| Address of Site: | 48 MONTAGUE RD SOUTH BRISBANE QLD 4101 |
| Real Property Description of Site: | L1 SP.118141 |
| Aspects of development and type of approval: | DA - PA - Building Work Development Permit - office DA - PA - Material Change of Use Development Permit - office DA - PA - Building Work Development Permit - office |
| Council File Reference: | A007068188 Permit Reference Number/s: DABW458532925; DAMC458533025; DABW458957225. |
| Package Status: | APPROVED - Version 2 (17th of September, 2026 1:08:21 PM) |
| Package Generated: | 17/09/2026 |
| Glyn CHISHOLM Senior Landscape Architect Landscape Architecture Team Glyn.Chisholm@brisbane.qld.gov.au 07 3403 0117 |
Beau MORRIS Senior Urban Planner Planning Services South beau.morris@brisbane.qld.gov.au 07 3178 7342 |
Kathryn KELLY Principal Urban Planner Planning Services South kathryn.kelly@brisbane.qld.gov.au 07 3407 1308 |
| Lucy TING Senior Engineer Engineering Services Hydraulics lucy.ting@brisbane.qld.gov.au (07) 3403 5005 |
Tom GIBBS Principal Engineer Engineering Services Traffic Tom.Gibbs@brisbane.qld.gov.au |
Michael CHOU Network Planning Michael.Chou@brisbane.qld.gov.au |
| John GRIMSEY Built Environment Officer WaRRS Assessment john.grimsey@brisbane.qld.gov.au 34071331 |
Tanay ALBUQUERQUE Technical Officer Engineering Services South Tanay.Albuquerque@brisbane.qld.gov.au (07) 3178 8519 |
Craig SLACK Engineer Engineering Scoping craig.slack@brisbane.qld.gov.au (07) 3403 8888 |
| Samuel NICHOLS Senior Heritage Advisor Architecture Team Samuel.Nichols@brisbane.qld.gov.au 31787933 |
Callan BENNETT Principal Architect Architecture Team Callan.Bennett@brisbane.qld.gov.au 07 31780595 |
Nicholas CUDICIO Urban Planner Planning Services South Nicholas.Cudicio@brisbane.qld.gov.au 34030404 |
| Alessio ZANCOLICH Principal Urban Planner Planning Services South alessio.zancolich@brisbane.qld.gov.au (07) 3407 8514 |
DRAWINGS AND DOCUMENTS
| Drawing or Document | Number | Plan Date |
|---|---|---|
| Car Parking Plan | AR 1.04 Rev 3 (Amended In Red 10-JUN-2025) | 09-JUN-2025 (Received) |
| Detail Section - Hope St Interface 02 (Proposed) | AR 5.04 Rev 1 | 18-MAR-2025 (Received) |
| Detail Section - Backyard Interface Detail 01 (Demolition) | AR 5.05 Rev 1 | 18-MAR-2025 (Received) |
| Detail Section - Backyard Interface Detail 01 (Proposed) | AR 5.06 Rev 1 | 18-MAR-2025 (Received) |
| Detail Section - Backyard Interface Detail 02 (Demolition) | AR 5.07 Rev 1 | 18-MAR-2025 (Received) |
| Detail Section - Backyard Interface Detail 02 (Proposed) | AR 5.08 Rev 1 | 18-MAR-2025 (Received) |
| 1.3 Site Analysis | 24133 LC-01 [B] Page 6 (Amended In Red 03-JUN-2025) | 10-FEB-2025 (Received) |
| Ground Level | 24133 LC-01 [B] Page 10 (Amended In Red 03-JUN-2025) | 10-FEB-2025 (Received) |
| Level 1 | 24133 LC-01 [B] Page 11 | 10-FEB-2025 (Received) |
| Section A | 24133 LC-01 [B] Page 12 | 10-FEB-2025 (Received) |
| Section B | 24133 LC-01 [B] Page 13 | 10-FEB-2025 (Received) |
| Ground Level | 24133 LC-01 [B] Page 16 | 10-FEB-2025 (Received) |
| Level 1 | 24133 LC-01 [B] Page 17 | 10-FEB-2025 (Received) |
| Planting | 24133 LC-01 [B] Page 18 | 10-FEB-2025 (Received) |
| Finishes and Furniture | 24133 LC-01 [B] Page 19 | 10-FEB-2025 (Received) |
| Landscape Care | 24133 LC-01 [B] Page 20 | 10-FEB-2025 (Received) |
| Site Plan - Existing | AR 1.01 Rev 3 | 18-MAR-2025 (Received) |
| Site Plan - Proposed | AR 1.02 Rev 3 | 18-MAR-2025 (Received) |
| Existing Plan - Basement | AR 2.01 Rev 3 | 18-MAR-2025 (Received) |
| Existing Plan - Ground | AR 2.02 Rev 3 | 18-MAR-2025 (Received) |
| Existing Plan - Level 1 | AR 2.03 Rev 4 | 18-MAR-2025 (Received) |
| Existing Plan - Roof Level | AR 2.04 Rev 2 | 18-MAR-2025 (Received) |
| Demolition Plan - Basement | AR 2.11 Rev 3 | 18-MAR-2025 (Received) |
| Demolition Plan - Ground | AR 2.12 Rev 4 | 18-MAR-2025 (Received) |
| Demolition Plan - Level 1 | AR 2.13 Rev 4 (Amended In Red 15-SEP-2026) | 18-MAR-2025 (Received) |
| Demolition Plan - Roof Level | AR 2.14 Rev 2 | 18-MAR-2025 (Received) |
| Proposed Plan - Basement | AR 2.21 Rev 4 | 18-MAR-2025 (Received) |
| Proposed Plan - Ground | AR 2.22 Rev 6 (Amended In Red 10-JUN-2025) | 10-JUN-2025 (Received) |
| Proposed Plan - Level 1 | AR 2.23 Rev 5 (Amended In Red 15-SEP-2026) | 18-MAR-2025 (Received) |
| Proposed Plan - Roof Level | AR 2.24 Rev 4 (Amended In Red 03-JUN-2025) | 18-MAR-2025 (Received) |
| Existing Elevation - North West (Montague Rd) | AR 3.01 Rev 3 | 18-MAR-2025 (Received) |
| Existing Elevation - South West (Hope St) | AR 3.02 Rev 3 | 18-MAR-2025 (Received) |
| Existing Elevation - North East | AR 3.03 Rev 3 | 18-MAR-2025 (Received) |
| Existing Elevation - South East | AR 3.04 Rev 3 | 18-MAR-2025 (Received) |
| Demolition Elevation - North West (Montague Rd) | AR 3.11 Rev 3 | 18-MAR-2025 (Received) |
| Demolition Elevation - South West (Hope St) | AR 3.12 Rev 3 | 18-MAR-2025 (Received) |
| Demolition Elevation - North East | AR 3.13 Rev 4 | 18-MAR-2025 (Received) |
| Demolition Elevation - South East | AR 3.14 Rev 3 | 18-MAR-2025 (Received) |
| Proposed Elevation - North West (Montague Rd) | AR 3.21 Rev 3 (Amended In Red 03-JUN-2025) | 18-MAR-2025 (Received) |
| Proposed Elevation - South West (Hope St) | AR 3.22 Rev 3 (Amended In Red 03-JUN-2025) | 18-MAR-2025 (Received) |
| Proposed Elevation - North East | AR 3.23 Rev 4 (Amended In Red 03-JUN-2025) | 18-MAR-2025 (Received) |
| Proposed Elevation - South East | AR 3.24 Rev 3 (Amended In Red 03-JUN-2025) | 18-MAR-2025 (Received) |
| Existing - Section A | AR 4.01 Rev 3 | 18-MAR-2025 (Received) |
| Existing - Section B | AR 4.02 Rev 3 | 18-MAR-2025 (Received) |
| Existing - Section C | AR 4.03 Rev 3 | 18-MAR-2025 (Received) |
| Existing - Section D | AR 4.04 Rev 3 | 18-MAR-2025 (Received) |
| Existing - Section E | AR 4.05 Rev 3 | 18-MAR-2025 (Received) |
| Existing - Section F | AR 4.06 Rev 3 | 18-MAR-2025 (Received) |
| Demolition - Section A | AR 4.11 Rev 4 (Amended In Red 15-SEP-2026) | 18-MAR-2025 (Received) |
| Demolition - Section B | AR 4.12 Rev 3 | 18-MAR-2025 (Received) |
| Demolition - Section C | AR 4.13 Rev 3 | 18-MAR-2025 (Received) |
| Demolition - Section D | AR 4.14 Rev 3 (Amended In Red 15-SEP-2026) | 18-MAR-2025 (Received) |
| Demolition - Section E | AR 4.15 Rev 3 | 18-MAR-2025 (Received) |
| Demolition - Section F | AR 4.16 Rev 3 | 18-MAR-2025 (Received) |
| Proposed - Section A | AR 4.21 Rev 4 (Amended In Red 15-SEP-2026) | 18-MAR-2025 (Received) |
| Proposed - Section B | AR 4.22 Rev 3 | 18-MAR-2025 (Received) |
| Proposed - Section C | AR 4.23 Rev 3 | 18-MAR-2025 (Received) |
| Proposed - Section D | AR 4.24 Rev 3 (Amended In Red 15-SEP-2026) | 18-MAR-2025 (Received) |
| Proposed - Section E | AR 4.25 Rev 3 | 18-MAR-2025 (Received) |
| Proposed - Section F | AR 4.26 Rev 3 | 18-MAR-2025 (Received) |
| Detail Sections - Montague Rd Interface | AR 5.01 Rev 1 | 18-MAR-2025 (Received) |
| Detail Sections - Hope St Interface 01 | AR 5.02 Rev 1 | 18-MAR-2025 (Received) |
| Detail Section - Hope St Interface 02 (Demolition) | AR 5.03 Rev 1 | 18-MAR-2025 (Received) |
APPROVAL CONDITIONS
| Permit to Which These Conditions Relate: | DA - PA - Building Work |
| Activity(ies): | office |
| Stage: | Office (Refurbishment of the former Coronation Hotel into an office building) in the Heritage and Flood overlay. |
| 1) Maintain the Approved Development Maintain the approved development in accordance with the approved DRAWINGS AND DOCUMENTS, and any other relevant Council approval required by the conditions. |
At all times |
| 2) Approved Drawings and Documents A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers. Note: This condition is imposed to ensure compliance with the conditions of development approval. |
While site/operational/building work is occurring |
| 3) Carry Out the Approved Development Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS. Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks). Permission to enter neighbouring properties must be obtained from the relevant property owners. |
While site/operational/building work is occurring |
| 4) Complete All Building Work Complete all building work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such building work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS. Note: Building work must also be completed in accordance with any other current development approval. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 5) External Details External details of the building, facade treatment and external materials and finishes must be consistent with the approved DRAWINGS AND DOCUMENTS. Note: The requirement to use particular materials and finishes is imposed only for the purpose of achieving a built form outcome that displays architectural merit. Council has not assessed the materials and finishes for compliance with the Building Act, the Building Fire Safety Regulation, the Building Regulation, the Building Code of Australia, the Queensland Development Code, relevant Australian Standards, fire safety standards or any other relevant requirement of a statutory authority with regard to building work. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 6) Overall Height The overall height of the building(s) must be in accordance with the floor and roof levels and overall height shown on the APPROVED DRAWINGS AND DOCUMENTS. |
While site/operational/building work is occurring and then to be maintained |
| 7) Partial Demolition of Building Partial demolition resulting from this approval must be in accordance with the APPROVED DRAWINGS AND DOCUMENTS and all building work must comply with this condition. |
While site/operational/building work is occurring and then to be maintained |
7(a) Adequate Bracing Provide adequate
bracing from the commencement of any demolition work and throughout the
demolition and construction phases of the project, to ensure that all parts of
the building not specifically designated for demolition on the APPROVED
DRAWINGS AND DOCUMENTS are retained and protected. |
As indicated |
7(b) Retain Original Fabric Retain all existing
external original fabric in the sections of the building which are not being
demolished. This will include, but is not limited to, existing decorative
detailing, balustrading, wall cladding, windows, doors, stairs and roof
sheeting. |
As indicated |
7(c) Submit Written
Confirmation Submit to Development Services written confirmation by a Registered Architect / Building Designer (holding a Queensland Building and Construction Commission Licence appropriate to the scale of the approved development)/ Building Certifier / Structural Engineer confirming that the partial demolition has been carried out in accordance with the requirements of this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use |
As indicated |
| 8) Construction Noise and Dust Emissions Pursuant to the
Environmental Protection Act 1994, all development involving the emission of
noise and dust from building and/or construction activities, must ensure that
the emissions are in accordance with the requirements of the Act. |
As indicated |
| 9) Contaminated Materials and Soils Any contaminated materials or soils encountered during siteworks, must be handled, stored and disposed of in accordance with the requirements of the relevant authority of the Queensland Government. A person must not dispose of contaminated soil or a hazardous substance at a place other than at a place approved by the relevant authority of the Queensland Government. |
As indicated |
| 10) Management of Asbestos Disposal, handling and restoration of any building materials containing asbestos must be in accordance with current state and federal legislation. |
As indicated |
| 11) Further Development Permit Required Further Development Permit(s) to carry out assessable building work under the Building Act may be required. |
As indicated |
| 12) Plumbing and Drainage Work Pursuant to the Plumbing and Drainage Act 2018, any plumbing and drainage work must be carried out in compliance with the Plumbing and Drainage Regulation 2019. Note: All new and existing plumbing services should be located within the lot that they serve. Compliance assessable plumbing and drainage work requires approval by Brisbane City Council prior to the work being carried out. |
As indicated |
| 13) Currency Period The currency period for this development approval is stated in the Decision Notice and is expressed as a date. This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016. |
As indicated |
| 14) Referral Agency Requirements SARA as CONCURRENCE agency has imposed the requirements contained in the letter dated 3 April 2025. |
As indicated |
| 15) Equitable Access Provision must be made during and after construction
for equitable access for persons with disabilities to and within the site and
on adjoining public areas, in accordance with the following: |
As indicated |
| 16) Damage to Trees on Adjoining Land Please note that any damage caused to vegetation on adjoining land as a result of exercising this development approval may result in an offence under other legislation (e.g. Natural Assets Local Law) and/or civil action |
As indicated |
| 17) Fire Ant Movement Controls To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected. These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products. Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014. For further information contact the relevant Queensland State Government department on 13 QGOV. |
As indicated |
| 18) Water and Wastewater Services for water and wastewater (sewerage) are not under the jurisdiction of Brisbane City Council. Authorisation to connect the approved development to the water/wastewater networks and for property service connections required a Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009. For further information about any necessary Water Approvals contact Urban Utilities. |
As indicated |
| 19) Cultural Heritage Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage.
The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care.
For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships). |
As indicated |
| Permit to Which These Conditions Relate: | DA - PA - Material Change of Use |
| Activity(ies): | office |
| Stage: | Office in the Heritage and Flood overlay |
| 20) Maintain the Approved Development Maintain the approved development in accordance with the approved DRAWINGS AND DOCUMENTS, and any other relevant Council approval required by the conditions. |
At all times |
| 21) Approved Drawings and Documents A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers. Note: This condition is imposed to ensure compliance with the conditions of development approval. |
While site/operational/building work is occurring |
| 22) Carry Out the Approved Development Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS. Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks). Permission to enter neighbouring properties must be obtained from the relevant property owners. |
While site/operational/building work is occurring |
| 23) Complete All Building Work Complete all building work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such building work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS. Note: Building work must also be completed in accordance with any other current development approval. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 24) Balconies/Verandahs/Terraces The verandah embellishment at Level 1 over the footpath facing Montague Road frontage
and Hope
Street frontage as shown on approved drawings must not be
trafficable, occupied or used at all
times. GUIDELINE This condition has been imposed as the verandah is located outside the property boundary and requires a term lease from the Department of Natural Resources and Mines, Manufacturing and Regional and Rural Development. Further development approval will be required where a term lease is granted and the verandah is proposed to be used. |
At all times |
| 25) External Details External details of the building, facade treatment and external materials and finishes must be consistent with the approved DRAWINGS AND DOCUMENTS. Note: The requirement to use particular materials and finishes is imposed only for the purpose of achieving a built form outcome that displays architectural merit. Council has not assessed the materials and finishes for compliance with the Building Act, the Building Fire Safety Regulation, the Building Regulation, the Building Code of Australia, the Queensland Development Code, relevant Australian Standards, fire safety standards or any other relevant requirement of a statutory authority with regard to building work. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 26) Overall Height The overall height of the building(s) must be in accordance with the floor and roof levels and overall height shown on the APPROVED DRAWINGS AND DOCUMENTS. |
While site/operational/building work is occurring and then to be maintained |
| 27) Partial Demolition of Building Partial demolition resulting from this approval must be in accordance with the APPROVED DRAWINGS AND DOCUMENTS and all building work must comply with this condition. |
While site/operational/building work is occurring and then to be maintained |
27(a) Adequate Bracing Provide adequate
bracing from the commencement of any demolition work and throughout the
demolition and construction phases of the project, to ensure that all parts of
the building not specifically designated for demolition on the APPROVED
DRAWINGS AND DOCUMENTS are retained and protected. |
As indicated |
27(b) Retain Original Fabric Retain all existing
external original fabric in the sections of the building which are not being
demolished. This will include, but is not limited to, existing decorative
detailing, balustrading, wall cladding, windows, doors, stairs and roof
sheeting. |
As indicated |
27(c) Submit Written
Confirmation Submit to Development Services written confirmation by a Registered Architect / Building Designer (holding a Queensland Building and Construction Commission Licence appropriate to the scale of the approved development)/ Building Certifier / Structural Engineer confirming that the partial demolition has been carried out in accordance with the requirements of this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use |
As indicated |
| 28) Screen Air Conditioning and Other Plant
Enclosures Install and maintain suitable screening to all air conditioning units, lift motor rooms, hot water systems plant and service facilities where externally visible or located on top of the building including where visible and/or located within private open space areas, communal open space areas, adjoining properties or public land. The screening structures must be constructed from durable materials that are consistent with materials used elsewhere on the facade of the building. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 29) Retain and Protect Existing Street Tree(s) Identify, retain and protect the existing street trees on the Hope Street and Montague Road frontages of 48 Montague Road, South Brisbane including the roots unless otherwise agreed in writing with Program, Planning and Integration Arboriculture (PPI Arb). Note: Street trees are protected under the Natural Assets Local Law. Street trees must not be removed or pruned without prior approval from PPI Arb. Where driveway crossovers occur within the Tree Protection Zone (TPZ) of existing street trees, seek approval from the Arboricultural Team in Program Planning and integration, City Standards for the final driveway crossover design and construction methodology to ensure the successful retention of the existing street tree(s) PROOF OF
FULFILMENT Contextual photographic evidence that the tree has been retained in equal or greater health than before development commenced. OR, evidence in writing from Asset Services Arboriculture that an alternative arrangement has been made. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
At all times |
29(a) Implement Protection
Measures Install tree protection measures in accordance with Australian Standard - AS4970 Retention of Trees on Development Site. There must be no excavation, filling or storage of materials or plant within the drip line of the tree(s). Where works are within the canopy drip line of existing street trees, contact PPI Arb Coordinator in relation to the required provision of protection measures. Note: If fencing is to protect street trees, a permit to temporarily occupy the footway will be required from Compliance and Regulatory Services. Timing: Prior to site/operational/building work occurring. PROOF OF
FULFILMENT Contextual photographic evidence to demonstrate the installation of protection measures prior to building works commencing. Timing: Prior to site / operational / building work occurring. |
As indicated |
29(b) Maintain Protection
Measures Maintain protection measures while development is occurring and remove protection measures prior to commencement of the use. Timing: While to site/operational/building work is occurring. |
As indicated |
| 30) Landscape the Site - Self Certification Landscape the site in accordance with the requirements of this condition. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
30(a) Detailed Landscape Plan for Self-
Certification Prepare a Detailed Landscape Plan at a scale of 1:100
for all on-site landscape works including planting areas identified on the
approved DRAWINGS AND DOCUMENTS - 24133 LC-01 B Pages 6, 10, 11, 12, 13, 16,
17, 18, 19 and 20, received 10/02/2025 and Amended in Red 03/06/2025 (Pages 6
and 10). The plan must be prepared by a Qualified Landscape Architect and
must comply with the relevant Brisbane Planning Scheme Codes. The plan must include the following: Timing: Prior to issue of Certificate of Occupancy/Final
Inspection Certificate or prior to commencement of use, whichever comes
first. PROOF OF FULFILMENT A detailed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
30(b) Centre or Mixed Use In addition to the
requirements listed above, the plan must include the following: Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT A detailed landscape plan accompanied by Brisbane City Council Landscape design and landscape works online form. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
30(c) Certify Detailed Landscape
Plan On completion of the Detailed Landscape Plan, submit to Development Services a landscape design certification via the Landscape Design and Landscape Works Certification online form. Design certification is to be prepared by a Qualified Landscape Architect, certifying that the Detailed Landscape Plan complies with the requirements of this condition. The Certification must include a copy of the:
NOTE: The landscape design and landscape works certification online form can be found by searching development application forms on Council's website. Timing: Prior to building work commencing. PROOF OF FULFILMENT A copy of the landscape design certification form and certified detailed landscape plan |
As indicated |
30(d) Implement Certified Detailed Landscape
Plan Carry out the landscape work in accordance with the above certified detailed Landscape Plan. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
30(e) Certify Work On completion of the landscape work, submit a Landscape Works Certification via the Landscape Design and Landscape Works Certification online form. The landscape works certification is to be prepared by a Qualified Landscape Architect, certifying that the landscape works comply with the certified Detailed Landscape Plan. The certification must include:
- a copy of the as-constructed landscape drawings. - Photos of installed landscaping.
NOTE: The landscape design and landscape works certification online form can be found by searching development application forms on Council's website. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT A copy of the Landscape works certification form, a copy of the as-constructed landscape drawings, photos of installed landscaping, confirmation in writing from the landscape contractor who completed the works, that the works were completed in accordance with best practice landscape construction and horticultural standards. |
As indicated |
30(f) Maintain Landscape Work Maintain the landscape work, including deep planting, in accordance with the certified Detailed Landscape Plan. Timing: To be maintained. |
As indicated |
| 31) Kitchen exhaust vents - (emitters) Kitchen and food preparation area exhaust vent outlets are discharged vertically, directed away from any sensitive use and separated by a minimum of 6m from a sensitive use, including any outdoor air intake of a sensitive use. Note: This condition does not authorise environmental nuisance under the Environmental Protection Act 1994. |
At all times |
| 32) Mechanical Plant or Equipment - Acoustically
Screened Mechanical plant or equipment is to be acoustically screened from an adjoining sensitive use. Mechanical plant includes generators, motors, compressors and pumps such as air-conditioning, refrigeration and cold room motors. Acoustically screened is defined in City Plan 2014. NOTE: This condition does not authorise environmental nuisance under the Environmental Protection Act 1994. PROOF OF FULFILMENT Submit to Development Services, certification that all mechanical plant or equipment, is acoustically screened. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 33) Amplified Music Amplified music is not permitted in all outdoor areas and terraces. |
At all times |
| 34) Information Signage Erect an information sign on the subject property in
accordance with Council's general requirements for signage and in accordance
with the requirements outlined below: Timing: Prior to site works commencing and then to be maintained until completion of the development for all stages. |
As indicated |
| 35) Construction Management Plan (Minor) Carry out development in a method consistent with a Construction Management Plan (Minor) prepared in accordance with the requirements of this condition. |
While site/operational/building work is occurring |
35(a) Construction Management Plan (Minor) -
Prepare Plan Prepare a detailed Construction Management Plan (CMP) for the
construction phase of the approved development.The Construction Management Plan
must be in accordance with the relevant Brisbane Planning Scheme Codes and
address the following: The Construction Management Plan must be supported by 'approval in principle' or written approvals from the relevant Council sections or other governing bodies responsible for any potentially impacted infrastructure. The list of relevant infrastructure and contacts is available on Council's website - Search 'Construction Management Plan'. Note: The Construction Management Plan is not required to be approved by Development Services. Timing: Prior to site/operational/building work commencing. |
As indicated |
35(b) Construction Management Plan (Minor) -
Submit Plan Submit a copy of the Construction Management Plan to Council's Development Services Branch at the following mailbox: engineeringservices@brisbane.qld.gov.au quoting the BCC planning development approval reference number. Timing: At least 10 days prior to site works commencing. |
As indicated |
35(c) Construction Management Plan (Minor) -
Documentation on Site Legible copies of the Construction Management Plan and current permits must be kept on site and be made available on request by Council at all times. The requirements of the CMP must be included in all induction of principal and subcontractors utilised in the development. An outline of the induction provided to contractors may be requested by Council to confirm compliance with this condition. Timing: While site/operational/building work is occurring. |
As indicated |
35(d) Construction Management Plan - Works to
be Performed Out of Hours Obtain an approval from Development Services for any
work that is proposed to be undertaken outside of normal business hours -
6:30am to 6:30pm, Monday to Saturday. |
As indicated |
35(e) Implement Construction Management Plan
(Minor) Carry out the development in accordance with the submitted Construction Management Plan. |
While site/operational/building work is occurring |
| 36) Protect Existing Infrastructure Where there is existing infrastructure in the vicinity of the proposed work, the new work must not damage or compromise the working ability of the existing infrastructure. Where alterations to public utility mains, existing mains, services or installations are necessitated by the development, prior to alterations commencing, the developer must notify Council or the relevant infrastructure provider and obtain agreement to the alterations. The developer must meet the costs of the alterations. The alterations must be carried out in accordance with the relevant Brisbane Planning Scheme Codes or infrastructure providers requirements. |
While site/operational/building work is occurring |
36(a) As Constructed Drawings - Alterations
to Existing Infrastructure Submit to Development Services As Constructed drawings showing all new and/or rectification works and an asset register, prepared by a Registered Professional Engineer Queensland. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. PROOF OF FULFILMENT Submit to Development Services certification from a Registered Professional Engineer Queensland, confirming that the alterations have been completed in accordance with the relevant Brisbane Planning Scheme Codes and any other relevant infrastructure requirements. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
As indicated |
| 37) Repair Damage to Kerb, Footpath or Road Repair any damage to the existing kerb and channel, footpath or roadway (including removal of concrete slurry from footways, roads, kerb and channel, stormwater gullies and drainlines) and re-instate existing traffic signs and pavement markings that have been removed or damaged during any works carried out in association with the approved development. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
37(a) Interim Repairs If at any time during the construction phase of the approved development, damage to the existing kerb and channel, footpath or roadway creates unsafe, unreasonable and/or not fit for purpose conditions as assessed by Council, interim repairs must be undertaken as directed by Program Planning and Integration. Note: Any interim repairs required to be undertaken shall not be considered to satisfy the requirements of this condition for the permanent repair of the infrastructure prior to the issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. Timing: While site / operational / building works is occurring. |
As indicated |
| 38) Access, Grades, Manoeuvring, Carparks, Signs and
Line Marking Construct and/or maintain access, parking and manoeuvring for vehicles on site in accordance with the relevant Brisbane Planning Scheme Codes, as indicated on the approved DRAWINGS AND DOCUMENTS, including the following: i. Parking on the site for 8 cars, 1 parking spaces for people with disabilities and for the loading and unloading of vehicle(s) within the site. There must a minimum number of 9 total carparking spaces provided on site. ii. A minimum of 2.3 metres height clearance to all undercover parking areas, including the entry and access to these areas, and a minimum of 2.5 metres above parking spaces for people with disabilities. The minimum clear height must be measured to the lowest protrusion from the ceiling (e.g. fire sprinklers, services, lighting fixtures, signs, etc). iii. A height clearance sign located at the entrance(s) to undercover car parking areas and a directional visitor parking sign clearly visible from the vehicle entrance to the site. iv. Prepare and implement signs and line markings drawings that show the internal paved areas signed and delineated in accordance with the approved drawings and documents. The drawings must be prepared and certified by a Registered Professional Engineer Queensland in accordance with the relevant Brisbane Planning Scheme Codes and the Manual of Uniform Traffic Control Devices. PROOF OF
FULFILMENT Certification from a Registered Professional Engineer Queensland, that the above requirements have been implemented in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first and then to be maintained. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 39) Flood Emergency Management Plan Prepare, implement and maintain a Flood Emergency Management Plan (FEMP) in accordance with the requirements of this condition. Note: Guidance for the preparation of drawings and/or documents to comply with this condition is provided in the Flood Planning Scheme Policies. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
39(a) Prepare and Certify a Flood Emergency
Management Plan Submit to Development Services a Flood Emergency Management Plan (FEMP) for the approved development prepared and certified by a Registered Professional Engineer Queensland with experience in flood risk management. Timing: Prior to issue of Certificate of Occupancy/Final Inspection. |
As indicated |
| 40) Minimum Flood Planning Levels Design and construct all building pad levels, floor levels and ancillary structures to the appropriate flood planning level with freeboard (where required) in accordance with the relevant Brisbane Planning Scheme Codes and the approved drawings and documents. The minimum level for essential electrical services must be 6.3 metres AHD. PROOF OF FULFILMENT As-Constructed drawings prepared by a Registered Surveyor (Qld). The Registered Surveyor (Qld) must certify that the development has been constructed in accordance with this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 41) Refuse Collection - Kerb Side (external road or
internal private road) Refuse and recycling bins for the development must be collected from the kerb side. Arrange for the installation of refuse/recycling bins and for the subsequent collection of refuse including recycling from the site by a Private Waste Contractor. Timing: At the commencement of use and then to be maintained. |
As indicated |
| 42) Refuse Storage - Kerb Side Collection Provide a refuse storage area to accommodate the type and quantity of refuse and recycling bins required to service the development, as shown on the APPROVED DRAWINGS AND DOCUMENTS. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 43) Water and Wastewater Pursuant to Schedule 18 of the Planning Regulation 2017 submit to Development Services, documentary evidence, issued by the relevant distributor-retailer, to verify that the conditions of any necessary connection certificate under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009, have been complied with. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 44) Construction Noise and Dust Emissions Pursuant to the
Environmental Protection Act 1994, all development involving the emission of
noise and dust from building and/or construction activities, must ensure that
the emissions are in accordance with the requirements of the Act. |
As indicated |
| 45) Contaminated Materials and Soils Any contaminated materials or soils encountered during siteworks, must be handled, stored and disposed of in accordance with the requirements of the relevant authority of the Queensland Government. A person must not dispose of contaminated soil or a hazardous substance at a place other than at a place approved by the relevant authority of the Queensland Government. |
As indicated |
| 46) Management of Asbestos Disposal, handling and restoration of any building materials containing asbestos must be in accordance with current state and federal legislation. |
As indicated |
| 47) Further Development Permit Required Further Development Permit(s) to carry out assessable building work under the Building Act may be required. |
As indicated |
| 48) Plumbing and Drainage Work Pursuant to the Plumbing and Drainage Act 2018, any plumbing and drainage work must be carried out in compliance with the Plumbing and Drainage Regulation 2019. Note: All new and existing plumbing services should be located within the lot that they serve. Compliance assessable plumbing and drainage work requires approval by Brisbane City Council prior to the work being carried out. |
As indicated |
| 49) Currency Period The currency period for this development approval is stated in the Decision Notice and is expressed as a date. This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016. |
As indicated |
| 50) Referral Agency Requirements SARA as CONCURRENCE agency has imposed the requirements contained in the letter dated 3 April 2025. |
As indicated |
| 51) Equitable Access Provision must be made during and after construction
for equitable access for persons with disabilities to and within the site and
on adjoining public areas, in accordance with the following: |
As indicated |
| 52) Damage to Trees on Adjoining Land Please note that any damage caused to vegetation on adjoining land as a result of exercising this development approval may result in an offence under other legislation (e.g. Natural Assets Local Law) and/or civil action |
As indicated |
| 53) Fire Ant Movement Controls To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected. These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products. Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014. For further information contact the relevant Queensland State Government department on 13 QGOV. |
As indicated |
| 54) Water and Wastewater Services for water and wastewater (sewerage) are not under the jurisdiction of Brisbane City Council. Authorisation to connect the approved development to the water/wastewater networks and for property service connections required a Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009. For further information about any necessary Water Approvals contact Urban Utilities. |
As indicated |
| 55) Cultural Heritage Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage.
The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care.
For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships). |
As indicated |
| Permit to Which These Conditions Relate: | DA - PA - Building Work |
| Activity(ies): | office |
| Stage: | Demolition of a component on a State Heritage Place |
| 56) Maintain the Approved Development Maintain the approved development in accordance with the approved DRAWINGS AND DOCUMENTS, and any other relevant Council approval required by the conditions. |
At all times |
| 57) Approved Drawings and Documents A legible copy of the Council approved DRAWINGS AND DOCUMENTS and the Development Approval Package must be maintained on site and kept available for inspection by site workers and Council officers. Note: This condition is imposed to ensure compliance with the conditions of development approval. |
While site/operational/building work is occurring |
| 58) Carry Out the Approved Development Carry out the approved development in accordance with the approved DRAWINGS AND DOCUMENTS. Note: This approval does not imply permission to enter neighbouring properties to carry out the construction (including, but not limited to, associated drainage and earthworks). Permission to enter neighbouring properties must be obtained from the relevant property owners. |
While site/operational/building work is occurring |
| 59) Complete All Building Work Complete all building work associated with this development approval, including work required by any of the conditions included in the Development Approval Package. Such building work must be carried out in accordance with the approved DRAWINGS AND DOCUMENTS. Note: Building work must also be completed in accordance with any other current development approval. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first |
| 60) External Details External details of the building, facade treatment and external materials and finishes must be consistent with the approved DRAWINGS AND DOCUMENTS. Note: The requirement to use particular materials and finishes is imposed only for the purpose of achieving a built form outcome that displays architectural merit. Council has not assessed the materials and finishes for compliance with the Building Act, the Building Fire Safety Regulation, the Building Regulation, the Building Code of Australia, the Queensland Development Code, relevant Australian Standards, fire safety standards or any other relevant requirement of a statutory authority with regard to building work. |
Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use, whichever comes first, and then to be maintained |
| 61) Overall Height The overall height of the building(s) must be in accordance with the floor and roof levels and overall height shown on the APPROVED DRAWINGS AND DOCUMENTS. |
While site/operational/building work is occurring and then to be maintained |
| 62) Partial Demolition of Building Partial demolition resulting from this approval must be in accordance with the APPROVED DRAWINGS AND DOCUMENTS and all building work must comply with this condition. |
While site/operational/building work is occurring and then to be maintained |
62(a) Adequate Bracing Provide adequate
bracing from the commencement of any demolition work and throughout the
demolition and construction phases of the project, to ensure that all parts of
the building not specifically designated for demolition on the APPROVED
DRAWINGS AND DOCUMENTS are retained and protected. |
As indicated |
62(b) Retain Original Fabric Retain all existing
external original fabric in the sections of the building which are not being
demolished. This will include, but is not limited to, existing decorative
detailing, balustrading, wall cladding, windows, doors, stairs and roof
sheeting. |
As indicated |
62(c) Submit Written
Confirmation Submit to Development Services written confirmation by a Registered Architect / Building Designer (holding a Queensland Building and Construction Commission Licence appropriate to the scale of the approved development)/ Building Certifier / Structural Engineer confirming that the partial demolition has been carried out in accordance with the requirements of this condition. Timing: Prior to issue of Certificate of Occupancy/Final Inspection Certificate or prior to commencement of use |
As indicated |
| 63) Construction Noise and Dust Emissions Pursuant to the
Environmental Protection Act 1994, all development involving the emission of
noise and dust from building and/or construction activities, must ensure that
the emissions are in accordance with the requirements of the Act. |
As indicated |
| 64) Contaminated Materials and Soils Any contaminated materials or soils encountered during siteworks, must be handled, stored and disposed of in accordance with the requirements of the relevant authority of the Queensland Government. A person must not dispose of contaminated soil or a hazardous substance at a place other than at a place approved by the relevant authority of the Queensland Government. |
As indicated |
| 65) Management of Asbestos Disposal, handling and restoration of any building materials containing asbestos must be in accordance with current state and federal legislation. |
As indicated |
| 66) Further Development Permit Required Further Development Permit(s) to carry out assessable building work under the Building Act may be required. |
As indicated |
| 67) Plumbing and Drainage Work Pursuant to the Plumbing and Drainage Act 2018, any plumbing and drainage work must be carried out in compliance with the Plumbing and Drainage Regulation 2019. Note: All new and existing plumbing services should be located within the lot that they serve. Compliance assessable plumbing and drainage work requires approval by Brisbane City Council prior to the work being carried out. |
As indicated |
| 68) Currency Period The currency period for this development approval is stated in the Decision Notice and is expressed as a date. This development approval lapses at the end of the currency period (the date stated in the decision notice) pursuant to section 85 of the Planning Act 2016. |
As indicated |
| 69) Referral Agency Requirements SARA as CONCURRENCE agency has imposed the requirements contained in the letter dated 3 April 2025. |
As indicated |
| 70) Equitable Access Provision must be made during and after construction
for equitable access for persons with disabilities to and within the site and
on adjoining public areas, in accordance with the following: |
As indicated |
| 71) Damage to Trees on Adjoining Land Please note that any damage caused to vegetation on adjoining land as a result of exercising this development approval may result in an offence under other legislation (e.g. Natural Assets Local Law) and/or civil action |
As indicated |
| 72) Fire Ant Movement Controls To prevent the spread of fire ants, the Queensland Government has implemented improvement controls in areas of Queensland (biosecurity zones) where this pest species has been detected. These controls apply to individuals and commercial operators and restrict the movement of materials that could carry fire ants which include soil, turf, potted plants, mulch, baled hay or straw, animal manures, mining or quarry products. Breaches of these controls can potentially impact the community, economy and the environment. Penalties for non-compliance with movement controls within fire ant biosecurity zones apply under the Biosecurity Act 2014. For further information contact the relevant Queensland State Government department on 13 QGOV. |
As indicated |
| 73) Water and Wastewater Services for water and wastewater (sewerage) are not under the jurisdiction of Brisbane City Council. Authorisation to connect the approved development to the water/wastewater networks and for property service connections required a Water Approval under the South-East Queensland Water (Distribution and Retail Restructuring) Act 2009. For further information about any necessary Water Approvals contact Urban Utilities. |
As indicated |
| 74) Cultural Heritage Aboriginal cultural heritage is protected under the Aboriginal Cultural Heritage Act 2003. This Act establishes a cultural heritage duty of care and in section 23(1) mandates that a person who carries out an activity must take all reasonable and practicable measures for ensuring activities are managed to avoid or minimise harm to Aboriginal cultural heritage.
The Duty of Care Guidelines gazetted pursuant to the Aboriginal Cultural Heritage Act 2003 provide guidance on identifying and protecting Aboriginal cultural heritage to fulfil the duty of care.
For further information contact the relevant Queensland State Government Department (Department of Aboriginal and Torres Strait Islander Partnerships). |
As indicated |