| Address of Site: | 152 MCROYLE ST WACOL QLD 4076 372 PROGRESS RD WACOL QLD 4076 402 PROGRESS RD WACOL QLD 4076 |
| Real Property Description of Site: | L86 SP.132953 L87 SP.288400 L91 SP.283375 |
| Aspects of development and type of approval: | DA - PA - Material Change of Use Development Permit - warehouse DA - PA - Material Change of Use Preliminary Approval - Variation Request - caretaker's accommodation,car wash,research and technology industry,warehouse,utility installation,telecommunications facility,shop,service station,service industry,renewable energy facility,parking station,park,medium impact industry,low impact industry,high impact industry,food and drink outlet,emergency services,educational establishment DA - PA - Reconfiguring a Lot Preliminary Approval - Variation Request - Subdivision of Land |
| Council File Reference: | A006973750 Permit Reference Number/s: DAMC412254321; DAMC412254421; DARL412254521. |
| Package Status: | APPROVED - Version 7 (25th of May, 2026 2:09:26 PM) |
| Package Generated: | 25/05/2026 |
| Alessio ZANCOLICH Principal Urban Planner Planning Services South alessio.zancolich@brisbane.qld.gov.au (07) 3407 8514 |
Eric OWEN Senior Technical Officer Engineering Services South eric.owen@brisbane.qld.gov.au (07) 3178 5195 |
Michael PICKERILL Network Planning Michael.Pickerill@brisbane.qld.gov.au |
| Alexandria WOOD Urban Planner Planning Services South Alexandria.Wood@brisbane.qld.gov.au 31782227 |
Zarndra PIPER Principal Urban Planner Planning Services South Zarndra.Piper@brisbane.qld.gov.au 0731780370 |
Harley LYONS Urban Planner Planning Services South Harley.Lyons@brisbane.qld.gov.au 31782223 |
| Nicola MEWING Principal Urban Planner Planning Services Special Assessment Nicola.Mewing@brisbane.qld.gov.au 31781002 |
Diana AVERY Landscape Architect Landscape Architecture Team Diana.Avery@brisbane.qld.gov.au 3403 8888 |
James LANGSTON Principal Engineer Engineering Services Hydraulics james.langston@brisbane.qld.gov.au 34034918 |
| Chris HENNESSY Engineering Services Traffic Chris.Hennessy@brisbane.qld.gov.au (07) 3403 5768 |
Tanveer BAINS Engineer Engineering Compliance Tanveer.Bains@brisbane.qld.gov.au 31787301 |
Bella FAULKNER Landscape Architect Landscape Architecture Team Isabella.Faulkner@brisbane.qld.gov.au 07 3403 8888 |
| Daniel SPILLANE Senior Engineer Engineering Services South Daniel.Spillane@brisbane.qld.gov.au 3403 5285 |
Samuel GAY Senior Engineer Engineering Services South samuel.gay@brisbane.qld.gov.au (07) 3407 1801 |
Radmila SUBOTIC Senior Landscape Architect Landscape Architecture Team Radmila.Subotic@brisbane.qld.gov.au 31780113 |
| Matthew WATT Principal Building and Construction Management Officer Building and Construction Management Team - Coordination Matthew.Watt@brisbane.qld.gov.au 3178 8877 |
Emma MEZZINA Team Manager Planning Services South Emma.Mezzina@brisbane.qld.gov.au 3178 0049 |
Justin LYNHAM Senior Urban Planner Planning Services South justin.lynham@brisbane.qld.gov.au 3407 1302 |
| Kim ROGERS Principal Urban Planner Planning Services South kim.rogers@brisbane.qld.gov.au 34071304 |
Michael O'REILLY Environmental Management Officer Environmental Management Services Michael.O'Reilly@brisbane.qld.gov.au 3403 9517 |
Timothy MCCAIG Ecologist Ecology Services Timothy.McCaig@brisbane.qld.gov.au 3403 0116 |
| Harley LYONS Urban Planner Planning Services South Harley.Lyons@brisbane.qld.gov.au 31782223 |
Alexandria WOOD Urban Planner Planning Services South Alexandria.Wood@brisbane.qld.gov.au 31782227 |
Ashleigh COOMBES Principal Urban Planner Planning Services South Ashleigh.Coombes@brisbane.qld.gov.au (07) 3403 1937 |
DRAWINGS AND DOCUMENTS
| Drawing or Document | Number | Plan Date |
|---|---|---|
| Specifications | 210214 02 issue a | 10-MAY-2022 (Received) |
| Planting Palette | 210214 03 issue a | 10-MAY-2022 (Received) |
| Development Area | SK01 (Amended In Red 04-APR-2022) | 14-SEP-2021 (Received) |
| Road Dedication Plan | SK01 Issue A (Amended In Red 27-SEP-2023) | 28-JUL-2023 (Received) |
| Roadworks and Stormwater Drainage Layout Plan Sheet 1 of 5 | C1101 Issue C (Amended In Red 27-SEP-2023) | 28-JUL-2023 (Received) |
| Roadworks and Stormwater Drainage Layout Plan Sheet 2 of 5 | C1102 Issue C (Amended In Red 27-SEP-2023) | 28-JUL-2023 (Received) |
| Roadworks and Stormwater Drainage Layout Plan Sheet 3 of 5 | C1103 Issue C (Amended In Red 27-SEP-2023) | 28-JUL-2023 (Received) |
| Roadworks and Stormwater Drainage Layout Plan Sheet 4 of 5 | C1104 Issue C (Amended In Red 27-SEP-2023) | 28-JUL-2023 (Received) |
| Roadworks and Stormwater Drainage Layout Plan Sheet 5 of 5 | C1105 Issue C (Amended In Red 27-SEP-2023) | 28-JUL-2023 (Received) |
| Site Based Stormwater Management Plan | REP002 06 20 3137 Issue 7 | 06-MAR-2024 (Received) |
| Site Plan | 4574-20 Q-15 (Amended In Red 22-MAY-2026) | 17-APR-2026 (Received) |
| Building A - Overall Floor Plan | 4574-21-Q-6 | 22-MAY-2026 (Received) |
| Building A - Detail Floor Plans (T1 & T2) | 4574-22A-Q-4 | 17-APR-2026 (Received) |
| Building A - Detail Floor Plans (T3) | 4574-22B-Q-4 | 17-APR-2026 (Received) |
| Building A - Elevations | 4574-23-Q-6 | 17-APR-2026 (Received) |
| Building B - Overall Floor Plan | 4574-24-Q-13 (Amended In Red 22-MAY-2026) | 17-APR-2026 (Received) |
| Building B - Detail Floor Plan | 4574-25-Q-12 | 17-APR-2026 (Received) |
| Building B - Elevations | 4574-26-Q-12 (Amended In Red 22-MAY-2026) | 17-APR-2026 (Received) |
| Building B - Sections | 4574-27-Q-5 | 17-APR-2026 (Received) |
| Landscape Plan | 4574-70-Q-9 | 17-APR-2026 (Received) |
APPROVAL CONDITIONS
| Permit to Which These Conditions Relate: | DA - PA - Material Change of Use |
| Activity(ies): | warehouse |
| Stage: | Warehouse |
| 1) Security Lighting - On Site Install and maintain a suitable system of security lighting to operate from dusk to dawn within all areas where the public may gain access, including car parking areas, building entrances and vegetated areas. Ensure that all external lighting is in accordance with Australian Standard - AS4282- Control of the Obtrusive Effects of Outdoor Lighting. Ensure lighting over publicly accessible internal pathways covered by permanent awnings is in accordance with Australian Standard - AS/NZS 1158.3.1 Lighting for roads and public spaces - Pedestrian area lighting - Performance and design requirements. Lighting must be maintained in safe and good working order.
Timing: ‘Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first’ |
As indicated |
| 2) Car Parking The car parking within the premises must be maintained exclusively for the ancillary use of the development. The parking must not be made available to the general public and there must not be signage erected on or in the vicinity of the site advertising the availability of car parking to the general public. |
At all times |
| 3) Maintain the Approved Development Maintain the approved development in accordance with the approved DRAWINGS AND DOCUMENTS, and any other relevant Council approval required by the conditions. |
At all times |
| 4) Approved Drawings and Documents A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers. Note: This condition is imposed to ensure compliance with the conditions of development approval. |
While site/operational/building work is occurring |
| 5) Carry Out the Approved Development Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS. Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks). Permission to enter neighbouring properties must be obtained from the relevant property owners. |
While site/operational/building work is occurring |
| 6) Complete All Operational Work Complete all operational work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such operational work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS or, if requiring a further approval from the Council, in accordance with the relevant further approval(s). |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 7) Complete All Building Work Complete all building work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such building work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS. Note: Building work must also be completed in accordance with any other current development approval. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 8) No Goods to be Sold On-site - Industry No goods are to be sold, displayed or offered for sale from the site to the general public unless an approval has been obtained to carry out retail uses on the site in accordance with Brisbane City Plan 2014 v29.00/2023. |
At all times |
| 9) Limitation of Approval The Office area is to remain ancillary to the development and must not operate separately. All prospective purchasers or tenants of the site are to be made fully aware of this provision.
|
To be maintained |
| 10) Bushfire Management Manage bushfire risk within the approved Bushfire Management Zone shown on the APPROVED DRAWINGS AND DOCUMENTS. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
10(a) Implement Bushfire Management
Measures The Bushfire Management Zone is provided and is managed in accordance
with the following requirements, unless otherwise agreed in writing by
Council: · Hazardous materials storage and handling areas that exceed the quantity thresholds specified in City Plan 2014 – Bushfire overlay code – Table 8.2.5.3.D – Threshold quantities for hazardous chemicals must not occur in outdoor areas exposed to a radiant heat flux greater than 12kW/m2 · Any boundary fences constructed to be of non-combustible material (e.g. steel panel fencing, masonry) · Grass must be short cropped (100mm) and maintained. · All leaves and vegetation debris must be removed at regular intervals. · Plants greater than 10 centimetres in height must not be placed within 3 metres of a window or glass feature of the building. · Trees and shrubs must not overhang or touch any elements of the building. · Establish and maintain lawn or paved areas such as paths and/or a pebble garden with herbs near to buildings, particularly flammable or glazed elements.
· Maintain cleared areas around all driveways, pathways, fire-trails and roadways that may need to be used as an access/egress route in the event of a bushfire.
· Plant trees adjacent to buildings so as to allow clear access and minimise canopy overhang of roofs and associated accumulation of leaf litter.
· Space trees and shrubs to avoid the creation of a continuous canopy that may carry fire.
· Prune lower limbs of trees to a height of 3m above ground level.
· Avoid using conifers, paperbarks (i.e. Melaleuca species), stringy-bark and ribbon-bark eucalypts in landscape plantings.
· Avoid using organic mulch with preference given to non-flammable mulches such as scoria (light weight volcanic stone), pebbles or recycled crushed bricks.
· Avoid planting and use of flammable mulching: · adjacent to windows to prevent the potential for windows to be broken by flames or excessive radiant heat if the plantings become involved in the bushfire (usually due to embers), then allowing embers to enter the structure; and
· adjacent to doorways and access paths that may need to be accessed during a bushfire incident. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
10(b) Submit Certification Submit certification to Development Services certifying that the bushfire management measures identified in (b) above have been implemented. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
10(c) Maintain Bushfire Management
Measures Maintain bushfire management measures identified in this condition. Timing: To be maintained. |
As indicated |
10(d) Notification to Prospective
Purchasers Notify all prospective purchasers of the requirements and effects of this condition. Timing: At the time of marketing a lot for sale. |
As indicated |
| 11) Streetscape Works - Industrial Street Carry out streetscape
improvement works including concrete path (where required by this condition),
turf and street trees to the verge to an Industrial Street standard in
accordance with the relevant Brisbane Planning Scheme Codes, Brisbane Standard
Drawings (BSD), the requirements of this condition and the Infrastructure
Design Planning Scheme Policy including sections 3.7.4.5 and 3.7.5. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first (MCU or BW), or prior to Council's notation of the plan of subdivision (ROL) |
11(a) Concrete Path Install a 1.2m wide
broom finished standard Portland grey concrete path. The edge of the path is to
be setback 1.9m from the back of kerb. The path is to transition to existing
paths on verges that adjoin the development. |
As indicated |
11(b) Submit As-Constructed
Drawings Submit to Development Services "As Constructed" plans
including an asset register, checked by a Registered Professional Engineer
Queensland, certifying that the concrete path works have been completed in
accordance with relevant Brisbane Planning Scheme Codes/Policies. |
As indicated |
11(c) Turf Install turf to the
full width of the verge excluding any concrete path required by this
condition. |
As indicated |
11(d) Street Tree(s) Contact the call centre
on 3403 8888 and request that Council undertake street tree planting in
accordance with the Infrastructure Design Planning Scheme Policy including
section 3.7.5 to the frontage of the development. Provide the call centre with
the Development Approval number and obtain a reference number for the phone
call for your record. |
As indicated |
| 12) Landscape the Site Landscape the site as indicated on the approved DRAWINGS AND DOCUMENTS and in accordance with the requirements of this condition. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
12(a) Submit Building Layout
Details Submit to Development Services, and obtain approval from for, details of the final building layout below and at ground level to demonstrate that provision has been made for deep planting, perimeter planting, services and existing trees that are required to be retained. The details must be provided by a qualified Landscape Architect or RPEQ. Timing: Prior to building works commencing. |
As indicated |
12(b) Submit Detailed Landscape
Plan Submit to Development Services, and obtain approval for, a detailed Landscape Plan for all on-site landscape works identified on the approved Landscape Concept Plans. The plan must be prepared at a scale of 1:100 by a qualified Landscape Architect and must comply with the relevant Brisbane Planning Scheme Codes. The plan must include the following: REFER TO BUSHFIRE CONDITION FOR LANDSCAPING REQUIREMENTS. Siteworks Planting Deep
Planting Timing: Prior to building work above ground level commencing. |
As indicated |
12(c) Additional Requirements -
Industry In addition to the requirements listed above, the
plan must include the following: Timing: Prior to building work above ground level commencing. |
As indicated |
12(d) Construct Approved Works Carry out the landscaping and associated works in accordance with the approved detailed Landscape Plan. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
12(e) Certify Works On completion of the works, provide Development Services with a copy of the as-constructed detailed Landscape Plan together with certification from a qualified Landscape Architect or qualified Landscape Contractor that the completed landscape work complies with the approved detailed Landscape Plan (Brisbane City Council Form CC10613 Landscape Works Certificate). Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
12(f) Maintain the Landscape
Works Maintain the landscape generally in accordance with the approved detailed Landscape Plan. Timing: Prior to commencement of use, whichever comes first. |
As indicated |
| 13) Hazardous Goods Storage There is to be no exceedance of the amounts of Dangerous Goods and Combustible Liquids, outlined in Table 9.3.12.3.H of the BCC Industry Code, and no exceedance of the Schedule 11 Placard and Manifest quantities (Workplace Health and Safety Regulations), stored on site at any time. All materials listed as dangerous goods under The Australian Code For The Transport Of Dangerous Goods By Road and Rail (ADG Code) must be stored and handled on site in accordance with the relevant Australian Standard which applies to the Dangerous Goods Class of the material. |
At all times |
| 14) Outdoor Lighting Outdoor lighting is required to efficiently light a desired area while minimising the adverse impacts of spill lighting on adjoining uses and does not create an adverse impact on the nearby sensitive zone/uses or the behaviour of native fauna. The installation, operation and maintenance of outdoor lighting are to comply with the requirements of AS 4282-1997 Control of the obtrusive effects of outdoor lighting. |
At all times |
| 15) Mechanical Plant or Equipment - Acoustically
Screened Mechanical plant or equipment is to be acoustically screened from an adjoining sensitive use. Mechanical plant includes generators, motors, compressors and pumps such as air-conditioning, refrigeration and cold room motors. Acoustically screened is defined in City Plan 2014. NOTE: This condition does not authorise environmental nuisance under the Environmental Protection Act 1994. PROOF OF FULFILMENT Submit to Development Services, certification that all mechanical plant or equipment, is acoustically screened. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 16) Dampening of Grilles and Metal Plates All metal grilles, metal plates or similar located within vehicle parking and manoeuvring areas must be securely fastened and meet the requirements of AS3996:2019, Access covers and grates. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 17) Tyre Noise Reduction The driveways and carpark surfaces are to be appropriately treated/surfaced to reduce tyre noise impacts from the development. PROOF OF
FULFILMENT Provide Certification that appropriate treatments/surfacing has been provided to the driveways and carpark areas to reduce tyre noise impact from the development. Certification must be provided by a Member or professional eligible to be a Member of the Australian Acoustic Society. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 18) Stormwater Quality (High Risk) - Submit Management
Plan Implement and maintain the approved Site Based Stormwater Quality Management Plan No. REP002 06 20 3137 Issue 7, prepared by AT&L Consulting Engineers received 6/3/2024, to achieve the Stormwater Code, City Plan 2014. Timing: Prior to issue of Certificate of Classification/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
Prior to site/operational/building work commencing |
18(a) Certification Submit to Development
Services certification from a Registered Professional Engineer Queensland, that
all the treatments and measures recommended in the approved Site Based
Stormwater Quality Management Plan have been implemented and constructed into
the development. |
As indicated |
| 19) On-site Erosion (Medium Risk) Manage on-site erosion and the release of sediment or sediment laden water from the site at all times by implementing best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version). Timing: Prior to commencement of any land disturbing activities and until all exposed soil areas are permanently stabilised against erosion. |
As indicated |
19(a) Manage earth disturbance on-
site (i) Drainage control measures must be implemented and maintained to minimise water flow onto areas of exposed earth. (ii) Sediment and erosion control measures must be implemented and maintained to prevent soil loss from earth disturbance areas and prevent deposition beyond earth disturbance areas. (iii) No release of contaminants to land beyond on-site area of earth disturbance other than releases that achieve water pollutant concentration release limits of: A. 50mg/L TSS (Total Suspended Solids); B. Turbidity, Nephelometric Turbidity Units (NTU) value less than 10% above background, 75 NTU, or as agreed in writing by an Officer from Councils Erosion and Sediment Control (ESC) Team in Compliance and Regulatory Services; C. pH between 6.5 and 8.5 at all times. (iv) Maintain a written record to demonstrate that water discharges from the site, including any dewatering operations, meet the release limits as detailed in (iii) for water discharge(s) from the site that occur during or immediately after a rainfall event, and during normal business hours. The water quality of the discharge flows must be measured at each discharge point from the site, including but not limited to sediment basin outlets, other applicable sediment control devices, the site water drainage system, and recorded against the release limits at least once on each calendar day until such discharge stops. Timing: Prior to commencement of any earth disturbing activities and until all exposed soil areas are permanently stabilised against erosion. |
As indicated |
19(b) Provide Land Occupier Notification to
Council (i) Notify Council's ESC Team of proposed land occupier/s by sending an email to CARS-ESC@Brisbane.qld.gov.au (ii) If the land is to be occupied by any person other than the registered landowner then advice must be provided to Council that confirms the name, contact information and the duration of any proposed occupation of the land. Timing: Prior to commencement of any earth disturbing activities. |
As indicated |
19(c) Prepare Erosion and Sediment Control
Plan Prepare an Erosion and Sediment Control Plan (ESCP) in accordance with best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version) and, to the extent of any inconsistency, relevant Brisbane Planning Scheme Codes and Policies. Obtain a design certificate in accordance with the relevant Brisbane Planning Scheme Codes and Policies. The ESCP and design certificate must be certified by a Certified Professional in Erosion and Sediment Control (CPESC) or a Registered Professional Engineer Qld (RPEQ) with suitable qualifications and experience in erosion and sediment control. Documentary evidence demonstrating appropriate qualifications in erosion and sediment control must be provided to the Council upon request. Timing: Prior to the commencement of any earth disturbing activities. |
As indicated |
19(d) Attend a pre-start
meeting Arrange and attend a pre-start meeting for ESC with an Officer from Councils ESC Team in Compliance and Regulatory Services (CARS). Note: To request a pre-start meeting from Council's ESC Team send an email to CARS-ESC@Brisbane.qld.gov.au. All relevant documentation, including both the certified ESCP and the certified design certificate, must be attached to this email. Please allow up to 10 business days for your request to be processed. Timing: Attend the pre- start meeting prior to the commencement of any earth disturbing activities. |
As indicated |
19(e) Implement Certified Erosion and
Sediment Control Plan Implement the certified ESCP and maintain all ESC measures in accordance with best industry practice for sediment and erosion control as per the International Erosion Control Association, Best Practice Erosion and Sediment Control documents (2008 or later version) and, to the extent of any inconsistency, relevant Brisbane Planning Scheme Codes and Policies. The ESCP and design certificate must be available on site at all times for inspection by Council officers. Any alteration to supplementary or Type 3 ESC measures must be reflected in the certified ESCP. Any alteration to Type 2 or Type 1 ESC measures will require a revised ESCP and design certificate that has been certified by either the CPESC or RPEQ. Timing: While earth disturbing activities are occurring and until all exposed soil areas are permanently stabilised against erosion. |
As indicated |
| 20) Maintenance Period for Engineering Work Maintain the work required by the Engineering condition(s) imposed on this development approval and rectify any defects in accordance with the requirements detailed in this condition. Note: Guidance for requesting a pre-start and co- ordinating the On/Off Maintenance process can be found on Council's website (https://www.brisbane.qld.gov.au/planning-and-building/applying-and-post- approval/on-and-off-maintenance-approvals). Timing: During the on-maintenance period. |
As indicated |
20(a) On-Maintenance Acceptance Arrange an on- maintenance inspection with Development Services and obtain written confirmation from Council that the work has been completed in accordance with the requirements of the condition and is accepted on-maintenance. Provide proof of Public Liability Insurance ($20 million) for the on- maintenance period. Lodge a maintenance security for the on-maintenance period. The security must be calculated as 5% of the value of the constructed work or $10,000.00, whichever is greater. Note: A maintenance security may consist of either a bank guarantee or monetary payment lodged with Council. Refer to Council's Infrastructure Installation and Construction Requirements Manual for further details about the on-maintenance procedure and requirements. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
20(b) On-Maintenance Period Provide a minimum 12 months maintenance to the work from the time the work is accepted on- maintenance by Council. During this period maintain the work and rectify any defects identified at the on-maintenance inspection and those arising during the on-maintenance period. Note: The on-maintenance period may be extended by Council pending concerns and/or unsatisfactory performance during the maintenance period. Timing: A minimum 12 months from acceptance on-maintenance. |
As indicated |
20(c) Off-Maintenance
Acceptance On completion of the maintenance period arrange an off-maintenance inspection with Development Services and obtain written confirmation from Council that the work is accepted off-maintenance. Ensure all defects are rectified prior to making an appointment for off- maintenance Inspection. Note: If the inspection is successful the maintenance security will be released. Timing: On completion of the on-maintenance period. |
As indicated |
| 21) Information Signage Erect an information sign on the subject property in
accordance with Council's general requirements for signage and in accordance
with the requirements outlined below: Timing: Prior to site works commencing and then to be maintained until completion of the development for all stages. |
As indicated |
| 22) Engineering Pre-Start Meeting Arrange and attend a pre-start meeting with Development Services and Program Planning and Integration. Applicable compliance and inspection fees must be paid, in full, to Council prior to the meeting being held. Note: To arrange an engineering pre-start meeting with Development Services an email supported by a completed copy of the Pre-Start Meeting Guidelines - Civil Engineering Works kit (https://www.brisbane.qld.gov.au/sites/default/files/20191008-cc11207-pre- start-meeting-guidelines-civil-engineering-works.pdf) must be sent to dalodgement@brisbane.qld.gov.au. Details include (but
are not limited too) the following: Note: Timing: Prior to site/operational/building work commencing. |
As indicated |
| 23) Filling and / or Excavation All earthworks must be carried out in accordance with the relevant Brisbane Planning Scheme Codes. |
Prior to building work commencing |
23(a) Submit Earthworks
Drawings Submit to, and obtain approval from, Development Services earthworks drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the approved DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes. The Earthworks Drawings
must include the following: Note: If the earthworks impact on the road reserve, the Developer must obtain applicable footpath and road permits prior to commencing any works. Such impacts may include footpath occupation, road closures, re-profiling, ground anchors and/or relocation of services. If the excavation has to be stabilised using ground anchors or similar, then the submitted plans must show the location of these in relation to all services. The cost of moving services, utilities and assets is the responsibility of the Developer. The permission of the service/utility/asset owner is required. Note: Irrespective of final earthworks, it is the responsibility of the RPEQ to manage any staged works associated with Erosion & Sediment Control. Timing: Prior to site/operational/building work commencing. |
As indicated |
23(b) Fill Material, Placement, Compaction
and Testing All fill material placed on the site must comprise only natural earth and rock and must be free of contaminants (as defined by Part 3, Division 2, Subdivision 2 Environmental contamination, Section 11 of the Environmental Protection Act 1994) and noxious, hazardous, deleterious and organic materials. Fill material, placement, compaction and testing must comply with the requirements of Australian Standard - AS 3798, Guidelines on Earthworks for Commercial and Residential Developments. Timing: While site/operational/building work is occurring. |
As indicated |
23(c) Implement Approved Earthworks
Drawings Construct and maintain the earthworks in accordance with the requirements of AS3798 and the approved earthworks drawings. Timing: While site/operational/building work is occurring and then to be maintained. |
As indicated |
23(d) Submit As Constructed
Drawings Submit to Development Services As Constructed drawings prepared by a Registered Surveyor. Timing: Prior to building work above ground commencing. |
As indicated |
23(e) Submit Certification Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the approved earthworks drawings. Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that all fill material used complies with the quality requirements of this condition and that placement, compaction and testing has been carried out in accordance with AS3798. Timing: Prior to building work above ground commencing. |
As indicated |
| 24) Construction Management Plan - Major Carry out development in a method consistent with a Construction Management Plan (CMP) prepared in accordance with the requirements of this condition. |
While site/operational/building work is occurring |
24(a) Construction Management Plan - Submit
Plan Submit to, and obtain compliance approval from, Development Services a detailed Construction Management Plan for the site preparation, demolition, excavation and construction phases of the approved development. The Construction Management Plan must be in accordance with the relevant Brisbane Planning Scheme Codes and address the following matters, both internal to and external to the development site: (i)
Location of and impacts to any Council vegetation (i.e. street
trees/park trees/garden beds) The Construction Management Plan must be supported by 'approval in principle' or written approvals from the relevant Council sections or other governing bodies responsible for any potentially impacted infrastructure. The list of relevant infrastructure and contacts is available on Council's website - Search 'Constructions Management Plan'. Timing: Prior to site/operational/building work commencing. |
As indicated |
24(b) Construction Management Plan -
Dilapidation Report Submit a dilapidation report to engineeringservices@brisbane.qld.gov.au detailing the pre-existing condition of the roadway, both footways, both verges and Council infrastructure, including vegetation, for 100m from the site entry in both directions or to the next street intersection (if less than 100m from the site entry) in both directions. Timing: Prior to the pre-start meeting. |
As indicated |
24(c) Construction Management Plan -
Documentation on Site Legible copies of the approved Construction Management Plan and current permits must be kept on site and be made available on request by Council, at all times. The requirements of the CMP must be included in all induction of principal and subcontractors utilised in the development. An outline of the induction provided to contractors may be requested by Council to confirm compliance with this condition. Timing: While site/operational/building work is occurring. |
As indicated |
24(d) Construction Management Plan - Works to
be Performed Out of Hours Obtain an approval from Development Services for any
work that is proposed to be undertaken outside of normal business hours -
6:30am to 6:30pm, Monday to Saturday. |
As indicated |
24(e) Construction Management Plan -
Implement Plan Carry out the development in accordance with the approved Construction
Management Plan. |
As indicated |
| 25) Protect Existing Infrastructure Where there is existing infrastructure in the vicinity of the proposed work, the new work must not damage or compromise the working ability of the existing infrastructure. Where alterations to public utility mains, existing mains, services or installations are necessitated by the development, prior to alterations commencing, the developer must notify Council or the relevant infrastructure provider and obtain agreement to the alterations. The developer must meet the costs of the alterations. The alterations must be carried out in accordance with the relevant Brisbane Planning Scheme Codes or infrastructure providers requirements. |
While site/operational/building work is occurring |
25(a) As Constructed Drawings - Alterations
to Existing Infrastructure Submit to Development Services As Constructed drawings showing all new and/or rectification works and an asset register, prepared by a Registered Professional Engineer Queensland. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that the alterations have been completed in accordance with the relevant Brisbane Planning Scheme Codes and any other relevant infrastructure requirements. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
| 26) Remove Improvements & Obstructions from Truncation
and Dedication Remove all improvements (fences, gates, letter boxes, garden beds and plots and other constructed items, etc.) and obstructions (existing earth banks, vegetation, etc.) from the area of dedicated road and reinstate the area as footway in accordance with the relevant Brisbane Planning Scheme Codes. Any new or existing installations of electrical pillar boxes, pad mounted transformers (PMTs), water meters and the like, must be installed/relocated to their ultimate alignment relative to the new property boundary and clear of the usable footpath areas irrespective of the alignment of the existing services/conduits. Note: The cost of moving services, utilities and assets is the responsibility of the Developer. The permission of the service, utility or asset owner will be required. Council permission is required if street trees, stormwater gullies/drains, and swales are affected. Urban Utilities permission is required if water supply and sewerage services are affected. Standard utility alignments may be found on Council's 'Brisbane Standard Drawings' 1013 to 1016 inclusive. PROOF OF
FULFILMENT Certification from a Registered Surveyor or Registered Professional Engineer Queensland that the above work has been completed in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 27) Retaining Walls Design and construct all retaining walls and
associated fences, in accordance with the relevant Brisbane Planning Scheme
Codes and the following: |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
27(a) Certification of Retaining
Walls For retaining walls over 1.0m in height, obtain certification from a Registered Professional Engineer Queensland that the design and construction of the retaining walls and ancillary drainage are in accordance with the requirements of this condition. |
As indicated |
| 28) Access, Grades, Manoeuvring, Carparks, Signs and
Line Marking Construct and maintain access, parking and manoeuvring for vehicles on site in accordance with the relevant Brisbane Planning Scheme Codes, as indicated on the approved DRAWINGS AND DOCUMENTS, including the following: i. A pavement of minimum Local road standard or equivalent surface material (including associated drainage) to the area on which motor vehicles will be driven and/or parked. ii. Manoeuvring on site for an AV and for the loading and unloading of vehicle(s); iii. Parking on the site for 127 cars, including 3 parking spaces for people with disabilities and for the loading and unloading of vehicle(s) within the site. There must a minimum number of 127 provided on site. iv. Provide and maintain 26 secure bicycle parking spaces and 52 lockers and 2 shower cubicles with ancillary change rooms for both females and males; v. An appropriate area for the storage and collection of refuse, including recyclables, in a position which is accessible to service vehicles on the site. vi. Prepare and implement signs and line markings drawings that show the internal paved areas signed and delineated in accordance with the approved drawings and documents. The drawings must be prepared and certified by a Registered Professional Engineer Queensland in accordance with the relevant Brisbane Planning Scheme Codes and the Manual of Uniform Traffic Control Devices. PROOF OF FULFILMENT Certification from a Registered Professional Engineer Queensland, that the above requirements have been implemented in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 29) Repair Damage to Kerb, Footpath or Road Repair any damage to the existing kerb and channel, footpath or roadway (including removal of concrete slurry from footways, roads, kerb and channel, stormwater gullies and drainlines) and re-instate existing traffic signs and pavement markings that have been removed or damaged during any works carried out in association with the approved development. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
29(a) Interim Repairs If at any time during the construction phase of the approved development, damage to the existing kerb and channel, footpath or roadway creates unsafe, unreasonable and/or not fit for purpose conditions as assessed by Council, interim repairs must be undertaken as directed by Program Planning and Integration. Note: Any interim repairs required to be undertaken shall not be considered to satisfy the requirements of this condition for the permanent repair of the infrastructure prior to the issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. Timing: While site / operational / building works is occurring. |
As indicated |
| 30) Refuse Collection - On Site Provide for the installation and collection of refuse/recycling bins by Brisbane City Council's Waste and Resource Recovery Services or a private waste contractor. |
At all times |
30(a) Arrange Refuse Collection Arrange for the installation of refuse/recycling bins and for the subsequent collection of refuse including recycling from the site by Brisbane City Council's Waste and Resource Recovery Services or a private waste contractor. Timing: A minimum of four weeks prior to the commencement of use and then to be maintained. PROOF OF FULFILMENT Where a private waste contractor is engaged, provide written confirmation from the proposed waste collection contractor of the agreement to service the property. The written agreement must be submitted to Council's Waste and Resource Recovery Services and include full details of the proposed system, bin sizes, number of bins, frequency of collection and the refuse collection vehicle size. Timing: Prior to commencement of use. |
As indicated |
30(b) Notify Future Owner Where Council is engaged as the waste contractor, the owner must notify any future owner/body corporate that the development has been approved on the basis that an indemnity must be provide for refuse collection vehicles to enter the property. Timing: At time of a change of ownership. |
As indicated |
30(c) Indemnify Council The owner and any subsequent owner must, by approved form to Waste and Resource Recovery Services, indemnify Council and its agents in respect of any damage to the pavement and other driving surfaces. Timing: When an arrangement for refuse/recycling collection services is made with Brisbane City Council. |
As indicated |
| 31) Refuse Storage - On Site Collection Provide a roofed and wholly screened refuse enclosure utilising materials consistent with the development or a dedicated refuse storage room, as shown on the approved plans and documents. The enclosure/refuse storage room must be of a design to accommodate the quantity of refuse and recycling including source separation to allow for low servicing collection of the development. Bins must be located in an area which allows them to be manoeuvred from the bin storage area to the designated internal collection point. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 32) Streetscape Works - Subdivision New Road Carry out streetscape improvement works, including concrete path (where required by this condition), turf and street trees to the verge of the new road(s). Improvement works must be to an Industrial Street standard for Industrial roads and a Neighbourhood Street Minor standard for all other roads (Suburban/District/Neighbourhood/Local) in accordance with: - the relevant Brisbane Planning Scheme Codes; - Brisbane Standard Drawings (BSD); - the requirements of this condition; and - the Infrastructure Design Planning Scheme Policy including sections 3.7.4.4, 3.7.4.5 and 3.7.5. Note: standard path alignments for new roads are shown on Brisbane Standard Drawing BSD-5201 sheet 2. |
Prior to Council's notation on the plan of subdivision |
32(a) Concrete Path Install a 1.2m wide broom finished standard Portland grey concrete path to both sides of the carriageway of Suburban/District/Neighbourhood (bus route)/Industrial roads and one side of the carriage way of a Neighbourhood (non-bus route) roads and one side of all local streets. The edge of the path is to be setback 1.9m from the back of kerb for industrial roads and 1.48m from the back of kerb for all other roads. Transition to existing paths on verges that adjoin the development. The transition is to occur fronting the adjoining developments, not the subject site. Note: If the above requirements cannot be achieved, contact the Engineering Services Team via email: engineeringservices@brisbane.qld.gov.au Timing: Prior to Council's notation of the plan of subdivision. |
As indicated |
| 33) Land for Transport Network - Road (Non-
trunk) Dedicate as road land shown as new road (non-trunk) on the approved drawing titled: Road Dedication Plan, SK01 issue A, received 28/7/2023, and amended in red 27/9/2023, including the following: i. A widening along the Progress Road frontage of the site to allow for a left turning lane; ii. Generally, 22.5 metre wide road corridor connecting Progress Road to McRoyle Street, required as part of the road construction. Note: This condition is imposed under section 145 of the Planning Act 2016. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
33(a) Submit Plan of
Subdivision Submit to, and obtain approval from, Development Services, a plan of subdivision showing the land to be dedicated for road to demonstrate compliance with the requirements of this condition. Timing: As part of the submission of the request pursuant to Schedule 18 of the Planning Regulation 2017 for Council's notation on the plan of subdivision necessary to comply with this condition. |
As indicated |
33(b) Lodge Notated Plan Lodge the plan of subdivision notated by Council pursuant to Schedule 18 of the Planning Regulation 2017 with the Registrar of Titles for the relevant Queensland State Government Authority. Timing: Prior to commencement of use. PROOF OF FULFILMENT Evidence of the registration of the required plan of subdivision. Timing: Within one month of the registration of the plan of subdivision. |
As indicated |
| 34) Work for Transport Network - Road (Non-trunk) -
External Construct the following roadwork with any associated drainage, verge, site access and services including street lighting for the Transport Network (Road) shown on the approved drawing titled: Roadworks and Stormwater Drainage Layout Plan Sheet 1 of 5, C1101 issue C, received 28/7/2023 as amended in red 27/9/2023 and the Roadworks and Stormwater Drainage Layout Plan Sheet 2 of 5, C1102 issue C received 28/7/2023 as amended in red 27/9/2023 and Roadworks and Stormwater Drainage Layout Plan Sheet 3 of 5 C1103, issue C, received 28/7/2023 as amended in red 27/9/2023, and Roadworks and Stormwater Drainage Layout Plan Sheet 5 of 5 C1105, issue C, received 28/7/2023 as amended in red 27/9/2023 in accordance with the relevant Brisbane Planning Scheme Codes, the Queensland Manual of Uniform Traffic Control Devices and the AUSTROADS design standards: - new type E concrete kerb and channel and associated drainage on both sides of McRoyle Street on a 3.75 metre alignment (taking into account any road reserve widening if required); - a full 12.5m wide Freight network type road pavement from the lip of the new kerb and channel with any appropriate tapers (the minimum width of road construction/reconstruction must be 1.2 metres); - new type E concrete kerb and
channel and associated drainage along the Progress Road frontage of the site on
a 4.25 metre alignment (taking into account the road reserve widening for the
left turning lane); - Right turn pocket from Progress Rd into the McRoyle St extension. - an Arterial Road type road pavement from the lip of the new kerb and channel to the existing road pavement with any appropriate tapers (the minimum width of road construction/reconstruction must be 1.2 metres); Note: Irrespective of the actual widening, the finished road pavement crown must be located along the centreline of the final pavement width. Note: This condition is imposed under section 145 of the Planning Act 2016. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
34(a) Submit Functional Layout
Drawings Submit to, and obtain approval from, Development Services functional layout drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes. Note: This approval must be obtained prior to the submission of drawings for Roadwork and Stormwater Drainage and Signs and Pavement Marking. Timing: Prior to site/operational/building work commencing. |
As indicated |
34(b) Submit Roadworks and Stormwater
Drainage Drawings Submit to, and obtain approval from, Development Services Roadworks and Stormwater Drainage Drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes. Timing: Prior to site/operational/building work commencing. |
As indicated |
34(c) Submit Signs and Pavement
Drawings Submit to, and obtain approval from, Development Services Signs and Pavement Marking drawings prepared and certified by a Registered Professional Engineer of Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes. Timing: Prior to site/operational/building work commencing. |
As indicated |
34(d) Submit Street Lighting Design
Drawings Submit to, and obtain approval from, City Lighting, street lighting design drawings prepared and certified by a Registered Professional Engineer of Queensland (Electrical) which show the proposed street lighting system in accordance with the relevant Brisbane Planning Scheme Codes. Timing: Prior to site/operational/building work commencing. |
As indicated |
34(e) Implement Approved
Drawings Construct the works in accordance with the above approved drawings. Timing: Prior to on-maintenance acceptance. |
As indicated |
34(f) Submit As Constructed
Drawings Submit to Development Services As Constructed drawings including an asset register and a pre-On-Maintenance Inspection Checklist, prepared by a Registered Professional Engineer Queensland. Timing: Prior to on-maintenance inspection. PROOF OF FULFILMENT Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the above approved drawings. |
As indicated |
| 35) Work for Transport Network - Road (Non-trunk) -
Internal Construct the following roadwork with any associated drainage, footpath, pathways and services including street lighting for the Transport Network (Road) shown on the approved drawing titled Roadworks and Stormwater Drainage Layout Plan Sheet 3 of 5 C1103 issue C received 28/7/2023, as amended in red 27/9/2023, the Roadworks and Stormwater Drainage Layout Plan Sheet 4 of 5 C1104 issue C received 28/7/2023, as amended in red 27/9/2023 and the Roadworks and Stormwater Drainage Layout Plan Sheet 5 of 5 C1105 issue C received 28/7/2023 as amended in red 27/9/2023. In accordance with the relevant Brisbane Planning Scheme Codes, the Manual of Uniform Traffic Control and the AUSTROADS design standards: - roads 22.5 metres wide designed and constructed as Primary Freight Accesses (designed for 85 percentile 50 km/hr maximum) and with street lighting category V5; Note: This condition is imposed under section 145 of the Planning Act 2016. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
35(a) Submit Functional Layout
Drawings Submit to, and obtain approval from, Development Services functional layout drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes. Note: This approval must be obtained prior to the submission of drawings for Roadwork and Stormwater Drainage and Signs and Pavement Marking. Timing: Prior to site/operational/building work commencing. |
As indicated |
35(b) Submit Roadworks and Stormwater
Drainage Drawings Submit to, and obtain approval from, Development Services Roadworks and Stormwater Drainage Drawings prepared and certified by a Registered Professional Engineer Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes. Timing: Prior to site/operational/building work commencing. |
As indicated |
35(c) Submit Signs and Pavement
Drawings Submit to, and obtain approval from, Development Services Signs and Pavement Marking drawings prepared and certified by a Registered Professional Engineer of Queensland in accordance with the APPROVED DRAWINGS AND DOCUMENTS and the relevant Brisbane Planning Scheme Codes. Timing: Prior to site/operational/building work commencing. |
As indicated |
35(d) Submit Street Lighting Design
Drawings Submit to, and obtain approval from, City Lighting, street lighting design drawings prepared and certified by a Registered Professional Engineer of Queensland (Electrical) which show the proposed street lighting system in accordance with the relevant Brisbane Planning Scheme Codes. Timing: Prior to site/operational/building work commencing. |
As indicated |
35(e) Implement Approved
Drawings Construct the works in accordance with the above approved drawings. Timing: Prior to on-maintenance acceptance. |
As indicated |
35(f) Submit As Constructed
Drawings Submit to Development Services As Constructed drawings including an asset register and a pre-On-Maintenance Inspection Checklist, prepared by a Registered Professional Engineer Queensland. Timing: Prior to on-maintenance inspection. PROOF OF FULFILMENT Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the above approved drawings. |
As indicated |
| 36) Site Drainage - Major Provide an internal drainage system to collect stormwater run-off from all proposed lots, roofed and developed surface areas and any run-off onto the site from adjacent areas and convey the collected run- off to a lawful point of discharge, in accordance with the relevant Brisbane Planning Scheme Codes. Notes: - Where external works are required and
infrastructure will be handed over to Council (e.g. Stormwater pipes 375mm or
greater and/or manholes within the road reserve, etc), the applicant will be
required to request an on-site Pre-Start with Council and ensure all future
owned Council assets follow the On/Off Maintenance process in accordance with
Councils Infrastructure Installation & Construction Requirements
Manual. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
36(a) Submit Site Drainage
Drawings Submit to, and obtain approval from, Development Services, site drainage drawings and engineering calculations, prepared and certified by a Registered Professional Engineer Queensland, in accordance with the relevant Brisbane Planning Scheme Codes. Notes: - Evidence that access for construction within the nominated Council Land is to be supplied with the submission of plans in accordance with the Temporary Access through Council Parkland for Private Works form, as found on Council’s website. - Queensland Building
and Construction Commission licensed hydraulic consultants may design the
stormwater system for sites less than 2000m2 with an upstream catchment
servicing no more than 4 residential lots. This excludes stormwater drainage
design (including subsoil drainage) of basements in flood planning areas and
the design of any onsite stormwater detention system Timing: Prior to site/operational/building work commencing |
As indicated |
36(b) Implement Approved
Drawings Carry out the works in accordance with the approved site drainage drawings. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
36(c) Submit As Constructed
Drawings Submit to Development Services As Constructed drawings prepared and certified by a Registered Professional Engineer Queensland or a Queensland Building and Construction Commission licensed hydraulic consultants (where applicable). Note: To be submitted via DA- ComplianceEngineering@brisbane.qld.gov.au and include the site address, A00 reference and Condition number in the subject line. All rehabilitated or disturbed areas of Brisbane City Council owned land following completion of works are to be to the satisfaction of Brisbane City Council’s Program Planning and Integration team. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT Certification from a Registered Professional Engineer Queensland or Queensland Building or Construction Commission licensed hydraulic consultants (where applicable) confirming that the works have been completed in accordance with the above stormwater drawings. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
| 37) Ponding of Stormwater Carry out the approved development to ensure that adjoining properties and roads are protected from ponding or nuisance from stormwater during construction. Notes: If remedial works are necessary to comply with this condition, prior approval must be obtained from Development Services. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 38) Street Lighting Provide street lighting in accordance with the requirements of this approval and the relevant Brisbane Planning Scheme Codes. Note: For required lighting categories please refer to the roadworks and/or pathway conditions within this conditions package. PROOF OF
FULFILMENT Evidence of an agreement with an electricity supply authority to provide a public lighting system in accordance with the approved street lighting design drawings. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 39) Service Conduits and Mains Provide and install all
service conduits and meet the cost of any alterations to public utility mains,
existing mains, services, street lighting or installations that are required to
carry out the approved development. These works must be in accordance with the
relevant Brisbane Planning Scheme Codes, and include the following, where
applicable: Note: |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
39(a) Submit As Constructed
Drawings Submit to Development Services As Constructed drawings, including an asset register, prepared and certified by a Registered Professional Engineer Queensland. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the requirements of this condition. Note: Civil works are to be certified by a RPEQ(Civil) and electrical works are to be certified by a RPEQ (Electrical). |
As indicated |
| 40) Conduit for Brisbane City Council Provide a single
underground conduit (100mm diameter UPVC class PN9) in favour of Brisbane City
Council on at least one side of all Neighbourhood Access Roads (Bus Route
only), Primary Freight Access Roads and Major Roads. The works must be in
accordance with the relevant Brisbane Planning Scheme Codes and the
following: |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
40(a) Submit As Constructed
Drawings Submit to Development Services, As Constructed drawings, including an asset register, prepared and certified by a Registered Professional Engineer Queensland. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT Certification from a Registered Professional Engineer Queensland, confirming that the works have been completed in accordance with the requirements of this condition. |
As indicated |
| 41) Telecommunications Submit to Development Services, certification from
an authorised telecommunications carrier/contractor, that the following works
and infrastructure have been undertaken and installed in accordance with
telecommunications industry standards: |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 42) Agreement with Electricity Supplier Submit to Development Services, evidence of an agreement with an electricity supplier to provide necessary services to the development in accordance with the relevant Brisbane Planning Scheme Codes. Where development is within an established area of overhead electricity supply and the electricity supplier determines that a property pole is the appropriate solution to supply electricity to the development, the developer must be responsible for the installation of the property pole(s). In the above circumstances, submit to Development Services, certification from the developer's electrical consultant confirming that the above installation has been completed in accordance with the relevant AS/NZS Standards and the Queensland Electricity Connection Manual (QECM) and Queensland Electricity Metering Manual (QEMM). |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 43) Water and Wastewater Pursuant to Schedule 18 of the Planning Regulation 2017 submit to Development Services, documentary evidence, issued by the relevant distributor-retailer, to verify that the conditions of any necessary connection certificate under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009, have been complied with. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 44) Permanent Driveway Crossover Provide a 10-metre-wide Type B2 permanent driveway crossover to the McRoyle Road frontage(s) of the site in accordance with the relevant Brisbane Planning Scheme Codes and located as shown on the approved DRAWINGS AND DOCUMENTS. Provide a 9-metre-wide Type B2 permanent driveway crossover to the New road frontage of the site in accordance with the relevant Brisbane Planning Scheme Codes and located as shown on the approved DRAWINGS AND DOCUMENTS. Written consent must be obtained from BCC - Field Services, Program Planning and Integration Arborist prior to any works occurring that will either impact on or require removal of a street tree (this includes pruning and excavation within the root zone/canopy of the tree) At all times during construction of the crossover, safe pedestrian access along the site frontage must be maintained. Note: No further driveway permit is required however additional footway permits or lane closure permits may be required for footpath/verge closures and/or lane closures. These permits must be obtained prior to construction of the crossover. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 45) Redundant Driveway Crossover Remove the redundant existing driveway crossover(s) on the frontage(s) of the site and reinstate the kerb and channel, road pavement, footways and footpaths in accordance with the relevant Brisbane Planning Scheme Codes. Note: Additional footway permits or lane closure permits may be required for footpath/verge closures and/or lane closures. These permits must be obtained prior to construction of the crossover. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 46) Construction Noise and Dust Emissions Pursuant to the Environmental
Protection Act 1994, all development involving the emission of noise and dust
from building and/or construction activities, must ensure that the emissions
are in accordance with the requirements of the Act. |
As indicated |
| 47) Natural Asset Local Law (NALL) - Protected
Vegetation on Public Land, Road or Park Work on or around protected vegetation on public land, road or park may require a permit under the Natural Assets Local Law (NALL). Arrangements must be made with Program Planning and Integration in relation to the works carried out on protected vegetation on public land, road or park including provision for costs and replacement planting as determined by Program Planning and Integration. Timing: Prior to carrying out any works on protected vegetation. |
As indicated |
| 48) Contaminated Materials and Soils Any contaminated materials or soils encountered during siteworks, must be handled, stored and disposed of in accordance with the requirements of the relevant authority of the Queensland Government. A person must not dispose of contaminated soil or a hazardous substance at a place other than at a place approved by the relevant authority of the Queensland Government. |
As indicated |
| 49) Management of Asbestos Disposal, handling and restoration of any building materials containing asbestos must be in accordance with current state and federal legislation. |
As indicated |
| 50) Stormwater Outlet into Waterways/Creeks &
Parks Ensure all stormwater outlets into parks, waterways and creeks are generally in accordance with Council's guideline 'Stormwater Outlets in parks & Waterways' 2003. Stormwater outlets are to be designed to minimise scouring velocity and associated bank/bed scour as per QUDM and Councils Infrastructure Design Planning Scheme Policy requirements. All scour protection and rehabilitation must extend from the stormwater outlet to the creek bed level and mitigate impacts to any existing vegetation and is to be shown on engineering drawings. Where necessary a rock lined swale or rock chute maybe required to convey water from the stormwater outlet to the creek/waterway invert and include localised stabilisation works where existing scour is occurring onsite. All works must be detailed on Vegetation Management Plans and/or Rehabilitation Plans where required as part of this approval. Note: If erosion associated with a stormwater outlet into a creek/waterway becomes evident during construction or the maintenance period of the development, stabilisation works are to be implemented to rectify the erosion/scour prior to handover as a Council asset. This may require Council approvals or permits. |
As indicated |
| 51) Further Development Permit Required Further Development Permit(s) to carry out assessable building work under the Building Act may be required. |
As indicated |
| 52) Plumbing and Drainage Work Pursuant to the Plumbing and Drainage Act 2018, any plumbing and drainage work must be carried out in compliance with the Plumbing and Drainage Regulation 2019. Plumbing and drainage permit work requires approval by Brisbane City Council prior to the work being carried out. |
As indicated |
| 53) Currency Period The currency period for this development approval is stated in the Decision Notice and is expressed as a date.
This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016. |
As indicated |
| 54) Cultural Heritage Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage. The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care. For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships). |
As indicated |
| 55) Equitable Access Provision must be made during and after construction
for equitable access for persons with disabilities to and within the site and
on adjoining public areas, in accordance with the following: |
As indicated |
| 56) Fire Ant Movement Controls To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected. These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products. Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014. For further information contact the relevant Queensland State Government department on 13 QGOV. |
As indicated |
| 57) Water and Wastewater Services for water and wastewater (sewerage) are not under the jurisdiction of Brisbane City Council. Authorisation to connect the approved development to the water/wastewater networks and for property service connections required a Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009. For further information about any necessary Water Approvals contact Urban Utilities. |
As indicated |
| Permit to Which These Conditions Relate: | DA - PA - Material Change of Use |
| Activity(ies): | caretaker's accommodation educational establishment emergency services food and drink outlet high impact industry low impact industry medium impact industry park parking station renewable energy facility service industry service station shop telecommunications facility utility installation warehouse research and technology industry car wash |
| Stage: | Variation approval to vary the effect of the Planning Scheme under section 61 of the Planning Act 2016 - Material Change of Use and Reconfiguration of a Lot |
| 58) Prescribed Period for Preliminary Approval The prescribed period for the variation approval is
84 months (seven (7) years) from the day the approval takes effect. |
As indicated |
| 59) General Compliance Requirements Development of the subject site must comply with the following; a) the approved drawings b) the conditions of the variation approval c)
subsequent
Material Change of Use and Reconfiguring a Lot of the subject site including
other plans and documents approved by subsequent development approvals. |
As indicated |
| 60) Category of Development and Assessment -
Subdivision
The extent to which this variation approval varies the effect of the Planning Scheme for Brisbane, is limited to a Reconfiguration of a Lot for development on land shown on the approved drawings titled Development Area, Plan No: SK01, received 14 September 2021 (as amended in red) and is limited to the circumstances detailed below.
Notwithstanding the contents of the category of development and assessment table in the
Planning Scheme, development for the purposes of
Reconfiguration of a Lot, pursuant to this variation approval, where that
development is compliant with the conditions of this variation approval and
where:
a) involving
Reconfiguration of a Lot where all resulting lots are
2,000m2 or greater shall be subject to Assessable Development - Code
Assessment against the Subdivision code, Richlands—Wacol corridor
neighbourhood plan code, Industry zone code, overlay codes, and
prescribed secondary codes |
As indicated |
| 61) Category of Development and Assessment Industrial
uses
The extent to which this variation approval varies the effect of the Planning Scheme for Brisbane, is limited to a Material Change of Use for any of the purposes listed below where that proposed use is on land shown on the approved drawings titled Development Area, Plan No: SK01, received 14 September 2021 (as amended in red) is limited to the circumstances detailed below. For the purposes of determining compliance with Section A of the Industry code with regard to level of assessment, the site is to be treated as being located within the General industry B zone.
The definition mentioned in this condition refers to definitions contained in the Brisbane City Plan 2014 as amended from time to time.
Any application for a Development Permit for Material Change of Use is to be assessed against the assessment benchmarks and policies in the Planning Scheme that are in effect at the time the application for a Development Permit is made, unless otherwise explicitly provided by conditions of this Variation approval.
Where there is conflict between the codes and the condition contained herein, the condition shall prevail.
|
As indicated |
61(a) Service industry
Notwithstanding the contents of the
category of development and assessment table in the planning scheme,
development for the purposes of Service industry, pursuant to this
variation approval, where that development is compliant with the
conditions of this variation approval and where applying to: b) an existing premises
with no increase in GFA, a new premises, or an
existing premises with an increase in gross floor area, where not complying
with all acceptable outcomes in section A of the Industry code shall be subject
to Assessable Development - Code Assessment against the Industry code, Richlands—Wacol corridor neighbourhood plan
code, Industry zone code, overlay codes
and prescribed secondary codes. |
As indicated |
61(b) Low impact industry
Notwithstanding the contents of the level of assessment table in
the planning scheme, development for the purposes of Low impact
industry, pursuant to this variation approval, where that development
is compliant with the conditions of this variation approval
and where
applying to: a) an existing premises with no increase in gross floor area and complying with all acceptable outcomes in section A of the Industry code, shall be Accepted development; or b) an existing premises with no increase in GFA, a new premises or an existing premises with an increase in
gross floor area, where not complying with all acceptable outcomes in section A
of the Industry code shall be subject to Assessable Development -
Code Assessment against the Industry code,
Richlands—Wacol corridor neighbourhood plan
code, Industry zone code, overlay codes
and prescribed secondary codes. |
As indicated |
61(c) Medium impact industry
Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of Medium impact industry, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where applying to: a) an existing premises with no increase in gross floor area, where complying with all acceptable outcomes in section A of the Industry code shall be Accepted development; or b) an existing premises
with no increase in GFA, a new premises or an
existing premises with an increase in gross floor area, where not complying
with all acceptable outcomes in section A of the Industry code shall be subject
to Assessable Development - Code Assessment against the Industry code, Richlands—Wacol corridor neighbourhood plan
code, Industry zone code, overlay codes
and prescribed secondary codes. |
As indicated |
61(d) Research and Technology
Industry
Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of Research and technology industry, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where applying to: a) an existing premises with no increase in gross floor area, where complying with all acceptable outcomes in section A of the Industry code shall be Accepted development; or b) an existing premises with no increase in GFA, a new premises, or an existing premises with an increase in
gross floor area, where not complying with all acceptable outcomes in section A
of the Industry code shall be subject to Assessable Development -
Code Assessment against the Industry code,
Richlands—Wacol corridor neighbourhood plan
code, Industry zone code, overlay codes
and prescribed secondary codes. |
As indicated |
61(e) Warehouse
Notwithstanding the contents of the
category of development and assessment table in the planning scheme,
development for the purposes of a Warehouse, pursuant to this variation
approval, where that development is compliant with the conditions of this
variation approval and
where applying to:
a) an existing premises with no increase in gross floor area, where complying with all acceptable outcomes in section A of the Industry code shall be Accepted development; b) an existing premises with no increase in GFA, a new premises or an existing premises with an increase in gross floor area, where not complying with all acceptable outcomes in section A of the Industry code shall be subject to Assessable Development - Code Assessment against the Industry code, Richlands—Wacol corridor neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary codes.
|
As indicated |
61(f) Renewable energy facility
Notwithstanding the contents of the
category of development and assessment table in the planning scheme,
development for the purposes of Renewable energy facility, pursuant to
this variation approval, where that development is compliant with the
conditions of this variation approval will be Assessable Development - Code
Assessment against the Industry code,
Richlands—Wacol corridor neighbourhood plan
code, Industry zone code, overlay codes
and prescribed secondary codes.
|
As indicated |
61(g) High impact industry Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of High impact industry, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval will be Assessable Development - Code Assessment against the Industry code, Richlands—Wacol corridor neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary codes.
|
As indicated |
| 62) Category of Development and Assessment - Non-
Industrial Uses
The extent to which this variation approval varies the effect of the Planning Scheme for Brisbane, is limited to a Material Change of Use for any of the purposes listed below where that proposed use is on land shown on the approved drawings titled Development Area, Plan No: SK01, received 14 September 2021 (as amended in red)is limited to the circumstances detailed below. The definition mentioned in this condition refers to
definitions contained in the Brisbane City Plan 2014 as amended from
time to time. Any application for a Development Permit for
Material Change of Use is to be assessed against the abovementioned assessment
benchmarks and policies in the Planning Scheme that are in effect at the time
the application for a Development Permit is made, unless otherwise explicitly
provided by conditions of this Variation approval. |
As indicated |
62(a) Caretakers Accommodation
Notwithstanding the contents of the category of development and assessment table in the Planning Scheme, development for the purposes of Caretaker’s accommodation, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where:
b) not complying with all acceptable outcomes in the Caretaker’s accommodation code will be Assessable Development - Code Assessment against the Caretaker’s accommodation code, overlay codes, and prescribed secondary codes.
|
As indicated |
62(b) Car Wash
Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of Car wash, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval will be Assessable Development - Code Assessment against the Industry code, Richlands—Wacol corridor neighbourhood plan code Industry zone code, overlay codes, and prescribed secondary codes.
|
As indicated |
62(c) Food and drink outlet
Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of Food and drink outlet, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where:
a) having a cumulative gross floor area over the entire site, as shown on the approved drawings titled Development Area, Plan No: SK01, received 14 September 2021 (as amended in red) of 250m2 or less, shall be subject to Assessable Development - Code Assessment against the Industry code, Low impact industry zone code, overlay codes and prescribed secondary codes; or b) having a cumulative gross floor area of greater than 250m2 area over the entire site, as shown on the approved drawings titled Development Area, Plan No: SK01, received 14 September 2021 (as amended in red) shall be subject to Assessable Development - Impact Assessment against the Planning Scheme.
|
As indicated |
62(d) Telecommunications Facility (where not
a broadcasting station or television station)
Notwithstanding the contents of the category of development and assessment table in the Planning Scheme, development for the purposes of Telecommunications facility, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where:
|
As indicated |
62(e) Service station
Notwithstanding the contents of the category of development and assessment table in the Planning Scheme, development for the purposes of Service station, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval will be Assessable Development - Code Assessment against the Industry code, Richlands—Wacol corridor neighbourhood plan code Industry zone code, overlay codes, and prescribed secondary codes. |
As indicated |
62(f) Park
Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of a Park pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where:
a) complying with all acceptable outcomes in the Park code shall be Accepted development; or b) not complying with all acceptable outcomes in the Park code will be Assessable Development - Code Assessment against the Park code, Richlands—Wacol corridor neighbourhood plan code, overlay codes, and prescribed secondary codes.
|
As indicated |
62(g) Parking Station
Notwithstanding the contents of the level of assessment table in the Planning Scheme, development for the purposes of Parking station – where a ‘park and ride’ or bicycle parking, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where:
a) the use is a Parking station where a ‘park and ride’ or bicycle facility - Code Assessment against the Industry code, Richlands—Wacol corridor neighbourhood plan code, Industry zone code, overlay codes, and prescribed secondary codes; or b) the use is a parking station where not a ‘park and ride’ or bicycle parking, shall be subject to Assessable Development - Impact Assessment against the Planning Scheme.
|
As indicated |
62(h) Utility Installation
Notwithstanding the contents of the level of assessment table in the planning scheme, development for the purposes of Utility installation pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where apply to:
a) if involving an existing premises with no increase in GFA, a new premises or an existing premises with an increase in gross floor area, where not complying with all acceptable outcomes in section A of the Industry code shall be subject to Assessable Development - Code Assessment against the Industry code, Richlands—Wacol corridor neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary codes. |
As indicated |
62(i) Educational Establishment
Notwithstanding the contents of the category of development and assessment table in the Planning Scheme, development for the purposes of an Educational establishment pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where: a) located within an existing premises with no increase in gross floor area, and limited to trade industry related training and not involving overnight accommodation, shall be subject to Assessable Development - Code assessment against the Community facilities code, Richlands—Wacol corridor neighbourhood plan code, Low impact industry zone code, overlay codes, and prescribed secondary codes; or b) a new premises or an existing premises with an increase in gross floor area where for trade industry related training and not involving overnight accommodation will be Assessable Development - Code Assessment against the Community facilities code, Richlands—Wacol corridor neighbourhood plan code, Low impact industry zone code, overlay codes, and prescribed secondary codes.
|
As indicated |
62(j) Shop Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of Shop, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval and where:
a) having a cumulative gross floor area over the entire site, as shown on the approved drawings titled Development Area, Plan No: SK01, received 14 September 2021 (as amended in red) of 250m2 or less, shall be subject to Assessable Development - Code Assessment against the Industry code, Low impact industry zone code, overlay codes and prescribed secondary codes; or b) having a cumulative gross floor area of greater than 250m2 area over the entire site, as shown on the approved drawings titled Development Area, Plan No: SK01, received 14 September 2021 (as amended in red) shall be subject to Assessable Development - Impact Assessment against the Planning Scheme.
|
As indicated |
62(k) Emergency Services Notwithstanding the contents of the category of development and assessment table in the planning scheme, development for the purposes of Emergency services, pursuant to this variation approval, where that development is compliant with the conditions of this variation approval will be Assessable Development - Code Assessment against the Industry code, Richlands—Wacol corridor neighbourhood plan code, Industry zone code, overlay codes and prescribed secondary codes. |
As indicated |
| 63) Limitation of site access No
direct vehicle access to or from the site (vehicle ingress, egress) is
permitted from Progress Road for any development application(s) for a Material
change of use or Reconfiguration of a lot benefiting from this variation
approval. |
At all times |
| 64) Stormwater Quality Management Plan Any Material Change of Use or Reconfiguration of a Lot is to include a Site Based Stormwater Quality Management Plan, including Stormwater Quality Modelling using the Model for Urban Stormwater Improvement Conceptualisation (MUSIC), in accordance with the requirements of the State Planning Policy 2018, and the Stormwater Code, City Plan 2014 as amended from time to time. |
As indicated |
| 65) Protection of Adjoining Trees Any Material Change of Use or Reconfiguration of a Lot is to install protection measures from construction damage those parts of neighbouring trees located adjoining the development site in accordance with Australian Standard - AS4970 Protection of trees on development sites. |
As indicated |
| 66) Land for Transport Network - Road (Non-
trunk) Any Material Change of Use or Reconfiguration of a Lot on this site is to construct the following roadwork with any associated drainage, verge, site access and services including street lighting for the Transport Network (Road) in accordance with the relevant Brisbane Planning Scheme Codes, the Queensland Manual of Uniform Traffic Control Devices and the AUSTROADS design standards: Dedicate as road land shown as new road (non-trunk) on the approved drawing titled: Road Dedication Plan, SK01 issue A, received 28/7/2023, and amended in red 27/9/2023, including the following: i. A widening along the Progress Road frontage of the site to allow for a left turning lane; ii. Generally, 22.5 metre wide road corridor connecting Progress Road to McRoyle Street required as part of the road construction; Note: This condition is imposed under section 145 of the Planning Act 2016. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 67) Work for Transport Network - Road (Non-trunk) -
External Any Material Change of Use or Reconfiguration of a Lot on this site is to construct the following roadwork with any associated drainage, verge, site access and services including street lighting for the Transport Network (Road) shown on the approved drawing titled: Roadworks and Stormwater Drainage Layout Plan Sheet 1 of 5, C1101 issue C, received 28/7/2023 as amended in red 27/9/2023 and the Roadworks and Stormwater Drainage Layout Plan Sheet 2 of 5, C1102 issue C received 28/7/2023 as amended in red 27/9/2023 and Roadworks and Stormwater Drainage Layout Plan Sheet 3 of 5 C1103, issue C, received 28/7/2023 as amended in red 27/9/2023, and Roadworks and Stormwater Drainage Layout Plan Sheet 5 of 5 C1105, issue C, received 28/7/2023 as amended in red 27/9/2023 in accordance with the relevant Brisbane Planning Scheme Codes, the Queensland Manual of Uniform Traffic Control Devices and the AUSTROADS design standards: - new type E concrete kerb and channel and associated drainage on both sides of McRoyle Street on a 3.75 metre alignment (taking into account any road reserve widening if required); - a full 12.5m wide Freight network type road pavement from the lip of the new kerb and channel with any appropriate tapers (the minimum width of road construction/reconstruction must be 1.2 metres); - new type E concrete kerb and channel and
associated drainage along the Progress Road frontage of the site on a 4.25
metre alignment (taking into account the road reserve widening for the left
turning lane); - Right turn pocket from Progress Rd into the McRoyle St extension. - an Arterial Road type road pavement from the lip of the new kerb and channel to the existing road pavement with any appropriate tapers (the minimum width of road construction/reconstruction must be 1.2 metres); Note: Irrespective of the actual widening, the finished road pavement crown must be located along the centreline of the final pavement width. Note: This condition is imposed under section 145 of the Planning Act 2016. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 68) Work for Transport Network - Road (Non-trunk) -
Internal Any Material Change of Use or Reconfiguration of a Lot on this site is to construct the following roadwork with any associated drainage, footpath, pathways and services including street lighting for the Transport Network (Road) shown on the approved drawing titled Roadworks and Stormwater Drainage Layout Plan Sheet 3 of 5 C1103 issue C received 28/7/2023, as amended in red 27/9/2023, the Roadworks and Stormwater Drainage Layout Plan Sheet 4 of 5 C1104 issue C received 28/7/2023, as amended in red 27/9/2023 and the Roadworks and Stormwater Drainage Layout Plan Sheet 5 of 5 C1105 issue C received 28/7/2023 as amended in red 27/9/2023. In accordance with the relevant Brisbane Planning Scheme Codes, the Manual of Uniform Traffic Control and the AUSTROADS design standards: - roads 22.5 metres wide designed and constructed as Primary Freight Accesses (designed for 85 percentile 50 km/hr maximum) and with street lighting category V5; Note: This condition is imposed under section 145 of the Planning Act 2016. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 69) Site Drainage - Major Any Material Change of Use or Reconfiguration of a Lot on this site is provide an internal drainage system to collect stormwater run-off from all proposed lots, roofed and developed surface areas and any run-off onto the site from adjacent areas and convey the collected run-off to a lawful point of discharge, in accordance with the relevant Brisbane Planning Scheme Codes. Notes: - Where external
works are required and infrastructure will be handed over to Council (e.g.
Stormwater pipes 375mm or greater and/or manholes within the road reserve,
etc), the applicant will be required to request an on-site Pre-Start with
Council and ensure all future owned Council assets follow the On/Off
Maintenance process in accordance with Councils Infrastructure Installation
& Construction Requirements Manual. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 70) Construction Noise and Dust Emissions Pursuant to the Environmental
Protection Act 1994, all development involving the emission of noise and dust
from building and/or construction activities, must ensure that the emissions
are in accordance with the requirements of the Act. |
As indicated |
| 71) Natural Asset Local Law (NALL) - Protected
Vegetation on Public Land, Road or Park Work on or around protected vegetation on public land, road or park may require a permit under the Natural Assets Local Law (NALL). Arrangements must be made with Program Planning and Integration in relation to the works carried out on protected vegetation on public land, road or park including provision for costs and replacement planting as determined by Program Planning and Integration. Timing: Prior to carrying out any works on protected vegetation. |
As indicated |
| 72) Contaminated Materials and Soils Any contaminated materials or soils encountered during siteworks, must be handled, stored and disposed of in accordance with the requirements of the relevant authority of the Queensland Government. A person must not dispose of contaminated soil or a hazardous substance at a place other than at a place approved by the relevant authority of the Queensland Government. |
As indicated |
| 73) Management of Asbestos Disposal, handling and restoration of any building materials containing asbestos must be in accordance with current state and federal legislation. |
As indicated |
| 74) Stormwater Outlet into Waterways/Creeks &
Parks Ensure all stormwater outlets into parks, waterways and creeks are generally in accordance with Council's guideline 'Stormwater Outlets in parks & Waterways' 2003. Stormwater outlets are to be designed to minimise scouring velocity and associated bank/bed scour as per QUDM and Councils Infrastructure Design Planning Scheme Policy requirements. All scour protection and rehabilitation must extend from the stormwater outlet to the creek bed level and mitigate impacts to any existing vegetation and is to be shown on engineering drawings. Where necessary a rock lined swale or rock chute maybe required to convey water from the stormwater outlet to the creek/waterway invert and include localised stabilisation works where existing scour is occurring onsite. All works must be detailed on Vegetation Management Plans and/or Rehabilitation Plans where required as part of this approval. Note: If erosion associated with a stormwater outlet into a creek/waterway becomes evident during construction or the maintenance period of the development, stabilisation works are to be implemented to rectify the erosion/scour prior to handover as a Council asset. This may require Council approvals or permits. |
As indicated |
| 75) Further Development Permit Required Further Development Permit(s) to carry out assessable building work under the Building Act may be required. |
As indicated |
| 76) Plumbing and Drainage Work Pursuant to the Plumbing and Drainage Act 2018, any plumbing and drainage work must be carried out in compliance with the Plumbing and Drainage Regulation 2019. Plumbing and drainage permit work requires approval by Brisbane City Council prior to the work being carried out. |
As indicated |
| 77) Currency Period The currency period for this development approval is stated in the Decision Notice and is expressed as a date.
This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016. |
As indicated |
| 78) Cultural Heritage Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage. The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care. For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships). |
As indicated |
| 79) Equitable Access Provision must be made during and after construction
for equitable access for persons with disabilities to and within the site and
on adjoining public areas, in accordance with the following: |
As indicated |
| 80) Fire Ant Movement Controls To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected. These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products. Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014. For further information contact the relevant Queensland State Government department on 13 QGOV. |
As indicated |
| 81) Water and Wastewater Services for water and wastewater (sewerage) are not under the jurisdiction of Brisbane City Council. Authorisation to connect the approved development to the water/wastewater networks and for property service connections required a Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009. For further information about any necessary Water Approvals contact Urban Utilities. |
As indicated |
| Permit to Which These Conditions Relate: | DA - PA - Reconfiguring a Lot |
| Activity(ies): | Subdivision of Land |
| Stage: |