BRISBANE CITY COUNCIL'S APPROVAL PACKAGE.



APPLICATION DETAILS

This package relates to the application detailed below
Address of Site: 152 MCROYLE ST WACOL QLD 4076
372 PROGRESS RD WACOL QLD 4076
402 PROGRESS RD WACOL QLD 4076
Real Property Description of Site: L86 SP.132953
L87 SP.288400
L91 SP.283375
Aspects of development and type of approval: DA - PA - Material Change of Use Development Permit - warehouse
DA - PA - Material Change of Use Preliminary Approval - Variation Request - caretaker's accommodation,car wash,research and technology industry,warehouse,utility installation,telecommunications facility,shop,service station,service industry,renewable energy facility,parking station,park,medium impact industry,low impact industry,high impact industry,food and drink outlet,emergency services,educational establishment
DA - PA - Reconfiguring a Lot Preliminary Approval - Variation Request - Subdivision of Land
Council File Reference: A006973750
Permit Reference Number/s: DAMC412254321; DAMC412254421; DARL412254521.
Package Status: APPROVED - Version 7 (25th of May, 2026 2:09:26 PM)
Package Generated: 25/05/2026


PROJECT TEAM

The assessment of this application has been undertaken by:
Alessio ZANCOLICH
Principal Urban Planner
Planning Services South
alessio.zancolich@brisbane.qld.gov.au
(07) 3407 8514
Eric OWEN
Senior Technical Officer
Engineering Services South
eric.owen@brisbane.qld.gov.au
(07) 3178 5195
Michael PICKERILL

Network Planning
Michael.Pickerill@brisbane.qld.gov.au
Alexandria WOOD
Urban Planner
Planning Services South
Alexandria.Wood@brisbane.qld.gov.au
31782227
Zarndra PIPER
Principal Urban Planner
Planning Services South
Zarndra.Piper@brisbane.qld.gov.au
0731780370
Harley LYONS
Urban Planner
Planning Services South
Harley.Lyons@brisbane.qld.gov.au
31782223
Nicola MEWING
Principal Urban Planner
Planning Services Special Assessment
Nicola.Mewing@brisbane.qld.gov.au
31781002
Diana AVERY
Landscape Architect
Landscape Architecture Team
Diana.Avery@brisbane.qld.gov.au
3403 8888
James LANGSTON
Principal Engineer
Engineering Services Hydraulics
james.langston@brisbane.qld.gov.au
34034918
Chris HENNESSY

Engineering Services Traffic
Chris.Hennessy@brisbane.qld.gov.au
(07) 3403 5768
Tanveer BAINS
Engineer
Engineering Compliance
Tanveer.Bains@brisbane.qld.gov.au
31787301
Bella FAULKNER
Landscape Architect
Landscape Architecture Team
Isabella.Faulkner@brisbane.qld.gov.au
07 3403 8888
Daniel SPILLANE
Senior Engineer
Engineering Services South
Daniel.Spillane@brisbane.qld.gov.au
3403 5285
Samuel GAY
Senior Engineer
Engineering Services South
samuel.gay@brisbane.qld.gov.au
(07) 3407 1801
Radmila SUBOTIC
Senior Landscape Architect
Landscape Architecture Team
Radmila.Subotic@brisbane.qld.gov.au
31780113
Matthew WATT
Principal Building and Construction Management Officer
Building and Construction Management Team - Coordination
Matthew.Watt@brisbane.qld.gov.au
3178 8877
Emma MEZZINA
Team Manager
Planning Services South
Emma.Mezzina@brisbane.qld.gov.au
3178 0049
Justin LYNHAM
Senior Urban Planner
Planning Services South
justin.lynham@brisbane.qld.gov.au
3407 1302
Kim ROGERS
Principal Urban Planner
Planning Services South
kim.rogers@brisbane.qld.gov.au
34071304
Michael O'REILLY
Environmental Management Officer
Environmental Management Services
Michael.O'Reilly@brisbane.qld.gov.au
3403 9517
Timothy MCCAIG
Ecologist
Ecology Services
Timothy.McCaig@brisbane.qld.gov.au
3403 0116
Harley LYONS
Urban Planner
Planning Services South
Harley.Lyons@brisbane.qld.gov.au
31782223
Alexandria WOOD
Urban Planner
Planning Services South
Alexandria.Wood@brisbane.qld.gov.au
31782227
Ashleigh COOMBES
Principal Urban Planner
Planning Services South
Ashleigh.Coombes@brisbane.qld.gov.au
(07) 3403 1937


DRAWINGS AND DOCUMENTS



The term 'drawings and documents' or similar expressions mean:
Drawing or Document Number Plan Date
Specifications 210214 02 issue a 10-MAY-2022 (Received)
Planting Palette 210214 03 issue a 10-MAY-2022 (Received)
Development Area SK01 (Amended In Red 04-APR-2022) 14-SEP-2021 (Received)
Road Dedication Plan SK01 Issue A (Amended In Red 27-SEP-2023) 28-JUL-2023 (Received)
Roadworks and Stormwater Drainage Layout Plan Sheet 1 of 5 C1101 Issue C (Amended In Red 27-SEP-2023) 28-JUL-2023 (Received)
Roadworks and Stormwater Drainage Layout Plan Sheet 2 of 5 C1102 Issue C (Amended In Red 27-SEP-2023) 28-JUL-2023 (Received)
Roadworks and Stormwater Drainage Layout Plan Sheet 3 of 5 C1103 Issue C (Amended In Red 27-SEP-2023) 28-JUL-2023 (Received)
Roadworks and Stormwater Drainage Layout Plan Sheet 4 of 5 C1104 Issue C (Amended In Red 27-SEP-2023) 28-JUL-2023 (Received)
Roadworks and Stormwater Drainage Layout Plan Sheet 5 of 5 C1105 Issue C (Amended In Red 27-SEP-2023) 28-JUL-2023 (Received)
Site Based Stormwater Management Plan REP002 06 20 3137 Issue 7 06-MAR-2024 (Received)
Site Plan 4574-20 Q-15 (Amended In Red 22-MAY-2026) 17-APR-2026 (Received)
Building A - Overall Floor Plan 4574-21-Q-6 22-MAY-2026 (Received)
Building A - Detail Floor Plans (T1 & T2) 4574-22A-Q-4 17-APR-2026 (Received)
Building A - Detail Floor Plans (T3) 4574-22B-Q-4 17-APR-2026 (Received)
Building A - Elevations 4574-23-Q-6 17-APR-2026 (Received)
Building B - Overall Floor Plan 4574-24-Q-13 (Amended In Red 22-MAY-2026) 17-APR-2026 (Received)
Building B - Detail Floor Plan 4574-25-Q-12 17-APR-2026 (Received)
Building B - Elevations 4574-26-Q-12 (Amended In Red 22-MAY-2026) 17-APR-2026 (Received)
Building B - Sections 4574-27-Q-5 17-APR-2026 (Received)
Landscape Plan 4574-70-Q-9 17-APR-2026 (Received)


Advice

Please see the attached document(s) for any advices.

APPROVAL CONDITIONS



Permit to Which These Conditions Relate: DA - PA - Material Change of Use
Activity(ies): warehouse
Stage: Warehouse

General/Planning Requirements
 
Timing
1)   Security Lighting - On Site

Install and maintain a suitable system of security lighting to operate from dusk to dawn within all areas where the public may gain access, including car parking areas, building entrances and vegetated areas.

Ensure that all external lighting is in accordance with Australian Standard - AS4282- Control of the Obtrusive Effects of Outdoor Lighting. 

Ensure lighting over publicly accessible internal pathways covered by permanent awnings is in accordance with Australian Standard - AS/NZS 1158.3.1 Lighting for roads and public spaces - Pedestrian area lighting - Performance and design requirements.  

Lighting must be maintained in safe and good working order.

 

Timing: ‘Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first’

 
As indicated
 
2)   Car Parking

The car parking within the premises must be maintained exclusively for the ancillary use of the development. The parking must not be made available to the general public and there must not be signage erected on or in the vicinity of the site advertising the availability of car parking to the general public.

 
At all times
 
3)   Maintain the Approved Development

Maintain the approved development in accordance with the approved DRAWINGS AND DOCUMENTS, and any other relevant Council approval required by the conditions.

 
At all times
 
4)   Approved Drawings and Documents

A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers.

Note: This condition is imposed to ensure compliance with the conditions of development approval.

 
While site/operational/building work is occurring
 
5)   Carry Out the Approved Development

Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks).  Permission to enter neighbouring properties must be obtained from the relevant property owners.

 
While site/operational/building work is occurring
 
6)   Complete All Operational Work

Complete all operational work associated with this development approval, including work required by any of the conditions included in the Development Approval Package.  Such operational work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS or, if requiring a further approval from the Council, in accordance with the relevant further approval(s).

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
7)   Complete All Building Work

Complete all building work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such building work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: Building work must also be completed in accordance with any other current development approval.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
8)   No Goods to be Sold On-site - Industry

No goods are to be sold, displayed or offered for sale from the site to the general public unless an approval has been obtained to carry out retail uses on the site in accordance with Brisbane City Plan 2014 v29.00/2023.

 
At all times
 
9)   Limitation of Approval

The Office area is to remain ancillary to the development and must not operate separately.

All prospective purchasers or tenants of the site are to be made fully aware of this provision.

 

 
To be maintained
 
Ecology
 
Timing
10)   Bushfire Management

Manage bushfire risk within the approved Bushfire Management Zone shown on the APPROVED DRAWINGS AND DOCUMENTS.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
10(a) Implement Bushfire Management Measures

The Bushfire Management Zone is provided and is managed in accordance with the following requirements, unless otherwise agreed in writing by Council:

·         Hazardous materials storage and handling areas that exceed the quantity thresholds specified in City Plan 2014 – Bushfire overlay code – Table 8.2.5.3.D – Threshold quantities for hazardous chemicals must not occur in outdoor areas exposed to a radiant heat flux greater than 12kW/m2

·         Any boundary fences constructed to be of non-combustible material (e.g. steel panel fencing, masonry)

·         Grass must be short cropped (100mm) and maintained.

·         All leaves and vegetation debris must be removed at regular intervals.

·         Plants greater than 10 centimetres in height must not be placed within 3 metres of a window or glass feature of the building.

·         Trees and shrubs must not overhang or touch any elements of the building.

·         Establish and maintain lawn or paved areas such as paths and/or a pebble garden with herbs near to buildings, particularly flammable or glazed elements.

 

·         Maintain cleared areas around all driveways, pathways, fire-trails and roadways that may need to be used as an access/egress route in the event of a bushfire.

 

·         Plant trees adjacent to buildings so as to allow clear access and minimise canopy overhang of roofs and associated accumulation of leaf litter.

 

·         Space trees and shrubs to avoid the creation of a continuous canopy that may carry fire.

 

·         Prune lower limbs of trees to a height of 3m above ground level.

 

·         Avoid using conifers, paperbarks (i.e. Melaleuca species), stringy-bark and ribbon-bark eucalypts in landscape plantings.

 

·         Avoid using organic mulch with preference given to non-flammable mulches such as scoria (light weight volcanic stone), pebbles or recycled crushed bricks.

 

·         Avoid planting and use of flammable mulching:

·         adjacent to windows to prevent the potential for windows to be broken by flames or excessive radiant heat if the plantings become involved in the bushfire (usually due to embers), then allowing embers to enter the structure; and

 

·         adjacent to doorways and access paths that may need to be accessed during a bushfire incident.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
10(b) Submit Certification

Submit certification to Development Services certifying that the bushfire management measures identified in (b) above have been implemented.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
10(c) Maintain Bushfire Management Measures

Maintain bushfire management measures identified in this condition.

Timing: To be maintained.

 
As indicated
10(d) Notification to Prospective Purchasers

Notify all prospective purchasers of the requirements and effects of this condition.

Timing: At the time of marketing a lot for sale.

 
As indicated
 
Landscape Architecture and Open Space Planning
 
Timing
11)   Streetscape Works - Industrial Street

Carry out streetscape improvement works including concrete path (where required by this condition), turf and street trees to the verge to an Industrial Street standard in accordance with the relevant Brisbane Planning Scheme Codes, Brisbane Standard Drawings (BSD), the requirements of this condition and the Infrastructure Design Planning Scheme Policy including sections 3.7.4.5 and 3.7.5.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL)
11(a) Concrete Path

Install a 1.2m wide broom finished standard Portland grey concrete path. The edge of the path is to be setback 1.9m from the back of kerb. The path is to transition to existing paths on verges that adjoin the development.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL).

 
As indicated
11(b) Submit As-Constructed Drawings

Submit to Development Services "As Constructed" plans including an asset register, checked by a Registered Professional Engineer Queensland, certifying that the concrete path works have been completed in accordance with relevant Brisbane Planning Scheme Codes/Policies.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL).

 
As indicated
11(c) Turf

Install turf to the full width of the verge excluding any concrete path required by this condition.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL).

 
As indicated
11(d) Street Tree(s)

Contact the call centre on 3403 8888 and request that Council undertake street tree planting in accordance with the Infrastructure Design Planning Scheme Policy including section 3.7.5 to the frontage of the development. Provide the call centre with the Development Approval number and obtain a reference number for the phone call for your record.

Timing: Prior to issue of Certificate of Occupancy / Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation on the plan of subdivision (ROL).

 
As indicated
 
12)   Landscape the Site

Landscape the site as indicated on the approved DRAWINGS AND DOCUMENTS and in accordance with the requirements of this condition.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
12(a) Submit Building Layout Details

Submit to Development Services, and obtain approval from for, details of the final building layout below and at ground level to demonstrate that provision has been made for deep planting, perimeter planting, services and existing trees that are required to be retained. The details must be provided by a qualified Landscape Architect or RPEQ.

Timing: Prior to building works commencing.

 
As indicated
12(b) Submit Detailed Landscape Plan

Submit to Development Services, and obtain approval for, a detailed Landscape Plan for all on-site landscape works identified on the approved Landscape Concept Plans. The plan must be prepared at a scale of 1:100 by a qualified Landscape Architect and must comply with the relevant Brisbane Planning Scheme Codes. The plan must include the following:

REFER TO BUSHFIRE CONDITION FOR LANDSCAPING REQUIREMENTS.

Siteworks
-  The extent of soft and hard landscape;
-  The extent of basement and/or roof lines;
-  Location and description of fencing, retaining walls and ramps;
-  Existing and  finished levels to external works particularly in critical areas (e.g. top and toe of retaining walls and steps);
-  Description/details of critical design elements where applicable (e.g.  surface treatments, stabilisation of batters, podium planters);
-  Basic specification notes on plan for all landscape works

Planting
-  A planting schedule listing  plants by botanical names, quantities, pot size, height, spread and calliper at time of planting

Deep Planting
-  Providing deep planting areas in accordance with the relevant Brisbane Planning Scheme Codes, and the following:
-  is exclusively used for landscaping and is accessible for maintenance purposes;
-  is 100% open to the sky with access to light and rainfall and extends into the natural ground with no underground development;
-   is consolidated to provide maximum advantage and opportunity to protect or establish trees capable of growing to a minimum canopy diameter of 5m and/or minimum height of 5m within 5 years of planting;
-  is sited to retain existing site features such as significant trees or grouped with deep planted areas on adjacent sites to maximise contiguous areas of deep soil planting;
-  is planted with large subtropical tree species that at maturity are complementary in scale and height to the building form.

Timing: Prior to building work above ground level commencing.

 
As indicated
12(c) Additional Requirements - Industry

In addition to the requirements listed above, the plan must include the following:
- Landscaping to the staff recreation area;
- Tiered planting consisting of trees (including shade trees along the frontage), shrubs and groundcovers to all garden areas;
- Provide large shade trees in landscape areas shown on the approved plans which adjoin car parking areas.
- Provide tree planting to site frontage which will achieve a canopy spread over 50% of the site frontage within 5 years of planting;
- Provide screening and buffering with large screening shrubs of an appropriate density and size to complement the scale and bulk of the subject building

Timing: Prior to building work above ground level commencing.

 
As indicated
12(d) Construct Approved Works

Carry out the landscaping and associated works in accordance with the approved detailed Landscape Plan.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
12(e) Certify Works

On completion of the works, provide Development Services with a copy of the as-constructed detailed Landscape Plan together with certification from a qualified Landscape Architect or qualified Landscape Contractor that the completed landscape work complies with the approved detailed Landscape Plan (Brisbane City Council Form CC10613 Landscape Works Certificate).

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
12(f) Maintain the Landscape Works

Maintain the landscape generally in accordance with the approved detailed Landscape Plan.

Timing: Prior to commencement of use, whichever comes first.

 
As indicated
 
Pollution
 
Timing
13)   Hazardous Goods Storage

There is to be no exceedance of the amounts of Dangerous Goods and Combustible Liquids, outlined in Table 9.3.12.3.H of the BCC Industry Code, and no exceedance of the Schedule 11 Placard and Manifest quantities (Workplace Health and Safety Regulations), stored on site at any time. All materials listed as dangerous goods under The Australian Code For The Transport Of Dangerous Goods By Road and Rail (ADG Code) must be stored and handled on site in accordance with the relevant Australian Standard which applies to the Dangerous Goods Class of the material.

 

 
At all times
 
14)   Outdoor Lighting

Outdoor lighting is required to efficiently light a desired area while minimising the adverse impacts of spill lighting on adjoining uses and does not create an adverse impact on the nearby sensitive zone/uses or the behaviour of native fauna. The installation, operation and maintenance of outdoor lighting are to comply with the requirements of AS 4282-1997 Control of the obtrusive effects of outdoor lighting.

 
At all times
 
15)   Mechanical Plant or Equipment - Acoustically Screened

Mechanical plant or equipment is to be acoustically screened from an adjoining sensitive use. Mechanical plant includes generators, motors, compressors and pumps such as air-conditioning, refrigeration and cold room motors. Acoustically screened is defined in City Plan 2014.

NOTE: This condition does not authorise environmental nuisance under the Environmental Protection Act 1994.

PROOF OF FULFILMENT
Submit to Development Services, certification that all mechanical plant or equipment, is acoustically screened. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
16)   Dampening of Grilles and Metal Plates

All metal grilles, metal plates or similar located within vehicle parking and manoeuvring areas must be securely fastened and meet the requirements of AS3996:2019, Access covers and grates.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
17)   Tyre Noise Reduction

The driveways and carpark surfaces are to be appropriately treated/surfaced to reduce tyre noise impacts from the development.

PROOF OF FULFILMENT
Provide Certification that appropriate treatments/surfacing has been provided to the driveways and carpark areas to reduce tyre noise impact from the development. Certification must be provided by a Member or professional eligible to be a Member of the Australian Acoustic Society. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
18)   Stormwater Quality (High Risk) - Submit Management Plan

Implement and maintain the approved Site Based Stormwater Quality Management Plan No. REP002 06 20 3137 Issue 7, prepared by AT&L Consulting Engineers received 6/3/2024, to achieve the Stormwater Code, City Plan 2014. Timing: Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained

 
Prior to site/operational/building work commencing
18(a) Certification

Submit to Development Services certification from a Registered Professional Engineer Queensland, that all the treatments and measures recommended in the approved Site Based Stormwater Quality Management Plan have been implemented and constructed into the development.

Timing: Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first

 
As indicated
 
Engineering
 
Timing
19)   On-site Erosion (Medium Risk)

Manage on-site erosion and the release of sediment or sediment laden water from the site at all times by implementing best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version).

Timing: Prior to commencement of any land disturbing activities and until all exposed soil areas are permanently stabilised against erosion.

 
As indicated
19(a) Manage earth disturbance on- site

(i)  Drainage control measures must be implemented and maintained to minimise water flow onto areas of exposed earth.

(ii)  Sediment and erosion control measures must be implemented and maintained to prevent soil loss from earth disturbance areas and prevent deposition beyond earth disturbance areas.

(iii)  No release of contaminants to land beyond on-site area of earth disturbance other than releases that achieve water pollutant concentration release limits of:

  A. 50mg/L TSS (Total Suspended Solids);

  B. Turbidity, Nephelometric Turbidity Units (NTU) value less than 10% above background, 75 NTU, or as agreed in writing by an Officer from Councils Erosion and Sediment Control (ESC) Team in Compliance and Regulatory Services;

  C. pH between 6.5 and 8.5 at all times.

(iv)  Maintain a written record to demonstrate that water discharges from the site, including any dewatering operations, meet the release limits as detailed in (iii) for water discharge(s) from the site that occur during or immediately after a rainfall event, and during normal business hours. The water quality of the discharge flows must be measured at each discharge point from the site, including but not limited to sediment basin outlets, other applicable sediment control devices, the site water drainage system, and recorded against the release limits at least once on each calendar day until such discharge stops.

Timing: Prior to commencement of any earth disturbing activities and until all exposed soil areas are permanently stabilised against erosion.

 
As indicated
19(b) Provide Land Occupier Notification to Council

(i) Notify Council's ESC Team of proposed land occupier/s by sending an email to CARS-ESC@Brisbane.qld.gov.au

(ii) If the land is to be occupied by any person other than the registered landowner then advice must be provided to Council that confirms the name, contact information and the duration of any proposed occupation of the land.

Timing: Prior to commencement of any earth disturbing activities.

 
As indicated
19(c) Prepare Erosion and Sediment Control Plan

Prepare an Erosion and Sediment Control Plan (ESCP) in accordance with best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version) and, to the extent of any inconsistency, relevant Brisbane Planning Scheme Codes and Policies.

Obtain a design certificate in accordance with the relevant Brisbane Planning Scheme Codes and Policies.

The ESCP and design certificate must be certified by a Certified Professional in Erosion and Sediment Control (CPESC) or a Registered Professional Engineer Qld (RPEQ) with suitable qualifications and experience in erosion and sediment control.

Documentary evidence demonstrating appropriate qualifications in erosion and sediment control must be provided to the Council upon request.

Timing: Prior to the commencement of any earth disturbing activities.

 
As indicated
19(d) Attend a pre-start meeting

Arrange and attend a pre-start meeting for ESC with an Officer from Councils ESC Team in Compliance and Regulatory Services (CARS).

Note: To request a pre-start meeting from Council's ESC Team send an email to CARS-ESC@Brisbane.qld.gov.au. All relevant documentation, including both the certified ESCP and the certified design certificate, must be attached to this email.

Please allow up to 10 business days for your request to be processed.

Timing: Attend the pre- start meeting prior to the commencement of any earth disturbing activities.

 
As indicated
19(e) Implement Certified Erosion and Sediment Control Plan

Implement the certified ESCP and maintain all ESC measures in accordance with best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version) and, to the extent of any inconsistency, relevant Brisbane Planning Scheme Codes and Policies.

The ESCP and design certificate must be available on site at all times for inspection by Council officers. Any alteration to supplementary or Type 3 ESC measures must be reflected in the certified ESCP. Any alteration to Type 2 or Type 1 ESC measures will require a revised ESCP and design certificate that has been certified by either the CPESC or RPEQ.

Timing: While earth disturbing activities are occurring and until all exposed soil areas are permanently stabilised against erosion.

 
As indicated
 
20)   Maintenance Period for Engineering Work

Maintain the work required by the Engineering condition(s) imposed on this development approval and rectify any defects in accordance with the requirements detailed in this condition.

Note: Guidance for requesting a pre-start and co- ordinating the On/Off Maintenance process can be found on Council's website (https://www.brisbane.qld.gov.au/planning-and-building/applying-and-post- approval/on-and-off-maintenance-approvals).

Timing: During the on-maintenance period.

 
As indicated
20(a) On-Maintenance Acceptance

Arrange an on- maintenance inspection with Development Services and obtain written confirmation from Council that the work has been completed in accordance with the requirements of the condition and is accepted on-maintenance.

Provide proof of Public Liability Insurance ($20 million) for the on- maintenance period.

Lodge a maintenance security for the on-maintenance period. The security must be calculated as 5% of the value of the constructed work or $10,000.00, whichever is greater.

Note: A maintenance security may consist of either a bank guarantee or monetary payment lodged with Council. Refer to Council's Infrastructure Installation and Construction Requirements Manual for further details about the on-maintenance procedure and requirements.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
20(b) On-Maintenance Period

Provide a minimum 12 months maintenance to the work from the time the work is accepted on- maintenance by Council. During this period maintain the work and rectify any defects identified at the on-maintenance inspection and those arising during the on-maintenance period.

Note: The on-maintenance period may be extended by Council pending concerns and/or unsatisfactory performance during the maintenance period.

Timing: A minimum 12 months from acceptance on-maintenance.

 
As indicated
20(c) Off-Maintenance Acceptance

On completion of the maintenance period arrange an off-maintenance inspection with Development Services and obtain written confirmation from Council that the work is accepted off-maintenance.

Ensure all defects are rectified prior to making an appointment for off- maintenance Inspection.

Note: If the inspection is successful the maintenance security will be released.

Timing: On completion of the on-maintenance period.

 
As indicated
 
21)   Information Signage

Erect an information sign on the subject property in accordance with Council's general requirements for signage and in accordance with the requirements outlined below:
a)  The sign should provide a brief description of the development proposed;
b)  The sign is to list the name, postal and/or email address and a contact telephone number for the following parties (where relevant) that are undertaking work on the site:
     -  Developer;
     -   Project Coordinator;
     -  Architect/Building Designer;
     -  Builder;
     -  Civil Engineer;
     -   Civil Contractor/s; and
     -  Landscape Architect;
c)  The lettering on the sign is to be at least 25 millimetres in height, be of regular weight and in sentence case;
d)  The sign is to be a minimum size of 1,200 millimetres by 900 millimetres;
e)  The maximum area of the sign is to be 2.0m2;
f)  The sign is to be positioned as follows:
     -  located centrally along each road frontage of the site to Progress Road;
     -  located on or within 1.5 metres of the road frontage;
     -  mounted at least 300 millimetres above ground level; and
     -  clearly visible from the street for a pedestrian;
g)  The sign is to contain no commercial or corporate advertising other than the name, logo or slogan of the parties outlined in part (b) of this condition;
h)  The sign is to be non-illuminated; and
i)   Both the sign and the supporting structure are to be made of weatherproof material and to be properly maintained at all times;

Timing: Prior to site works commencing and then to be maintained until completion of the development for all stages.

 
As indicated
 
22)   Engineering Pre-Start Meeting

Arrange and attend a pre-start meeting with Development Services and Program Planning and Integration.

Applicable compliance and inspection fees must be paid, in full, to Council prior to the meeting being held.

Note: To arrange an engineering pre-start meeting with Development Services an email supported by a completed copy of the Pre-Start Meeting Guidelines - Civil Engineering Works kit (https://www.brisbane.qld.gov.au/sites/default/files/20191008-cc11207-pre- start-meeting-guidelines-civil-engineering-works.pdf) must be sent to dalodgement@brisbane.qld.gov.au.

Details include (but are not limited too) the following:
-  Site address, Development Approval number (A00) and relevant stage/s (if appropriate);
-  List all Development Approval conditions requiring compliance prior to site/operational/building work commencing and demonstrate compliance with those conditions;
-  Payee details (Name and address) for the issue of a development 'Compliance and Inspection Fee' quote;
-  Superintendent (Consultant) name, address and telephone number (including after-hours contact);
-  Contractor/s and major Sub-Contractor/s, name, address and telephone number (including after-hours contact);
-  Intended date of commencement of works.

Note:
-  All operational works/compliance assessment applications are to be approved prior to requesting the pre-start meeting.
-  A minimum 5 working days' notice is required.
-  Compliance and Inspection fee to be paid prior to undertaking pre-start meeting.
-  All operational works/compliance assessment approved documents and the Development Approval package (conditions and plans) must be available at the pre-start meeting.
-  Further guidance for requesting a pre-start and co-ordinating the On/Off Maintenance process can be found on Council's website (https://www.brisbane.qld.gov.au/planning-and-building/applying-and-post- approval/on-and-off-maintenance-approvals).

Timing: Prior to site/operational/building work commencing.

 
As indicated
 
23)   Filling and / or Excavation

All earthworks must be carried out in accordance with the relevant Brisbane Planning Scheme Codes.

 
Prior to building work commencing
23(a) Submit Earthworks Drawings

Submit to, and obtain approval from, Development Services earthworks drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the approved DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes.

The Earthworks Drawings must include the following:
-  The location of any cut and/or fill;
-  The quantity of fill to be deposited and finished fill levels;
-  Maintenance of access roads to and from the site such that they remain free of all fill material and are cleaned as necessary;
-  The existing and future finished levels in reference to the Australian Height Datum (including cross-sections or long sections into the adjacent properties);
-  Preservation of all drainage structures from the effects of structural loading generated by the earthworks;
-  Protection of adjoining properties and roads from adverse impacts as a result of the works;
-  That all vehicles exiting from the site will be cleaned and treated so as to prevent material being tracked or deposited on public roads.

Note: If the earthworks impact on the road reserve, the Developer must obtain applicable footpath and road permits prior to commencing any works. Such impacts may include footpath occupation, road closures, re-profiling, ground anchors and/or relocation of services. If the excavation has to be stabilised using ground anchors or similar, then the submitted plans must show the location of these in relation to all services. The cost of moving services, utilities and assets is the responsibility of the Developer. The permission of the service/utility/asset owner is required.

Note: Irrespective of final earthworks, it is the responsibility of the RPEQ to manage any staged works associated with Erosion & Sediment Control.

Timing: Prior to site/operational/building work commencing.

 
As indicated
23(b) Fill Material, Placement, Compaction and Testing

All fill material placed on the site must comprise only natural earth and rock and must be free of contaminants (as defined by Part 3, Division 2, Subdivision 2 Environmental contamination, Section 11 of the Environmental Protection Act 1994) and noxious, hazardous, deleterious and organic materials.

Fill material, placement, compaction and testing must comply with the requirements of Australian Standard - AS 3798, Guidelines on Earthworks for Commercial and Residential Developments.

Timing: While site/operational/building work is occurring.

 
As indicated
23(c) Implement Approved Earthworks Drawings

Construct and maintain the earthworks in accordance with the requirements of AS3798 and the approved earthworks drawings.

Timing: While site/operational/building work is occurring and then to be maintained.

 
As indicated
23(d) Submit As Constructed Drawings

Submit to Development Services As Constructed drawings prepared by a Registered Surveyor.

Timing: Prior to building work above ground commencing.

 
As indicated
23(e) Submit Certification

Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the approved earthworks drawings.

Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that all fill material used complies with the quality requirements of this condition and that placement, compaction and testing has been carried out in accordance with AS3798.

Timing: Prior to building work above ground commencing.

 
As indicated
 
24)   Construction Management Plan - Major

Carry out development in a method consistent with a Construction Management Plan (CMP) prepared in accordance with the requirements of this condition.

 
While site/operational/building work is occurring
24(a) Construction Management Plan - Submit Plan

Submit to, and obtain compliance approval from, Development Services a detailed Construction Management Plan for the site preparation, demolition, excavation and construction phases of the approved development.  The Construction Management Plan must be in accordance with the relevant Brisbane Planning Scheme Codes and address the following matters, both internal to and external to the development site:

(i)    Location of and impacts to any Council vegetation (i.e. street trees/park trees/garden beds)
(ii)   Location of and impact to any trees/vegetation on adjoining properties, including mitigation of potential impacts;
(iii)  Provision for pedestrian management;
(iv)  Existing and proposed kerbside allocation signs and line marking (such as bus stops, loading zones and parking meters and/or ticket dispensers);
(v)    Location of and impacts to any Council or other public utility assets;
(vi)   Location and design of temporary vehicular construction access points, including frequency of use;
(vii)  Management and mitigation strategies for the impact of dust, noise and vibration upon adjoining and nearby properties;
(viii)  Provision for loading and unloading materials including the location of any remote loading sites / truck layby sites;
(ix)   Location of materials, structures, plant and equipment to be stored or placed on the construction site;
(x)     Location of proposed external hoardings and/or gantries, and the impacts on existing street furniture and other assets located within the verge as well as impacts on any existing advertising signage located either along or adjacent to the site frontage  - this includes any potential obstruction of sight lines for such advertising  (e.g. 'CityCycle' bicycle stations or bus stops with advertising);
(xi)    Anticipated staging and programming;
(xii)   Complaint management processes to be implemented; and
(xiii)  Compliance with the Management Plans Planning Scheme Policy and other relevant Planning Scheme Policies.

The Construction Management Plan must be supported by 'approval in principle' or written approvals from the relevant Council sections or other governing bodies responsible for any potentially impacted infrastructure.

The list of relevant infrastructure and contacts is available on Council's website - Search 'Constructions Management Plan'.

Timing: Prior to site/operational/building work commencing.

 
As indicated
24(b) Construction Management Plan - Dilapidation Report

Submit a dilapidation report to engineeringservices@brisbane.qld.gov.au detailing the pre-existing condition of the roadway, both footways, both verges and Council infrastructure, including vegetation, for 100m from the site entry in both directions or to the next street intersection (if less than 100m from the site entry) in both directions.

Timing: Prior to the pre-start meeting.

 
As indicated
24(c) Construction Management Plan - Documentation on Site

Legible copies of the approved Construction Management Plan and current permits must be kept on site and be made available on request by Council, at all times.

The requirements of the CMP must be included in all induction of principal and subcontractors utilised in the development. An outline of the induction provided to contractors may be requested by Council to confirm compliance with this condition.

Timing: While site/operational/building work is occurring.

 
As indicated
24(d) Construction Management Plan - Works to be Performed Out of Hours

Obtain an approval from Development Services for any work that is proposed to be undertaken outside of normal business hours - 6:30am to 6:30pm, Monday to Saturday.

Timing: Prior to site/operational/building work commencing.

 
As indicated
24(e) Construction Management Plan - Implement Plan

Carry out the development in accordance with the approved Construction Management Plan.

Timing: While site/operational/building work is occurring.

 
As indicated
 
25)   Protect Existing Infrastructure

Where there is existing infrastructure in the vicinity of the proposed work, the new work must not damage or compromise the working ability of the existing infrastructure.

Where alterations to public utility mains, existing mains, services or installations are necessitated by the development, prior to alterations commencing, the developer must notify Council or the relevant infrastructure provider and obtain agreement to the alterations.

The developer must meet the costs of the alterations. The alterations must be carried out in accordance with the relevant Brisbane Planning Scheme Codes or infrastructure providers requirements.

 
While site/operational/building work is occurring
25(a) As Constructed Drawings - Alterations to Existing Infrastructure

Submit to Development Services As Constructed drawings showing all new and/or rectification works and an asset register, prepared by a Registered Professional Engineer Queensland.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that the alterations have been completed in accordance with the relevant Brisbane Planning Scheme Codes and any other relevant infrastructure requirements. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
26)   Remove Improvements & Obstructions from Truncation and Dedication

Remove all improvements (fences, gates, letter boxes, garden beds and plots and other constructed items, etc.) and obstructions (existing earth banks, vegetation, etc.) from the area of dedicated road and reinstate the area as footway in accordance with the relevant Brisbane Planning Scheme Codes.

Any new or existing installations of electrical pillar boxes, pad mounted transformers (PMTs), water meters and the like, must be installed/relocated to their ultimate alignment relative to the new property boundary and clear of the usable footpath areas irrespective of the alignment of the existing services/conduits.

Note:  The cost of moving services, utilities and assets is the responsibility of the Developer. The permission of the service, utility or asset owner will be required. Council permission is required if street trees, stormwater gullies/drains, and swales are affected. Urban Utilities permission is required if water supply and sewerage services are affected.

Standard utility alignments may be found on Council's 'Brisbane Standard Drawings' 1013 to 1016 inclusive.

PROOF OF FULFILMENT
Certification from a Registered Surveyor or Registered Professional Engineer Queensland that the above work has been completed in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
27)   Retaining Walls

Design and construct all retaining walls and associated fences, in accordance with the relevant Brisbane Planning Scheme Codes and the following:
-  All retaining walls including the footings, must be located wholly within the property boundaries of the site where works are occurring
-  Runoff from surface drains and subsoil drainage associated with the retaining walls (irrespective of the height of the wall) must be collected and conveyed to a lawful point of discharge and must not cause any ponding, nuisance or disturbance to adjacent property owners.
-  Retaining walls to stabilise excavation must be set back from property boundaries to accommodate subsoil drainage without encroachment into the neighbouring property. This set back may vary depending on the height, structure and design of the retaining wall, surcharge loadings from neighbouring properties, and to provide a surface drain along the top of the retaining wall
-  Retaining walls that are greater than 1.0m in height must be vertically and horizontally tiered by a ratio of 1:1 unless an alternative has been approved by Development Services
-  Retaining walls in excess of 1.0m in height must be designed and certified by a Registered Professional Engineer Queensland
-  Retaining walls facing onto Council property (including the road reserve and parkland) must not be constructed from timber.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
27(a) Certification of Retaining Walls

For retaining walls over 1.0m in height, obtain certification from a Registered Professional Engineer Queensland that the design and construction of the retaining walls and ancillary drainage are in accordance with the requirements of this condition.

 
As indicated
 
28)   Access, Grades, Manoeuvring, Carparks, Signs and Line Marking

Construct and maintain access, parking and manoeuvring for vehicles on site in accordance with the relevant Brisbane Planning Scheme Codes, as indicated on the approved DRAWINGS AND DOCUMENTS, including the following:

i. A pavement of minimum Local road standard or equivalent surface material (including associated drainage) to the area on which motor vehicles will be driven and/or parked.

ii. Manoeuvring on site for an AV and for the loading and unloading of vehicle(s);

iii. Parking on the site for 127 cars, including 3 parking spaces for people with disabilities and for the loading and unloading of vehicle(s) within the site. There must a minimum number of 127 provided on site.

iv. Provide and maintain 26 secure bicycle parking spaces and 52 lockers and 2 shower cubicles with ancillary change rooms for both females and males;

v. An appropriate area for the storage and collection of refuse, including recyclables, in a position which is accessible to service vehicles on the site.

vi. Prepare and implement signs and line markings drawings that show the internal paved areas signed and delineated in accordance with the approved drawings and documents. The drawings must be prepared and certified by a Registered Professional Engineer Queensland in accordance with the relevant Brisbane Planning Scheme Codes and the Manual of Uniform Traffic Control Devices.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland, that the above requirements have been implemented in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
29)   Repair Damage to Kerb, Footpath or Road

Repair any damage to the existing kerb and channel, footpath or roadway (including removal of concrete slurry from footways, roads, kerb and channel, stormwater gullies and drainlines) and re-instate existing traffic signs and pavement markings that have been removed or damaged during any works carried out in association with the approved development.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
29(a) Interim Repairs

If at any time during the construction phase of the approved development, damage to the existing kerb and channel, footpath or roadway creates unsafe, unreasonable and/or not fit for purpose conditions as assessed by Council, interim repairs must be undertaken as directed by Program Planning and Integration.

Note: Any interim repairs required to be undertaken shall not be considered to satisfy the requirements of this condition for the permanent repair of the infrastructure prior to the issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

Timing: While site / operational / building works is occurring.

 
As indicated
 
30)   Refuse Collection - On Site

Provide for the installation and collection of refuse/recycling bins by Brisbane City Council's Waste and Resource Recovery Services or a private waste contractor.

 
At all times
30(a) Arrange Refuse Collection

Arrange for the installation of refuse/recycling bins and for the subsequent collection of refuse including recycling from the site by Brisbane City Council's Waste and Resource Recovery Services or a private waste contractor.

Timing: A minimum of four weeks prior to the commencement of use and then to be maintained. 

PROOF OF FULFILMENT
Where a private waste contractor is engaged, provide written confirmation from the proposed waste collection contractor of the agreement to service the property. The written agreement must be submitted to Council's Waste and Resource Recovery Services and include full details of the proposed system, bin sizes, number of bins, frequency of collection and the refuse collection vehicle size. Timing: Prior to commencement of use.

 
As indicated
30(b) Notify Future Owner

Where Council is engaged as the waste contractor, the owner must notify any future owner/body corporate that the development has been approved on the basis that an indemnity must be provide for refuse collection vehicles to enter the property.

Timing:  At time of a change of ownership.

 
As indicated
30(c) Indemnify Council

The owner and any subsequent owner must, by approved form to Waste and Resource Recovery Services, indemnify Council and its agents in respect of any damage to the pavement and other driving surfaces. 

Timing:  When an arrangement for refuse/recycling collection services is made with Brisbane City Council.

 
As indicated
 
31)   Refuse Storage - On Site Collection

Provide a roofed and wholly screened refuse enclosure utilising materials consistent with the development or a dedicated refuse storage room, as shown on the approved plans and documents. 

The enclosure/refuse storage room must be of a design to accommodate the quantity of refuse and recycling including source separation to allow for low servicing collection of the development.

Bins must be located in an area which allows them to be manoeuvred from the bin storage area to the designated internal collection point.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
32)   Streetscape Works - Subdivision New Road

Carry out streetscape improvement works, including concrete path (where required by this condition), turf and street trees to the verge of the new road(s).

Improvement works must be to an Industrial Street standard for Industrial roads and a Neighbourhood Street Minor standard for all other roads (Suburban/District/Neighbourhood/Local) in accordance with:

- the relevant Brisbane Planning Scheme Codes;

- Brisbane Standard Drawings (BSD);

- the requirements of this condition; and

- the Infrastructure Design Planning Scheme Policy including sections 3.7.4.4, 3.7.4.5 and 3.7.5.

Note: standard path alignments for new roads are shown on Brisbane Standard Drawing BSD-5201 sheet 2.

 
Prior to Council's notation on the plan of subdivision
32(a) Concrete Path

Install a 1.2m wide broom finished standard Portland grey concrete path to both sides of the carriageway of Suburban/District/Neighbourhood (bus route)/Industrial roads and one side of the carriage way of a Neighbourhood (non-bus route) roads and one side of all local streets. The edge of the path is to be setback 1.9m from the back of kerb for industrial roads and 1.48m from the back of kerb for all other roads.

Transition to existing paths on verges that adjoin the development. The transition is to occur fronting the adjoining developments, not the subject site.

Note: If the above requirements cannot be achieved, contact the Engineering Services Team via email: engineeringservices@brisbane.qld.gov.au

Timing: Prior to Council's notation of the plan of subdivision.

 
As indicated
 
33)   Land for Transport Network - Road (Non- trunk)

Dedicate as road land shown as new road (non-trunk) on the approved drawing titled: Road Dedication Plan, SK01 issue A, received 28/7/2023, and amended in red 27/9/2023, including the following:

i. A widening along the Progress Road frontage of the site to allow for a left turning lane;

ii. Generally, 22.5 metre wide road corridor connecting Progress Road to McRoyle Street, required as part of the road construction.

Note: This condition is imposed under section 145 of the Planning Act 2016.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
33(a) Submit Plan of Subdivision

Submit to, and obtain approval from, Development Services, a plan of subdivision showing the land to be dedicated for road to demonstrate compliance with the requirements of this condition.

Timing: As part of the submission of the request pursuant to Schedule 18 of the Planning Regulation 2017 for Council's notation on the plan of subdivision necessary to comply with this condition.

 
As indicated
33(b) Lodge Notated Plan

Lodge the plan of subdivision notated by Council pursuant to Schedule 18 of the Planning Regulation 2017 with the Registrar of Titles for the relevant Queensland State Government Authority.

Timing: Prior to commencement of use.

PROOF OF FULFILMENT
Evidence of the registration of the required plan of subdivision. Timing: Within one month of the registration of the plan of subdivision.

 
As indicated
 
34)   Work for Transport Network - Road (Non-trunk) - External

Construct the following roadwork with any associated drainage, verge, site access and services including street lighting for the Transport Network (Road) shown on the approved drawing titled: Roadworks and Stormwater Drainage Layout Plan Sheet 1 of 5, C1101 issue C, received 28/7/2023 as amended in red 27/9/2023 and the Roadworks and Stormwater Drainage Layout Plan Sheet 2 of 5, C1102 issue C received 28/7/2023 as amended in red 27/9/2023 and Roadworks and Stormwater Drainage Layout Plan Sheet 3 of 5 C1103, issue C, received 28/7/2023 as amended in red 27/9/2023, and Roadworks and Stormwater Drainage Layout Plan Sheet 5 of 5 C1105, issue C, received 28/7/2023 as amended in red 27/9/2023 in accordance with the relevant Brisbane Planning Scheme Codes, the Queensland Manual of Uniform Traffic Control Devices and the AUSTROADS design standards:

- new type E concrete kerb and channel and associated drainage on both sides of McRoyle Street on a 3.75 metre alignment (taking into account any road reserve widening if required);

- a full 12.5m wide Freight network type road pavement from the lip of the new kerb and channel with any appropriate tapers (the minimum width of road construction/reconstruction must be 1.2 metres);

- new type E concrete kerb and channel and associated drainage along the Progress Road frontage of the site on a 4.25 metre alignment (taking into account the road reserve widening for the left turning lane);

- Right turn pocket from Progress Rd into the McRoyle St extension.

- an Arterial Road type road pavement from the lip of the new kerb and channel to the existing road pavement with any appropriate tapers (the minimum width of road construction/reconstruction must be 1.2 metres);

Note: Irrespective of the actual widening, the finished road pavement crown must be located along the centreline of the final pavement width.

Note: This condition is imposed under section 145 of the Planning Act 2016.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
34(a) Submit Functional Layout Drawings

Submit to, and obtain approval from, Development Services functional layout drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes.

Note: This approval must be obtained prior to the submission of drawings for Roadwork and Stormwater Drainage and Signs and Pavement Marking.

Timing: Prior to site/operational/building work commencing.

 
As indicated
34(b) Submit Roadworks and Stormwater Drainage Drawings

Submit to, and obtain approval from, Development Services Roadworks and Stormwater Drainage Drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes.

Timing: Prior to site/operational/building work commencing.

 
As indicated
34(c) Submit Signs and Pavement Drawings

Submit to, and obtain approval from, Development Services Signs and Pavement Marking drawings prepared and certified by a Registered Professional Engineer of Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes.

Timing: Prior to site/operational/building work commencing.

 
As indicated
34(d) Submit Street Lighting Design Drawings

Submit to, and obtain approval from, City Lighting, street lighting design drawings prepared and certified by a Registered Professional Engineer of Queensland (Electrical) which show the proposed street lighting system in accordance with the relevant Brisbane Planning Scheme Codes.

Timing: Prior to site/operational/building work commencing.

 
As indicated
34(e) Implement Approved Drawings

Construct the works in accordance with the above approved drawings.

Timing: Prior to on-maintenance acceptance.

 
As indicated
34(f) Submit As Constructed Drawings

Submit to Development Services As Constructed drawings including an asset register and a pre-On-Maintenance Inspection Checklist, prepared by a Registered Professional Engineer Queensland.

Timing: Prior to on-maintenance inspection.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the above approved drawings.

 
As indicated
 
35)   Work for Transport Network - Road (Non-trunk) - Internal

Construct the following roadwork with any associated drainage, footpath, pathways and services including street lighting for the Transport Network (Road) shown on the approved drawing titled Roadworks and Stormwater Drainage Layout Plan Sheet 3 of 5 C1103 issue C received 28/7/2023, as amended in red 27/9/2023, the Roadworks and Stormwater Drainage Layout Plan Sheet 4 of 5 C1104 issue C received 28/7/2023, as amended in red 27/9/2023 and the Roadworks and Stormwater Drainage Layout Plan Sheet 5 of 5 C1105 issue C received 28/7/2023 as amended in red 27/9/2023. In accordance with the relevant Brisbane Planning Scheme Codes, the Manual of Uniform Traffic Control and the AUSTROADS design standards:

- roads 22.5 metres wide designed and constructed as Primary Freight Accesses (designed for 85 percentile 50 km/hr maximum) and with street lighting category V5;

Note: This condition is imposed under section 145 of the Planning Act 2016.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
35(a) Submit Functional Layout Drawings

Submit to, and obtain approval from, Development Services functional layout drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes.

Note: This approval must be obtained prior to the submission of drawings for Roadwork and Stormwater Drainage and Signs and Pavement Marking.

Timing: Prior to site/operational/building work commencing.

 
As indicated
35(b) Submit Roadworks and Stormwater Drainage Drawings

Submit to, and obtain approval from, Development Services Roadworks and Stormwater Drainage Drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes.

Timing: Prior to site/operational/building work commencing.

 
As indicated
35(c) Submit Signs and Pavement Drawings

Submit to, and obtain approval from, Development Services Signs and Pavement Marking drawings prepared and certified by a Registered Professional Engineer of Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes.

Timing: Prior to site/operational/building work commencing.

 
As indicated
35(d) Submit Street Lighting Design Drawings

Submit to, and obtain approval from, City Lighting, street lighting design drawings prepared and certified by a Registered Professional Engineer of Queensland (Electrical) which show the proposed street lighting system in accordance with the relevant Brisbane Planning Scheme Codes.

Timing: Prior to site/operational/building work commencing.

 
As indicated
35(e) Implement Approved Drawings

Construct the works in accordance with the above approved drawings.

Timing: Prior to on-maintenance acceptance.

 
As indicated
35(f) Submit As Constructed Drawings

Submit to Development Services As Constructed drawings including an asset register and a pre-On-Maintenance Inspection Checklist, prepared by a Registered Professional Engineer Queensland.

Timing: Prior to on-maintenance inspection.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the above approved drawings.

 
As indicated
 
36)   Site Drainage - Major

Provide an internal drainage system to collect stormwater run-off from all proposed lots, roofed and developed surface areas and any run-off onto the site from adjacent areas and convey the collected run- off to a lawful point of discharge, in accordance with the relevant Brisbane Planning Scheme Codes.

Notes:
-  The stormwater design must ensure the stormwater runoff from the site does not adversely impact on flooding or drainage (peak discharge and duration for all storm events up to the 1% AEP event) of properties that are upstream, downstream or adjacent to the site.  Where a development has not specifically addressed this issue, the development may require implementation of one or more mitigation measures to offset adverse impacts, (e.g. stormwater detention, rainwater tanks, and upgrade of stormwater drainage infrastructure).
   i)  Guidance for the preparation of drawings and/or documents to comply with this condition is provided in the Brisbane Planning Scheme Policies.

-  Where external works are required and infrastructure will be handed over to Council (e.g. Stormwater pipes 375mm or greater and/or manholes within the road reserve, etc), the applicant will be required to request an on-site Pre-Start with Council and ensure all future owned Council assets follow the On/Off Maintenance process in accordance with Councils Infrastructure Installation & Construction Requirements Manual.
   i)  Guidance for requesting a pre-start and co- ordinating the On/Off Maintenance process can be found on Council's website (https://www.brisbane.qld.gov.au/planning-and-building/applying-and-post- approval/on-and-off-maintenance-approvals).

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
36(a) Submit Site Drainage Drawings

Submit to, and obtain approval from, Development Services, site drainage drawings and engineering calculations, prepared and certified by a Registered Professional Engineer Queensland, in accordance with the relevant Brisbane Planning Scheme Codes.

Notes:

-   Evidence that access for construction within the nominated Council Land is to be supplied with the submission of plans in accordance with the Temporary Access through Council Parkland for Private Works form, as found on Council’s website.

- Queensland Building and Construction Commission licensed hydraulic consultants may design the stormwater system for sites less than 2000m2 with an upstream catchment servicing no more than 4 residential lots. This excludes stormwater drainage design (including subsoil drainage) of basements in flood planning areas and the design of any onsite stormwater detention system
-  Guidance for the preparation of drawings and/or documents to comply with this condition is provided in the Brisbane Planning Scheme Policies.

Timing: Prior to site/operational/building work commencing

 
As indicated
36(b) Implement Approved Drawings

Carry out the works in accordance with the approved site drainage drawings.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
36(c) Submit As Constructed Drawings

Submit to Development Services As Constructed drawings prepared and certified by a Registered Professional Engineer Queensland or a Queensland Building and Construction Commission licensed hydraulic consultants (where applicable).

Note: To be submitted via DA- ComplianceEngineering@brisbane.qld.gov.au and include the site address, A00 reference and Condition number in the subject line.

All rehabilitated or disturbed areas of Brisbane City Council owned land following completion of works are to be to the satisfaction of Brisbane City Council’s Program Planning and Integration team.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. 

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland or Queensland Building or Construction Commission licensed hydraulic consultants (where applicable) confirming that the works have been completed in accordance with the above stormwater drawings. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
37)   Ponding of Stormwater

Carry out the approved development to ensure that adjoining properties and roads are protected from ponding or nuisance from stormwater during construction.

Notes: If remedial works are necessary to comply with this condition, prior approval must be obtained from Development Services.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
38)   Street Lighting

Provide street lighting in accordance with the requirements of this approval and the relevant Brisbane Planning Scheme Codes.

Note: For required lighting categories please refer to the roadworks and/or pathway conditions within this conditions package.

PROOF OF FULFILMENT
Evidence of an agreement with an electricity supply authority to provide a public lighting system in accordance with the approved street lighting design drawings.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
39)   Service Conduits and Mains

Provide and install all service conduits and meet the cost of any alterations to public utility mains, existing mains, services, street lighting or installations that are required to carry out the approved development. These works must be in accordance with the relevant Brisbane Planning Scheme Codes, and include the following, where applicable:
-  the provision of all services and/or conduits along the full length of any rear allotment access or access easement.
-  the breaking and/or relocation of any existing sewer combine drains.
-  the relocation of any fire hydrant and/or valves from the development's vehicular footway crossings.
-  the retention and/or relocation of any existing foul water lines that currently exist within the site.
-  any new or existing installations of electrical pillar boxes, pad mounted transformers (PMTs), water reticulation mains, water meters and the like, must be installed/relocated to their ultimate alignment relative to the new property boundary and clear of the usable footpath areas irrespective of the alignment of the existing services/conduits.

Note:
-  The cost of moving services, utilities and assets is the responsibility of the Developer. The permission of the service, utility or asset owner will be required. Council permission is required if street trees, stormwater gullies/drains, and swales are affected. Urban Utilities permission is required if water supply and sewerage services are affected.
-  Standard utility alignments may be found on Council's 'Brisbane Standard Drawings' 1013 to 1016 inclusive.
-  Applicants must liaise with the appropriate service authorities. Typical underground services and/or conduits to be constructed include power, phone, telecommunications, sewer (including private combine drains) stormwater and gas, if applicable.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
39(a) Submit As Constructed Drawings

Submit to Development Services As Constructed drawings, including an asset register, prepared and certified by a Registered Professional Engineer Queensland.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the requirements of this condition. Note: Civil works are to be certified by a RPEQ(Civil) and electrical works are to be certified by a RPEQ (Electrical).

 
As indicated
 
40)   Conduit for Brisbane City Council

Provide a single underground conduit (100mm diameter UPVC class PN9) in favour of Brisbane City Council on at least one side of all Neighbourhood Access Roads (Bus Route only), Primary Freight Access Roads and Major Roads. The works must be in accordance with the relevant Brisbane Planning Scheme Codes and the following:
-  The conduit must be laid in the telecommunication alignment of the footpath, on the kerb side of the Telecommunication Carrier conduit or in an agreed shared trench arrangement with the Telecommunication Carrier and other Utilities as may be relevant, subject to the approval of Development Services.
-  The conduit must bypass the Telecommunication Carrier pits.
-  Pits (minimum size, Type 4 as per BCC Standard Drawing BSD-1011) with lids (as per Drawing BSD-1012 but Class B instead of Class C) must be installed at the "dead ends" of the conduit, both sides of road crossings, at intersections and at other locations that may be specified by Council.
-  The conduit must be plugged at each pit.
-  The conduit must be located and installed in such a way that facilitates the installation of cable and additional pits in the future.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
40(a) Submit As Constructed Drawings

Submit to Development Services, As Constructed drawings, including an asset register, prepared and certified by a Registered Professional Engineer Queensland.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the requirements of this condition.

 
As indicated
 
41)   Telecommunications

Submit to Development Services, certification from an authorised telecommunications carrier/contractor, that the following works and infrastructure have been undertaken and installed in accordance with telecommunications industry standards:
- Provide telecommunications to the subject buildings, lead-in conduits and equipment space in a suitable location within the buildings, to suit the carrier of choice.
- If new pits and conduit infrastructure are required to be installed within the road reserve fronting the site, it must be suitably sized to cater for future installation of fibre optic cables.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
42)   Agreement with Electricity Supplier

Submit to Development Services, evidence of an agreement with an electricity supplier to provide necessary services to the development in accordance with the relevant Brisbane Planning Scheme Codes.

Where development is within an established area of overhead electricity supply and the electricity supplier determines that a property pole is the appropriate solution to supply electricity to the development, the developer must be responsible for the installation of the property pole(s).

In the above circumstances, submit to Development Services, certification from the developer's electrical consultant confirming that the above installation has been completed in accordance with the relevant AS/NZS Standards and the Queensland Electricity Connection Manual (QECM) and Queensland Electricity Metering Manual (QEMM).

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
43)   Water and Wastewater

Pursuant to Schedule 18 of the Planning Regulation 2017 submit to Development Services, documentary evidence, issued by the relevant distributor-retailer, to verify that the conditions of any necessary connection certificate under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009, have been complied with.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
44)   Permanent Driveway Crossover

Provide a 10-metre-wide Type B2 permanent driveway crossover to the McRoyle Road frontage(s) of the site in accordance with the relevant Brisbane Planning Scheme Codes and located as shown on the approved DRAWINGS AND DOCUMENTS.

Provide a 9-metre-wide Type B2 permanent driveway crossover to the New road frontage of the site in accordance with the relevant Brisbane Planning Scheme Codes and located as shown on the approved DRAWINGS AND DOCUMENTS.

Written consent must be obtained from BCC - Field Services, Program Planning and Integration Arborist prior to any works occurring that will either impact on or require removal of a street tree (this includes pruning and excavation within the root zone/canopy of the tree)

At all times during construction of the crossover, safe pedestrian access along the site frontage must be maintained.

Note: No further driveway permit is required however additional footway permits or lane closure permits may be required for footpath/verge closures and/or lane closures. These permits must be obtained prior to construction of the crossover.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
45)   Redundant Driveway Crossover

Remove the redundant existing driveway crossover(s) on the frontage(s) of the site and reinstate the kerb and channel, road pavement, footways and footpaths in accordance with the relevant Brisbane Planning Scheme Codes.

Note: Additional footway permits or lane closure permits may be required for footpath/verge closures and/or lane closures. These permits must be obtained prior to construction of the crossover.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
Standard Advice
 
Timing
46)   Construction Noise and Dust Emissions

Pursuant to the Environmental Protection Act 1994, all development involving the emission of noise and dust from building and/or construction activities, must ensure that the emissions are in accordance with the requirements of the Act.
The Environmental Protection Act 1994 prescribes that:

1. A person must not carry out building work in a way that makes an audible noise-
-  on a business day or Saturday, before 6.30a.m. or after 6.30p.m; or
-   on any other day, at any time. 
2. The reference in subsection (1) to a person carrying out building work-
-  includes a person carrying out building work under an owner-builder permit; and
-  otherwise does not include a person carrying out building work at premises used by the person only for residential purposes.

Note: A request can be made to work outside of these hours by submitting an Environmental Management Plan for assessment and obtaining an endorsed decision from the Environmental Management delegate Development Services.

 
As indicated
 
47)   Natural Asset Local Law (NALL) - Protected Vegetation on Public Land, Road or Park

Work on or around protected vegetation on public land, road or park may require a permit under the Natural Assets Local Law (NALL).

Arrangements must be made with Program Planning and Integration in relation to the works carried out on protected vegetation on public land, road or park including provision for costs and replacement planting as determined by Program Planning and Integration.

Timing: Prior to carrying out any works on protected vegetation.

 
As indicated
 
48)   Contaminated Materials and Soils

Any contaminated materials or soils encountered during siteworks, must be handled, stored and disposed of in accordance with the requirements of the relevant authority of the Queensland Government. A person must not dispose of contaminated soil or a hazardous substance at a place other than at a place approved by the relevant authority of the Queensland Government.

 
As indicated
 
49)   Management of Asbestos

Disposal, handling and restoration of any building materials containing asbestos must be in accordance with current state and federal legislation.

 
As indicated
 
50)   Stormwater Outlet into Waterways/Creeks & Parks

Ensure all stormwater outlets into parks, waterways and creeks are generally in accordance with Council's guideline 'Stormwater Outlets in parks & Waterways' 2003.  Stormwater outlets are to be designed to minimise scouring velocity and associated bank/bed scour as per QUDM and Councils Infrastructure Design Planning Scheme Policy requirements.  All scour protection and rehabilitation must extend from the stormwater outlet to the creek bed level and mitigate impacts to any existing vegetation and is to be shown on engineering drawings.  Where necessary a rock lined swale or rock chute maybe required to convey water from the stormwater outlet to the creek/waterway invert and include localised stabilisation works where existing scour is occurring onsite.

All works must be detailed on Vegetation Management Plans and/or Rehabilitation Plans where required as part of this approval.

Note: If erosion associated with a stormwater outlet into a creek/waterway becomes evident during construction or the maintenance period of the development, stabilisation works are to be implemented to rectify the erosion/scour prior to handover as a Council asset.  This may require Council approvals or permits.

 
As indicated
 
51)   Further Development Permit Required

Further Development Permit(s) to carry out assessable building work under the Building Act may be required.

 
As indicated
 
52)   Plumbing and Drainage Work

Pursuant to the Plumbing and Drainage Act 2018, any plumbing and drainage work must be carried out in compliance with the Plumbing and Drainage Regulation 2019. Plumbing and drainage permit work requires approval by Brisbane City Council prior to the work being carried out.

 
As indicated
 
53)   Currency Period

The currency period for this development approval is stated in the Decision Notice and is expressed as a date.

 

This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016.

 
As indicated
 
54)   Cultural Heritage

Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003.  This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage.

The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care.

For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships).

 
As indicated
 
55)   Equitable Access

Provision must be made during and after construction for equitable access for persons with disabilities to and within the site and on adjoining public areas, in accordance with the following:
- Queensland Anti-Discrimination Act 1991;
- Federal Disability Discrimination Act 1992;
- Australian Standards AS1428 Parts 1-4;
- Australian Standard for Access and Mobility; and
- National Construction Code.

 
As indicated
 
56)   Fire Ant Movement Controls

To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected.

These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products.

Breaches of these controls can potentially impact the community, economy and the environment.  Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014.

For further information contact the relevant Queensland State Government department on 13 QGOV.

 
As indicated
 
57)   Water and Wastewater

Services for water and wastewater (sewerage) are not under the jurisdiction of Brisbane City Council.  Authorisation to connect the approved development to the water/wastewater networks and for property service connections required a Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009.

For further information about any necessary Water Approvals contact Urban Utilities.

 
As indicated
 



Permit to Which These Conditions Relate: DA - PA - Material Change of Use
Activity(ies): caretaker's accommodation
educational establishment
emergency services
food and drink outlet
high impact industry
low impact industry
medium impact industry
park
parking station
renewable energy facility
service industry
service station
shop
telecommunications facility
utility installation
warehouse
research and technology industry
car wash
Stage: Variation approval to vary the effect of the Planning Scheme under section 61 of the Planning Act 2016 - Material Change of Use and Reconfiguration of a Lot

General/Planning Requirements
 
Timing
58)   Prescribed Period for Preliminary Approval

The prescribed period for the variation approval is 84 months (seven (7) years) from the day the approval takes effect.

Note: If development or an aspect of development relating to this variation approval is not completed within the prescribed period, the variation approval lapses.

 
As indicated
 
59)   General Compliance Requirements

Development of the subject site must comply with the following;

a)       the approved drawings

b)      the conditions of the variation approval

c)    subsequent Material Change of Use and Reconfiguring a Lot of the subject site including other plans and documents approved by subsequent development approvals.

 
As indicated
 
60)   Category of Development and Assessment - Subdivision

 

The extent to which this variation approval varies the effect of the Planning Scheme for Brisbane, is limited to a Reconfiguration of a Lot for development on land shown on the approved drawings titled Development Area, Plan No: SK01, received 14 September 2021 (as amended in red) and is limited to the circumstances detailed below.

  

Notwithstanding the contents of the category of development and assessment table in the Planning Scheme, development for the purposes of Reconfiguration of a Lot, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where:

 

a)   involving Reconfiguration of a Lot where all resulting lots are 2,000m2 or greater shall be subject to Assessable Development - Code Assessment against the Subdivision code, Richlands—Wacol corridor neighbourhood plan code, Industry zone code, overlay codes, and prescribed secondary codes

 
As indicated
 
61)   Category of Development and Assessment Industrial uses

 

The extent to which this variation approval varies the effect of the Planning Scheme for Brisbane, is limited to a Material Change of Use for any of the purposes listed below where that proposed use is on land shown on the approved drawings titled Development Area, Plan No: SK01, received 14 September 2021 (as amended in red) is limited to the circumstances detailed below.

For the purposes of determining compliance with Section A of the Industry code with regard to level of assessment, the site is to be treated as being located within the General industry B zone. 

 

The definition mentioned in this condition refers to definitions contained in the Brisbane City Plan 2014 as amended from time to time.

 

Any application for a Development Permit for Material Change of Use is to be assessed against the assessment benchmarks and policies in the Planning Scheme that are in effect at the time the application for a Development Permit is made, unless otherwise explicitly provided by conditions of this Variation approval.

 

Where there is conflict between the codes and the condition contained herein, the condition shall prevail.

 

 
As indicated
61(a) Service industry

 

Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of Service industry, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where applying to:

 

a)   an existing premises with no increase in gross floor area and complying with all acceptable outcomes in section A of the Industry code, shall be Accepted development;

b)   an existing premises with no increase in GFA, a new premises, or an existing premises with an increase in gross floor area, where not complying with all acceptable outcomes in section A of the Industry code shall be subject to Assessable Development - Code Assessment against the Industry code, Richlands—Wacol corridor neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary codes. 

 
As indicated
61(b) Low impact industry

 

Notwithstanding the contents of the level of assessment table in the planning scheme, development for the purposes of Low impact industry, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where applying to:

 

a)   an existing premises with no increase in gross floor area and complying with all acceptable outcomes in section A of the Industry code, shall be Accepted development; or

b)  an existing premises with no increase in GFA, a new premises or an existing premises with an increase in gross floor area, where not complying with all acceptable outcomes in section A of the Industry code shall be subject to Assessable Development - Code Assessment against the Industry code, Richlands—Wacol corridor neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary codes. 

 

 
As indicated
61(c) Medium impact industry

 

Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of Medium impact industry, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where applying to:

 

a)    an existing premises with no increase in gross floor area, where complying with all acceptable outcomes in section A of the Industry code shall be Accepted development; or

b)   an existing premises with no increase in GFA, a new premises or an existing premises with an increase in gross floor area, where not complying with all acceptable outcomes in section A of the Industry code shall be subject to Assessable Development - Code Assessment against the Industry code, Richlands—Wacol corridor neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary codes. 

 

 
As indicated
61(d) Research and Technology Industry

 

Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of Research and technology industry, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where applying to:

 

a)    an existing premises with no increase in gross floor area, where complying with all acceptable outcomes in section A of the Industry code shall be Accepted development; or

b)   an existing premises with no increase in GFA, a new premises, or an existing premises with an increase in gross floor area, where not complying with all acceptable outcomes in section A of the Industry code shall be subject to Assessable Development - Code Assessment against the Industry code, Richlands—Wacol corridor neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary codes. 

 

 
As indicated
61(e) Warehouse

 

Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of a Warehouse, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where applying to:

 

a) an existing premises with no increase in gross floor area, where complying with all acceptable outcomes in section A of the Industry code shall be Accepted development;  

b) an existing premises with no increase in GFA, a new premises or an existing premises with an increase in gross floor area, where not complying with all acceptable outcomes in section A of the Industry code shall be subject to Assessable Development - Code Assessment against the Industry code, Richlands—Wacol corridor neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary codes.

 

 

 

 
As indicated
61(f) Renewable energy facility

 

Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of Renewable energy facility, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval will be Assessable Development - Code Assessment against the Industry code, Richlands—Wacol corridor neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary codes. 

 

 
As indicated
61(g) High impact industry

Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of High impact industry, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval will be Assessable Development - Code Assessment against the Industry codeRichlands—Wacol corridor neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary codes. 

 

 
As indicated
 
62)   Category of Development and Assessment - Non- Industrial Uses

 

The extent to which this variation approval varies the effect of the Planning Scheme for Brisbane, is limited to a Material Change of Use for any of the purposes listed below where that proposed use is on land shown on the approved drawings titled Development Area, Plan No: SK01, received 14 September 2021 (as amended in red)is limited to the circumstances detailed below.

The definition mentioned in this condition refers to definitions contained in the Brisbane City Plan 2014 as amended from time to time.

Any application for a Development Permit for Material Change of Use is to be assessed against the abovementioned assessment benchmarks and policies in the Planning Scheme that are in effect at the time the application for a Development Permit is made, unless otherwise explicitly provided by conditions of this Variation approval.

Where there is conflict between the codes and the condition contained herein, the condition shall prevail.

 

 
As indicated
62(a) Caretakers Accommodation

 

Notwithstanding the contents of the category of development and assessment table in the Planning Scheme, development for the purposes of Caretaker’s accommodation, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where:

 

a)   complying with all acceptable outcomes in the Caretaker’s accommodation code shall be Accepted development; or

b)   not complying with all acceptable outcomes in the Caretaker’s accommodation code will be Assessable Development - Code Assessment against the Caretaker’s accommodation code, overlay codes, and prescribed secondary codes. 

 

 
As indicated
62(b) Car Wash

 

Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of Car wash, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval will be Assessable Development - Code Assessment against the Industry code, Richlands—Wacol corridor neighbourhood plan code Industry zone code, overlay codes, and prescribed secondary codes.

 

 

 
As indicated
62(c) Food and drink outlet

 

Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of Food and drink outlet, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where:

 

a)   having a cumulative gross floor area over the entire site, as shown on the approved drawings titled Development Area, Plan No: SK01, received 14 September 2021 (as amended in red) of 250m2 or less, shall be subject to Assessable Development - Code Assessment against the Industry code, Low impact industry zone code, overlay codes and prescribed secondary codes; or

b)   having a cumulative gross floor area of greater than 250m2 area over the entire site, as shown on the approved drawings titled Development Area, Plan No: SK01, received 14 September 2021 (as amended in red) shall be subject to Assessable Development - Impact Assessment against the Planning Scheme.

 

 

 
As indicated
62(d) Telecommunications Facility (where not a broadcasting station or television station)

 

Notwithstanding the contents of the category of development and assessment table in the Planning Scheme, development for the purposes of Telecommunications facility, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where:

a)   the use is not a low impact Telecommunication Facility, a broadcasting station or television station shall be subject to Assessable Development - Code Assessment against the Telecommunications facility code, Richlands—Wacol corridor neighbourhood plan code, Low impact industry zone code, overlay codes, and prescribed secondary codes; or

b)   the use includes a broadcasting station or television station shall be subject to Assessable Development - Impact Assessment against the Planning Scheme.

 

 
As indicated
62(e) Service station

 

Notwithstanding the contents of the category of development and assessment table in the Planning Scheme, development for the purposes of Service station, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval will be Assessable Development - Code Assessment against the Industry code, Richlands—Wacol corridor neighbourhood plan code Industry zone code, overlay codes, and prescribed secondary codes.

 

 

 
As indicated
62(f) Park

 

Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of a Park pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where:

 

a)   complying with all acceptable outcomes in the Park code shall be Accepted development; or

b)   not complying with all acceptable outcomes in the Park code will be Assessable Development - Code Assessment against the Park code, Richlands—Wacol corridor neighbourhood plan code, overlay codes, and prescribed secondary codes. 

 

 
As indicated
62(g) Parking Station

 

Notwithstanding the contents of the level of assessment table in the Planning Scheme, development for the purposes of Parking station – where a ‘park and ride’ or bicycle parking, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where:

 

a)   the use is a Parking station where a ‘park and ride’ or bicycle facility - Code Assessment against the Industry code, Richlands—Wacol corridor neighbourhood plan code, Industry zone code, overlay codes, and prescribed secondary codes; or

b)   the use is a parking station where not a ‘park and ride’ or bicycle parking, shall be subject to Assessable Development - Impact Assessment against the Planning Scheme.

 

 
As indicated
62(h) Utility Installation

 

Notwithstanding the contents of the level of assessment table in the planning scheme, development for the purposes of Utility installation pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where apply to:

 

a)   if involving an existing premises with no increase in GFA, a new premises or an existing premises with an increase in gross floor area, where not complying with all acceptable outcomes in section A of the Industry code shall be subject to Assessable Development - Code Assessment against the Industry code, Richlands—Wacol corridor neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary codes.

 
As indicated
62(i) Educational Establishment

 

Notwithstanding the contents of the category of development and assessment table in the Planning Scheme, development for the purposes of an Educational establishment pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where:

a)   located within an existing premises with no increase in gross floor area, and limited to trade industry related training and not involving overnight accommodation, shall be subject to Assessable Development - Code assessment against the Community facilities code, Richlands—Wacol corridor neighbourhood plan code, Low impact industry zone code, overlay codes, and prescribed secondary codes; or

b)   a new premises or an existing premises with an increase in gross floor area where for trade industry related training and not involving overnight accommodation will be Assessable Development - Code Assessment against the Community facilities code, Richlands—Wacol corridor neighbourhood plan code, Low impact industry zone code, overlay codes, and prescribed secondary codes.

 

 

 
As indicated
62(j) Shop

Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of Shop, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where:

 

a)   having a cumulative gross floor area over the entire site, as shown on the approved drawings titled Development Area, Plan No: SK01, received 14 September 2021 (as amended in red) of 250m2 or less, shall be subject to Assessable Development - Code Assessment against the Industry code, Low impact industry zone code, overlay codes and prescribed secondary codes; or

b)   having a cumulative gross floor area of greater than 250m2 area over the entire site, as shown on the approved drawings titled Development Area, Plan No: SK01, received 14 September 2021 (as amended in red) shall be subject to Assessable Development - Impact Assessment against the Planning Scheme.

 

 
As indicated
62(k) Emergency Services

Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of Emergency services, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval will be Assessable Development - Code Assessment against the Industry codeRichlands—Wacol corridor neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary codes. 

 
As indicated
 
63)   Limitation of site access

No direct vehicle access to or from the site (vehicle ingress, egress) is permitted from Progress Road for any development application(s) for a Material change of use or Reconfiguration of a lot benefiting from this variation approval.

 
At all times
 
64)   Stormwater Quality Management Plan

Any Material Change of Use or Reconfiguration of a Lot is to include a Site Based Stormwater Quality Management Plan, including Stormwater Quality Modelling using the Model for Urban Stormwater Improvement Conceptualisation (MUSIC), in accordance with the requirements of the State Planning Policy 2018, and the Stormwater Code, City Plan 2014 as amended from time to time.

 
As indicated
 
65)   Protection of Adjoining Trees

Any Material Change of Use or Reconfiguration of a Lot is to install protection measures from construction damage those parts of neighbouring trees located adjoining the development site in accordance with Australian Standard - AS4970 Protection of trees on development sites.

 
As indicated
 
Engineering
 
Timing
66)   Land for Transport Network - Road (Non- trunk)

Any Material Change of Use or Reconfiguration of a Lot on this site is to construct the following roadwork with any associated drainage, verge, site access and services including street lighting for the Transport Network (Road) in accordance with the relevant Brisbane Planning Scheme Codes, the Queensland Manual of Uniform Traffic Control Devices and the AUSTROADS design standards:

Dedicate as road land shown as new road (non-trunk) on the approved drawing titled: Road Dedication Plan, SK01 issue A, received 28/7/2023, and amended in red 27/9/2023, including the following:

i. A widening along the Progress Road frontage of the site to allow for a left turning lane;

ii. Generally, 22.5 metre wide road corridor connecting Progress Road to McRoyle Street required as part of the road construction;

Note: This condition is imposed under section 145 of the Planning Act 2016.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
67)   Work for Transport Network - Road (Non-trunk) - External

Any Material Change of Use or Reconfiguration of a Lot on this site is to construct the following roadwork with any associated drainage, verge, site access and services including street lighting for the Transport Network (Road) shown on the approved drawing titled: Roadworks and Stormwater Drainage Layout Plan Sheet 1 of 5, C1101 issue C, received 28/7/2023 as amended in red 27/9/2023 and the Roadworks and Stormwater Drainage Layout Plan Sheet 2 of 5, C1102 issue C received 28/7/2023 as amended in red 27/9/2023 and Roadworks and Stormwater Drainage Layout Plan Sheet 3 of 5 C1103, issue C, received 28/7/2023 as amended in red 27/9/2023, and Roadworks and Stormwater Drainage Layout Plan Sheet 5 of 5 C1105, issue C, received 28/7/2023 as amended in red 27/9/2023 in accordance with the relevant Brisbane Planning Scheme Codes, the Queensland Manual of Uniform Traffic Control Devices and the AUSTROADS design standards:

- new type E concrete kerb and channel and associated drainage on both sides of McRoyle Street on a 3.75 metre alignment (taking into account any road reserve widening if required);

- a full 12.5m wide Freight network type road pavement from the lip of the new kerb and channel with any appropriate tapers (the minimum width of road construction/reconstruction must be 1.2 metres);

- new type E concrete kerb and channel and associated drainage along the Progress Road frontage of the site on a 4.25 metre alignment (taking into account the road reserve widening for the left turning lane);

- Right turn pocket from Progress Rd into the McRoyle St extension.

- an Arterial Road type road pavement from the lip of the new kerb and channel to the existing road pavement with any appropriate tapers (the minimum width of road construction/reconstruction must be 1.2 metres);

Note: Irrespective of the actual widening, the finished road pavement crown must be located along the centreline of the final pavement width.

Note: This condition is imposed under section 145 of the Planning Act 2016.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
68)   Work for Transport Network - Road (Non-trunk) - Internal

Any Material Change of Use or Reconfiguration of a Lot on this site is to construct the following roadwork with any associated drainage, footpath, pathways and services including street lighting for the Transport Network (Road) shown on the approved drawing titled Roadworks and Stormwater Drainage Layout Plan Sheet 3 of 5 C1103 issue C received 28/7/2023, as amended in red 27/9/2023, the Roadworks and Stormwater Drainage Layout Plan Sheet 4 of 5 C1104 issue C received 28/7/2023, as amended in red 27/9/2023 and the Roadworks and Stormwater Drainage Layout Plan Sheet 5 of 5 C1105 issue C received 28/7/2023 as amended in red 27/9/2023. In accordance with the relevant Brisbane Planning Scheme Codes, the Manual of Uniform Traffic Control and the AUSTROADS design standards:

- roads 22.5 metres wide designed and constructed as Primary Freight Accesses (designed for 85 percentile 50 km/hr maximum) and with street lighting category V5;

Note: This condition is imposed under section 145 of the Planning Act 2016.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
69)   Site Drainage - Major

Any Material Change of Use or Reconfiguration of a Lot on this site is provide an internal drainage system to collect stormwater run-off from all proposed lots, roofed and developed surface areas and any run-off onto the site from adjacent areas and convey the collected run-off to a lawful point of discharge, in accordance with the relevant Brisbane Planning Scheme Codes.

Notes:
-  The stormwater design must ensure the stormwater runoff from the site does not adversely impact on flooding or drainage (peak discharge and duration for all storm events up to the 1% AEP event) of properties that are upstream, downstream or adjacent to the site.  Where a development has not specifically addressed this issue, the development may require implementation of one or more mitigation measures to offset adverse impacts, (e.g. stormwater detention, rainwater tanks, and upgrade of stormwater drainage infrastructure).
   i)  Guidance for the preparation of drawings and/or documents to comply with this condition is provided in the Brisbane Planning Scheme Policies.

-  Where external works are required and infrastructure will be handed over to Council (e.g. Stormwater pipes 375mm or greater and/or manholes within the road reserve, etc), the applicant will be required to request an on-site Pre-Start with Council and ensure all future owned Council assets follow the On/Off Maintenance process in accordance with Councils Infrastructure Installation & Construction Requirements Manual.
   i)  Guidance for requesting a pre-start and co-ordinating the On/Off Maintenance process can be found on Council's website (https://www.brisbane.qld.gov.au/planning-and- building/applying-and-post-approval/on-and-off-maintenance- approvals).

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
Standard Advice
 
Timing
70)   Construction Noise and Dust Emissions

Pursuant to the Environmental Protection Act 1994, all development involving the emission of noise and dust from building and/or construction activities, must ensure that the emissions are in accordance with the requirements of the Act.
The Environmental Protection Act 1994 prescribes that:

1. A person must not carry out building work in a way that makes an audible noise-
-  on a business day or Saturday, before 6.30a.m. or after 6.30p.m; or
-   on any other day, at any time. 
2. The reference in subsection (1) to a person carrying out building work-
-  includes a person carrying out building work under an owner-builder permit; and
-  otherwise does not include a person carrying out building work at premises used by the person only for residential purposes.

Note: A request can be made to work outside of these hours by submitting an Environmental Management Plan for assessment and obtaining an endorsed decision from the Environmental Management delegate Development Services.

 
As indicated
 
71)   Natural Asset Local Law (NALL) - Protected Vegetation on Public Land, Road or Park

Work on or around protected vegetation on public land, road or park may require a permit under the Natural Assets Local Law (NALL).

Arrangements must be made with Program Planning and Integration in relation to the works carried out on protected vegetation on public land, road or park including provision for costs and replacement planting as determined by Program Planning and Integration.

Timing: Prior to carrying out any works on protected vegetation.

 
As indicated
 
72)   Contaminated Materials and Soils

Any contaminated materials or soils encountered during siteworks, must be handled, stored and disposed of in accordance with the requirements of the relevant authority of the Queensland Government. A person must not dispose of contaminated soil or a hazardous substance at a place other than at a place approved by the relevant authority of the Queensland Government.

 
As indicated
 
73)   Management of Asbestos

Disposal, handling and restoration of any building materials containing asbestos must be in accordance with current state and federal legislation.

 
As indicated
 
74)   Stormwater Outlet into Waterways/Creeks & Parks

Ensure all stormwater outlets into parks, waterways and creeks are generally in accordance with Council's guideline 'Stormwater Outlets in parks & Waterways' 2003.  Stormwater outlets are to be designed to minimise scouring velocity and associated bank/bed scour as per QUDM and Councils Infrastructure Design Planning Scheme Policy requirements.  All scour protection and rehabilitation must extend from the stormwater outlet to the creek bed level and mitigate impacts to any existing vegetation and is to be shown on engineering drawings.  Where necessary a rock lined swale or rock chute maybe required to convey water from the stormwater outlet to the creek/waterway invert and include localised stabilisation works where existing scour is occurring onsite.

All works must be detailed on Vegetation Management Plans and/or Rehabilitation Plans where required as part of this approval.

Note: If erosion associated with a stormwater outlet into a creek/waterway becomes evident during construction or the maintenance period of the development, stabilisation works are to be implemented to rectify the erosion/scour prior to handover as a Council asset.  This may require Council approvals or permits.

 
As indicated
 
75)   Further Development Permit Required

Further Development Permit(s) to carry out assessable building work under the Building Act may be required.

 
As indicated
 
76)   Plumbing and Drainage Work

Pursuant to the Plumbing and Drainage Act 2018, any plumbing and drainage work must be carried out in compliance with the Plumbing and Drainage Regulation 2019. Plumbing and drainage permit work requires approval by Brisbane City Council prior to the work being carried out.

 
As indicated
 
77)   Currency Period

The currency period for this development approval is stated in the Decision Notice and is expressed as a date.

 

This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016.

 
As indicated
 
78)   Cultural Heritage

Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003.  This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage.

The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care.

For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships).

 
As indicated
 
79)   Equitable Access

Provision must be made during and after construction for equitable access for persons with disabilities to and within the site and on adjoining public areas, in accordance with the following:
- Queensland Anti-Discrimination Act 1991;
- Federal Disability Discrimination Act 1992;
- Australian Standards AS1428 Parts 1-4;
- Australian Standard for Access and Mobility; and
- National Construction Code.

 
As indicated
 
80)   Fire Ant Movement Controls

To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected.

These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products.

Breaches of these controls can potentially impact the community, economy and the environment.  Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014.

For further information contact the relevant Queensland State Government department on 13 QGOV.

 
As indicated
 
81)   Water and Wastewater

Services for water and wastewater (sewerage) are not under the jurisdiction of Brisbane City Council.  Authorisation to connect the approved development to the water/wastewater networks and for property service connections required a Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009.

For further information about any necessary Water Approvals contact Urban Utilities.

 
As indicated
 



Permit to Which These Conditions Relate: DA - PA - Reconfiguring a Lot
Activity(ies): Subdivision of Land
Stage:  

** End of Package **