BRISBANE CITY COUNCIL'S APPROVAL PACKAGE.



APPLICATION DETAILS

This package relates to the application detailed below
Address of Site: 48 MONTAGUE RD SOUTH BRISBANE QLD 4101
Real Property Description of Site: L1 SP.118141
Aspects of development and type of approval: DA - PA - Building Work Development Permit - office
DA - PA - Material Change of Use Development Permit - office
DA - PA - Building Work Development Permit - office
Council File Reference: A007068188
Permit Reference Number/s: DABW458532925; DAMC458533025; DABW458957225.
Package Status: APPROVED - Version 2 (17th of September, 2026 1:08:21 PM)
Package Generated: 17/09/2026


PROJECT TEAM

The assessment of this application has been undertaken by:
Glyn CHISHOLM
Senior Landscape Architect
Landscape Architecture Team
Glyn.Chisholm@brisbane.qld.gov.au
07 3403 0117
Beau MORRIS
Senior Urban Planner
Planning Services South
beau.morris@brisbane.qld.gov.au
07 3178 7342
Kathryn KELLY
Principal Urban Planner
Planning Services South
kathryn.kelly@brisbane.qld.gov.au
07 3407 1308
Lucy TING
Senior Engineer
Engineering Services Hydraulics
lucy.ting@brisbane.qld.gov.au
(07) 3403 5005
Tom GIBBS
Principal Engineer
Engineering Services Traffic
Tom.Gibbs@brisbane.qld.gov.au
Michael CHOU

Network Planning
Michael.Chou@brisbane.qld.gov.au
John GRIMSEY
Built Environment Officer
WaRRS Assessment
john.grimsey@brisbane.qld.gov.au
34071331
Tanay ALBUQUERQUE
Technical Officer
Engineering Services South
Tanay.Albuquerque@brisbane.qld.gov.au
(07) 3178 8519
Craig SLACK
Engineer
Engineering Scoping
craig.slack@brisbane.qld.gov.au
(07) 3403 8888
Samuel NICHOLS
Senior Heritage Advisor
Architecture Team
Samuel.Nichols@brisbane.qld.gov.au
31787933
Callan BENNETT
Principal Architect
Architecture Team
Callan.Bennett@brisbane.qld.gov.au
07 31780595
Nicholas CUDICIO
Urban Planner
Planning Services South
Nicholas.Cudicio@brisbane.qld.gov.au
34030404
Alessio ZANCOLICH
Principal Urban Planner
Planning Services South
alessio.zancolich@brisbane.qld.gov.au
(07) 3407 8514


DRAWINGS AND DOCUMENTS



The term 'drawings and documents' or similar expressions mean:
Drawing or Document Number Plan Date
Car Parking Plan AR 1.04 Rev 3 (Amended In Red 10-JUN-2025) 09-JUN-2025 (Received)
Detail Section - Hope St Interface 02 (Proposed) AR 5.04 Rev 1 18-MAR-2025 (Received)
Detail Section - Backyard Interface Detail 01 (Demolition) AR 5.05 Rev 1 18-MAR-2025 (Received)
Detail Section - Backyard Interface Detail 01 (Proposed) AR 5.06 Rev 1 18-MAR-2025 (Received)
Detail Section - Backyard Interface Detail 02 (Demolition) AR 5.07 Rev 1 18-MAR-2025 (Received)
Detail Section - Backyard Interface Detail 02 (Proposed) AR 5.08 Rev 1 18-MAR-2025 (Received)
1.3 Site Analysis 24133 LC-01 [B] Page 6 (Amended In Red 03-JUN-2025) 10-FEB-2025 (Received)
Ground Level 24133 LC-01 [B] Page 10 (Amended In Red 03-JUN-2025) 10-FEB-2025 (Received)
Level 1 24133 LC-01 [B] Page 11 10-FEB-2025 (Received)
Section A 24133 LC-01 [B] Page 12 10-FEB-2025 (Received)
Section B 24133 LC-01 [B] Page 13 10-FEB-2025 (Received)
Ground Level 24133 LC-01 [B] Page 16 10-FEB-2025 (Received)
Level 1 24133 LC-01 [B] Page 17 10-FEB-2025 (Received)
Planting 24133 LC-01 [B] Page 18 10-FEB-2025 (Received)
Finishes and Furniture 24133 LC-01 [B] Page 19 10-FEB-2025 (Received)
Landscape Care 24133 LC-01 [B] Page 20 10-FEB-2025 (Received)
Site Plan - Existing AR 1.01 Rev 3 18-MAR-2025 (Received)
Site Plan - Proposed AR 1.02 Rev 3 18-MAR-2025 (Received)
Existing Plan - Basement AR 2.01 Rev 3 18-MAR-2025 (Received)
Existing Plan - Ground AR 2.02 Rev 3 18-MAR-2025 (Received)
Existing Plan - Level 1 AR 2.03 Rev 4 18-MAR-2025 (Received)
Existing Plan - Roof Level AR 2.04 Rev 2 18-MAR-2025 (Received)
Demolition Plan - Basement AR 2.11 Rev 3 18-MAR-2025 (Received)
Demolition Plan - Ground AR 2.12 Rev 4 18-MAR-2025 (Received)
Demolition Plan - Level 1 AR 2.13 Rev 4 (Amended In Red 15-SEP-2026) 18-MAR-2025 (Received)
Demolition Plan - Roof Level AR 2.14 Rev 2 18-MAR-2025 (Received)
Proposed Plan - Basement AR 2.21 Rev 4 18-MAR-2025 (Received)
Proposed Plan - Ground AR 2.22 Rev 6 (Amended In Red 10-JUN-2025) 10-JUN-2025 (Received)
Proposed Plan - Level 1 AR 2.23 Rev 5 (Amended In Red 15-SEP-2026) 18-MAR-2025 (Received)
Proposed Plan - Roof Level AR 2.24 Rev 4 (Amended In Red 03-JUN-2025) 18-MAR-2025 (Received)
Existing Elevation - North West (Montague Rd) AR 3.01 Rev 3 18-MAR-2025 (Received)
Existing Elevation - South West (Hope St) AR 3.02 Rev 3 18-MAR-2025 (Received)
Existing Elevation - North East AR 3.03 Rev 3 18-MAR-2025 (Received)
Existing Elevation - South East AR 3.04 Rev 3 18-MAR-2025 (Received)
Demolition Elevation - North West (Montague Rd) AR 3.11 Rev 3 18-MAR-2025 (Received)
Demolition Elevation - South West (Hope St) AR 3.12 Rev 3 18-MAR-2025 (Received)
Demolition Elevation - North East AR 3.13 Rev 4 18-MAR-2025 (Received)
Demolition Elevation - South East AR 3.14 Rev 3 18-MAR-2025 (Received)
Proposed Elevation - North West (Montague Rd) AR 3.21 Rev 3 (Amended In Red 03-JUN-2025) 18-MAR-2025 (Received)
Proposed Elevation - South West (Hope St) AR 3.22 Rev 3 (Amended In Red 03-JUN-2025) 18-MAR-2025 (Received)
Proposed Elevation - North East AR 3.23 Rev 4 (Amended In Red 03-JUN-2025) 18-MAR-2025 (Received)
Proposed Elevation - South East AR 3.24 Rev 3 (Amended In Red 03-JUN-2025) 18-MAR-2025 (Received)
Existing - Section A AR 4.01 Rev 3 18-MAR-2025 (Received)
Existing - Section B AR 4.02 Rev 3 18-MAR-2025 (Received)
Existing - Section C AR 4.03 Rev 3 18-MAR-2025 (Received)
Existing - Section D AR 4.04 Rev 3 18-MAR-2025 (Received)
Existing - Section E AR 4.05 Rev 3 18-MAR-2025 (Received)
Existing - Section F AR 4.06 Rev 3 18-MAR-2025 (Received)
Demolition - Section A AR 4.11 Rev 4 (Amended In Red 15-SEP-2026) 18-MAR-2025 (Received)
Demolition - Section B AR 4.12 Rev 3 18-MAR-2025 (Received)
Demolition - Section C AR 4.13 Rev 3 18-MAR-2025 (Received)
Demolition - Section D AR 4.14 Rev 3 (Amended In Red 15-SEP-2026) 18-MAR-2025 (Received)
Demolition - Section E AR 4.15 Rev 3 18-MAR-2025 (Received)
Demolition - Section F AR 4.16 Rev 3 18-MAR-2025 (Received)
Proposed - Section A AR 4.21 Rev 4 (Amended In Red 15-SEP-2026) 18-MAR-2025 (Received)
Proposed - Section B AR 4.22 Rev 3 18-MAR-2025 (Received)
Proposed - Section C AR 4.23 Rev 3 18-MAR-2025 (Received)
Proposed - Section D AR 4.24 Rev 3 (Amended In Red 15-SEP-2026) 18-MAR-2025 (Received)
Proposed - Section E AR 4.25 Rev 3 18-MAR-2025 (Received)
Proposed - Section F AR 4.26 Rev 3 18-MAR-2025 (Received)
Detail Sections - Montague Rd Interface AR 5.01 Rev 1 18-MAR-2025 (Received)
Detail Sections - Hope St Interface 01 AR 5.02 Rev 1 18-MAR-2025 (Received)
Detail Section - Hope St Interface 02 (Demolition) AR 5.03 Rev 1 18-MAR-2025 (Received)


Advice

Please see the attached document(s) for any advices.

APPROVAL CONDITIONS



Permit to Which These Conditions Relate: DA - PA - Building Work
Activity(ies): office
Stage: Office (Refurbishment of the former Coronation Hotel into an office building) in the Heritage and Flood overlay.

General/Planning Requirements
 
Timing
1)   Maintain the Approved Development

Maintain the approved development in accordance with the approved DRAWINGS AND DOCUMENTS, and any other relevant Council approval required by the conditions.

 
At all times
 
2)   Approved Drawings and Documents

A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers.

Note: This condition is imposed to ensure compliance with the conditions of development approval.

 
While site/operational/building work is occurring
 
3)   Carry Out the Approved Development

Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks). Permission to enter neighbouring properties must be obtained from the relevant property owners.

 
While site/operational/building work is occurring
 
4)   Complete All Building Work

Complete all building work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such building work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: Building work must also be completed in accordance with any other current development approval.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
Architecture
 
Timing
5)   External Details

External details of the building, facade treatment and external materials and finishes must be consistent with the approved DRAWINGS AND DOCUMENTS.

Note: The requirement to use particular materials and finishes is imposed only for the purpose of achieving a built form outcome that displays architectural merit. Council has not assessed the materials and finishes for compliance with the Building Act, the Building Fire Safety Regulation, the Building Regulation, the Building Code of Australia, the Queensland Development Code, relevant Australian Standards, fire safety standards or any other relevant requirement of a statutory authority with regard to building work.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
6)   Overall Height

The overall height of the building(s) must be in accordance with the floor and roof levels and overall height shown on the APPROVED DRAWINGS AND DOCUMENTS.

 
While site/operational/building work is occurring and then to be maintained
 
7)   Partial Demolition of Building

Partial demolition resulting from this approval must be in accordance with the APPROVED DRAWINGS AND DOCUMENTS and all building work must comply with this condition.

 
While site/operational/building work is occurring and then to be maintained
7(a) Adequate Bracing

Provide adequate bracing from the commencement of any demolition work and throughout the demolition and construction phases of the project, to ensure that all parts of the building not specifically designated for demolition on the APPROVED DRAWINGS AND DOCUMENTS are retained and protected.

Timing: While site/operational/building work is occurring.

 
As indicated
7(b) Retain Original Fabric

Retain all existing external original fabric in the sections of the building which are not being demolished. This will include, but is not limited to, existing decorative detailing, balustrading, wall cladding, windows, doors, stairs and roof sheeting.

Timing: While site/operational/building work is occurring and then to be maintained.

 
As indicated
7(c) Submit Written Confirmation

Submit to Development Services written confirmation by a Registered Architect / Building Designer (holding a Queensland Building and Construction Commission Licence appropriate to the scale of the approved development)/ Building Certifier / Structural Engineer confirming that the partial demolition has been carried out in accordance with the requirements of this condition.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use

 
As indicated
 
Standard Advice
 
Timing
8)   Construction Noise and Dust Emissions

Pursuant to the Environmental Protection Act 1994, all development involving the emission of noise and dust from building and/or construction activities, must ensure that the emissions are in accordance with the requirements of the Act.
The Environmental Protection Act 1994 prescribes that:

1. A person must not carry out building work in a way that makes an audible noise-
-  on a business day or Saturday, before 6.30a.m. or after 6.30p.m; or
-   on any other day, at any time. 
2. The reference in subsection (1) to a person carrying out building work-
-  includes a person carrying out building work under an owner-builder permit; and
-  otherwise does not include a person carrying out building work at premises used by the person only for residential purposes.

Note: A request can be made to work outside of these hours by submitting an Environmental Management Plan for assessment and obtaining an endorsed decision from the Environmental Management delegate Development Services.

 
As indicated
 
9)   Contaminated Materials and Soils

Any contaminated materials or soils encountered during siteworks, must be handled, stored and disposed of in accordance with the requirements of the relevant authority of the Queensland Government. A person must not dispose of contaminated soil or a hazardous substance at a place other than at a place approved by the relevant authority of the Queensland Government.

 
As indicated
 
10)   Management of Asbestos

Disposal, handling and restoration of any building materials containing asbestos must be in accordance with current state and federal legislation.

 
As indicated
 
11)   Further Development Permit Required

Further Development Permit(s) to carry out assessable building work under the Building Act may be required.

 
As indicated
 
12)   Plumbing and Drainage Work

Pursuant to the Plumbing and Drainage Act 2018, any plumbing and drainage work must be carried out in compliance with the Plumbing and Drainage Regulation 2019.

Note: All new and existing plumbing services should be located within the lot that they serve.

Compliance assessable plumbing and drainage work requires approval by Brisbane City Council prior to the work being carried out.

 
As indicated
 
13)   Currency Period

The currency period for this development approval is stated in the Decision Notice and is expressed as a date.

This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016.

 
As indicated
 
14)   Referral Agency Requirements

SARA as CONCURRENCE agency has imposed the requirements contained in the letter dated 3 April 2025.

 
As indicated
 
15)   Equitable Access

Provision must be made during and after construction for equitable access for persons with disabilities to and within the site and on adjoining public areas, in accordance with the following:
- Queensland Anti-Discrimination Act 1991;
- Federal Disability Discrimination Act 1992;
- Australian Standards AS1428 Parts 1-4;
- Australian Standard for Access and Mobility; and
- National Construction Code.

 
As indicated
 
16)   Damage to Trees on Adjoining Land

Please note that any damage caused to vegetation on adjoining land as a result of exercising this development approval may result in an offence under other legislation (e.g. Natural Assets Local Law) and/or civil action

 
As indicated
 
17)   Fire Ant Movement Controls

To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected.

These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products.

Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014.

For further information contact the relevant Queensland State Government department on 13 QGOV.

 
As indicated
 
18)   Water and Wastewater

Services for water and wastewater (sewerage) are not under the jurisdiction of Brisbane City Council. Authorisation to connect the approved development to the water/wastewater networks and for property service connections required a Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009.

For further information about any necessary Water Approvals contact Urban Utilities.

 
As indicated
 
19)   Cultural Heritage

Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage.

 

The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care.

 

For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships).

 
As indicated
 



Permit to Which These Conditions Relate: DA - PA - Material Change of Use
Activity(ies): office
Stage: Office in the Heritage and Flood overlay

General/Planning Requirements
 
Timing
20)   Maintain the Approved Development

Maintain the approved development in accordance with the approved DRAWINGS AND DOCUMENTS, and any other relevant Council approval required by the conditions.

 
At all times
 
21)   Approved Drawings and Documents

A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers.

Note: This condition is imposed to ensure compliance with the conditions of development approval.

 
While site/operational/building work is occurring
 
22)   Carry Out the Approved Development

Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks). Permission to enter neighbouring properties must be obtained from the relevant property owners.

 
While site/operational/building work is occurring
 
23)   Complete All Building Work

Complete all building work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such building work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: Building work must also be completed in accordance with any other current development approval.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
24)   Balconies/Verandahs/Terraces

The verandah embellishment at Level 1 over the footpath facing Montague Road frontage and Hope Street frontage as shown on approved drawings must not be trafficable, occupied or used at all times.

GUIDELINE
This condition has been imposed as the verandah is located outside the property boundary and requires a term lease from the Department of Natural Resources and Mines, Manufacturing and Regional and Rural Development. Further development approval will be required where a term lease is granted and the verandah is proposed to be used.

 
At all times
 
Architecture
 
Timing
25)   External Details

External details of the building, facade treatment and external materials and finishes must be consistent with the approved DRAWINGS AND DOCUMENTS.

Note: The requirement to use particular materials and finishes is imposed only for the purpose of achieving a built form outcome that displays architectural merit. Council has not assessed the materials and finishes for compliance with the Building Act, the Building Fire Safety Regulation, the Building Regulation, the Building Code of Australia, the Queensland Development Code, relevant Australian Standards, fire safety standards or any other relevant requirement of a statutory authority with regard to building work.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
26)   Overall Height

The overall height of the building(s) must be in accordance with the floor and roof levels and overall height shown on the APPROVED DRAWINGS AND DOCUMENTS.

 
While site/operational/building work is occurring and then to be maintained
 
27)   Partial Demolition of Building

Partial demolition resulting from this approval must be in accordance with the APPROVED DRAWINGS AND DOCUMENTS and all building work must comply with this condition.

 
While site/operational/building work is occurring and then to be maintained
27(a) Adequate Bracing

Provide adequate bracing from the commencement of any demolition work and throughout the demolition and construction phases of the project, to ensure that all parts of the building not specifically designated for demolition on the APPROVED DRAWINGS AND DOCUMENTS are retained and protected.

Timing: While site/operational/building work is occurring.

 
As indicated
27(b) Retain Original Fabric

Retain all existing external original fabric in the sections of the building which are not being demolished. This will include, but is not limited to, existing decorative detailing, balustrading, wall cladding, windows, doors, stairs and roof sheeting.

Timing: While site/operational/building work is occurring and then to be maintained.

 
As indicated
27(c) Submit Written Confirmation

Submit to Development Services written confirmation by a Registered Architect / Building Designer (holding a Queensland Building and Construction Commission Licence appropriate to the scale of the approved development)/ Building Certifier / Structural Engineer confirming that the partial demolition has been carried out in accordance with the requirements of this condition.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use

 
As indicated
 
28)   Screen Air Conditioning and Other Plant Enclosures

Install and maintain suitable screening to all air conditioning units, lift motor rooms, hot water systems plant and service facilities where externally visible or located on top of the building including where visible and/or located within private open space areas, communal open space areas, adjoining properties or public land. The screening structures must be constructed from durable materials that are consistent with materials used elsewhere on the facade of the building.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
Landscape Architecture and Open Space Planning
 
Timing
29)   Retain and Protect Existing Street Tree(s)

Identify, retain and protect the existing street trees on the Hope Street and Montague Road frontages of 48 Montague Road, South Brisbane including the roots unless otherwise agreed in writing with Program, Planning and Integration Arboriculture (PPI Arb).

Note: Street trees are protected under the Natural Assets Local Law. Street trees must not be removed or pruned without prior approval from PPI Arb.

Where driveway crossovers occur within the Tree Protection Zone (TPZ) of existing street trees, seek approval from the Arboricultural Team in Program Planning and integration, City Standards for the final driveway crossover design and construction methodology to ensure the successful retention of the existing street tree(s)

PROOF OF FULFILMENT
Contextual photographic evidence that the tree has been retained in equal or greater health than before development commenced. OR, evidence in writing from Asset Services Arboriculture that an alternative arrangement has been made. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
At all times
29(a) Implement Protection Measures

Install tree protection measures in accordance with Australian Standard - AS4970 Retention of Trees on Development Site.

There must be no excavation, filling or storage of materials or plant within the drip line of the tree(s).

Where works are within the canopy drip line of existing street trees, contact PPI Arb Coordinator in relation to the required provision of protection measures.

Note: If fencing is to protect street trees, a permit to temporarily occupy the footway will be required from Compliance and Regulatory Services.

Timing: Prior to site/operational/building work occurring.

PROOF OF FULFILMENT
Contextual photographic evidence to demonstrate the installation of protection measures prior to building works commencing. Timing: Prior to site / operational / building work occurring.

 
As indicated
29(b) Maintain Protection Measures

Maintain protection measures while development is occurring and remove protection measures prior to commencement of the use.

Timing: While to site/operational/building work is occurring.

 
As indicated
 
30)   Landscape the Site - Self Certification

Landscape the site in accordance with the requirements of this condition.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
30(a) Detailed Landscape Plan for Self- Certification

Prepare a Detailed Landscape Plan at a scale of 1:100 for all on-site landscape works including planting areas identified on the approved DRAWINGS AND DOCUMENTS - 24133 LC-01 B Pages 6, 10, 11, 12, 13, 16, 17, 18, 19 and 20, received 10/02/2025 and Amended in Red 03/06/2025 (Pages 6 and 10). The plan must be prepared by a Qualified Landscape Architect and must comply with the relevant Brisbane Planning Scheme Codes.

The plan must include the following:
- Planting media and mulch in accordance with AS4454 Composts, soil conditioners and mulches and AS 4419-2003 Soils for landscaping and garden use.
- Unless otherwise specified, trees provided as 45 litre stock or larger, staked and tied, and complying with Australian Standards.
- Plant selection and densities to achieve full surface coverage of garden beds within 2 years of planting.
- A reticulated drip irrigation system to all planting areas, with drainage connected to the stormwater system; the irrigation system must be connected to a non-mains water source.
- Trees required to be retained are documented, integrated into landscape design, and protected in accordance with the relevant sections of Australian Standard AS4970 Protection of trees on development sites.
- Details of a 12 week establishment period.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
A detailed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
30(b) Centre or Mixed Use

In addition to the requirements listed above, the plan must include the following:
- Landscape planting areas as shown on the approved drawings planted with tree, shrub and groundcover species that provide the landscape amenity and shade outcomes as shown on approved plans.
- A minimum of 25% of all trees as 200L stock or larger.
- Landscape planting such as screening tree, shrub and groundcover species planted at suitable spacings along the side boundary in planting areas shown on the approved drawings.
- Containerised planters provide minimum internal depths and widths sufficient to support healthy plant growth, with the following dimensions or other dimensions if achieving the same soil volume; trees - 1200m width x depth, large shrubs and palms - 800mm width x depth, small shrubs and groundcovers - 600mm width x depth.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
A detailed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
30(c) Certify Detailed Landscape Plan

On completion of the Detailed Landscape Plan, submit to Development Services a landscape design certification via the Landscape Design and Landscape Works Certification online form. Design certification is to be prepared by a Qualified Landscape Architect, certifying that the Detailed Landscape Plan complies with the requirements of this condition. The Certification must include a copy of the:


- Landscape design certification form.


- Certified detailed landscape plan.

NOTE: The landscape design and landscape works certification online form can be found by searching development application forms on Council's website.

Timing: Prior to building work commencing.

PROOF OF FULFILMENT
A copy of the landscape design certification form and certified detailed landscape plan

 
As indicated
30(d) Implement Certified Detailed Landscape Plan

Carry out the landscape work in accordance with the above certified detailed Landscape Plan.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
30(e) Certify Work

On completion of the landscape work, submit a Landscape Works Certification via the Landscape Design and Landscape Works Certification online form. The landscape works certification is to be prepared by a Qualified Landscape Architect, certifying that the landscape works comply with the certified Detailed Landscape Plan. The certification must include:


- a copy of the Landscape works certification form.

- a copy of the as-constructed landscape drawings.

- Photos of installed landscaping.


- Confirmation in writing from the landscape contractor who completed the works, that the works were completed in accordance with best practice landscape construction and horticultural standards.

NOTE: The landscape design and landscape works certification online form can be found by searching development application forms on Council's website.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
A copy of the Landscape works certification form, a copy of the as-constructed landscape drawings, photos of installed landscaping, confirmation in writing from the landscape contractor who completed the works, that the works were completed in accordance with best practice landscape construction and horticultural standards.

 
As indicated
30(f) Maintain Landscape Work

Maintain the landscape work, including deep planting, in accordance with the certified Detailed Landscape Plan.

Timing: To be maintained.

 
As indicated
 
Pollution
 
Timing
31)   Kitchen exhaust vents - (emitters)

Kitchen and food preparation area exhaust vent outlets are discharged vertically, directed away from any sensitive use and separated by a minimum of 6m from a sensitive use, including any outdoor air intake of a sensitive use.

Note: This condition does not authorise environmental nuisance under the Environmental Protection Act 1994.

 
At all times
 
32)   Mechanical Plant or Equipment - Acoustically Screened

Mechanical plant or equipment is to be acoustically screened from an adjoining sensitive use. Mechanical plant includes generators, motors, compressors and pumps such as air-conditioning, refrigeration and cold room motors. Acoustically screened is defined in City Plan 2014.

NOTE: This condition does not authorise environmental nuisance under the Environmental Protection Act 1994.

PROOF OF FULFILMENT
Submit to Development Services, certification that all mechanical plant or equipment, is acoustically screened. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
33)   Amplified Music

Amplified music is not permitted in all outdoor areas and terraces.

 
At all times
 
Engineering
 
Timing
34)   Information Signage

Erect an information sign on the subject property in accordance with Council's general requirements for signage and in accordance with the requirements outlined below:
a) The sign should provide a brief description of the development proposed;
b) The sign is to list the name, postal and/or email address and a contact telephone number for the following parties (where relevant) that are undertaking work on the site:
- Developer;
- Project Coordinator;
- Architect/Building Designer;
- Builder;
- Civil Engineer;
- Civil Contractor/s; and
- Landscape Architect;
c) The lettering on the sign is to be at least 25 millimetres in height, be of regular weight and in sentence case;
d) The sign is to be a minimum size of 1,200 millimetres by 900 millimetres;
e) The maximum area of the sign is to be 2.0m2;
f) The sign is to be positioned as follows:
- located centrally along each road frontage of the site to Montague Road and Hope Streets;
- located on or within 1.5 metres of the road frontage;
- mounted at least 300 millimetres above ground level; and
- clearly visible from the street for a pedestrian;
g) The sign is to contain no commercial or corporate advertising other than the name, logo or slogan of the parties outlined in part (b) of this condition;
h) The sign is to be non- illuminated; and
i) Both the sign and the supporting structure are to be made of weatherproof material and to be properly maintained at all times;

Timing: Prior to site works commencing and then to be maintained until completion of the development for all stages.

 
As indicated
 
35)   Construction Management Plan (Minor)

Carry out development in a method consistent with a Construction Management Plan (Minor) prepared in accordance with the requirements of this condition.

 
While site/operational/building work is occurring
35(a) Construction Management Plan (Minor) - Prepare Plan

Prepare a detailed Construction Management Plan (CMP) for the construction phase of the approved development.The Construction Management Plan must be in accordance with the relevant Brisbane Planning Scheme Codes and address the following:
(i) Provision for pedestrian management including acceptable alternative DDA compliant pedestrian routes (adjacent to or surrounding the site);
(ii) Existing and proposed kerbside allocation signs and line marking (such as bus stops, loading zones and parking meters and/or ticket dispensers);
(iii) Location of and impacts to any Council or other public utility or local authority's assets on or within external to the site;
(iv) Location and design of temporary vehicular construction access points, including frequency of use;
(v) Management and mitigation strategies for the impact of dust, noise and vibration upon adjoining and nearby properties;
(vi) Provision for loading and unloading of materials including the location of any remote loading sites;
(vii) Location of materials, structures, plant and equipment to be stored or placed on the construction site;
(viii) Location of proposed external hoardings and/or gantries, and including clearances to the impacts of this on existing street furniture and other footpath assets located within the verge as well as impacts on any existing advertising signage located either along or adjacent to the site frontage - this includes any potential obstruction of sight lines for such advertising (e.g. bus stops with advertising);
(ix) Location of proposed employee and visitor parking areas;
(x) Anticipated staging and programming;
(xi) Impacts of any actions proposed to address any of the above items or any actions resulting from construction of the development that will impact on existing street trees;
(xii) Complaint management processes to be implemented; and
(xiii) Compliance with the Management Plans Planning Scheme Policy and other relevant Planning Scheme Policies.

The Construction Management Plan must be supported by 'approval in principle' or written approvals from the relevant Council sections or other governing bodies responsible for any potentially impacted infrastructure.

The list of relevant infrastructure and contacts is available on Council's website - Search 'Construction Management Plan'.

Note: The Construction Management Plan is not required to be approved by Development Services.

Timing: Prior to site/operational/building work commencing.

 
As indicated
35(b) Construction Management Plan (Minor) - Submit Plan

Submit a copy of the Construction Management Plan to Council's Development Services Branch at the following mailbox: engineeringservices@brisbane.qld.gov.au quoting the BCC planning development approval reference number.

Timing: At least 10 days prior to site works commencing.

 
As indicated
35(c) Construction Management Plan (Minor) - Documentation on Site

Legible copies of the Construction Management Plan and current permits must be kept on site and be made available on request by Council at all times. The requirements of the CMP must be included in all induction of principal and subcontractors utilised in the development. An outline of the induction provided to contractors may be requested by Council to confirm compliance with this condition.

Timing: While site/operational/building work is occurring.

 
As indicated
35(d) Construction Management Plan - Works to be Performed Out of Hours

Obtain an approval from Development Services for any work that is proposed to be undertaken outside of normal business hours - 6:30am to 6:30pm, Monday to Saturday.

Timing: Prior to site/operational/building work commencing.

 
As indicated
35(e) Implement Construction Management Plan (Minor)

Carry out the development in accordance with the submitted Construction Management Plan.

 
While site/operational/building work is occurring
 
36)   Protect Existing Infrastructure

Where there is existing infrastructure in the vicinity of the proposed work, the new work must not damage or compromise the working ability of the existing infrastructure.

Where alterations to public utility mains, existing mains, services or installations are necessitated by the development, prior to alterations commencing, the developer must notify Council or the relevant infrastructure provider and obtain agreement to the alterations.

The developer must meet the costs of the alterations. The alterations must be carried out in accordance with the relevant Brisbane Planning Scheme Codes or infrastructure providers requirements.

 
While site/operational/building work is occurring
36(a) As Constructed Drawings - Alterations to Existing Infrastructure

Submit to Development Services As Constructed drawings showing all new and/or rectification works and an asset register, prepared by a Registered Professional Engineer Queensland.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

PROOF OF FULFILMENT
Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that the alterations have been completed in accordance with the relevant Brisbane Planning Scheme Codes and any other relevant infrastructure requirements. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
As indicated
 
37)   Repair Damage to Kerb, Footpath or Road

Repair any damage to the existing kerb and channel, footpath or roadway (including removal of concrete slurry from footways, roads, kerb and channel, stormwater gullies and drainlines) and re-instate existing traffic signs and pavement markings that have been removed or damaged during any works carried out in association with the approved development.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
37(a) Interim Repairs

If at any time during the construction phase of the approved development, damage to the existing kerb and channel, footpath or roadway creates unsafe, unreasonable and/or not fit for purpose conditions as assessed by Council, interim repairs must be undertaken as directed by Program Planning and Integration.

Note: Any interim repairs required to be undertaken shall not be considered to satisfy the requirements of this condition for the permanent repair of the infrastructure prior to the issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

Timing: While site / operational / building works is occurring.

 
As indicated
 
38)   Access, Grades, Manoeuvring, Carparks, Signs and Line Marking

Construct and/or maintain access, parking and manoeuvring for vehicles on site in accordance with the relevant Brisbane Planning Scheme Codes, as indicated on the approved DRAWINGS AND DOCUMENTS, including the following:

i. Parking on the site for 8 cars, 1 parking spaces for people with disabilities and for the loading and unloading of vehicle(s) within the site. There must a minimum number of 9 total carparking spaces provided on site.

ii. A minimum of 2.3 metres height clearance to all undercover parking areas, including the entry and access to these areas, and a minimum of 2.5 metres above parking spaces for people with disabilities. The minimum clear height must be measured to the lowest protrusion from the ceiling (e.g. fire sprinklers, services, lighting fixtures, signs, etc).

iii. A height clearance sign located at the entrance(s) to undercover car parking areas and a directional visitor parking sign clearly visible from the vehicle entrance to the site.

iv. Prepare and implement signs and line markings drawings that show the internal paved areas signed and delineated in accordance with the approved drawings and documents. The drawings must be prepared and certified by a Registered Professional Engineer Queensland in accordance with the relevant Brisbane Planning Scheme Codes and the Manual of Uniform Traffic Control Devices.

PROOF OF FULFILMENT
Certification from a Registered Professional Engineer Queensland, that the above requirements have been implemented in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first and then to be maintained.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
39)   Flood Emergency Management Plan

Prepare, implement and maintain a Flood Emergency Management Plan (FEMP) in accordance with the requirements of this condition.

Note: Guidance for the preparation of drawings and/or documents to comply with this condition is provided in the Flood Planning Scheme Policies.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
39(a) Prepare and Certify a Flood Emergency Management Plan

Submit to Development Services a Flood Emergency Management Plan (FEMP) for the approved development prepared and certified by a Registered Professional Engineer Queensland with experience in flood risk management.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection.

 
As indicated
 
40)   Minimum Flood Planning Levels

Design and construct all building pad levels, floor levels and ancillary structures to the appropriate flood planning level with freeboard (where required) in accordance with the relevant Brisbane Planning Scheme Codes and the approved drawings and documents.

The minimum level for essential electrical services must be 6.3 metres AHD.

PROOF OF FULFILMENT
As-Constructed drawings prepared by a Registered Surveyor (Qld). The Registered Surveyor (Qld) must certify that the development has been constructed in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
41)   Refuse Collection - Kerb Side (external road or internal private road)

Refuse and recycling bins for the development must be collected from the kerb side.

Arrange for the installation of refuse/recycling bins and for the subsequent collection of refuse including recycling from the site by a Private Waste Contractor.

Timing: At the commencement of use and then to be maintained.

 
As indicated
 
42)   Refuse Storage - Kerb Side Collection

Provide a refuse storage area to accommodate the type and quantity of refuse and recycling bins required to service the development, as shown on the APPROVED DRAWINGS AND DOCUMENTS.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
43)   Water and Wastewater

Pursuant to Schedule 18 of the Planning Regulation 2017 submit to Development Services, documentary evidence, issued by the relevant distributor-retailer, to verify that the conditions of any necessary connection certificate under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009, have been complied with.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
Standard Advice
 
Timing
44)   Construction Noise and Dust Emissions

Pursuant to the Environmental Protection Act 1994, all development involving the emission of noise and dust from building and/or construction activities, must ensure that the emissions are in accordance with the requirements of the Act.
The Environmental Protection Act 1994 prescribes that:

1. A person must not carry out building work in a way that makes an audible noise-
-  on a business day or Saturday, before 6.30a.m. or after 6.30p.m; or
-   on any other day, at any time. 
2. The reference in subsection (1) to a person carrying out building work-
-  includes a person carrying out building work under an owner-builder permit; and
-  otherwise does not include a person carrying out building work at premises used by the person only for residential purposes.

Note: A request can be made to work outside of these hours by submitting an Environmental Management Plan for assessment and obtaining an endorsed decision from the Environmental Management delegate Development Services.

 
As indicated
 
45)   Contaminated Materials and Soils

Any contaminated materials or soils encountered during siteworks, must be handled, stored and disposed of in accordance with the requirements of the relevant authority of the Queensland Government. A person must not dispose of contaminated soil or a hazardous substance at a place other than at a place approved by the relevant authority of the Queensland Government.

 
As indicated
 
46)   Management of Asbestos

Disposal, handling and restoration of any building materials containing asbestos must be in accordance with current state and federal legislation.

 
As indicated
 
47)   Further Development Permit Required

Further Development Permit(s) to carry out assessable building work under the Building Act may be required.

 
As indicated
 
48)   Plumbing and Drainage Work

Pursuant to the Plumbing and Drainage Act 2018, any plumbing and drainage work must be carried out in compliance with the Plumbing and Drainage Regulation 2019.

Note: All new and existing plumbing services should be located within the lot that they serve.

Compliance assessable plumbing and drainage work requires approval by Brisbane City Council prior to the work being carried out.

 
As indicated
 
49)   Currency Period

The currency period for this development approval is stated in the Decision Notice and is expressed as a date.

This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016.

 
As indicated
 
50)   Referral Agency Requirements

SARA as CONCURRENCE agency has imposed the requirements contained in the letter dated 3 April 2025.

 
As indicated
 
51)   Equitable Access

Provision must be made during and after construction for equitable access for persons with disabilities to and within the site and on adjoining public areas, in accordance with the following:
- Queensland Anti-Discrimination Act 1991;
- Federal Disability Discrimination Act 1992;
- Australian Standards AS1428 Parts 1-4;
- Australian Standard for Access and Mobility; and
- National Construction Code.

 
As indicated
 
52)   Damage to Trees on Adjoining Land

Please note that any damage caused to vegetation on adjoining land as a result of exercising this development approval may result in an offence under other legislation (e.g. Natural Assets Local Law) and/or civil action

 
As indicated
 
53)   Fire Ant Movement Controls

To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected.

These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products.

Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014.

For further information contact the relevant Queensland State Government department on 13 QGOV.

 
As indicated
 
54)   Water and Wastewater

Services for water and wastewater (sewerage) are not under the jurisdiction of Brisbane City Council. Authorisation to connect the approved development to the water/wastewater networks and for property service connections required a Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009.

For further information about any necessary Water Approvals contact Urban Utilities.

 
As indicated
 
55)   Cultural Heritage

Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage.

 

The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care.

 

For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships).

 
As indicated
 



Permit to Which These Conditions Relate: DA - PA - Building Work
Activity(ies): office
Stage: Demolition of a component on a State Heritage Place

General/Planning Requirements
 
Timing
56)   Maintain the Approved Development

Maintain the approved development in accordance with the approved DRAWINGS AND DOCUMENTS, and any other relevant Council approval required by the conditions.

 
At all times
 
57)   Approved Drawings and Documents

A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers.

Note: This condition is imposed to ensure compliance with the conditions of development approval.

 
While site/operational/building work is occurring
 
58)   Carry Out the Approved Development

Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks). Permission to enter neighbouring properties must be obtained from the relevant property owners.

 
While site/operational/building work is occurring
 
59)   Complete All Building Work

Complete all building work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such building work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS.

Note: Building work must also be completed in accordance with any other current development approval.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first
 
Architecture
 
Timing
60)   External Details

External details of the building, facade treatment and external materials and finishes must be consistent with the approved DRAWINGS AND DOCUMENTS.

Note: The requirement to use particular materials and finishes is imposed only for the purpose of achieving a built form outcome that displays architectural merit. Council has not assessed the materials and finishes for compliance with the Building Act, the Building Fire Safety Regulation, the Building Regulation, the Building Code of Australia, the Queensland Development Code, relevant Australian Standards, fire safety standards or any other relevant requirement of a statutory authority with regard to building work.

 
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained
 
61)   Overall Height

The overall height of the building(s) must be in accordance with the floor and roof levels and overall height shown on the APPROVED DRAWINGS AND DOCUMENTS.

 
While site/operational/building work is occurring and then to be maintained
 
62)   Partial Demolition of Building

Partial demolition resulting from this approval must be in accordance with the APPROVED DRAWINGS AND DOCUMENTS and all building work must comply with this condition.

 
While site/operational/building work is occurring and then to be maintained
62(a) Adequate Bracing

Provide adequate bracing from the commencement of any demolition work and throughout the demolition and construction phases of the project, to ensure that all parts of the building not specifically designated for demolition on the APPROVED DRAWINGS AND DOCUMENTS are retained and protected.

Timing: While site/operational/building work is occurring.

 
As indicated
62(b) Retain Original Fabric

Retain all existing external original fabric in the sections of the building which are not being demolished. This will include, but is not limited to, existing decorative detailing, balustrading, wall cladding, windows, doors, stairs and roof sheeting.

Timing: While site/operational/building work is occurring and then to be maintained.

 
As indicated
62(c) Submit Written Confirmation

Submit to Development Services written confirmation by a Registered Architect / Building Designer (holding a Queensland Building and Construction Commission Licence appropriate to the scale of the approved development)/ Building Certifier / Structural Engineer confirming that the partial demolition has been carried out in accordance with the requirements of this condition.

Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use

 
As indicated
 
Standard Advice
 
Timing
63)   Construction Noise and Dust Emissions

Pursuant to the Environmental Protection Act 1994, all development involving the emission of noise and dust from building and/or construction activities, must ensure that the emissions are in accordance with the requirements of the Act.
The Environmental Protection Act 1994 prescribes that:

1. A person must not carry out building work in a way that makes an audible noise-
-  on a business day or Saturday, before 6.30a.m. or after 6.30p.m; or
-   on any other day, at any time. 
2. The reference in subsection (1) to a person carrying out building work-
-  includes a person carrying out building work under an owner-builder permit; and
-  otherwise does not include a person carrying out building work at premises used by the person only for residential purposes.

Note: A request can be made to work outside of these hours by submitting an Environmental Management Plan for assessment and obtaining an endorsed decision from the Environmental Management delegate Development Services.

 
As indicated
 
64)   Contaminated Materials and Soils

Any contaminated materials or soils encountered during siteworks, must be handled, stored and disposed of in accordance with the requirements of the relevant authority of the Queensland Government. A person must not dispose of contaminated soil or a hazardous substance at a place other than at a place approved by the relevant authority of the Queensland Government.

 
As indicated
 
65)   Management of Asbestos

Disposal, handling and restoration of any building materials containing asbestos must be in accordance with current state and federal legislation.

 
As indicated
 
66)   Further Development Permit Required

Further Development Permit(s) to carry out assessable building work under the Building Act may be required.

 
As indicated
 
67)   Plumbing and Drainage Work

Pursuant to the Plumbing and Drainage Act 2018, any plumbing and drainage work must be carried out in compliance with the Plumbing and Drainage Regulation 2019.

Note: All new and existing plumbing services should be located within the lot that they serve.

Compliance assessable plumbing and drainage work requires approval by Brisbane City Council prior to the work being carried out.

 
As indicated
 
68)   Currency Period

The currency period for this development approval is stated in the Decision Notice and is expressed as a date.

This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016.

 
As indicated
 
69)   Referral Agency Requirements

SARA as CONCURRENCE agency has imposed the requirements contained in the letter dated 3 April 2025.

 
As indicated
 
70)   Equitable Access

Provision must be made during and after construction for equitable access for persons with disabilities to and within the site and on adjoining public areas, in accordance with the following:
- Queensland Anti-Discrimination Act 1991;
- Federal Disability Discrimination Act 1992;
- Australian Standards AS1428 Parts 1-4;
- Australian Standard for Access and Mobility; and
- National Construction Code.

 
As indicated
 
71)   Damage to Trees on Adjoining Land

Please note that any damage caused to vegetation on adjoining land as a result of exercising this development approval may result in an offence under other legislation (e.g. Natural Assets Local Law) and/or civil action

 
As indicated
 
72)   Fire Ant Movement Controls

To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected.

These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products.

Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014.

For further information contact the relevant Queensland State Government department on 13 QGOV.

 
As indicated
 
73)   Water and Wastewater

Services for water and wastewater (sewerage) are not under the jurisdiction of Brisbane City Council. Authorisation to connect the approved development to the water/wastewater networks and for property service connections required a Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009.

For further information about any necessary Water Approvals contact Urban Utilities.

 
As indicated
 
74)   Cultural Heritage

Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage.

 

The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care.

 

For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships).

 
As indicated
 

** End of Package **