| Address of Site: | 28 SAMFORD RD ALDERLEY QLD 4051 28 SAMFORD RD ALDERLEY QLD 4051 32 SAMFORD RD ALDERLEY QLD 4051 |
| Real Property Description of Site: | L102 RP.20288 & L5 RP.163102 L3 RP.96856 L1 RP.133040 |
| Aspects of development and type of approval: | DA - PA - Material Change of Use Development Permit - multiple
dwelling,office |
| Council File Reference: | A007053603 Permit Reference Number/s: DAMC478711826. |
| Package Status: | APPROVED - Version 1 (9th of September, 2026 12:16:43 PM) |
| Package Generated: | 09/09/2026 |
| John GRIMSEY Built Environment Officer WaRRS Assessment john.grimsey@brisbane.qld.gov.au 34071331 |
William DANN Senior Engineer Engineering Services North William.Dann@brisbane.qld.gov.au 31780361 |
Andrew BLAKE Principal Engineer Engineering Services Hydraulics andrew.blake@brisbane.qld.gov.au (07) 3403 5018 |
| Ben COVE Principal Engineer Engineering Services Traffic Ben.Cove@brisbane.qld.gov.au |
Michael PICKERILL Network Planning Michael.Pickerill@brisbane.qld.gov.au |
Mario FURLAN Architect Architecture Team Mario.Furlan@brisbane.qld.gov.au (07) 3403 5698 |
| Thomas JONKER Landscape Architect Landscape Architecture Team Thomas.Jonker@brisbane.qld.gov.au 31780712 |
Kally CHEN Environmental Management Officer Environmental Management Services Kally.Chen@brisbane.qld.gov.au (07) 3403 8888 |
Liam PRENTICE Urban Planner Planning Services Special Assessment Liam.Prentice@brisbane.qld.gov.au 31782137 |
| Jian-Min CHEN Principal Urban Planner Planning Services Special Assessment jianmin.chen@brisbane.qld.gov.au (07) 3178 0821 |
DRAWINGS AND DOCUMENTS
| Drawing or Document | Number | Plan Date |
|---|---|---|
| Site Based Stormwater Management Plan | NA230692, Rev D | 22-JUN-2026 (Received) |
| General Arrangement Plan Basement | DA0002, Issue DA5 (Amended In Red 31-AUG-2026) | 07-AUG-2026 (Received) |
| General Arrangement Plan Ground Floor | DA0003, Issue DA6 | 07-AUG-2026 (Received) |
| General Arrangement Plan Level 01 | DA0004, Issue DA5 | 07-AUG-2026 (Received) |
| General Arrangement Plan Level 02 | DA0005, Issue DA3 | 22-JUN-2026 (Received) |
| General Arrangement Plan Level 03 | DA0007, Issue DA3 | 22-JUN-2026 (Received) |
| General Arrangement Plan Level 04 | DA0008, Issue DA3 | 22-JUN-2026 (Received) |
| General Arrangement Plan Level 05 | DA0009, Issue DA3 | 22-JUN-2026 (Received) |
| General Arrangement Plan Roof | DA0011, Issue DA2 | 22-JUN-2026 (Received) |
| Sections - Sheet 1 | DA0013, Issue DA3 | 22-JUN-2026 (Received) |
| Sections - Sheet 2 | DA0014, Issue DA3 | 22-JUN-2026 (Received) |
| Elevations West & North | DA0015, Issue DA5 | 07-AUG-2026 (Received) |
| Elevations South & East | DA0016, Issue DA3 | 22-JUN-2026 (Received) |
| Landscape Concept Plan | Rev D (Amended In Red 08-SEP-2026) | 22-JUN-2026 (Received) |
APPROVAL CONDITIONS
| Permit to Which These Conditions Relate: | DA - PA - Material Change of Use |
| Activity(ies): | multiple dwelling office |
| Stage: | Request to change the development approval under s81 of the Planning Act 2016 |
| 1) Approved Drawings and Documents A legible copy of the Council approved DRAWINGS
AND DOCUMENTS and the Development Approval Package must be available on
site. |
While site/operational/building work is occurring |
| 2) Carry Out the Approved Development Carry out the approved development generally in
accordance with the approved DRAWINGS AND DOCUMENTS. |
While site/operational/building work is occurring and then to be maintained |
| 3) Complete All Building Work Complete all building work associated with this
development approval, including work required by any of the conditions included
in the Development Approval Package. Such building work must be carried out
generally in accordance with the approved DRAWINGS AND DOCUMENTS, and, where
the building work is assessable development, in accordance with a current
development approval. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL), and then to be maintained |
| 4) Maintain the Approved Development Maintain the approved development generally in
accordance with the approved DRAWINGS AND DOCUMENTS, and any relevant Council
engineering or other approval required by the conditions. |
To be maintained |
| 5) Landscaping of Vacant Site If construction for the approved development
does not commence within 3 months of the demolition of the existing building(s)
on site, the site must be landscaped in accordance with a landscape drawing
that has been submitted to and approved by Development Assessment. |
As indicated |
| 6) Bicycle Parking Install and maintain secure bicycle parking and associated
support facilities consistent with the approved DRAWINGS AND DOCUMENTS and in
accordance with the relevant Brisbane Planning Scheme
Codes. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 7) Security Lighting Install and maintain a suitable system of security
lighting to operate from dusk to dawn within all areas where the public and
residents may gain access, including car parking areas, building entrances and
vegetated areas |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 8) Visitor Parking Visitor car parking
spaces must: - Be clearly labelled
as 'Visitor Parking'; and - Remain unimpeded by landscaping,
water tanks, storage (temporary or otherwise), gates (except for the roller
door/security gate as shown on the approved DRAWINGS AND DOCUMENTS) or any
other fitting, fixture or structure to provide 24 hour unrestricted
access for bona fide visitors. - Allow unrestricted access for bona
fide visitors by maintaining the roller door/security gate in a permanent open
position between the hours of 5am and 10pm; - Allow
bona fide visitors 24 hour unrestricted access to the visitor parking
spaces
between the hours of 10pm and 5am via an electronic
access control system; - The electronic access
control system is to be clearly located in a position which can be easily and
efficiently accessed while the vehicle is standing. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 9) Car Parking The car parking within the premises must be maintained
exclusively for the ancillary use of the development. The parking must not be
made available to the general public and there must not be signage erected on
or in the vicinity of the site advertising the availability of car parking to
the general public. |
To be maintained |
| 10) Final External Detailing of Building Construct the development in accordance with architectural drawings approved pursuant to this condition. The architectural drawings must be in accordance with the APPROVED DRAWINGS AND DOCUMENTS, relevant Brisbane Planning Scheme Codes and the requirements of this condition. |
To be maintained |
10(a) Submit Architectural
Drawings Submit
for the approval of Development Assessment architectural drawings prepared and
certified by a Registered Architect showing the final developed details of the
façade treatment, the ground interface and the roof top/building capping
elements which depict a higher level of documentation detail than that shown on
the APPROVED DRAWINGS AND DOCUMENTS, including: Elevation and façade treatment
drawings for all ground, podium and typical tower floor levels that demonstrate
the final design outcome for all elevations of the built form including: - Detailed plans, sections
and elevations at 1:50 or 1:20 scale for elements at the façade
including structural elements and fixed and operable elements such as
balustrades, screens, doors, windows, projecting fins and planter
beds/trellises - All servicing and infrastructure,
including but not limited to, padmount transformers,
pump rooms, fire hydrant boosters etc. - Roof top or building
capping elements, awnings and soffits - One rendered perspective
showing the intended finished built form The
architectural drawings must: - include dimensions for the extent of projecting elements, balustrade
height and door and window/glazing configurations - nominate materials, colours and
finishes -
have title blocks and be cross referenced to larger scaled
drawings. Timing: Prior to building works
commencing |
As indicated |
10(b) Arrange a Pre-Start
Meeting Arrange
a pre-start meeting with Development Assessment. Timing: Prior to building works commencing |
As indicated |
10(c) Implement Approved Architectural
Drawings Carry
out the building work in accordance with the approved architectural drawings.
Timing: While building work is occurring and then to be maintained |
As indicated |
10(d) Submit Certification Submit to Development Assessment
certification by a Registered Architect confirming that the building has been
constructed in accordance with the approved architectural
drawings. Timing: Prior to the commencement of the use |
As indicated |
| 11) Overall Height The overall height of the proposed building(s) must be in accordance with the floor and roof levels and overall height shown on the APPROVED DRAWINGS AND DOCUMENTS. |
While site/operational/building work is occurring and then to be maintained |
11(a) Submit Certification Submit to Development
Assessment certification from a registered surveyor confirming that the
“as constructed” floor and roof levels and overall height are in
accordance with the requirements of this condition. Timing: Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
| 12) Balconies/Verandahs/Terraces All balconies/verandahs/terraces must remain unenclosed with no shutters,
glazing, louvres or similar permanent fixtures. Note: Any Community Management Statement that may apply to this approval must contain a by-law which reflects the requirements of this condition. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 13) Driveway Material and Finishes Provide materials and finishes to the driveway
and external carparking surfaces that reduce the
visual impact of these areas when viewed from the street. One or a combination
of the following must be used: |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 14) Awning Lighting System Install a lighting system to the underside of the proposed awning fronting the Samford Road footpath in accordance with the following: |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
14(a) Submit Lighting Plan Submit for the approval of Asset Services a
detailed Lighting Plan demonstrating that the under awning lighting complies
with Australian Standard - AS/NZS 1158.3.1 -sub category P6, within - Road Lighting Part 3.1: Pedestrian area
(Category P) lighting - Performance and installation design requirements and
achieves glare control to ensure zero candelas (cd) at 90 degrees |
As indicated |
14(b) Implement Approved Lighting
Plan Carry out the
works in accordance with the approved Lighting Plan. |
As indicated |
14(c) Certification Submit to City Assets certification from a
licensed electrical contractor that the awning lighting has been installed in
accordance with the approved Lighting Plan. |
As indicated |
14(d) Maintain the Work Maintain the awning lighting, (including
operating costs) in accordance with the approved Lighting Plan from dusk to
dawn. |
As indicated |
| 15) Screen Air Conditioning and Other Plant
Enclosures Install and maintain suitable
screening to all air conditioning, lift motor rooms, plant and service
facilities located at the top of or on the external face of the building. The
screening structures must be constructed from materials that are consistent
with materials used elsewhere on the facade of the building. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 16) Sun Shading Devices Provide sun shading in accordance with the approved DRAWINGS AND DOCUMENTS. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 17) Provide Detailed and Textured Model Submit to Development Assessment, a detailed and
textured digital 3D model in Autodesk compatible format for inclusion into the
Brisbane City Council Virtual Brisbane 3D Model. The digital model must be a
high quality 3D Exterior Detailed Model to the extent of the development at a
standard which can be publicly viewable and include: |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 18) Landscape the Site - Self Certification Landscape the site in accordance with the
requirements of this condition. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL) |
18(a) Prepare a detailed Landscape Plan for
Self Certification Prepare a detailed Landscape Plan for areas nominated on the approved
drawings, in accordance with the approved Landscape Concept Plan, the relevant
Brisbane Planning Scheme Codes/Policies and the following conditions: |
Prior to site/operational/building work commencing |
18(b) Construct Approved Work Construct landscaping in accordance with the
prepared detailed Landscape Plan. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first |
18(c) Certify Work On completion of works, submit to Development
Assessment certification from: |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
18(d) Maintain Landscape Work Maintain the landscape generally in accordance
with the detailed plans. |
To be maintained |
| 19) Retain and Protect Existing Street Tree(s) Identify, retain and protect
the existing street trees unless otherwise agreed in writing with Asset
Services. |
While site/operational/building work is occurring |
19(a) Implement Protection
Measures Install
tree protection measures in accordance with Australian Standard - AS4970
Retention of Trees on Development Site. |
As indicated |
19(b) Maintain Protection
Measures Maintain
protection measures while development is occurring and remove protection
measures prior to commencement of the use. |
As indicated |
| 20) Street Tree Replacement Provide for replacement planting of the existing street tree (1x Xanthostemon chrysanthus - Golden Penda) fronting Lorne Street frontage of the development site. PROOF OF
FULFILMENT Contextual photographic evidence of installed replacement trees. OR, evidence in writing from Program Planning and Integration Arboriculture that an alternative arrangement has been made. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
20(a) Enter Arrangement Enter into an arrangement with Program, Planning and Integration Arboriculture (PPI Arb) to pay the cost or undertake works, as agreed with PPI Arb, for the removal and replacement planting of the existing street tree(s) fronting the development site. Timing: Prior to site/operational/building work commencing. |
As indicated |
20(b) Implement Arrangement Implement the arrangement agreed with PPI Arb. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
| 21) Transport Air Emissions All Multiple Dwellings units must be setback at least 10 metres from the kerb (minimum separation distance as specified in the Transport Air Quality Corridor Overlay Code) of Samford Road, or alternatively, any Multiple Dwellings units located within the 10 metres must be installed with ducted mechanical ventilation for the supply of outdoor air in compliance with AS 1668.2-2002: The use of ventilation and air conditioning in the buildings, and: (i) locates the mechanical
ventilation outdoor air intakes at least 10 metres from the kerb (measured in
the horizontal and vertical planes as specified in Transport Air Quality
Corridor Overlay Code); or (ii) include filtration of outdoor air to a minimum performance standard of
F6 or minimum efficiency reporting value (MERV) 9, and then to be
maintained. For Multiple Dwelling units located within 10m from the kerb as mentioned above, install ducted mechanical ventilation as per AO1(b) of the Transport Air Quality Corridor Overlay Code of Brisbane City Plan 2014, for the supply of outdoor air in compliance with AS 1668.2: The use of ventilation and air conditioning in the buildings, and: (i) locate the mechanical ventilation outdoor air intakes at least the minimum distance, measured in the horizontal and vertical planes (refer to Figure b), from the kerb as specified in Table 8.2.23.3.B of the Transport Air Quality Corridor Overlay Code of Brisbane City Plan 2014; or (ii) include filtration of outdoor air to a minimum performance standard of
F6 or minimum efficiency reporting value (MERV) 9, and then to be
maintained. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
21(a) Submit Certification Submit to Development Assessment certification that the requirements of this condition have been achieved. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 22) Hours of Operation Hours of operation for the approved Office must be in accordance with the following: · Hours of operation, including for deliveries, limited to 6am to 10pm. |
At all times |
| 23) Plant and Equipment Certification Submit to Development Assessment certification
from an appropriately qualified acoustic professional that all the mechanical
plant or equipment (e.g. generators, motors, compressors and pumps, air
conditioning, mechanical ventilation, refrigeration equipment or coldroom
motors): (i) is acoustically screened from adjoining sensitive
uses. Or (ii) is noise-attenuated and complies with the noise
criteria of the relevant Brisbane Planning Scheme Codes. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 24) Multiple Dwelling in Centre or Mixed Use
Zone The approved Multiple Dwelling
development must be designed, constructed and maintained to achieve a minimum
reduction in sound pressure level between the exterior of the building and the
bedrooms or indoor primary living areas of 30dBA, to achieve compliance with
the relevant Brisbane Planning Scheme Codes, AO21 / PO21 of Multiple Dwelling
Code of Brisbane City Plan 2014 v29.00/2023. Timing: Prior to building work
commencing, while building work is occurring and then to be
maintained |
As indicated |
24(a) Minimum Acoustic Performance of
Glazing Design and construct all bedrooms and other habitable rooms to achieve
the following minimum acoustic performance to comply with the applicable noise
criteria in accordance with the relevant Brisbane City Planning Scheme
Codes/Policies: Timing:
Prior to building work commencing, while building work is occurring and then to
be maintained |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first |
24(b) Submit Certification Submit to Development Assessment certification
from an appropriately qualified acoustic professional that the building has
been constructed in accordance with the design to achieve the above
criteria. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 25) On-site Erosion (medium risk) Minimise on-site
erosion and the release of sediment or sediment laden stormwater from the site
at all times. Timing: While site works are
occurring and until all exposed soil areas are permanently stabilised against
erosion. |
As indicated |
25(a) Prepare Erosion and Sediment Control
Plan Prepare Erosion and Sediment Control (ESC) Plan(s), and provide design
certificates for the site in accordance with the relevant Brisbane Planning
Scheme Codes. The plan(s) and design
certificates must be certified by a Certified Professional in Erosion and
Sediment Control (CPESC) or a Registered Professional Engineer Qld (RPEQ) with
suitable qualifications and experience in erosion and sediment
control. Documentary evidence demonstrating appropriate qualifications in
erosion and sediment control must be provided to the Council upon
request. At least 10 days prior to either
the pre-start meeting or commencement of site works, submit copies of design
certificates to Council’s Compliance and Regulatory Services
at: Timing: Prior to pre-start
meeting or commencement of any site works and to be maintained until all
exposed soil areas are permanently stabilised against
erosion. |
As indicated |
25(b) Attend a pre-start
meeting Request and attend a pre-start meeting with an Erosion & Sediment
Control Officer from Council’s Compliance and Regulatory Services. Requests are to be made when submitting
copies of all required documentation, including design certificates to:
CARS-
ESC@brisbane.qld.gov.au Timing: Prior to commencement of
any site works causing exposure of soil. |
As indicated |
25(c) Implement Certified Erosion and
Sediment Control Plan Implement the certified ESC plan(s) to maintain compliance
with all parts of the relevant Brisbane Planning Scheme Codes, while site works
are occurring and until all exposed soil areas are permanently stabilised
against erosion. The plan(s) and design
certifications must be available on site at all times for inspection by Council
officers until all exposed soil areas are permanently stabilised against
erosion. Minimise on-site erosion and the
release of sediment or sediment laden stormwater from the site at all
times. Timing: While site works are occurring and until all exposed
soil areas are permanently stabilised against erosion. |
As indicated |
| 26) Basement Excavation and Support Basement
excavation and support of all exposed walls must be carried out in accordance
with the relevant Brisbane Planning Scheme Codes and the requirements of this
condition. Timing: Prior to building
work commencing. |
As indicated |
26(a) Submit Engineering
Drawings Submit for the approval of Development Assessment
engineering drawings prepared and certified by a Registered Professional
Engineer Queensland in accordance with the relevant Brisbane Planning Scheme
detailing the design of the proposed excavation as well as proposed temporary
and permanent support (if no temporary proposed) systems. - detailed design of proposed temporary support of the
excavation; - if
no temporary support is proposed then detail design of the proposed permanent
support of the excavation; - any retention system, including associated drainage, is to
be wholly contained within the site unless written approval has been obtained
from the affected neighbouring property owner; -The existing and proposed finished levels in
reference to the Australian Height Datum (including cross-sections or long
sections into the adjacent properties); - Preservation of all drainage structures from the
effects of structural loading generated by the
excavation; -Protection of adjoining
properties and roads from ponding or nuisance from
stormwater; - all existing Brisbane City
Council stormwater lines and Maintenance Holes, including depths of Maintenance
Holes and clearances to retention structures is to be
shown. Where ground or rock anchors are proposed as a
temporary support (Note: permanent anchors are not acceptable) the design is to
include the following in addition to the above: - their position and length (in elevation view and sectional
view); - where the anchoring system is proposed to encroach into a
neighbouring property written approval is to be obtained from the affected
property owner; - Plans
must show the location of the ground anchors in relation to all existing
services and public utilities. The cost of relocating any existing services,
public utilities or BCC assets is the responsibility of the
Developer; Notes: Where any ground anchors or rock bolts are proposed
within 10metres in the vertical plane of a QUU sewer, QUU water main, BCC
stormwater line or combined sanitary drain assessment will be required against
the QDC section MP1.4 by the building certifier. (Ground anchors are not to be located closer than
1.0m vertically or 1.0m horizontally from existing or proposed Council
Infrastructure) Where public utilities such as QUU sewer or water
infrastructure, electricity, telecommunication or gas infrastructure will be
affected it is recommended advice be obtained from the
respective utility owner. |
As indicated |
26(b) Implement Approved Engineering
Drawings Construct and maintain the basement excavation and
proposed support system in accordance with the approved engineering
drawings. Timing: While basement
excavation and support system installation is occurring and then to be
maintained |
As indicated |
26(c) Submit Post Construction
Certification Submit certification by a Registered Professional
Engineer Queensland that the basement excavation and support have been
installed in compliance with the approved engineering drawings, the relevant
Brisbane Planning Scheme Codes and the requirements of this
condition. Timing:
Prior to building work commencing Where
ground or rock anchors have been installed, submit certification by a
Registered Professional Engineer Qld (geo-technical) that all anchors have been
de-stressed. Timing: Prior to issue of Certificate of
Classification/Final Inspection Certificate or prior to commencement of use,
whichever comes first. |
As indicated |
| 27) Information Signage Erect an "Information Sign" on the subject
property in accordance with Council’s general requirements for signage
and in accordance with the requirements outlined below: a)
The sign should provide a brief description of the development proposed; Developer; c) The lettering on the sign is to be at least
25 millimetres in height, be of regular weight and in sentence case; located centrally along each road
frontage of the site to Lorne Street and Samford Road; g) The sign is to contain no commercial
or corporate advertising other than the name, logo or slogan of the parties
outlined in part (b) of this condition; Timing: Prior to site works commencing and then to be maintained until completion of the development for all stages. |
As indicated |
| 28) Retaining Walls Design and construct all
retaining walls and associated fences, in accordance with the relevant Brisbane
Planning Scheme Codes and including the following: |
Prior to site/operational/building work commencing |
28(a) Certification of Retaining
Walls For
retaining walls over 1.0m in height, obtain certification from a Registered
Professional Engineer Queensland that the design and construction of the
retaining wall and ancillary drainage is in accordance with this condition. |
As indicated |
| 29) Construction Management Plan - Major Carry out development in
accordance with a Construction Management Plan prepared in accordance with the
requirements of this condition. |
While site/operational/building work is occurring |
29(a) Submit Construction Management
Plan Submit for the approval
of Development Assessment a Construction Management Plan for the demolition,
excavation and construction phases of the approved development. Separate
Construction Management Plans may be appropriate for the individual components.
The Construction Management Plan must be in accordance with the relevant
Brisbane Planning Scheme Codes, Workplace Health and Safety Legislation,
Environmental Protection Act, the requirements of any Concurrence Agency, any
other relevant legislative requirements and the following. |
As indicated |
29(b) Construction Management Plan - Pre-
start Meeting Arrange
a Pre-Start meeting with Development Assessment. |
As indicated |
29(c) Construction Management Plan -
Associated Activities in Road Reserve Obtain relevant approvals to carry out any works
required by the approved Construction Management Plan, including the following,
within the road reserve: |
As indicated |
29(d) Construction Management Plan -
Documentation on Site Legible copies of the approved Construction Management Plan and
current permits must be kept on site and be made available on request at all
times. |
As indicated |
29(e) Construction Management Plan - Works to
be Performed Out of Hours Obtain approval from Development Assessment for any
work that is to be undertaken outside of normal business hours - 6:30am to
6:30pm, Monday to Saturday. |
As indicated |
29(f) Implement Approved Construction
Management Plan Carry
out the development in accordance with the approved Construction Management
Plan. |
As indicated |
| 30) Protect Existing Infrastructure Where there is existing
infrastructure in the vicinity of the proposed work, the new work must not
damage or compromise the working ability of the existing infrastructure. Should
the development be required to provide alterations to public utility mains,
existing mains, services or installations, then the developer must notify
Council or the relevant infrastructure provider prior to work commencing as
well as meet the costs of the alteration/s, which must be carried out in
accordance with the relevant Brisbane Planning Scheme Codes or infrastructure
providers requirements. |
While site/operational/building work is occurring |
30(a) As Constructed Drawings If alterations to existing infrastructure are
required then submit to Development Assessment "As Constructed"
drawings, showing all new and/or rectification works and an asset register,
prepared and certified by a Registered Professional Engineer Queensland
certifying that the works have been completed in accordance with the relevant
Brisbane Planning Scheme Codes and any other relevant infrastructure
requirements. |
As indicated |
| 31) Repair Damage to Kerb, Footpath Or Road Repair any damage to the
existing kerb and channel, footpath or roadway (including removal of concrete
slurry from footways, roads, kerb and channel and stormwater gullies and drainlines) and re-instate existing traffic signs and
pavement markings that have been removed or damaged during any works carried
out in association with the approved development. Contact Council’s SCIPs
team to get advice relating to the reinstatement of any footpath
works. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL) |
| 32) Remove Redundant Drainage Outlets Remove any redundant drainage
outlets from the kerb and channel including any associated pipe work across the
footway and reinstate the kerb and channel and the footway area in accordance
with the relevant Brisbane Planning Scheme Codes. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL) |
| 33) Signs and Line Markings - Internal Prepare signs and line
markings drawings, prepared and certified by a Registered Professional Engineer
Queensland in accordance with the relevant Brisbane Planning Scheme Codes and
the Manual of Uniform Traffic Control Devices - Queensland Department of
Transport and Main Roads -Transport Operations (Road Use Management) Act 1995
showing the traffic signs, pavement markings and traffic control
devices. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
33(a) Implement Signs and Line
Marking Carry
out the signs and line marking in accordance with the certified
drawings. |
As indicated |
| 34) Access, Grades, Manoeuvring, Carparks, Signs and
Line Marking Provide
access, parking and manoeuvring for vehicles on site in accordance with the
relevant Brisbane Planning Scheme Codes, as indicated on the approved DRAWINGS
AND DOCUMENTS, including the following: |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
34(a) Provide certification Submit to Development
Assessment, certification from a Registered Professional Engineer Queensland,
that the above requirements have been implemented in accordance with this
condition. |
As indicated |
| 35) Residential Refuse Collection - On Site Provide for the installation and collection of refuse/recycling bins by Brisbane City Council's Waste and Resource Recovery Services. |
At all times |
35(a) Arrange Refuse Collection Arrange for the installation of refuse/recycling bins and for the subsequent collection of refuse including recycling from the site by Brisbane City Council's Waste and Resource Recovery Services. Timing: A minimum of four weeks prior to the commencement of use and then to be maintained. |
As indicated |
35(b) Indemnify Council The owner and any subsequent owner must, by approved form to Waste and Resource Recovery Services, indemnify Council and its agents in respect of any damage to the pavement and other driving surfaces. Timing: When an arrangement for refuse/recycling collection services is made with Brisbane City Council and then to be maintained. |
As indicated |
35(c) Notify Future Owner The owner must notify any future owner/body corporate that the development has been approved on the basis that an indemnity must be provide for refuse collection vehicles to enter the property. Timing: At time of a change of ownership. |
As indicated |
| 36) Non-Residential Refuse Collection - On Site Provide for the installation and collection of refuse/recycling bins. |
At all times |
36(a) Arrange Refuse Collection Arrange for the installation of refuse/recycling bins and for the subsequent collection of refuse including recycling from the site by a private waste contractor or Brisbane City Council's Waste and Resource Recovery Services. Timing: A minimum of four weeks prior to the commencement of use and then to be maintained. PROOF OF FULFILMENT Where a private waste contractor is engaged, provide written confirmation from the proposed waste collection contractor of the agreement to service the property. The written agreement must be submitted to Council's Waste and Resource Recovery Services and include full details of the proposed system, bin sizes, number of bins, frequency of collection and the refuse collection vehicle size. Prior to commencement of use |
As indicated |
36(b) Indemnify Council Where Council is engaged as the waste contractor, the owner and any subsequent owner must, by approved form to Waste and Resource Recovery Services, indemnify Council and its agents in respect of any damage to the pavement and other driving surfaces. Timing: When an arrangement for refuse/recycling collection services is made with Brisbane City Council. |
At all times |
36(c) Notify Future Owner Where Council is engaged as the waste contractor, the owner must notify any future owner/body corporate that the development has been approved on the basis that an indemnity must be provide for refuse collection vehicles to enter the property. Timing: At time of a change of ownership. |
At all times |
| 37) Refuse Storage - On Site Collection Provide a roofed and wholly screened refuse enclosure utilising materials consistent with the development or a dedicated refuse storage room, as shown on the approved plans and documents. The enclosure/refuse storage room must be of a design to accommodate the quantity of refuse and recycling including source separation to allow for low servicing collection of the development. Bins must be located in an area which allows them to be manoeuvred from the bin storage area to the designated internal collection point. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 38) Future Road Widening The proposed development must not prejudice the future road reserve widening along the Samford Road frontage of the site by keeping the area clear of permanent improvements and structures associated with the approved development, with the exception of a maximum 60mm encroachment on the first level. The extent of the land to be set aside for a future road reserve widening is 3.0 metres wide for the full frontage of the Samford Road site, including a single chord truncation at the Samford Road and Lorne Street intersection in accordance with the approved DRAWINGS AND DOCUMENTS. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL), and then to be maintained |
| 39) Stormwater - Site Based Stormwater Management
Plan Construct the development generally in accordance
with the approved Site Based Stormwater Management Plan prepared by ACOR
Consultants Pty Ltd (Ref: NA230692 Revision D) received date 22/06/2026. |
As indicated |
39(a) Certification Submit to Development
Assessment certification from a Registered Professional Engineer Queensland
that the development is in accordance with the approved site based stormwater
management plan. |
As indicated |
| 40) On Site Drainage - Minor Provide a stormwater connection to
all new or existing allotments and provide drainage infrastructure to ensure
stormwater run-off from all roof and developed surface areas will be collected
internally and piped in accordance with the relevant Brisbane Planning Scheme
Codes to 'a lawful point of discharge' in accordance with Site Based Stormwater
Management Plan prepared by ACOR Consultants Pty Ltd (Ref: NA230692 Revision D)
received dated 22/06/2026. - Guidance for requesting a pre-
start and co-ordinating the On/Off Maintenance process can be found on Council's
website (https://www.brisbane.qld.gov.au/planning-and-building/applying-and-
post-approval/on-and-off-maintenance-
approvals). |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 41) All Basements - Stormwater Runoff Design and construct
basements to manage stormwater runoff in accordance with the relevant Brisbane
Planning Scheme Codes and the following: |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 42) Telecommunications Submit to Development Assessment, certification
from an authorised telecommunications carrier/contractor, that the following
works and infrastructure have been undertaken and installed in accordance with
telecommunications industry standards: a) Provide telecommunications to the subject buildings, lead-in conduits and equipment space in a suitable location within the buildings, to suit the carrier of choice. b) If new pits and conduit infrastructure are required to be installed within the road reserve fronting the site, it must be suitably sized to cater for future installation of fibre optic cables. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL) |
| 43) Agreement with Electricity Supplier Submit to Development
Assessment, evidence of an agreement with an electricity supplier to provide
necessary services to the development in accordance with the relevant Brisbane
Planning Scheme Codes. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL) |
| 44) Permanent Vehicle Crossover Provide a 6.70 metre
wide Type B2 permanent vehicle crossover to the Lorne Street frontage of the
site in accordance with the relevant Brisbane Planning Scheme Codes and located
as shown on the approved DRAWINGS AND DOCUMENTS. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL) |
| 45) Redundant Crossover Remove the redundant existing vehicle crossing(s) on
the frontage(s) of the site and reinstate the kerb and channel, road pavement,
footways and footpaths in accordance with the relevant Brisbane Planning Scheme
Codes. |
Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL) |
| 46) Construction Noise and Dust Emissions Pursuant to the
Environmental Protection Act 1994, all development involving the emission of
noise and dust from building and/or construction activities, must ensure that
the emissions are in accordance with the requirements of the Act. |
As indicated |
| 47) Buildings in Transport Noise Corridors - Acoustic
Treatments (State Roads) All new houses, townhouses, units, hotels and motels (Class 1-4 buildings) on sites located in a designated transport noise corridor are required to comply with the requirements of the Queensland Development Code Mandatory Part 4.4 - Buildings in Transport Noise Corridors. The buildings will need to achieve specific levels of noise mitigation through the use of appropriate materials for floors, walls, roofs, windows and doors for the relevant noise category. |
As indicated |
| 48) In Principle support for street tree interference
or removal As street trees are protected vegetation, the interference with or removal of these trees requires a permit under the Natural Assets Local Law (NALL), issued by Program Planning and Integration (PPI). Development Services has sought preliminary advice from PPI regarding the identified removal/interference with existing street tree/s. Removal of 1x Xanthostemon chrysanthus - Golden Penda identified on the approved plans fronting Lorne Street is supported in principle for this development at this time. However, a separate NALL permit is required. Detailed arrangements must be made with PPI in relation to the works carried out on protected vegetation (including provision for tree removal and replacement tree planning costs as determined by the Arboriculture Team) prior to carrying out any works on protected vegetation. PPI Arboriculture Team can be contacted via BI-CS-PPI-PLANNING- ARB@brisbane.qld.gov.au. Note: All requirements of development approval conditions with timing stipulated as 'prior to site works commencing' (or equivalent) must be fulfilled before Council can issue a NALL permit. |
As indicated |
| 49) Advice Please note that the information contained in this section under
the heading Standard Advice has been provided as advice only and does not form
part of the development approval conditions. This information has been provided to advise of other obligations under state legislation or local
laws that may require action to be undertaken prior to commencing the activity
approved by this development approval. |
As indicated |
| 50) Equitable Access Provision must be made for equitable access for persons with
disabilities to and within the site in accordance with the Queensland Anti-
Discrimination Act 1991, the Federal Disability Discrimination Act 1992 and
Australian Standard AS1428 Parts 1-4, Australian Standard for Access and
Mobility and the National Construction Code. |
As indicated |
| 51) Water and Wastewater Services for water and wastewater (sewerage) are
no longer under the jurisdiction of Brisbane City Council. Authorisation to
connect the approved development to the water/wastewater networks and for
property service connections requires a Water Approval under the South-East
Queensland Water (Distribution and Retail Restructuring) Act 2009. Any
necessary Water Approval must be obtained from the relevant distributor-
retailer (currently operating as Queensland Urban Utilities for the Brisbane
City Council area). For the purpose of compliance assessment of a subdivision plan pursuant to Schedule 19 of the Sustainable Planning Regulation 2009 (whether in relation to a development permit for Reconfiguring a Lot or a Building Format Plan subsequent to a development permit for a Material Change of Use), documentary evidence, issued by the relevant distributor-retailer, must be provided to Council to verify that the conditions of any necessary Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009, have been complied with. |
As indicated |