (NALL). Arrangements must be made with Program Planning and Integration in relation to the works carried out on protected vegetation on public land, road or park including provision for costs and replacement planting as determined by Program Planning and Integration. Timing: Prior to carrying out any works on protected vegetation. |
As indicated |
| Permit to Which These Conditions Relate: | DA - PA - Material Change of Use |
| Activity(ies): | medium impact industry high impact industry low impact industry parking station research and technology industry renewable energy facility service industry food and drink outlet emergency services caretaker's accommodation car wash service station telecommunications facility utility installation warehouse park shop |
| Stage: | Preliminary Approval Under Section 50(3) of the Planning Act 2016 to vary the effect of Brisbane City Plan 2014 |
| 33) Prescribed Period for Preliminary Approval The prescribed period for the variation approval is
72 months (six (6) years) from the day the approval takes effect. |
As indicated |
| 34) General Compliance Requirements Development of the subject site must comply with the following; a) the approved drawings b) the conditions of the variation approval c) subsequent Material Change of Use of the subject
site including other plans and documents approved by subsequent development
approvals. |
As indicated |
| 35) Category of Development and Assessment Industrial
uses - Industry A Zone Precinct
The extent to which this variation approval varies the effect of the Planning Scheme for Brisbane, is limited to a Material Change of Use for any of the purposes listed below where that proposed use is on land shown within the Industry A Zone Precinct on the approved drawing titled Zoning Plan, Plan No: 25-0067S-04 Sheet No. 1 of 1 G, received 28 May 2026 is limited to the circumstances detailed below. For the purposes of determining compliance with Section A of the Industry code with regard to level of assessment, the site is to be treated as being located within the General industry A zone.
The definition mentioned in this condition refers to definitions contained in the Brisbane City Plan 2014 as amended from time to time.
Any application for a Development Permit for Material Change of Use is to be assessed against the assessment benchmarks and policies in the Planning Scheme that are in effect at the time the application for a Development Permit is made, unless otherwise explicitly provided by conditions of this Variation approval.
Where there is conflict between the codes and the condition contained herein, the condition shall prevail.
|
As indicated |
35(a) Service industry
Notwithstanding the contents of the category of development
and assessment table in the planning scheme, development for the purposes of
Service industry, pursuant to this variation approval, where that
development is compliant with the conditions of this variation approval and where applying to: b) an existing premises
with no increase in GFA, a new premises or an
existing premises with an increase in gross floor area, where not complying
with all acceptable outcomes in section A of the Industry code shall be subject
to Assessable Development - Code Assessment against the Industry code, Darra-Oxley
district neighbourhood plan code,
Industry zone code, overlay codes and prescribed secondary
codes. |
As indicated |
35(b) Low impact industry
Notwithstanding the contents of the level of assessment table in
the planning scheme, development for the purposes of Low impact
industry, pursuant to this variation approval, where that development
is compliant with the conditions of this variation approval
and where
applying to: a) an existing premises with no increase in gross floor area and complying with all acceptable outcomes in section A of the Industry code, shall be Accepted development; or b) an existing premises with no increase in GFA, a new premises or an existing premises with an increase in
gross floor area, where not complying with all acceptable outcomes in section A
of the Industry code shall be subject to Assessable Development -
Code Assessment against the Industry code,
Darra-Oxley district neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary
codes. |
As indicated |
35(c) Medium impact industry
Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of Medium impact industry, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where applying to: a) an existing premises with no increase in gross floor area, where complying with all acceptable outcomes in section A of the Industry code shall be Accepted development; or b) an existing premises
with no increase in GFA, a new premises or an
existing premises with an increase in gross floor area, where not complying
with all acceptable outcomes in section A of the Industry code shall be subject
to Assessable Development - Code Assessment against the Industry code, Darra-Oxley
district neighbourhood plan code,
Industry zone code, overlay codes and prescribed secondary
codes. |
As indicated |
35(d) Research and Technology
Industry
Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of Research and technology industry, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where applying to: a) an existing premises with no increase in gross floor area, where complying with all acceptable outcomes in section A of the Industry code shall be Accepted development; or b) an existing premises
with no increase in GFA, a new premises or an
existing premises with an increase in gross floor area, where not complying
with all acceptable outcomes in section A of the Industry code shall be subject
to Assessable Development - Code Assessment against the Industry code, Darra-Oxley
district neighbourhood plan code,
Industry zone code, overlay codes and prescribed secondary
codes. |
As indicated |
35(e) Warehouse
Notwithstanding the contents of the
category of development and assessment table in the planning scheme,
development for the purposes of a Warehouse, pursuant to this variation
approval, where that development is compliant with the conditions of this
variation approval and
where applying to:
a) an existing premises with no increase in gross floor area, where complying with all acceptable outcomes in section A of the Industry code shall be Accepted development; or b) an existing premises with no increase in GFA, a new premises or an existing premises with an increase in gross floor area, where not complying with all acceptable outcomes in section A of the Industry code shall be subject to Assessable Development - Code Assessment against the Industry code, Darra-Oxley district neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary codes.
|
As indicated |
35(f) Renewable energy facility
Notwithstanding the contents of the
category of development and assessment table in the planning scheme,
development for the purposes of Renewable energy facility, pursuant to
this variation approval, where that development is compliant with the
conditions of this variation approval will be Assessable Development - Code
Assessment against the Industry code,
Darra-Oxley district neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary
codes.
|
As indicated |
| 36) Category of Development and Assessment - Non-
Industrial Uses
The extent to which this variation approval varies the effect of the Planning Scheme for Brisbane, is limited to a Material Change of Use for any of the purposes listed below where that proposed use is on land shown within the Industry A Zone Precinct and the Industry B Zone Precinct on the approved drawings titled Zoning Plan, Plan No: 25-0067S-04 Sheet No. 1 of 1 G, received 28 May 2026 is limited to the circumstances detailed below. The definition mentioned in this
condition refers to definitions contained in the Brisbane City Plan 2014
as amended from time to time. Any application for a Development
Permit for Material Change of Use is to be assessed against the abovementioned
assessment benchmarks and policies in the Planning Scheme that are in effect at
the time the application for a Development Permit is made, unless otherwise
explicitly provided by conditions of this Variation
approval. |
As indicated |
36(a) Caretakers Accommodation
Notwithstanding the contents of the category of development and assessment table in the Planning Scheme, development for the purposes of Caretaker’s accommodation, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where:
b) not complying with all acceptable outcomes in the Caretaker’s accommodation code will be Assessable Development - Code Assessment against the Caretaker’s accommodation code, Darra-Oxley district neighbourhood plan code, overlay codes, and prescribed secondary codes.
|
As indicated |
36(b) Car Wash
Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of Car wash, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval will be Assessable Development - Code Assessment against the Industry code, Darra-Oxley district neighbourhood plan code, Industry zone code, overlay codes, and prescribed secondary codes.
|
As indicated |
36(c) Food and drink outlet
Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of Food and drink outlet, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where:
a) if less than 250m2 gross floor area, shall be subject to Assessable Development - Code Assessment against the Industry code, Darra-Oxley district neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary codes; or b) if 250m2 or greater gross floor area shall be subject to Assessable Development - Impact Assessment against the Planning Scheme.
|
As indicated |
36(d) Telecommunications Facility (where not
a broadcasting station or television station)
Notwithstanding the contents of the category of development and assessment table in the Planning Scheme, development for the purposes of Telecommunications facility, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where:
|
As indicated |
36(e) Service station Notwithstanding the contents of the category of development and assessment table in the Planning Scheme, development for the purposes of Service station, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval will be Assessable Development - Code Assessment against the Service station code, Darra-Oxley district neighbourhood plan code, Industry zone code, overlay codes, and prescribed secondary codes. |
As indicated |
36(f) Park
Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of a Park pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where:
a) complying with all acceptable outcomes in the Park code shall be Accepted development; or b) not complying with all acceptable outcomes in the Park code will be Assessable Development - Code Assessment against the Park code, Darra-Oxley district neighbourhood plan code, overlay codes, and prescribed secondary codes.
|
As indicated |
36(g) Parking Station
Notwithstanding the contents of the level of assessment table in the Planning Scheme, development for the purposes of Parking station – where a ‘park and ride’ or bicycle parking, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where:
a) the use is a Parking station where a ‘park and ride’ or bicycle facility - Code Assessment against the Industry code, Darra-Oxley district corridor neighbourhood plan code, Industry zone code, overlay codes, and prescribed secondary codes; or b) the use is a parking station where not a ‘park and ride’ or bicycle parking, shall be subject to Assessable Development - Impact Assessment against the Planning Scheme.
|
As indicated |
36(h) Utility Installation
Notwithstanding the contents of the level of assessment table in the planning scheme, development for the purposes of Utility installation pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where apply to:
a) if involving an existing premises with no increase in GFA, a new premises or an existing premises with an increase in gross floor area, where not complying with all acceptable outcomes in section A of the Industry code shall be subject to Assessable Development - Code Assessment against the Industry code, Darra-Oxley district neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary codes. |
As indicated |
36(i) Shop Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of Shop, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where:
a) if less than 250m2 gross floor area, shall be subject to Assessable Development - Code Assessment against the Industry code, Industry zone code, Darra-Oxley district neighbourhood plan code, overlay codes and prescribed secondary codes; or b) if 250m2 or greater gross floor area shall be subject to Assessable Development - Impact Assessment against the Planning Scheme.
|
As indicated |
36(j) Emergency Services Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of Emergency services, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval will be Assessable Development - Code Assessment against the Industry code, Darra-Oxley district neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary codes. |
As indicated |
| 37) Category of Development and Assessment Industrial
uses - Industry B Zone Precinct The extent to which this variation
approval varies the effect of the Planning Scheme for Brisbane, is limited to a
Material Change of Use for any of the purposes listed below where that
proposed use is on land shown within the Industry B Zone Precinct on the
approved drawing titled Zoning Plan, Plan No: 25-0067S-04 Sheet No. 1 of 1 G,
received 28 May 2026 is limited to the circumstances detailed
below. For the purposes of determining
compliance with Section A of the Industry code with regard to level of
assessment, the site is to be treated as being located within the General
industry B zone. The definition mentioned in this condition
refers to definitions contained in the Brisbane City Plan 2014 as
amended from time to time. Any
application for a Development Permit for Material Change of Use is to be
assessed against the assessment benchmarks and policies in the Planning Scheme
that are in effect at the time the application for a Development Permit is
made, unless otherwise explicitly provided by conditions of this Variation
approval. Where there is conflict between the codes and the condition contained herein, the condition shall prevail.
|
As indicated |
37(a) Service industry Notwithstanding the contents of the category of development
and assessment table in the planning scheme, development for the purposes
of Service industry, pursuant to this variation
approval, where that development is compliant
with the conditions of this variation approval and where applying to: b) an existing premises with no increase in GFA, a new premises or an existing premises with an increase in gross floor area, where not complying with all acceptable outcomes in section A of the Industry code shall be subject to Assessable Development - Code Assessment against the Industry code, Darra-Oxley district neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary codes.
|
As indicated |
37(b) Low impact industry Notwithstanding the contents of the level of assessment
table in the planning scheme, development for the purposes of Low
impact industry, pursuant to this variation approval, where
that development is compliant with the conditions of this variation
approval and where applying
to: a) an existing premises with no increase in gross floor area and complying with all acceptable outcomes in section A of the Industry code, shall be Accepted development; or b) an existing premises with no increase in GFA, a new premises or an existing premises with an increase in gross floor area, where not complying with all acceptable outcomes in section A of the Industry code shall be subject to Assessable Development - Code Assessment against the Industry code, Darra-Oxley district neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary codes.
|
As indicated |
37(c) Medium impact industry Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of Medium impact industry, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where applying to: b) an existing premises with no increase in GFA, a new premises or an existing premises with an increase in gross floor area, where not complying with all acceptable outcomes in section A of the Industry code shall be subject to Assessable Development - Code Assessment against the Industry code, Darra-Oxley district neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary codes.
|
As indicated |
37(d) High impact industry Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of High impact industry, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval will be Assessable Development - Code Assessment against the Industry code, Darra-Oxley district neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary codes. |
As indicated |
37(e) Research and Technology
Industry Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of Research and technology industry, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where applying to: b) an existing premises with no increase in GFA, a new premises or an existing premises with an increase in gross floor area, where not complying with all acceptable outcomes in section A of the Industry code shall be subject to Assessable Development - Code Assessment against the Industry code, Darra-Oxley district neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary codes.
|
As indicated |
37(f) Warehouse Notwithstanding the contents of the category of development
and assessment table in the planning scheme, development for the purposes of
a Warehouse, pursuant to this variation approval, where that
development is compliant with the conditions of this variation
approval and where applying
to:
a) an existing premises with no increase in gross floor area, where complying with all acceptable outcomes in section A of the Industry code shall be Accepted development; b) an existing premises with no increase in GFA, a new premises or an existing premises with an increase in gross floor area, where not complying with all acceptable outcomes in section A of the Industry code shall be subject to Assessable Development - Code Assessment against the Industry code, Darra-Oxley district neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary codes.
|
As indicated |
37(g) Renewable energy facility Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of Renewable energy facility, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval will be Assessable Development - Code Assessment against the Industry code, Darra-Oxley district neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary codes. |
As indicated |
| 38) Stormwater Quality Management Plan Any Material Change of Use is to include a Site Based Stormwater Quality Management Plan, including Stormwater Quality Modelling using the Model for Urban Stormwater Improvement Conceptualisation (MUSIC), in accordance with the requirements of the State Planning Policy 2018, and the Stormwater Code, City Plan 2014 as amended from time to time. |
As indicated |
| 39) Protection of Adjoining Trees Any Material Change of Use is to install protection measures from construction damage those parts of neighbouring trees located adjoining the development site in accordance with Australian Standard - AS4970 Protection of trees on development sites. |
As indicated |
| 40) Commencement of Variation Approval A material change of use applied for and obtained pursuant to this variation approval shall not commence, exclusive of development over Lot 4 of Stage 2, until the Stage 3 reconfiguring of a lot is sealed and registered with the Titles Office. |
As indicated |
| 41) Streetscape Works - Industrial Street Any Material Change of Use is to carry out streetscape improvement works to the Harcourt Rd site frontage including concrete path (where required by this condition), turf and street trees to the verge to an Industrial Street standard in accordance with the relevant Brisbane Planning Scheme Codes, Brisbane Standard Drawings (BSD), the requirements of this condition and the Infrastructure Design Planning Scheme Policy including sections 3.7.4.5 and 3.7.5. |
As indicated |
41(a) Turf Install turf to the
full width of the verge excluding any concrete path required by this
condition. |
As indicated |
41(b) Street Tree(s) Enter into and implement an arrangement with the Public Space Operations Arboriculture Planning (PSO-Arb PLANNING) in relation to the required provision of the street tree planting in accordance with the above sections of the Infrastructure Design Planning Scheme Policy, including the number, species, location, installation and maintenance of the required street tree(s) as determined by PSO-Arb PLANNING. Provide to Development Assessment a copy of the agreement signed by PSO-Arb PLANNING. Note: Street trees should not be planted until all utilities have been installed.
|
As indicated |
| 42) Streetscape Works - Subdivision New Road Any Material Change of Use within the lots forming part of Stage 3 of
the Reconfiguration of a lot under this development approval, as shown on the
approved Plan of Reconfiguration Stage 3, Ref: Improvement works must be to an Industrial Street standard for Industrial roads and a Neighbourhood Street Minor standard for all other roads (Suburban/District/Neighbourhood/Local) in accordance with: - the relevant Brisbane Planning Scheme Codes; Note: standard path alignments for
new roads are shown on Brisbane Standard Drawing BSD-5201 sheet
2. |
As indicated |
42(a) Concrete Path Install a 1.2m wide broom finished standard Portland grey concrete path to both sides of the carriageway of Suburban/District/Neighbourhood (bus route)/Industrial roads and one side of the carriage way of a Neighbourhood (non-bus route) roads and one side of all local streets. The edge of the path is to be setback 1.9m from the back of kerb for industrial roads and 1.48m from the back of kerb for all other roads. Transition to existing paths on verges that adjoin the development. The transition is to occur fronting the adjoining developments, not the subject site. Note: If the above requirements cannot be achieved, contact the Engineering Services Team via email: engineeringservices@brisbane.qld.gov.au&n bsp; Timing: Prior to Council's notation of the plan of subdivision. |
As indicated |
42(b) Submit As Constructed
Drawings Submit to Development Services As Constructed plans including an asset register, checked by a Registered Professional Engineer Queensland, certifying that the concrete path works have been completed in accordance with relevant Brisbane Planning Scheme Codes/Policies. Timing: Prior to Council's notation of the plan of subdivision. |
As indicated |
42(c) Turf Install turf to the full width of the verge excluding any concrete path required by this condition. Timing: Prior Council's notation of the plan of subdivision. |
As indicated |
42(d) Street Tree(s) Enter into and implement an arrangement with the Public Space Operations Arboriculture Planning (PSO-Arb PLANNING) in relation to the required provision of the street tree planting in accordance with the above sections of the Infrastructure Design Planning Scheme Policy, including the number, species, location, installation and maintenance of the required street tree(s) as determined by PSO-Arb PLANNING. Provide to Development Services a copy of the agreement signed by PSO-Arb PLANNING. Note: Street trees should not be planted until all utilities have been installed. Timing: Prior to Council's notation on the plan of subdivision. |
As indicated |
| 43) Land for Transport Network - Road (Non-
trunk) Any Material Change of Use is to dedicate as road land shown as new road (non-trunk) on the approved drawings titled: Plan of Reconfiguration Stage 1, Drawing No. 25-0067S-02 1 of 3 D received 16 December 2025; Plan of Reconfiguration Stage 3, 25-0067S-02 Sheet No. 3 of 3 H received 28 May 2026 as amended in red 2 June 2026 and Road Widening Plan, Drawing No. RC16154 Issue 3 dated 13 July 2022. NOTE: This condition is imposed under section 145 of the Planning Act 2016. |
As indicated |
| 44) Work for Transport Network - Road (Non-trunk) -
Internal Any Material Change of Use within the lots forming part of Stage 3 of the Reconfiguration of a lot under this development approval to construct the following roadwork with any associated drainage, footpath, pathways and services including street lighting for the Transport Network (Road) shown on the approved drawing titled Concept Roadworks and Drainage Layout Plan, Drawing No. DA- 0200, Rev B, received 28 May 2026 in accordance with the relevant Brisbane Planning Scheme Codes, the Manual of Uniform Traffic Control Devices and the AUSTROADS design standards: - culs-de-sac designed and constructed as
Primary Freight Accesses (designed for 85 percentile 40 km/hr maximum) and with
street lighting category V5; Note: This condition is imposed under section 145 of the Planning Act 2016. |
As indicated |
44(a) Submit Functional Layout
Drawings Submit to, and obtain approval from, Development Services functional layout drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes. Note: This approval must be obtained prior to the submission of drawings for Roadwork and Stormwater Drainage and Signs and Pavement Marking. Timing: Prior to site/operational work commencing. |
As indicated |
44(b) Submit Roadworks and Stormwater
Drainage Drawings Submit to, and obtain approval from, Development Services Roadworks and Stormwater Drainage Drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes. Timing: Prior to site/operational work commencing. |
As indicated |
44(c) Submit Street Lighting Design
Drawings Submit to, and obtain approval from, City Lighting, street lighting design drawings prepared and certified by a Registered Professional Engineer of Queensland (electrical) which show the proposed street lighting system in accordance with the relevant Brisbane Planning Scheme Codes. Timing: Prior to site/operational work commencing. |
As indicated |
44(d) Implement Approved
Drawings Construct the works in accordance with the above approved drawings. Timing: Prior to on-maintenance acceptance. |
As indicated |
44(e) Submit As Constructed
Drawings Submit to Development Services As Constructed drawings including an asset register and a pre-On-Maintenance Inspection Checklist, prepared and certified by a Registered Professional Engineer Queensland. Timing: Prior to on-maintenance inspection. PROOF OF FULFILMENT Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the above approved drawings. |
As indicated |
| 45) Work for Transport Network - Road (Trunk) Any Material Change of Use is to construct the following roadwork with any associated drainage, verge and services including street lighting for the Transport Network (Road) shown on the Harcourt Road Functional Layout Plan, Drawing No. 20058-SK33 rev C received 10 March 2023 as amended in red 2 June 2026, which forms part of LGIP ID DAR-RI-004 in the Local government infrastructure plan 2016 in accordance with the relevant Brisbane Planning Scheme Codes, the Queensland Manual of Uniform Traffic Control Devices and the AUSTROADS design standards: - new type E concrete kerb and channel and associated drainage along the full length of the Harcourt Road frontage of the site on a 6.0 metre alignment (taking into account any road reserve widening if required); - a Primary Freight Access type road pavement from the lip of the new kerb and channel to the existing road pavement with any appropriate tapers (the minimum width of road construction/reconstruction must be 1.2 metres); Note: Irrespective of the actual widening, the finished road pavement crown must be located along the centreline of the final pavement width - a Signalisation of the intersection of Harcourt Road, Gordon Avenue and Winslow Street; - a new median island along the Harcourt Road frontage as shown on the APPROVED DRAWINGS AND DOCUMENTS; - signs and pavement markings along the Harcourt Road frontage Note: This condition is imposed under section 128 of the Planning Act 2016. |
As indicated |
45(a) Submit Functional Layout
Drawings Submit and obtain approval from Development Services, functional layout drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes. Note: This approval must be obtained prior to the submission of drawings for Roadwork and Stormwater Drainage and Signs and Pavement Marking. Timing: Prior to site/operational/building work commencing. |
As indicated |
45(b) Submit Roadworks and Stormwater
Drainage Drawings Submit to, and obtain approval from, Development Services, Roadworks and Stormwater Drainage Drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes. Timing: Prior to site/operational/building work commencing. |
As indicated |
45(c) Submit Traffic Signal Design
Drawings Submit to, and obtain approval from, Development Services, Traffic Signal Design drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with this condition. Note: The Traffic Signal Design drawings must be endorsed by Brisbane Infrastructure -Transport Planning and Operations (TPO), prior to submission of the Traffic Signal Design Drawings. Timing: Prior to site/operational/building work commencing. |
As indicated |
45(d) Submit Signs and Pavement
Drawings Submit to, and obtain approval from, Development Services, Signs and Pavement Marking drawings prepared and certified by a Registered Professional Engineer of Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes. Timing: Prior to site/operational/building work commencing. |
As indicated |
45(e) Submit Street Lighting Design
Drawings Submit to, and obtain approval from, City Lighting, street lighting design drawings prepared and certified by a Registered Professional Engineer of Queensland (Electrical) which show the proposed street lighting system in accordance with the relevant Brisbane Planning Scheme Codes. Timing: Prior to site/operational/building work commencing. |
As indicated |
45(f) Implement Approved
Drawings Construct the works in accordance with the above approved drawings. Timing: Prior to on-maintenance acceptance. |
As indicated |
45(g) Submit As Constructed
Drawings Submit to Development Services As Constructed drawings including an asset register and a pre-On-Maintenance Inspection Checklist, prepared by a Registered Professional Engineer Queensland. Timing: Prior to on-maintenance inspection. PROOF OF FULFILMENT Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the above approved drawings. |
As indicated |
| 46) Work for Internal Private Road - Major Any Material Change of Use within the lots forming part of Stage 3 of the Reconfiguration of a lot under this development approval is to construct the following roadworks with any associated drainage, signs, pavement marking, footpath, pathways and services including street lighting as shown on the Concept Roadworks and Drainage Layout Plan, Drawing No. DA-0200, Rev B, received 28 May 2026, in accordance with the relevant Brisbane Planning Scheme Codes, the Manual of Uniform Traffic Control Devices and the AUSTROADS design standards: - Internal private road designed and constructed to a Freight-dependent development pavement standard or approved equivalent, with minimum 7.5m wide carriageway contained within a 10.0m wide accessway reserve, (designed for 85 percentile speed 40km/hr maximum and design vehicle B-Double; - Install a 1.5m wide broom finished standard Portland grey concrete path along the verge on one side of the accessway reserve. Note 1: These works are to be in accordance with the intent of the relevant Brisbane Planning Scheme Codes, the Manual of Uniform Traffic Control and the Austroads design standards and is also endorsed by the certifying RPEQ. Note 2: Where a development does not meet the acceptable outcomes of a code it will be assessed against the performance outcomes of the code. Performance outcomes can be demonstrated in an engineering report prepared and certified by a RPEQ in accordance with the Infrastructure Design Planning Scheme Policy. |
As indicated |
46(a) Submit Roadworks and Drainage
Drawings Submit to, and obtain approval from, Development Services Roadworks and Drainage Drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes. Timing: Prior to site/operational/building work commencing. |
As indicated |
46(b) Implement Approved
Drawings Construct the works in accordance with the above approved drawings. Timing: Prior to Council's notation on the plan of subdivision. |
As indicated |
46(c) Submit As Constructed
Drawings Submit to Development Services As Constructed drawings prepared by a Registered Professional Engineer Queensland. Timing: Prior to Council's notation on the plan of subdivision. PROOF OF FULFILMENT Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the approved drawings. |
As indicated |
| 47) Land for Transport Network - Road (Trunk) Any Material Change of Use it to dedicate as road the land shown as new road (trunk) on the Road Widening Plan, Drawing no. RC16154 Issue 3 dated 13 July 2022 for the Transport Network which forms part of LGIP ID DAR-RI-004 in the Local Government Infrastructure Plan 2016 including the following: i. An 8.1 metre widening along the Harcourt Road frontage of the site which then tapers at each end; NOTE: This condition is imposed under section 128 of the Planning Act 2016. |
Prior to commencement of use |
47(a) Submit Plan of
Subdivision Submit for the approval of Development Services, a plan of subdivision showing the land to be dedicated for road to demonstrate compliance with the requirements of this condition. Timing: As part of the submission of request pursuant to Schedule 18 of the Planning Regulation 2017 for Council's notation on the plan of subdivision necessary to comply with this condition. |
As indicated |
47(b) Lodge Notated Plan Lodge the plan of subdivision notated by Council pursuant to Schedule 18 of the Planning Regulation 2017 with the Registrar of Titles for the relevant Queensland State Government Authority. Timing: Prior to commencement of use. PROOF OF FULFILMENT Evidence of the registration of the required plan of subdivision. Timing: Within one month of the registration of the plan of subdivision. |
As indicated |
| 48) Site Drainage - Major Any Material Change of Use within the lots forming part of Stage 3
of the Reconfiguring a lot under this development approval is to provide an internal
drainage system to collect stormwater run-off from all proposed lots, roofed
and developed surface areas and any run-off onto the site from adjacent areas
and convey the collected run-off to a lawful point of discharge, in accordance
with the approved Stormwater Management Plan, No. 24-0920SMP02-V4, dated 28 May
2026 and relevant Brisbane Planning Scheme Codes. Any Material Change of Use within the lots forming part of Stage 3 of the
Reconfiguration of a lot under this development approval on Lots 1-3 and 5-6
must be provided with detention to ensure the peak flows do not exceed the
values in Table 2-3:’Peak permissible flow rates’ ‘Lot
Permissible Site Discharge’. - The stormwater design
must ensure the stormwater runoff from the site does not adversely impact on
flooding or drainage (peak discharge and duration for all storm events up to
the 1% AEP event) of properties that are upstream, downstream or adjacent to
the site. Where a development has not specifically addressed this issue, the
development may require implementation of one or more mitigation measures to
offset adverse impacts, (e.g. stormwater detention, rainwater tanks, and
upgrade of stormwater drainage infrastructure). -
Where external works are required and infrastructure will be handed over to
Council (e.g. Stormwater pipes 375mm or greater and/or manholes within the road
reserve, etc), the applicant will be required to request an on-site Pre-Start
with Council and ensure all future owned Council assets follow the On/Off
Maintenance process in accordance with Councils Infrastructure Installation &
Construction Requirements Manual. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 49) Construction Noise and Dust Emissions Pursuant to the Environmental
Protection Act 1994, all development involving the emission of noise and dust
from building and/or construction activities, must ensure that the emissions
are in accordance with the requirements of the Act. |
As indicated |
| 50) Natural Assets Local Law (NALL) - Protected
Vegetation On Site Work on or around protected vegetation may require a permit under the Natural Assets Local Law 2003 (NALL). Permits under the NALL are issued by Development Services. To apply for a permit to work on protected vegetation go to Council's website or contact the call centre on 3403 8888 |
As indicated |
| 51) Natural Asset Local Law (NALL) - Protected
Vegetation on Public Land, Road or Park Work on or around protected vegetation on public land, road or park may require a permit under the Natural Assets Local Law (NALL). Arrangements must be made with Program Planning and Integration in relation to the works carried out on protected vegetation on public land, road or park including provision for costs and replacement planting as determined by Program Planning and Integration. Timing: Prior to carrying out any works on protected vegetation. |
As indicated |
| 52) Contaminated Materials and Soils Any contaminated materials or soils encountered during siteworks, must be handled, stored and disposed of in accordance with the requirements of the relevant authority of the Queensland Government. A person must not dispose of contaminated soil or a hazardous substance at a place other than at a place approved by the relevant authority of the Queensland Government. |
As indicated |
| 53) Management of Asbestos Disposal, handling and restoration of any building materials containing asbestos must be in accordance with current state and federal legislation. |
As indicated |
| 54) Stormwater Outlet into Waterways/Creeks &
Parks Ensure all stormwater outlets into parks, waterways and creeks are generally in accordance with Council's guideline 'Stormwater Outlets in parks & Waterways' 2003. Stormwater outlets are to be designed to minimise scouring velocity and associated bank/bed scour as per QUDM and Councils Infrastructure Design Planning Scheme Policy requirements. All scour protection and rehabilitation must extend from the stormwater outlet to the creek bed level and mitigate impacts to any existing vegetation and is to be shown on engineering drawings. Where necessary a rock lined swale or rock chute maybe required to convey water from the stormwater outlet to the creek/waterway invert and include localised stabilisation works where existing scour is occurring onsite. All works must be detailed on Vegetation Management Plans and/or Rehabilitation Plans where required as part of this approval. Note: If erosion associated with a stormwater outlet into a creek/waterway becomes evident during construction or the maintenance period of the development, stabilisation works are to be implemented to rectify the erosion/scour prior to handover as a Council asset. This may require Council approvals or permits. |
As indicated |
| 55) Further Development Permit Required Further Development Permit(s) to carry out assessable building work under the Building Act may be required. |
As indicated |
| 56) Plumbing and Drainage Work Pursuant to the Plumbing and Drainage Act 2018, any plumbing and drainage work must be carried out in compliance with the Plumbing and Drainage Regulation 2019. Plumbing and drainage permit work requires approval by Brisbane City Council prior to the work being carried out. |
As indicated |
| 57) Currency Period The currency period for this development approval is stated in the Decision Notice and is expressed as a date.
This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016. |
As indicated |
| 58) Referral Agency Requirements The SARA as a concurrence agency has imposed the requirements contained in the letter dated 3 June 2026 (ref: 2605-52297SPD). |
As indicated |
| 59) Cultural Heritage Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage. The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care. For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships). |
As indicated |
| 60) Equitable Access Provision must be made during and after construction
for equitable access for persons with disabilities to and within the site and
on adjoining public areas, in accordance with the following: |
As indicated |
| 61) Fire Ant Movement Controls To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected. These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products. Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014. For further information contact the relevant Queensland State Government department on 13 QGOV. |
As indicated |
| 62) Water and Wastewater Services for water and wastewater (sewerage) are not under the jurisdiction of Brisbane City Council. Authorisation to connect the approved development to the water/wastewater networks and for property service connections required a Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009. For further information about any necessary Water Approvals contact Urban Utilities. |
As indicated |
| Permit to Which These Conditions Relate: | DA - PA - Reconfiguring a Lot |
| Activity(ies): | Subdivision of Land |
| Stage: | Stage 2 - Reconfiguring a lot (1 into 2 lots) |
| 63) Commencement of Use Stage 2 must not commence use until all conditions
relating to the earlier Stage 1 have been complied with, and the plan of
subdivision for the approved reconfiguration of a lot in Stage 1 has been
registered with the Registrar of Titles for the relevant Queensland State
Government Authority. Timing: When all conditions relating to the earlier
stage have been complied with and Registration of the plan of
subdivision. |
As indicated |
| 64) Approved Drawings and Documents A legible copy of the Council approved
DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained
on site and kept available for inspection by site workers and Council
officers. |
While site/operational/building work is occurring |
| 65) Carry Out the Approved Development Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS. Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks). Permission to enter neighbouring properties must be obtained from the relevant property owners. |
While site/operational/building work is occurring |
| 66) Demolish or Relocate Buildings/Structures Demolish or Relocate buildings/structures on the site in accordance with the approved DRAWINGS AND DOCUMENTS and where applicable, the approved Construction Management Plan.
The removal of buildings/structures includes the removal of all existing concrete slabs, foundations and footings. |
Prior to Council's notation on the plan of subdivision |
| 67) Complete All Operational Work Complete all operational work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such operational work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS or, if requiring a further approval from the Council, in accordance with the relevant further approval(s). |
Prior to Council's notation on the plan of subdivision and then to be maintained |
| 68) Retain and Protect Existing Street Tree(s) Identify, retain and protect the existing street trees unless otherwise agreed in writing with Public Space Operations Arboriculture Planning (PSO-Arb PLANNING). Note: Street trees are protected under the Natural Assets Local Law. Street trees must not be removed or pruned without prior approval from PSO-Arb PLANNING. Where driveway crossovers occur within the Tree Protection Zone (TPZ) of existing street trees, seek approval from the PSO-Arb PLANNING the final driveway crossover design and construction methodology to ensure the successful retention of the existing street tree(s). PROOF OF FULFILMENT Contextual photographic evidence that the tree has been retained in equal or greater health than before development commenced. OR, evidence in writing from Program Planning and Intergration Arboriculture that an alternative arrangement has been made. |
At all times |
68(a) Implement Protection
Measures Install tree protection measures in accordance with Australian Standard - AS4970 Retention of Trees on Development Site. There must be no excavation, filling or storage of materials or plant within the drip line of the tree(s). Where works are within the canopy drip line of existing street trees, contact PSO-Arb PLANNING in relation to the required provision of protection measures. Note: If fencing is to protect street trees, a permit to temporarily occupy the footway will be required from Compliance and Regulatory Services. Timing: Prior to site/operational work occurring. |
As indicated |
68(b) Maintain Protection
Measures Maintain protection measures while development is occurring and remove protection measures prior to commencement of the use. Timing: While to site/operational work is occurring. PROOF OF FULFILMENT Contextual photographic evidence to demonstrate the installation of protection measures prior to building works commencing. |
As indicated |
| 69) Streetscape Works - Industrial Street Carry out streetscape improvement works to the Harcourt Rd site frontage including concrete path (where required by this condition), turf and street trees to the verge to an Industrial Street standard in accordance with the relevant Brisbane Planning Scheme Codes, Brisbane Standard Drawings (BSD), the requirements of this condition and the Infrastructure Design Planning Scheme Policy including sections 3.7.4.5 and 3.7.5. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL) |
69(a) Turf Install turf to the
full width of the verge excluding any concrete path required by this
condition. |
As indicated |
69(b) Street Tree(s) Enter into and implement an arrangement with the Public Space Operations Arboriculture Planning (PSO-Arb PLANNING) in relation to the required provision of the street tree planting in accordance with the above sections of the Infrastructure Design Planning Scheme Policy, including the number, species, location, installation and maintenance of the required street tree(s) as determined by PSO-Arb PLANNING. Provide to Development Assessment a copy of the agreement signed by PSO-Arb PLANNING. Note: Street trees should not be planted until all utilities have been installed.
|
As indicated |
| 70) Grant Easements Grant the following easement(s) as may be
required: Timing: As part of the plan of subdivision notated by Council, and then to be maintained. |
As indicated |
70(a) Submit Plan of Subdivision and
Documentation (Council Easement in Gross) Submit to, and obtain approval from, Development Services a plan of subdivision showing the easement and a request for Council to prepare the necessary easement documentation to demonstrate compliance with the requirements of this condition. Note: Easements in favour of the Brisbane City Council must have the necessary easement documentation prepared by the Brisbane City Council, free of cost to Council. Timing: Prior to submission of the request pursuant to Schedule 18 of the Planning Regulation 2017 for Council's notation on the plan of subdivision necessary to comply with this condition or give effect to this approval. |
As indicated |
70(b) Submit Plan of Subdivision and
Documentation (other Easement) Submit to, and obtain approval from, Development Services, a plan of subdivision showing the easement and the necessary easement documentation to demonstrate compliance with the requirements of this condition. Note: Easements not in favour of the Brisbane City Council must have the necessary documentation prepared by the applicant's private solicitors. Timing: As part of the submission of the request pursuant to Schedule 18 of the Planning Regulation 2017 for Council's notation on the plan of subdivision necessary to comply with this condition or give effect to this approval. |
As indicated |
70(c) Lodge Notated Plan and
Documentation Lodge the plan of subdivision notated by Council pursuant to Schedule 18 of the Planning Regulation 2017 and the necessary easement documentation with the Registrar of Titles for the relevant Queensland State Government Authority. Timing: As part of the registration of the plan of subdivision notated by Council. PROOF OF FULFILMENT Evidence of the registration of the necessary easement documentation. Timing: Within one month of the registration of the easement documentation. |
As indicated |
| 71) Ponding of Stormwater Carry out the approved development to
ensure that adjoining properties and roads are protected from ponding or
nuisance from stormwater during construction. |
Prior to Council's notation on the plan of subdivision |
| 72) Telecommunications Submit to Development Services, evidence of an agreement with a telecommunication carrier to provide underground telecommunication services within and adjacent to the proposed development in accordance with the relevant Brisbane Planning Scheme Codes. |
Prior to Council's notation on the plan of subdivision |
| 73) Agreement with Electricity Supplier Submit to Development Services, evidence of an agreement with an electricity supplier to provide necessary services to the development in accordance with the relevant Brisbane Planning Scheme Codes. Where development is within an established area of overhead electricity supply and the electricity supplier determines that a property pole is the appropriate solution to supply electricity to the development, the developer must be responsible for the installation of the property pole(s). In the above circumstances, submit to Development Services, certification from the developer's electrical consultant confirming that the above installation has been completed in accordance with the relevant AS/NZS Standards and the Queensland Electricity Connection Manual (QECM) and Queensland Electricity Metering Manual (QEMM). |
Prior to Council's notation on the plan of subdivision |
| 74) Water and Wastewater Pursuant to Schedule 18 of the Planning Regulation 2017 submit to Development Services, documentary evidence, issued by the relevant distributor-retailer, to verify that the conditions of any necessary connection certificate under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009, have been complied with. |
Prior to Council's notation on the plan of subdivision |
| 75) Natural Assets Local Law (NALL) - Protected
Vegetation On Site Work on or around protected vegetation may require a permit under the Natural Assets Local Law 2003 (NALL). Permits under the NALL are issued by Development Services. To apply for a permit to work on protected vegetation go to Council's website or contact the call centre on 3403 8888. |
As indicated |
| 76) Further Development Permit Required Further Development Permit(s) to carry out assessable building work under the Building Act may be required. |
As indicated |
| 77) Plumbing and Drainage Work Pursuant to the Plumbing and Drainage Act 2018, any plumbing and drainage work must be carried out in compliance with the Plumbing and Drainage Regulation 2019. Plumbing and drainage permit work requires approval by Brisbane City Council prior to the work being carried out. |
As indicated |
| 78) Currency Period The currency period for this development approval is stated in the Decision Notice and is expressed as a date. This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016. |
As indicated |
| 79) Referral Agency Requirements The SARA as a concurrence agency has imposed the requirements contained in the letter dated 3 June 2026 (ref: 2605-52297SPD). |
As indicated |
| 80) Cultural Heritage Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage. The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care. For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships). |
As indicated |
| 81) Contaminated Land The owner or occupier must give notice to the relevant State administering authority of any notifiable activity being carried out on the land, in accordance with the Environmental Protection Act 1994. For further information about Contaminated Land contact the relevant Queensland State Government department on 13 QGOV. |
As indicated |
| 82) Damage to Trees on Adjoining Land Please note that any damage caused to vegetation on adjoining land as a result of exercising this development approval may result in an offence under other legislation (e.g. Natural Assets Local Law) and/or civil action. |
As indicated |
| 83) Fire Ant Movement Controls To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected. These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products. Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014. For further information contact the relevant Queensland State Government department on 13 QGOV. |
As indicated |
| 84) Natural Asset Local Law (NALL) - Protected
Vegetation on Public Land, Road or Park Work on or around protected vegetation on public land, road or park may require a permit under the Natural Assets Local Law (NALL). Arrangements must be made with Program Planning and Integration in relation to the works carried out on protected vegetation on public land, road or park including provision for costs and replacement planting as determined by Program Planning and Integration. Timing: Prior to carrying out any works on protected vegetation. |
As indicated |
| Permit to Which These Conditions Relate: | DA - PA - Reconfiguring a Lot |
| Activity(ies): | Subdivision of Land |
| Stage: | Stage 3 - Reconfiguring a lot (1 into 5 lots), New Road and Access Easement |
| 85) Commencement of Use Stage 3 must not commence use until
all conditions relating to the earlier Stage 2 have been complied with, and the
plan of subdivision for the approved reconfiguration of a lot in Stage 2 has
been registered with the Registrar of Titles for the relevant Queensland State
Government Authority. |
As indicated |
| 86) Approved Drawings and Documents A legible copy of the Council approved
DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained
on site and kept available for inspection by site workers and Council
officers. |
While site/operational/building work is occurring |
| 87) Carry Out the Approved Development Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS. Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks). Permission to enter neighbouring properties must be obtained from the relevant property owners. |
While site/operational/building work is occurring |
| 88) Demolish or Relocate Buildings/Structures Demolish or Relocate buildings/structures on the site in accordance with the approved DRAWINGS AND DOCUMENTS and where applicable, the approved Construction Management Plan.
The removal of buildings/structures includes the removal of all existing concrete slabs, foundations and footings. |
Prior to Council's notation on the plan of subdivision |
| 89) Street Naming (Public Roads) Provide street name signs |
Prior to Council's notation on the plan of subdivision |
89(a) Submit Street Names Submit to, and obtain approval from, Development Services for proposed street names. Timing: A minimum of four weeks prior to lodging the request for Council's notation of the plan of subdivision |
As indicated |
89(b) Supply and install Supply and install the street name signs in accordance with the street names approved by Council. Timing: Prior to Council's notation of the plan of subdivision. |
As indicated |
| 90) Complete All Operational Work Complete all operational work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such operational work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS or, if requiring a further approval from the Council, in accordance with the relevant further approval(s). |
Prior to Council's notation on the plan of subdivision and then to be maintained |
| 91) Retain and Protect Existing Street Tree(s) Identify, retain and protect the existing street trees unless otherwise agreed in writing with Public Space Operations Arboriculture Planning (PSO-Arb PLANNING). Note: Street trees are protected under the Natural Assets Local Law. Street trees must not be removed or pruned without prior approval from PSO-Arb PLANNING. Where driveway crossovers occur within the Tree Protection Zone (TPZ) of existing street trees, seek approval from PSO-Arb PLANNING for the final driveway crossover design and construction methodology to ensure the successful retention of the existing street tree(s). PROOF OF FULFILMENT Contextual photographic evidence that the tree has been retained in equal or greater health than before development commenced. OR, evidence in writing from Program Planning and Intergration Arboriculture that an alternative arrangement has been made. |
At all times |
91(a) Implement Protection
Measures Install tree protection measures in accordance with Australian Standard - AS4970 Retention of Trees on Development Site. There must be no excavation, filling or storage of materials or plant within the drip line of the tree(s). Where works are within the canopy drip line of existing street trees, contact Public Space Operations Arboriculture Planning (PSO-Arb PLANNING) in relation to the required provision of protection measures. Note: If fencing is to protect street trees, a permit to temporarily occupy the footway will be required from Compliance and Regulatory Services. Timing: Prior to site/operational work occurring. |
As indicated |
91(b) Maintain Protection
Measures Maintain protection measures while development is occurring and remove protection measures prior to commencement of the use. Timing: While to site/operational work is occurring. PROOF OF FULFILMENT Contextual photographic evidence to demonstrate the installation of protection measures prior to building works commencing. |
As indicated |
| 92) Streetscape Works - Industrial Street Carry out streetscape improvement works to the Harcourt Rd site frontage including concrete path (where required by this condition), turf and street trees to the verge to an Industrial Street standard in accordance with the relevant Brisbane Planning Scheme Codes, Brisbane Standard Drawings (BSD), the requirements of this condition and the Infrastructure Design Planning Scheme Policy including sections 3.7.4.5 and 3.7.5. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL) |
92(a) Turf Install turf to the
full width of the verge excluding any concrete path required by this
condition. |
As indicated |
92(b) Street Tree(s) Enter into and implement an arrangement with the Public Space Operations Arboriculture Planning (PSO-Arb PLANNING) in relation to the required provision of the street tree planting in accordance with the above sections of the Infrastructure Design Planning Scheme Policy, including the number, species, location, installation and maintenance of the required street tree(s) as determined by PSO-Arb PLANNING. Provide to Development Assessment a copy of the agreement signed by PSO-Arb PLANNING. Note: Street trees should not be planted until all utilities have been installed. Timing: Prior to issue of Certificate of Occupancy / Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation on the plan of subdivision (ROL). |
As indicated |
| 93) Grant Easements Grant the following easement(s) as may be required: (i) Easements, in favour of
Brisbane City Council for: (ii) Easement for the purpose of access, construction and maintenance of utility services over lot 6 in favour of lots 3 and 5. (iii) Easement for the purpose of access,
construction and maintenance of utility services over lot 5 in favour of lots 3
and 6. (iv) Easements for emergency fire access purposes over lots 5 in favour of lot 4 as indicated on the approved DRAWINGS AND DOCUMENTS. Timing: As part of the plan of subdivision notated by Council, and then to be maintained. |
As indicated |
93(a) Submit Plan of Subdivision and
Documentation (Council Easement in Gross) Submit to, and obtain approval from, Development Services a plan of subdivision showing the easement and a request for Council to prepare the necessary easement documentation to demonstrate compliance with the requirements of this condition. Note: Easements in favour of the Brisbane City Council must have the necessary easement documentation prepared by the Brisbane City Council, free of cost to Council. Timing: Prior to submission of the request pursuant to Schedule 18 of the Planning Regulation 2017 for Council's notation on the plan of subdivision necessary to comply with this condition or give effect to this approval. |
As indicated |
93(b) Submit Plan of Subdivision and
Documentation (other Easement) Submit to, and obtain approval from, Development Services, a plan of subdivision showing the easement and the necessary easement documentation to demonstrate compliance with the requirements of this condition. Note: Easements not in favour of the Brisbane City Council must have the necessary documentation prepared by the applicant's private solicitors. Timing: As part of the submission of the request pursuant to Schedule 18 of the Planning Regulation 2017 for Council's notation on the plan of subdivision necessary to comply with this condition or give effect to this approval. |
As indicated |
93(c) Lodge Notated Plan and
Documentation Lodge the plan of subdivision notated by Council pursuant to Schedule 18 of the Planning Regulation 2017 and the necessary easement documentation with the Registrar of Titles for the relevant Queensland State Government Authority. Timing: As part of the registration of the plan of subdivision notated by Council. PROOF OF FULFILMENT Evidence of the registration of the necessary easement documentation. Timing: Within one month of the registration of the easement documentation. |
As indicated |
| 94) Maintenance Period for Engineering Work Maintain the work required by the Engineering condition(s) imposed on this development approval and rectify any defects in accordance with the requirements detailed in this condition. NOTE: Guidance for requesting a pre-start and co- ordinating the On/Off Maintenance process can be found on Council's website (https://www.brisbane.qld.gov.au/planning-and-building/applying-and- post-approval/on-and-off-maintenance-approvals) Timing: During the on-maintenance period. |
As indicated |
94(a) On-Maintenance Acceptance Arrange an on- maintenance inspection with Development Services and obtain written confirmation from Council that the work has been completed in accordance with the requirements of the condition and is accepted on-maintenance. Provide proof of Public Liability Insurance ($20 million) for the on- maintenance period. Lodge a maintenance security for the on-maintenance period. The security must be calculated as 5% of the value of the constructed work or $10,000.00, whichever is greater. NOTE: A maintenance security may consist of either a bank guarantee or monetary payment lodged with Council. Refer to Council's Infrastructure Installation and Construction Requirements Manual for further details about the on-maintenance procedure and requirements. Timing: Prior to Council's notation on the plan of subdivision. |
As indicated |
94(b) On-Maintenance Period Provide a minimum 12 months maintenance to the work from the time the work is accepted on- maintenance by Council. During this period maintain the work and rectify any defects identified at the on-maintenance inspection and those arising during the on-maintenance period. NOTE: The on-maintenance period may be extended by Council pending concerns and/or unsatisfactory performance during the maintenance period. Timing: A minimum 12 months from acceptance on-maintenance. |
As indicated |
94(c) Off-Maintenance
Acceptance On completion of the maintenance period arrange an off-maintenance inspection with Development Services and obtain written confirmation from Council that the work is accepted off-maintenance. Ensure all defects are rectified prior to making an appointment for off- maintenance Inspection. NOTE: If the inspection is successful the maintenance security will be released. Timing: On completion of the on-maintenance period. |
As indicated |
| 95) Information Signage Erect an information sign on the subject property in accordance with Council's general requirements for signage and in accordance with the requirements outlined below: a) The sign should provide a brief description of the development proposed; b) The sign is to list the name, postal and/or email address and a contact telephone number for the following parties (where relevant) that are undertaking work on the site: -
Developer; c) The lettering on the sign is to be at least 25 millimetres in height, be of regular weight and in sentence case; d) The sign is to be a minimum size of 1,200 millimetres by 900 millimetres; e) The maximum area of the sign is to be 2.0m2; f) The sign is to be positioned as follows: - located centrally along each road frontage of the site to Harcourt
Road and Ipswich Road; g) The sign is to contain no commercial or corporate advertising other than the name, logo or slogan of the parties outlined in part (b) of this condition; h) The sign is to be non- illuminated; and i) Both the sign and the supporting structure are to be made of weatherproof material and to be properly maintained at all times. Timing: Prior to site works commencing and then to be maintained until completion of the development for all stages. |
As indicated |
| 96) Engineering Pre-Start Meeting Arrange and attend a pre-start meeting with Development Services. Applicable compliance and inspection fees must be paid, in full, to Council prior to the meeting being held. NOTE: To arrange an engineering pre-start meeting with Development Services an email supported by a completed copy of the Pre-Start Meeting Guidelines - Civil Engineering Works kit (https://www.brisbane.qld.gov.au/sites/default/files/20191008- cc11207-pre-start-meeting-guidelines-civil-engineering-works.pdf) is to be sent to dalodgement@brisbane.qld.gov.au a>. Details include (but are not limited too) the following: - Site address, Development Approval number (A00) and relevant stage/s (if appropriate); - List all Development Approval conditions requiring compliance prior to site/operational work commencing and demonstrate compliance with those conditions; - Payee details (Name and address) for the issue of a development "Compliance and Inspection Fee" quote; - Superintendent (Consultant) name, address and telephone number (including after-hours contact); - Contractor/s and major Sub- Contractor/s, name, address and telephone number (including after-hours contact); - Intended date of commencement of works. NOTE: - All operational works applications are to be approved prior to requesting the pre-start meeting. - A minimum 5 working days' notice is required. - Compliance and Inspection fee to be paid prior to undertaking pre-start meeting. - All operational works approved documents and the Development Approval package (conditions and plans) must be available at the pre-start meeting. - Further guidance for requesting a pre-start and co-ordinating the On/Off Maintenance process can be found on Council's website (https://www.brisbane.qld.gov.au/planning-and-building/applying-and- post-approval/on-and-off-maintenance-approvals). Timing: Prior to site/operational work commencing. |
As indicated |
| 97) Construction Management Plan (Minor) Carry out development in a method consistent with a Construction Management Plan (Minor) prepared in accordance with the requirements of this condition. |
While site/operational/building work is occurring |
97(a) Construction Management Plan (Minor) -
Prepare Plan Prepare a detailed Construction Management Plan (CMP) for the construction phase of the approved development. The Construction Management Plan must be in accordance with the relevant Brisbane Planning Scheme Codes and address the following: (i) Provision for pedestrian management including alternative pedestrian routes (adjacent to or surrounding the site); (ii) Existing and proposed kerbside allocation signs and line marking (such as bus stops, loading zones and parking meters and/or ticket dispensers); (iii) Location of and impacts to any Council or other public utility or local authority's assets on or within or external to the site; (iv) Location and design of temporary vehicular construction access points, including frequency of use; (v) Management and mitigation strategies for the impact of dust, noise and vibration upon adjoining and nearby properties; (vi) Provision for loading and unloading of materials including the location of any remote loading sites; (vii) Location of materials, structures, plant and equipment to be stored or placed on the construction site; (viii) Location of proposed external hoardings or gantries, including clearances to the impacts of this on existing street furniture and other footpath assets located within the verge as well as impacts on any existing advertising signage located either along or adjacent to the site frontage this includes any potential obstruction of sight lines for such advertising (e.g. 'CityCycle' bicycle stations or bus stops with advertising); (ix) Location of proposed employee and visitor parking areas; (x) Anticipated staging and programming; (xi) Impacts of any actions proposed to address any of the above items or any actions resulting from construction of the development that will impact on existing street trees; (xii) Complaint management processes to be implemented; and (xiii) Compliance with the Management Plans Planning Scheme Policy and other relevant Planning Scheme Policies. The Construction Management Plan must be supported by "approval in principle" or written approvals from the relevant Council sections or other governing bodies responsible for any potentially impacted infrastructure. The list of relevant infrastructure and contacts is available on Council's website - Search "Constructions Management Plan". Note: The Construction Management Plan is not required to be approved by Development Services. Timing: Prior to site/operational work commencing. |
As indicated |
97(b) Construction Management Plan (Minor) -
Submit Plan Submit a copy of the Construction Management Plan to Council's Development Services Branch at the following mailbox: engineeringservices@brisbane.qld.gov.au quoting the BCC planning development approval reference number. Timing: At least 10 days prior to site works commencing |
As indicated |
97(c) Construction Management Plan (Minor) -
Documentation on Site Legible copies of the Construction Management Plan and current permits must be kept on site and be made available on request by Council at all times. The requirements of the CMP must be included in all induction of principal and subcontractors utilised in the development. An outline of the induction provided to contractors may be requested by Council to confirm compliance with this condition. Timing: While site/operational work is occurring. |
As indicated |
97(d) Construction Management Plan - Works to
be Performed Out of Hours Obtain an approval from Development Services for any
work that is proposed to be undertaken outside of normal business hours -
6:30am to 6:30pm, Monday to Saturday. |
As indicated |
97(e) Implement Construction Management Plan
(Minor) Carry out the development in accordance with the submitted Construction Management Plan. |
While site/operational/building work is occurring |
| 98) Protect Existing Infrastructure Where there is existing infrastructure in the vicinity of the proposed work, the new work must not damage or compromise the working ability of the existing infrastructure. Where alterations to public utility mains, existing mains, services or installations are necessitated by the development, prior to alterations commencing, the developer must notify Council or the relevant infrastructure provider and obtain agreement to the alterations. The developer must meet the costs of the alterations. The alterations must be carried out in accordance with the relevant Brisbane Planning Scheme Codes or infrastructure providers requirements. |
While site/operational/building work is occurring |
98(a) As Constructed Drawings - Alterations
to Existing Infrastructure Submit to Development Services As Constructed drawings showing all new and/or rectification works and an asset register, prepared and certified by a Registered Professional Engineer Queensland. Timing: Prior to Council's notation on the plan of subdivision. PROOF OF
FULFILMENT Certification from a Registered Professional Engineer Queensland, confirming that the alterations have been completed in accordance with the relevant Brisbane Planning Scheme Codes and any other relevant infrastructure requirements. |
As indicated |
| 99) Filling and/or Excavation All earthworks must be carried out in accordance with the relevant Brisbane Planning Scheme Codes. |
Prior to Council's notation on the plan of subdivision |
99(a) Submit Earthworks
Drawings Submit to, and obtain approval from, Development Services earthworks drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the approved DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes. The Earthworks Drawings must include the following: - The location of any cut and/or fill; Note: - If the earthworks impact on the road reserve, the Developer must obtain
applicable footpath and road permits prior to commencing any works. Such
impacts may include footpath occupation, road closures, re-profiling, ground
anchors and/or relocation of services. If the excavation has to be stabilised
using ground anchors or similar, then the submitted plans must show the
location of these in relation to all services. The cost of moving services,
utilities and assets is the responsibility of the Developer. The permission of
the service/utility/asset owner is required. Timing: Prior to site/operational work commencing. |
As indicated |
99(b) Fill Material, Placement, Compaction
and Testing All fill material placed on the site must comprise only natural earth and rock and must be free of contaminants (as defined by Part 3, Division 2, Subdivision 2 Environmental contamination, Section 11 of the Environmental Protection Act 1994) and noxious, hazardous, deleterious and organic materials. Fill material, placement, compaction and testing must comply with the requirements of Australian Standard - AS 3798, Guidelines on Earthworks for Commercial and Residential Developments. Timing: While site/operational work is occurring. |
As indicated |
99(c) Implement Approved Earthworks
Drawings Construct and maintain
the earthworks in accordance with the requirements of AS3798 and the approved
earthworks drawings. |
As indicated |
99(d) Submit As Constructed
Drawings Submit to Development Services As Constructed drawings prepared by a Registered Surveyor (Qld). Timing: Prior to Council's notation on the plan of subdivision. |
As indicated |
99(e) Submit Certification Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the approved earthworks drawings. Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that all fill material used complies with the quality requirements of this condition and that placement, compaction and testing has been carried out in accordance with AS3798. Timing: Prior to Council's notation on the plan of subdivision. |
As indicated |
| 100) Certified Site Survey Levels Submit to Development Services, "As Constructed" drawings prepared by a Registered Surveyor (Qld). The registered surveyor must certify that the "As Constructed" drawings are in accordance with the APPROVED PLANS and the relevant Brisbane Planning Scheme Codes and show finished surface level information over the completed development. Note: The survey information must show surface levels and site contours at 1 metre intervals. All levels must be shown as Reduced Levels to the "Australian Height Datum" (AHD). |
Prior to Council's notation on the plan of subdivision |
| 101) Remove Improvements & Obstructions from Truncation
and Dedication Remove all improvements (fences, gates, letter boxes, garden beds and plots and other constructed items, etc.) and obstructions (existing earth banks, vegetation, etc.) from the area of dedicated road and reinstate the area as footway in accordance with the relevant Brisbane Planning Scheme Codes. Any new or existing installations of electrical pillar boxes, pad mounted transformers (PMTs), water meters and the like, must be installed/relocated to their ultimate alignment relative to the new property boundary and clear of the usable footpath areas irrespective of the alignment of the existing services/conduits. Note: -
The cost of moving services, utilities and assets is the responsibility of the
Developer. The permission of the service, utility or asset owner will be
required. Council permission is required if street trees, stormwater
gullies/drains, and swales are affected. Urban Utilities permission is required
if water supply and sewerage services are affected. PROOF OF
FULFILMENT Certification from a Registered Surveyor (Qld) or Registered Professional Engineer Queensland that the above work has been completed in accordance with this condition. |
Prior to Council's notation on the plan of subdivision |
| 102) Retaining Walls Design and construct all retaining walls and associated fences, in accordance with the relevant Brisbane Planning Scheme Codes and the following: - All retaining walls including the footings, must be located wholly within the property boundaries of the site where works are occurring - Runoff from surface drains and subsoil drainage associated with the retaining walls must be collected and connected to a lawful point of discharge (LPD) where possible. If no LPD is available the surface drains and sub-soil drainage must be designed, installed and discharged to ensure there is no ponding, nuisance or concentration of stormwater discharge to adjacent properties. - Retaining walls to stabilise excavation must be set back from property boundaries to accommodate subsoil drainage without encroachment into the neighbouring property. This set back may vary depending on the height, structure and design of the retaining wall, surcharge loadings from neighbouring properties, and to provide a surface drain along the top of the retaining wall - For retaining walls in excess of
1.0m in height: NOTE: Refer to City Plan 2014; Infrastructure Design Planning Scheme Policy (IDPSP) for Council’s definition of a LPD. |
Prior to Council's notation on the plan of subdivision |
102(a) Certification of Retaining
Walls For retaining walls over 1.0m in height, obtain certification from a Registered Professional Engineer Queensland that the design and construction of the retaining walls and ancillary drainage are in accordance with the requirements of this condition. Timing: Prior to Council notation on the plan of subdivision. |
As indicated |
| 103) Repair Damage to Kerb, Footpath or Road Repair any damage to the existing kerb and channel, footpath or roadway (including removal of concrete slurry from footways, roads, kerb and channel, stormwater gullies and drainlines) and re-instate existing traffic signs and pavement markings that have been removed or damaged during any works carried out in association with the approved development. |
Prior to Council's notation on the plan of subdivision |
103(a) Interim Repairs If at any time during the construction phase of the approved development, damage to the existing kerb and channel, footpath or roadway creates unsafe, unreasonable and/or not fit for purpose conditions as assessed by Council, interim repairs must be undertaken as directed by Program Planning and Integration. Note: Any interim repairs required to be undertaken shall not be considered to satisfy the requirements of this condition for the permanent repair of the infrastructure prior to Council's notation on the plan of subdivision. Timing: While site/operational works is occurring |
As indicated |
| 104) Land for Transport Network - Road (Non-
trunk) Dedicate as road land shown as new road (non-trunk) on the APPROVED DRAWING Plan of Reconfiguration Stage 3, 25-0067S-02 Sheet No. 3 of 3 H received 28 May 2026 as amended in red 2 June 2026. NOTE: This condition is imposed under section 145 of the Planning Act 2016. PROOF
OF FULFILMENT The plan of subdivision is to clearly show the dimensions of the land dedication(s) required by this condition and certification by a registered surveyor (Qld) is to be provided that the plan of survey meets the requirements of this condition. |
Prior to Council's notation on the plan of subdivision |
| 105) Work for Transport Network - Road (Non-trunk) -
Internal Construct the following roadwork with any associated drainage, footpath, pathways and services including street lighting for the Transport Network (Road) shown on the approved drawing titled Concept Roadworks and Drainage Layout Plan, Drawing No. DA-0200, Rev B, dated 28 May 2026, in accordance with the relevant Brisbane Planning Scheme Codes, the Manual of Uniform Traffic Control Devices and the AUSTROADS design standards: -
culs-de-sac designed and constructed as Primary Freight
Accesses (designed for 85 percentile 40 km/hr maximum) and with street lighting
category V5; Note: This condition is imposed under section 145 of the Planning Act 2016. |
Prior to Council's notation on the plan of subdivision |
105(a) Submit Functional Layout
Drawings Submit to, and obtain approval from, Development Services functional layout drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes. Note: This approval must be obtained prior to the submission of drawings for Roadwork and Stormwater Drainage and Signs and Pavement Marking. Timing: Prior to site/operational work commencing. |
As indicated |
105(b) Submit Roadworks and Stormwater
Drainage Drawings Submit to, and obtain approval from, Development Services Roadworks and Stormwater Drainage Drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes. Timing: Prior to site/operational work commencing. |
As indicated |
105(c) Submit Street Lighting Design
Drawings Submit to, and obtain approval from, City Lighting, street lighting design drawings prepared and certified by a Registered Professional Engineer of Queensland (electrical) which show the proposed street lighting system in accordance with the relevant Brisbane Planning Scheme Codes. Timing: Prior to site/operational work commencing. |
As indicated |
105(d) Implement Approved
Drawings Construct the works in accordance with the above approved drawings. Timing: Prior to on-maintenance acceptance. |
As indicated |
105(e) Submit As Constructed
Drawings Submit to Development Services As Constructed drawings including an asset register and a pre-On-Maintenance Inspection Checklist, prepared and certified by a Registered Professional Engineer Queensland. Timing: Prior to on-maintenance inspection. PROOF OF FULFILMENT Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the above approved drawings. |
As indicated |
| 106) Streetscape Works - Subdivision New Road Carry out streetscape improvement works, including concrete path (where required by this condition), turf and street trees to the verge of the new road(s). Improvement works must be to an Industrial Street standard for Industrial roads and a Neighbourhood Street Minor standard for all other roads (Suburban/District/Neighbourhood/Local) in accordance with: - the relevant Brisbane Planning Scheme Codes; - Brisbane Standard Drawings (BSD); - the requirements of this condition; and - the Infrastructure Design Planning Scheme Policy including sections 3.7.4.4, 3.7.4.5 and 3.7.5. Note: standard path alignments for new roads are shown on Brisbane Standard Drawing BSD-5201 sheet 2. |
Prior to Council's notation on the plan of subdivision |
106(a) Concrete Path Install a 1.2m wide broom finished standard Portland grey concrete path to both sides of the carriageway of Suburban/District/Neighbourhood (bus route)/Industrial roads and one side of the carriage way of a Neighbourhood (non-bus route) roads and one side of all local streets. The edge of the path is to be setback 1.9m from the back of kerb for industrial roads and 1.48m from the back of kerb for all other roads. Transition to existing paths on verges that adjoin the development. The transition is to occur fronting the adjoining developments, not the subject site. Note: If the above requirements cannot be achieved, contact the Engineering Services Team via email: engineeringservices@brisbane.qld.gov.au Timing: Prior to Council's notation of the plan of subdivision. |
As indicated |
106(b) Submit As Constructed
Drawings Submit to Development Services As Constructed plans including an asset register, checked by a Registered Professional Engineer Queensland, certifying that the concrete path works have been completed in accordance with relevant Brisbane Planning Scheme Codes/Policies. Timing: Prior to Council's notation of the plan of subdivision. |
As indicated |
106(c) Turf Install turf to the full width of the verge excluding any concrete path required by this condition. Timing: Prior Council's notation of the plan of subdivision. |
As indicated |
106(d) Street Tree(s) Enter into and implement an arrangement with the Program Planning and Integration Regional Coordinator Arboriculture in relation to the required provision of the street tree planting in accordance with the above sections of the Infrastructure Design Planning Scheme Policy, including the number, species, location, installation and maintenance of the required street tree(s) as determined by Program Planning and Integration. Provide to Development Services a copy of the agreement signed by Program Planning and Integration. Note: Street trees should not be planted until all utilities have been installed. Timing: Prior to Council's notation on the plan of subdivision. |
As indicated |
| 107) Work for Internal Private Road - Major Construct the following roadworks with any associated drainage, signs, pavement marking, footpath, pathways and services including street lighting as shown on the Concept Roadworks and Drainage Layout Plan, Drawing No. DA-0200, Rev B, dated 28 May 2026 in accordance with the relevant Brisbane Planning Scheme Codes, the Manual of Uniform Traffic Control Devices and the AUSTROADS design standards: -Internal private road designed and constructed to a Freight-dependent development pavement standard or approved equivalent, with minimum 7.5m wide carriageway contained within a 10.0m wide accessway reserve, (designed for 85 percentile speed 40km/hr maximum and design vehicle B-Double; - Install a 1.5m wide broom finished standard Portland grey concrete path along the verge on one side of the accessway reserve. Note 1: These works are to be in accordance with the intent of the relevant Brisbane Planning Scheme Codes, the Manual of Uniform Traffic Control and the Austroads design standards and is also endorsed by the certifying RPEQ. Note 2: Where a development does not meet the acceptable outcomes of a code it will be assessed against the performance outcomes of the code. Performance outcomes can be demonstrated in an engineering report prepared and certified by a RPEQ in accordance with the Infrastructure Design Planning Scheme Policy. |
Prior to Council's notation on the plan of subdivision and then to be maintained |
107(a) Submit Roadworks and Drainage
Drawings Submit to, and obtain approval from, Development Services Roadworks and Drainage Drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes. Timing: Prior to site/operational/building work commencing. |
As indicated |
107(b) Implement Approved
Drawings Construct the works in accordance with the above approved drawings. Timing: Prior to Council's notation on the plan of subdivision. |
As indicated |
107(c) Submit As Constructed
Drawings Submit to Development Services As Constructed drawings prepared by a Registered Professional Engineer Queensland. Timing: Prior to Council's notation on the plan of subdivision. PROOF OF FULFILMENT Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the approved drawings. |
As indicated |
| 108) Remove Redundant Drainage Outlets Remove any redundant drainage outlets from
the kerb and channel including any associated pipe work across the footway and
reinstate the kerb and channel and the footway area in accordance with the
relevant Brisbane Planning Scheme Codes. |
Prior to Council's notation on the plan of subdivision |
| 109) Site Drainage - Major Provide an internal drainage system to collect stormwater run-off from all proposed lots, roofed and developed surface areas and any run-off onto the site from adjacent areas and convey the collected run-off to a lawful point of discharge, in accordance with the approved Stormwater Management Plan, No. 24- 0920SMP02-V4, dated 28 May 2026 and relevant Brisbane Planning Scheme Codes. Notes: - The stormwater design has made provisions that future Lots 1-3 and 5-6 will require the installation of detention as part of future development to ensure the peak flow to the existing channel within the Ipswich Road verge is not increased beyond the existing design allowance. - The stormwater design must ensure
the stormwater runoff from the site does not adversely impact on flooding or
drainage (peak discharge and duration for all storm events up to the 1% AEP
event) of properties that are upstream, downstream or adjacent to the site.
Where a development has not specifically addressed this issue, the development
may require implementation of one or more mitigation measures to offset adverse
impacts, (e.g. stormwater detention, rainwater tanks, and upgrade of stormwater
drainage infrastructure). Guidance for requesting a pre-start and co- ordinating the On/Off Maintenance process can be found on Council's website (https://www.brisbane.qld.gov.au/planning-and-building/applying-and-post- approval/on-and-off-maintenance-approvals. |
Prior to Council's notation on the plan of subdivision |
109(a) Submit Site Drainage
Drawings Submit to, and obtain approval from, Development Services, site drainage drawings and engineering calculations, prepared and certified by a Registered Professional Engineer Queensland, in accordance with the relevant Brisbane Planning Scheme Codes. Note: -
Queensland Building and Construction Commission licensed hydraulic consultants
may design the stormwater system for sites less than 2000m2 with an upstream
catchment servicing no more than 4 residential lots. This excludes stormwater
drainage design (including subsoil drainage) of basements in flood planning
areas and the design of any onsite stormwater detention system Timing: Prior to site/operational work commencing |
As indicated |
109(b) Implement Approved
Drawings Carry out the works in accordance with the approved site drainage drawings. Timing: Prior to Councils notation on the plan of subdivision. |
As indicated |
109(c) Submit As Constructed
Drawings Submit to Development Services As Constructed drawings prepared and certified by a Registered Professional Engineer Queensland or a Queensland Building and Construction Commission licensed hydraulic consultants (where applicable). Note: To be submitted via DA- ComplianceEngineering@brisbane.qld.gov.au and include the site address, A00 reference and Condition number in the subject line. Timing: Prior to Council's notation on the plan of subdivision. PROOF OF
FULFILMENT Certification (incl. QA documentation, CCTV, etc) from a Registered Professional Engineer Queensland, or a Queensland Building and Construction Commission licensed hydraulic consultants (where applicable), confirming that the works have been completed in accordance with the above stormwater approved site drainage drawings. Timing: Prior to Council's notation on the plan of subdivision. |
As indicated |
| 110) Ponding of Stormwater Carry out the approved development to
ensure that adjoining properties and roads are protected from ponding or
nuisance from stormwater during construction. |
Prior to Council's notation on the plan of subdivision |
| 111) Street Lighting Provide street lighting in accordance with the requirements of this approval and the relevant Brisbane Planning Scheme Codes. Note: for required lighting categories please refer to the roadworks and/or pathway conditions within this conditions package. PROOF OF FULFILMENT Evidence of an agreement with an electricity supply authority to provide a public lighting system in accordance with the approved street lighting design drawings. |
Prior to Council's notation on the plan of subdivision |
| 112) Service Conduits and Mains Provide and install all service conduits and meet the cost of any alterations to public utility mains, existing mains, services, street lighting or installations that are required to carry out the approved development. These works must be in accordance with the relevant Brisbane Planning Scheme Codes, and include the following, where applicable: - the provision of all services and/or conduits
along the full length of any rear allotment access or access easement. Note: -
The cost of moving services, utilities and assets is the responsibility of the
Developer. The permission of the service, utility or asset owner will be
required. Council permission is required if street trees, stormwater
gullies/drains, and swales are affected. Urban Utilities permission is required
if water supply and sewerage services are affected. PROOF OF FULFILMENT Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the requirements of this condition. Note: Civil works are to be certified by a RPEQ(Civil) and electrical works are to be certified by a RPEQ (Electrical) |
Prior to Council's notation on the plan of subdivision |
112(a) Submit As Constructed
Drawings Submit to Development Services As Constructed drawings, including an asset register, prepared by a Registered Professional Engineer Queensland. Timing: Prior to Council's notation of the plan of subdivision. PROOF OF
FULFILMENT Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the requirements of this condition. Note: Civil works are to be certified by a RPEQ(Civil) and electrical works are to be certified by a RPEQ (Electrical) |
As indicated |
| 113) Telecommunications Submit to Development Services, evidence of an agreement with a telecommunication carrier to provide underground telecommunication services within and adjacent to the proposed development in accordance with the relevant Brisbane Planning Scheme Codes. |
Prior to Council's notation on the plan of subdivision |
| 114) Agreement with Electricity Supplier Submit to Development Services, evidence of an agreement with an electricity supplier to provide necessary services to the development in accordance with the relevant Brisbane Planning Scheme Codes. Where development is within an established area of overhead electricity supply and the electricity supplier determines that a property pole is the appropriate solution to supply electricity to the development, the developer must be responsible for the installation of the property pole(s). In the above circumstances, submit to Development Services, certification from the developer's electrical consultant confirming that the above installation has been completed in accordance with the relevant AS/NZS Standards and the Queensland Electricity Connection Manual (QECM) and Queensland Electricity Metering Manual (QEMM). |
Prior to Council's notation on the plan of subdivision |
| 115) Water and Wastewater Pursuant to Schedule 18 of the Planning Regulation 2017 submit to Development Services, documentary evidence, issued by the relevant distributor-retailer, to verify that the conditions of any necessary connection certificate under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009, have been complied with. |
Prior to Council's notation on the plan of subdivision |
| 116) Permanent Driveway Crossover Provide a Type C4 permanent driveway crossover to the New Road frontage of proposed lot 6 generally in accordance with standard drawing BSD- 2021 Sheet 1 of 2 (Revision F) and Sheet 2 of 2 (Revision G) and the relevant Brisbane Planning Scheme Codes and located as shown on the approved DRAWINGS AND DOCUMENTS. Written consent must be obtained from BCC - Field Services, Program Planning and Integration Arborist prior to any works occurring that will either impact on or require removal of a street tree (this includes pruning and excavation within the root zone/canopy of the tree) At all times during construction of the crossover, safe pedestrian access along the site frontage must be maintained. Note: No further driveway permit is required however additional footway permits or lane closure permits may be required for footpath/verge closures and/or lane closures. These permits must be obtained prior to construction of the crossover. |
Prior to Council's notation on the plan of subdivision |
| 117) Natural Assets Local Law (NALL) - Protected
Vegetation On Site Work on or around protected vegetation may require a permit under the Natural Assets Local Law 2003 (NALL). Permits under the NALL are issued by Development Services. To apply for a permit to work on protected vegetation go to Council's website or contact the call centre on 3403 8888. |
As indicated |
| 118) Further Development Permit Required Further Development Permit(s) to carry out assessable building work under the Building Act may be required. |
As indicated |
| 119) Plumbing and Drainage Work Pursuant to the Plumbing and Drainage Act 2018, any plumbing and drainage work must be carried out in compliance with the Plumbing and Drainage Regulation 2019. Plumbing and drainage permit work requires approval by Brisbane City Council prior to the work being carried out. |
As indicated |
| 120) Currency Period The currency period for this development approval is stated in the Decision Notice and is expressed as a date. This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016. |
As indicated |
| 121) Referral Agency Requirements The SARA as a concurrence agency has imposed the requirements contained in the letter dated 3 June 2026 (ref: 2605-52297SPD). |
As indicated |
| 122) Cultural Heritage Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage. The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care. For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships). |
As indicated |
| 123) Contaminated Land The owner or occupier must give notice to the relevant State administering authority of any notifiable activity being carried out on the land, in accordance with the Environmental Protection Act 1994. For further information about Contaminated Land contact the relevant Queensland State Government department on 13 QGOV. |
As indicated |
| 124) Damage to Trees on Adjoining Land Please note that any damage caused to vegetation on adjoining land as a result of exercising this development approval may result in an offence under other legislation (e.g. Natural Assets Local Law) and/or civil action. |
As indicated |
| 125) Fire Ant Movement Controls To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected. These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products. Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014. For further information contact the relevant Queensland State Government department on 13 QGOV. |
As indicated |
| 126) Natural Asset Local Law (NALL) - Protected
Vegetation on Public Land, Road or Park Work on or around protected vegetation on public land, road or park may require a permit under the Natural Assets Local Law (NALL). Arrangements must be made with Program Planning and Integration in relation to the works carried out on protected vegetation on public land, road or park including provision for costs and replacement planting as determined by Program Planning and Integration. Timing: Prior to carrying out any works on protected vegetation. |
As indicated |